25
12A10SW8M1 2.1127* STOCK 010 REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY ON THE PROPERTY OF BEARDMORE RESOURCES LTD. GERMAN AND STOCK TOWNSHIPS, ONTARIO BY UK J l! K Ml* SIN ION H. FERDERBER GEOPHYSICS LTD May, 3988 Va] d'Or, Quebec Lisa L. Ahern, B.Se, Geologist

Upload: others

Post on 30-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

12A10SW8M1 2.1127* STOCK 010

REPORT ON THE

COMBINED AIRBORNE GEOPHYSICAL SURVEY

ON THE PROPERTY OF

BEARDMORE RESOURCES LTD.

GERMAN AND STOCK TOWNSHIPS, ONTARIO

BY

UKJ l! K

Ml* SIN ION

H. FERDERBER GEOPHYSICS LTD

May, 3988Va] d'Or, Quebec

Lisa L. Ahern, B.Se, Geologist

Page 2: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY

ON THE PROPERTY OF BEARDMORE RESOURCES LTD.,

GERMAN AND STOCK TOWNSHIPS, ONTARIO

INTRODUCTION

l l l l l On April 2, 1988 a combined airborne geophysical survey was

* completed on the Beardmore Resources Ltd. property in German and

l Stock Townships, Ontario. Magnetic and VLF-electromagnetic data

was collected by the airborne division of H. Ferderber Geophysics

J Ltd. The survey was flown from a base at Iroquois Falls,

. Ontario. A total of 107.2 miles of data was collected along

north-south flight lines,

l The magnetic survey provides information which helps

define the underlying geological structures and identifies any

l potential economic concentrations which may contain variations in

M accessory magnetic minerals. The VLF-electromagnetic survey

outlines conductive zones which may represent shear zones and/or

l metallic sulphide deposits containing gold mineralization.

l

l

l

l

l

l

Page 3: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

l l l

2

PROPERTY DESCRIPTION, LOCATION AND ACCESS

l The Beardmore Resources property is composed of 81 claims in

one claim block in German and Stock Townships, Ontario. They

l cover approximately 1296 hectares and are registered with the

mm Office of the Mining Recorder at Timmins, Ontario and are listed

in Appendix 1.

l The property is located approximately twenty-four miles

east-northeast of the city of Timmins, four miles southeast of

l the town of Barbers Bay, and six miles west-southwest of the town

•m of Alert. Access can be obtained north off of Highway 101 by a

secondary road that extends into the claim block in German

l Township. As well, Highway 67 passes within 2-3 miles to the

west of the property, and Highway 577 is situated 6-7 miles east

l of the property.

m A gas pipeline lies to the north of the Beardmore claim

block, and cuts the three most northerly claims from southwest to

l northeast. As well, the property borders the Kettle Lake

Provincial Park along its western boundary.

l Physiography of the claim group is essentially that of a low

wm swampy area, having low relief. Approximately 95% of the

property is forested.

l

l

l

l

Page 4: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

l l l l l l l l l l l l l l l l l l l

-3-

Supplies, services, and qualified manpower are readily

available locally in the Timmins area.

GEOLOGY

The Beardmore Resources property is located in the western

portion of the Abitibi Volcanic Belt of the Superior Province of

the Canadian Shield. The Abitibi Volcanic Belt extends for

nearly 350 miles in an east-west direction from Timmins to

Chibougamau. It is host to a variety of precious and base metal

deposits which includes the Timmins, Kirkland Lake, Noranda, Val

D'Or, and Chibougamau mining camps.

The Abitibi Volcanic Belt is composed of a complex

assemblage of interbedded volcanic and sedimentary rocks intruded

by a variety of intrusives from ultrabasic to granitic in

composition. The rocks are Archean in age and have been

metamorphosed to the greenschist facies. Numerous late

Precambrian diabase dykes cut formations of the belt. The rocks

generally strike; east-west, have a vertical dip and are highly

folded and faulted. Geological interpretation of the Abitibi

Volcanic Belt is complicated by both the wide scattering of

outcrops and the complex structural relationships.

Page 5: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

l l

l

l l l l l

-4-

The Ontario Department of Mines Geological CompilationlSeries, Timmins-Kirkland Lake Sheet, map 2205, outlines the

l geology underlying the property. According to Map 2205, the

Beardmore Resources Ltd. property is predominantly underlain by

B Early Precambrian Metasediments of conglomerate, siltstone,

j slate, argillite, and minor pebble conglomerate composition. Two

small elongated metamorphosed mafic and ultramafic bodies of

l periodotite, dunite, pyroxenite, and serpentinite composition are

located along the northwestern boundary and just north of the

B German township claim block.

