  • 8/20/2019 Report on Foundation Design of HR Bldgs

    1/20

    Prof. Dipl.-Ing. Hubert Quick City Hall of Dubai, March, 7th, 2005

      

    oooo  

    Prof. Dipl.-Ing. H. Quick • Ingenieure und Geologen GmbH provides geotechni-

    cal engineering services e. g. for high-rise buildings in Germany and abroad.

    oooo

     

    The geotechnical design procedure for high-rise buildings consists of severalphases from the feasibility study and the concept / realisation of the soil investi-

    gation to the soil report and finally the final geotechnical design.

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    2/20

     

    For a safe design a high quality soil report with the following specifications is

    indispensable.

    The serviceability of construction has to be evaluated regarding the uniform set-

    tlement of the construction, the differential settlement, the tilting as well as the

    deflection ratio.

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    3/20

    oooo  

    The raft foundation is characterised by the following specifications:

    the loads are transferred by raft into the ground• the raft covers the entire area of the structure

    In case of expected large differential settlements the raft must be separated

    (joints), this can cause difficult construction phases. In general the stress distri-

    bution (bearing pressure) of a raft foundation is described by Boussinesq.

    The ultimate limit state (ULS) and for the serviceability limit state (SLS) for a raft

    foundation must be proved with the following calculations:

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    4/20