M The major structural feature of the area is the east-west

striking Destor-Porcupine Fault, located approximately one mile

l south of the property. This major crustal dislocation has a

known strike length of 300 km, from the Timmins area in the west

B to Destor in western Quebec. O.D.M. Map 2205 also indicates that

the western extent of the Pipestone fault lies approximately 0.5

miles north of the claim block,

l Numerous gold deposits are associated with the Destor-

Porcupine Fault and its related structures. Foremost among these

are the deposits of the Timmins-Porcupine camp (ie. Mcintyre

Mine, Hollinger Mine, Ross Mine and Croesus Mine).

Page 6: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

l l l

l

l l l l l l

D *~

INSTRUMENTATION AND SURVEY METHODS

l The survey was completed using a 1972 Cessna 172, fixed-wing

aircraft, call letters CF'-EWK, owned and operated by H. Ferderber

l Geophysics Ltd. The pilot and navigator/operator were Y. Saucier

m and F. Longpre, respectively, of Val d 'Or. Geophysical sensors

were mounted in modified wing tips. The geophysical, navigation

l and data acquisition systems are described below.

l

m The magnetometer used was GEM Systems GSM-11, high

sensitivity airborne proton (Overhauser) magnetometer. The

l instrument continuously measures the Earth's magnetic field at a

0.01 gamma sensitivity for l reading per second or 0.05 gamma to

l 10 rocidings per second at a 0.1 gamma absolute accuracy. The

analog output is on 3 channels, from l to 10,000 gammas full

scale .

l

Page 7: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

l l l l l l l l l l l l l l l l l l l

-6-

VLFHEM System

A Herz Totem 2A VLF-EM System was used to measure the

changes in the total field and in the vertical quadrature field

on two frequencies simultaneously, with an accuracy of J.%. The

primary transmitting station of Cutler, Maine, (NAA), frequency

24.0 KHz was employed in survey.

Radla r AJ t i me t e r

The ground clearance was measured with a King 10/10 A radar

altimeter. The survey was flown at a mean clearance of 300 feet

with the altimeter producing an accuracy of 5*^ (15 feet) at this

altitude.

Tracking Camera and Video Centre

A RCA TC-200 colour video camera and Galaxy 200 video

centre was used to record the flight path on standard VHS type

video tapes. Manual fiducials were indicated on the picture

Page 8: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

l l

l

l l l l l

-7-

frames for reference with digital printout. Flight path recovery

was aided using a Panasonic Colour Video Monitor-81300 and Video

Cassette Recorder AG-2500.

l Da ta J^cjjui sit i on System

A Picodas Group Inc. PDAS 1100 data acquisition system

l featuring seven analog inputs with two frequency inputs and

external interfacing was used. A Termiflex Corp. ST/32 Keyboard

l control unit and Sharp Corp. LCD display unit are connected to

m the data acquisition system. At present this system stores the

altimeter VLF-1 inphase, VLF-1 quadrature, VLF-2 inphase, VLF-2

l quadrature, magnetic field (coarse), magnetic field (fine), and

the fourth difference (noise), and fiducials on 3.5 inch floppy

l disk drive. The data is then printed out in digital and profile

m form.

The survey was conducted on north-south lines were flown at

l spacings of 440 feet at a speed of approximately 90 miles per

hour. Navigation was visual using airphoto mosaics, at a scale

of one inch to 1320 feet, manual fiducials and the flight path

recovery system as references.

Page 9: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

l l l

-8-

DATA PRESENTATION

l Flight lines, fiducial points and geophysical responses

were reproduced from the airphoto mosaics at a scale of one inch

to 1320 feet (1:15,840). The outline of the claim blocks and

B claim map are shown on each map sheet.

The aeromagnetic data was corrected for diurnal

l variations by using a base line as reference. The data was then

reduced to a base level of 58,000 gammas, contoured at 20 and

B 100 gamma intervals and presented on Map MG-1.

B The VLF-EM was transferred from the Totem 2AG memory to

printed form. A base value was determined for the VLF-EM

l profiled data. These values were used to correct for variations

in transmitter strength and the corrected changes in the total

* field strengths were plotted on Map EM-1. The positive values

B were contoured at intervals of 2%. The conductor axes were

determined and labelled l, 2, 3, etc. No priority was attached

l to the labelling system.

l

l

l

l

l

l

Page 10: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

l l l l l l l l l l l l l l l l l l l

-9-

SURVEY RESULTS AND INTERPRETATION

Magnetic Survey

The magnetic survey was successful in confirming the

underlying geology as indicated on O.D.M. Map 2205. Ninety

percent of the Beardmore Resources Ltd. property has a

consistently low magnetic signature with values ranging from 700

to 800 gammas above background. This indicates that the rocks

underlying these regions are relatively homogeneous in

composition, and contain similar amounts of magnetite. O.D.M.

map 2205 shows that Early Precambrian metasediments underlie this

area .

Along the northwestern boundary of the property is an east-

west striking elliptical shaped magnetic high with values up to

and in excess of 1100 gammas above background. This magnetic

high corresponds in position and shape to the presumed

metamorphic mafic and ultramafic bodies located north and along

the northern boundary of the German Township claim block.

Page 11: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

-10-

yjkE ~ Ejjic t iiprna cj n etic Su rvey

Two conductive zones were outlined on the property by the

VLF-EM Survey.

J Zone l is a strong two-line conductor striking north-south

and located within the southeastern part of German Township. The

* conductor overlies a low swampy area and a creek which connects

l two small lakes located north and south of the conductor. The

strength and position of this conductor may be caused by

g conductive overburden or a change in topographic relief.

^ Conductor 2 is a short north-northeast to south-southwest

striking one-line conductor located in the southwestern corner of

l the claim block. This conductor may represent a shear within the

rocks of metasedimentary composition.

lm CONCLJJl SIGNSL AND RECOMMENDATIONS

l The results of the combined airborne magnetic and VLF-

electromagnetic surveys were successful in helping outline the

g geology and in delineating 2 conductive zones underlying the

^ Beardmore Resources Ltd. property in German and Stock Townships,

~ Ontario. The claims appear to have an elliptical shaped body of

l

l

l

l

l

Page 12: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

l

-11-

metamorphosed mafic and ultramafic rocks along the northern

boundary of the property, while the rest of the property seems to

be underlain by relatively homogeneous metasediments with a low

magnetic signature.

H. FERDERBER GEOPHYSICS LTD.

l Further exploration work could be conducted over the

property in the vicinity of the possible bedrock conductor.

l Ground magnetic and horizontal loop-electromagnetic surveys

M could be performed to better define the underlying geology and

to delineate and classify the conductive zone.

l

l Respectfully submitted,

l

l

' fiL*m L .L. Ahern, B.Se.

Geologist.

l

l

l

l

l

Page 13: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

l l l l l l i i i i i i i i i i i i i

APPENDIX l

German Township

' 969633969634969635969636969637969638969639969640969641969642969643969644969645969646969647969648969649969650969651969653969654969655969656969657969658969659969660969661969662969663969664969665969666969667969668969669969670969671969672986718986719986720986721986722986723986724986725986726986727997952

CLAIM LIST

Stock Township

P 969745969746969747969748969749969750969751969752969753969754969755969756969757969758969759969760969761969762969763969764969765969766969767969768969769969956969957969958969959969960969961

Page 14: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

Ontario

Ministry ofNorthern Developmentand Mines

Ministere du Developpement du Nord et des Mines

4PA10SW0141 2.11270 STOCK 900

July 21, 1988 Your file: W8806-111 W8806-147

Our file: 2.11270

Mining RecorderMinistry of Northern Development and Mines60 Wilson AvenueTimmins, OntarioP4N 2S7

Dear Sir:

ONTARIO G t Oi OUllVa SuilVi'Y

ASSt-SSMf. N't Hit." SOf f IGF.

J in, i ̂ I cts8

R E C t l V E D

Re: Notice of Intent dated July 6, 1988Airborne Geophysical (Electromagnetic S Magnetometer) Surveysubmitted on Mining Claims P 969633 et alin the Townships of German and Stock________________

The assessment work credits, as listed with the above-mentioned Notice of Intent, have been approved as of the above date.

Please inform the recorded holder of these mining claims and so indicate on your records.

Yours sincerely,

W. R. Cowan, Manager Mining Lands Section Mines ft Minerals Division

Whitney Block, Room 6610 Queen's Park Toronto, Ontario M7A 1W3

Telephone: (416) 965-4888

Enclosure

cc: Mr. 6. H. FergusonMining and Lands Commissioner Toronto, Ontario

Beardmore Resources Ltd. 160 Bryan Road North Bay, Ontario PIC 1C2

Resident Geologist Timmins, Ontario

Page 15: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

Ministry ofNorthern Developmentand.Mmes

Ontario

Technical Assessment

Work CreditsDate

July 6, 1988

File

2,11270Mining Recorder's Report of Work No. W8806-111

W8806-147

Recorded Holder

Townshi

Beardmore Resources Ltd.

German A Stock

Type of survey and number of Assessment days credit per claim

Geophysical

Electromagnetic ..

Magnetometer.

Radiometric. -........

Induced polari?ation

Other __..'......

33

33

-. . days

_... days

days

. -- days

-- days

Section 77 (19) See "Mining Claims Assessed" column

Geological. . ... ....... days

Geochemical ^ . . . ... .. .. ...... .-.days

Man days [^ | Airborne Q)J

Special provision [ ] Ground [ j

Q Credits have been reduced because of partial

coverage of claims.

[^ C redits have been reduced because of corrections

to work dates and figures of applicant.

Mining Claims Assessed

P 969633 to 51 inclusive 969653 to 72 inclusive 986718 to 27 inclusive 969745 to 69 inclusive 969956 to 61 inclusive 997952

Special credits under section 77 (16) for the following mining claims

No credits have been allowed for the following mining claims

not sufficiently covered by the survey [ ] insufficient technical data filed

The Mining Recorder may reduce the above credits if necessary in order that the total number of approved assessment days recorded on each claim does not

exceed the maximum allowed as follows: Geophysical - 80; Geologocal - 40; Geochemical - 40; Section 77(19) - 60.

Page 16: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

Ministry ofNorthern Developmentand Mines

ntario

Geophysical-Geological-Geochemical Technical Data Statement

File—

70 BE ATI ACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT

TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.

Type of Survcy(s), A j rhorne Magnetj c and VLF-E3 ectomagnetic

Township or Area. .^

Claim Holdcr(s).. Beardmore Resources Ltd.

Survey Company. JU .I-'-crdcrbcr— Geophysics Ltd .

Author of Report ^ L. Ahearn — - __ — ____ — ———

Address of Author. 169 _ P cr-re.au li... ave . , Val d ' Or

Covering Dates of Survey^ ......April.Ouebe

. . - .. (linecutting to office)

Total Miles of Line Snt^ flown ..J.D.7.....2D. ————

SPECIAL PROVISIONS CREDITS REQUESTED

ENTER 40 days (includes line cutting) for first survey.

ENTER 20 days for each additional survey using same grid.

Geophysical

- Electromagnetic.-Magnetometer—

-Radiometric——

-Other--—.—-——

DAYS per claim

Geological ̂

Geochemical.

AIRBORNE CREDITS (Special provision credits do not apply to airborne lurveyi)

Magnetometer 33 Klprtmniafmpiir 33 Radiometric ____(enter days per claim)

nATR:Jlay 33 , 1988 SIGNATURE:.Author of Report or Agent

Res. Gcol..

Prey ion s Survey^ File No. Type

Qualifications ̂

Date Claim Holder

MINING CLAIMS TRAVERSED List numerically

(prefix) (number)(see attached appendix)

TOTAL CLAIMS.81

Page 17: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

SELF POTENTIAL

Instrument_____________________________________________ Range.

Survey Method.____________;—,-...-—-—--——----.——-—-—---——-—————-——..—.—.

Corrections made.

RADIOMETRIC

Instrument^^—

Values measured.

Energy windows (levels)____.______________________________________

Height of instrument_______________________________Background Count

Size of detector._________________ ________________^_^_____^__

Overburden,-——(type, depth — include outcrop map)

OTHERS (SEISMIC, DRILL WELL LOGGING ETC.)

Type of survey.———-^-———-———^-———-——..^———.

Instrument ^———^-.—-—-——.—---——-,.^———-———-—.

Accuracy^—-.—-—-—.-—..———.—.——————.—-—

Parameters measured —

Additional information (for understanding results).

AIRBORNE SURVEY*?

Type of stirvcy(s). A i rhorno M^gn^ti^ prirl VLF-Electomaqnetic-

Instrurnc'nt(s) ____ GEM GRM-1 1 Her? Tot em. 7 A

5ipecify for each type of survey) "o

(specify for each type of survey)A - f. , Cessna 172Aircrait used__________ _________ ______________

Sensor altitude____3QQ foot.

Navigation and flight path recovery method Navi qation was visual on airphoto mosaics. Flight path recovery was obtained with a RCA colour video camera Panasonic Col OLIJ—V-j cleve) Moni t-.or'—————————————————————————————————————————————————

Aircraft altitude_____30^q-fcot____________________ Line Sparing 4 40 feet

Miles flown over total area______307 .20_______________Over claims only 6 6.43

Page 18: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

APPENDIX l CLAIM LIST

German Township

? 969633969634969635969636969637969638969639969640969641969642969643969644969645969646969647969648969649969650969651969653969654969655969656969657969658969659969660969661969662969663969664969665969666969667969668969669969670969671969672986718986719986720986721986722986723986724986725986726986727997952

Stock Township

} 969745969746969747969748969749969750969751969752969753969754969755969756969757969758969759969760969761969762969763969764969765969766969767969768969769969956969957969958969959969960969961

Page 19: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

1, 1ST OF CLAIMS TRAVERSED 3ERMAN TOWNSHIP

969633969634969635969636969637969638969639969640969641969642969643969644969645969646969647969648969649969650

969653969654969655969656969657969658969659969660969661969662969663969664969665969666969667969668969669969670969671 969672^986718986719986720986721986722986723986724986725986726 986727/

LIST OF CLAIMS TRAVERSED STOCK TOWNSHIP

969745'969746969747969748969749969750969751969752969753969754969755969756969757969758969759969760969761969762969763969764969765969766969767969768 969769^969956969957969958969959969960969961

CJ)

a\

Page 20: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

Ontario

Ministry of Northern Affairs ary

\. t

Report of Work

(Geophysical, Geological, Geochemical and Expenditure

DOCUMENT No.

^8806' X//

f Mining Act

Instructions: Please type or print. If number of mining claims traversed

exceeds space on this form, attach a list.Note: Only days credits calculated in the

"Expenditures" section may be enteredin the "Expend. Days Cr." columns.

Do not use shaded areas below.Type of Survey(s)

MAGNETOMETER -'AND^^r:-^m^m^'^"- ; 'BEARDMORE' RESOURCES LTD.- ;-

[Township or Area

. ? IAN, STOCK

Address

160 Bryan Road, North Bay, OntarioSurvey Company

Geophysics Ltd. _^ ̂ .^

Prospector's Licence No.

T- 5148

Name and Address of Author (of Goo-1 ochnical report)

R. Campbell

\PlC_i-lC2__- __bate of Survey (from Si to)

C*ay T Mo. l YT

Total Miles of line Cut

__100 miles

Credits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:

Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man Days

Complete reverse side and enter total (s) here

Geophysical

- Electromagnetic

- Magnetometer

- Radiomcitric

- Other

Geological

Geochemical

Geophysical

- Electromagnetic

- Magnetometer

Days per Claim

Days per , Claim

Mining Claims Traversed (List in numerical sequence)

Type of Work Performed

Performea on C'aimts)

Calculation of Efxponditure Days Credits

Total ExpendituresTotal

Days Credits

Instructions

Total Days Credits may tie apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.

Total number of mining claims covered by this report of work.

Date

April 7/88Recorded Holder or Agoni (Signature)

/2Certification Verifying Repor/^bi Work

Dart* Approved arf Recorded

l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed tne work or witnessed same durinq and/or after its completion and the annexed report is true.

Name and Postal Address of F'erson Certifying

R. J. Meikle, P.O. Box 1880, Timmins, Ontario P4N 741 10

( Date Certified 1 Certified b y (Sifjttittturo),

Page 21: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

Ministry oi Report of Work Northern Affairsand Mines (Geophysical, Geological,

'nlario .^k. Geochemical and Expenditures)

DOCUMENT No."

^8806- H IInstru

Mining Act

tions: -r Please type or print.If number of mining claims traversedexceeds space- on this form, attach a list,

Note: Only days credits calculated in the^ "Expenditures" section may be entered

in the "Expend. Days Cr." columns.- Do not use shaded areas below.

ype of Survey(s)

; ___ jBjJ2. plaim Holber(s)

Township or Area

Gf Rsls?s(SProspector's Licence No.

Z deft'

urvey Company

L/ , f f- /2 sOSz *ame and Address of Author (of Goo-Technical report)

Date of Survey (from BJ t o)

pay j Mo. j Yr.

Total Miles of line Cut

edits Requested per Each Claim in Columns at rightpecial Provisions

For first survey:

Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

an Days

Complete reverse side

and enter total(s) here

irborne Credits

Note: Special provisionscredits do not apply to Airborne Surveys.

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Goochomtcal

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Goochornlcnl

Electromagnetic

Magnetometer

Radiometric

Days per Claim

~*fe

Days per Claim

Days per Claim

//C*

40-xpenditures (excludes power stripping)ype of Work Performed IVhoun

trformed on Claim(s)

ilculation of Expenditi ie Days Credits

Total Expenditures

MAY 80 J98R

structionsTotal Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected In columns at right.

ite RecordodHold (SjXrjature)

rtifica^n Vpflfying Rcp^ff of Work

Mining Claims Traversed (List in numerical sequence)Mining Claim

Prefix Number

^''/ JULCli^

H-E-CJQJ*

-MAY--H-I———........yJJL

Expend. Days Cr.

v? r- *

Mining ClaimPrefix

n

NumberE xpend. Days Cr.

Total number of mining claims covered by this report of work.

For Office Use OnlyTotal DaysCr. Date Recorded Recorded

SOproved a s R ecorded

Mining ordej

Brmlch

^

l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.

ame and Postal Address of Person Certifying

t J-

Page 22: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

REFERENCES

AREAS WITHDRAWN FROM DISPOSITION

M.R.O. - MINING RIGHTS ONLY

S.R.O. - SURFACE RIGHTS ONLY

M.+ S. - MINING AND SURFACE RIGHTS

Dmcrlptlon Order No. D ataRttirv* for r*cr*0tional pjrpotM unfl*f Ste 3 PL A

-x

ftppUt*^.**J p^Aol.n^ i"

Diipoiition Fit*

S R O 186541

f.L-A-

200

CLERGUE TWP.

LEGEND

HIGHWAY AND ROUTE No.

OTHER ROADS

TRAILS

SURVEYED LINES:

TOWNSHIPS, BASE LINES, ETC. ,

LOTS, MINING CLAIMS, PARCELS. ETC,

UNSURVEYED LINES;

LOT LINES

PARCEL BOUNDARY .

MINING CLAIMS ETC.

RAILWAY AND RIGHT OF WAY

UTILITY LINES

NON PERENNIAL STREAM

FLOODING OR FLOODING RIGHTS

SUBDIVISION OR COMPOSITE PLAN

RESERVATIONS

ORIGINALSHORELINE

MARSH OR MUSKEG

MINES

TRAVERSE MONUMENT

DISPOSITION OF CROWN LANDS

TYPE O F DOCUMENT*

PATENT, SURFACE A MINING RIGHTS

, SURFACE RIGHTS ONLY....

, MINING RIGHTS ONLY -,,, fc .

YEASE,SURFACE 4 MINING RIGHTS.." .SURFACE RIGHTSONLY._..." , MINING RIGHTS ONLY......

LICENCE OF OCCUPATION ...,..,w..

SYMBOL

...,,..^.,...^ O

...^........^, O

.-,............ B

............m. H

................ B

. W ....,..M. V

ORDER-IN-COUNCIL -. .-,.^.,.-.......,.,......^m OC

RESERVATION ..........,,__...-.,....................

CANCELLED _ .. .,....^.........^^.,,.....,..

SAND fl( GRAVEL ..............,......,.^........ K ...^..

NOTE: MINING HIQHTS IN PARCELS PATENTED PHIOR TO MAY C. 1B13, VESTED IN ORIGINAL PATENTEE BY THE PUBLIC LANDS ACT, R.S.O. 1B70, CHAP. 380, SEC. 83. S UBSEC 1.

SCALE: 1 INCH * 40 CHAINS

FEETO 10OP 2OOO 4OOO 6000 BOOO

O 200 METRES

l 00011 KM]

2000 U KM

TOWNSHIP

STOCKM:N.R, ADMINISTRATIV

TIMMINSMINING DIVISION

PORCUPINESLAND TITLES/ REGISTRY DIVISION

COCHRANE

~ Ministryof Natural Resources

LandManagement

BranchOntario

Dlt * MARCH, 1985',

G-3248

Page 23: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

MAP S YMBOLOGY

Aerial Cobleway

Boundary

l iitrnalionai

Inttrpf ounttol

Dltmct, To*n*riip Inttlan Riitrt*

Lol, Cones-marl

Pork B uutido'r

Bridge

ftaad, ReHiaDd

Building

Chimney

Cliff, Pit, Pile

Contours

lnirrpolol*d

Apprci i if o t*

D*0ret*icft

Cuntrol Points

rtoriroMOl

virt l eo'

Culver!

Foils

Fence, Hedge, _WallFeature Outline

.IE.) '

Flooded Land ^^

cock "t

Marsh or Swamp -*jMast -^Mine Head Frame a

Outcrop -.'.V-'

C, O 77405'

O 3OO OZ

Pipeline(o6om ground]

Rai l road

Sing!* T *-atk

OouBI* TIDE*

Abandoned

Rood

igrnficant dr.v

Rapids

^oubl* tin* r iver ml H Multiple ra*!*i

Ka f, a t

Reser voi r

River, Stream, Canal

itll •••o l ~- ~\. -~~ ~

Hockit j ni f F Eon l ^

: h OD l : '("?':-

Spot Elevation[lo*. .It.olian) 'i00 ' 0

Tower H *

Transmission Line

Pylflfii

Tunnel—————————*

Utility Poles

Wharf , Dock, Pier

Wooded Area

AREAS WITHDRAWN FROM DISPOSITION

M.R.O. - MINING RIGHTS ONLY

S.R.O. - SURFACE RIGHTS ONLY

M.+ S. - MINING AND SURFACE RIGHTS

Description Order No. Dale Disposition File

R| CERTIFIED AGRICULTURAL LAND

NO

W T6/77 22/9/77 S.R.O. 54333

Rg) SEWAGE DISPOSAL SITE — BONA FIDE APPLICATION "UNDER P.L.A.

Rn M INING RICH" * a^4_ - W, " H; s; i ̂ \ ,., y . r ~ ,- . 1iON,s;^~ --r M.N.N

* SURFACE RJCHTS WFTHDRAWH WDfR SECTION OF T* MWC ACT^ISO I960 ORDER NO. W-9/88 JAN. 29/88

MBKTS ONLY ARE WTTHDWWN UNDER SECTIOH I9O (Z).Cf HE M*K ACT RSOJ9BO OROER NO. VMO/B6 JAN. Z9;Bfl

42AI0SW0141 2.11270 STOCK 210

DUNDONALD TWP

p IP IP837719 i 837707 ,S3BII

— 5395QOO m N

Me tntosh Lake IP IP

^ 1795055 -1 79^056 iD l ' \ 7

— ~ ~ ~7- —-©7- —

-fi-* A A ^Q

D69633 l 969634

969643 969642

y

Hughes Lake

p l P v624493 624490

KETTlE LAKES

6Z44B8 1624467

559 00 oo m N539QOOOmN —

,_ __ —— ^ _ _^ ,_ ^^ _ , ^^ __ _ i_ i_

-I- P l P 594864 , 594B65

KETTLE

tAKESp } \ p

. f -* * J* ***^ } r | f -y * j ft i**u y ^ ^trtj < u -J ^ ^ *f i3B-G7I9 ^1 969669

PROVINCIAL

PARK

KETTLE LAKES

^PROVINCIAL

— — g — ^

--2BJ — l—— ——f

99792O j 997456

* 9 3I96C . ~-~

'77/77/rt//S7-Ap ; P

-.753264 l 755263

Hawk-Lake - -

MACKLEM T W P

LEGEND

HIGHWAY AND ROUTE No

OTHER ROADS

TRAILS

SURVEYED LINES:TOWNSHIPS. BASE LINES. ETC.LOTS. MINING CLAIMS. PARCELS, ETC

UNSURVEYED LINESLOT LINES

PARCEL BOUNDARYMINING CLAIMS ETC

RAILWAY AND RIGHT OF WAY

UTILITY LINES

NON-PERENNIAL STREAM

FLOODING OR FLOODING RIGHTS

SUBDIVISION OR COMPOSITE PLAN

RESERVATIONS

ORIGINAL SHORELINE

MARSH OR MUSKEG

MINES

TRAVERSE MONUMENT

DISPOSITION OF CROWN LANDS

TYPE O F DOCUMENT SYMBOL

PATENT, SURFACE S MINING RIGHTS ...—.—.....—— *

. SURFACE RIGHTSONLY....... ,............... ©

, MINING RIGHTS ONLY ____ ..^.,..........^. ®

LEASE. SURFACE Si MINING RIGHTS—— — —.-—— B

" .SURFACE RIGHTS ONLY,_—.. .-^.—...—— H

" , MINING RIGHTSONLY.——————... ———....-— H

LICENCE OF OCCUPATION ...........__..—.......—— T

ORDER IN-COUNCIL ........,,.........^—.......——,. OC

RESERVATION .^.................................—-. ©

CANCELLED __...... — ............ — -........ —.. ®

SAND 81 GRAVEL ..........._..—... —,........——.. ©

NOTE: MINING RIGHTS IN PARCELS P ATENTED P RIOR TO MAY 6 1913. VESTED IN ORIGINAL PATENTEE BY THE P UBLIC LANDS ACT, RSO 1970. CHAP. 38O. SEC 63. SUBSEC 1

500Metres

1000 — Metre*

10 D 10 20 30 dD 50 60 70Chains - - -. r-, r.—————— —————— —————— —————— Chains

500 O 1000 2000 3000 " 4000 5000 feel - - ————————— ————————— ————————— F

SCALE 1:20 000

GRID ZONE ' 17

NOTES

FLOODING RIGHTS ON NIGHTHAWK LAKE AND

FREDRICK HOUSE RIVER TO ELEV. 903-5' RESERVED TO ONTARIO HYDRO.

FLOODING RIGHTS ON FREDRICK H OUSE L AKE TO ELEV. 903-0' TO ONTARIO HYDRO

REGISTERED PLAN OF SUBDIVISION

1AY 3 1988

TOWNSHIP

GERMANM.N.R. ADMINISTRATIVE DISTRICT

TIMMINSMINING DIVISION

PORCUPINELAND TITLES/ REGISTRY DIVISION

COCHRANE

Ministry ofNaturalResources

Land

Management

Branch

Ontario

ORIGINAL COMPILATION JULY 1984

JMM

REVISED j^i

Numb*'

G-3992

Page 24: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

'^*-V^'.^ ;*P'yS

. ,,' . *^ . wfi'-"' ' ,- 'v - ii.V1 ;-. ' "/i ' ^ j' -A

. '"W* t .'- yi'" " ' ' Ji'1' 1 - ' '

l^fW0 -W^TOVu A' 1 .-'' ' *^L*

GERMAN TWP STOCK TWP

b*1— ^^ ̂ —

LEGENDTOTAL FIELD CONTOUR INTERVAL 20 GAMMAsFIDUCIAL POINTLINE DIRECTIONBASE VALUE ssooo GAMMASMAGNETIC LOW1000 GAMMAS

100 GAMMAS

20 GAMMAS

42A10SW0141 2,11270 STOCK 220

VPF Of- WORK

AIRBORNE MAGNETIC SURVEY

BEARDMORE RESOURCES LTD.

2.11270

H. Ferderber Geophysics Ltd.

A R t. A

GERMAN, STOCK TWPS,OMT.

SCALE

- 1/4 mile

DRAWN BY

/7

DATE

MAY 1988

MAP OH SHEET NO

MG-

Page 25: REPORT ON THE COMBINED AIRBORNE GEOPHYSICAL SURVEY … · 2017-01-17 · DATA PRESENTATION l Flight lines, fiducial points and geophysical responses were reproduced from the airphoto

GERMAN TWP STCK TWP

CLAIM MAP

SCALL h /2 mile

LEGENDTOTAL FIELD CONTOUR INTERVAL 2 CONDUCTOR AXISFIDUCIAL POINT LINE DIRECTIONSTATION USED.'CUTLER, MAINE,USA.(NAA 24.0 kHz.)

LESS THAN ZERO10 "/o

07o

H30

TYPE OF WORK

AIRBORNE VLF-EM SURVEY'LIENT

BEARDMORE RESOURCES LTD.PROJECT

2.11270

H. Ferderber Geophysics Ltd

AREA

GERMAN, STOCK TWPS,ONT.

SCALE

^ 1/4 miteDRAWN BY

DATE

MAYMAP OR SHEET NO

EM-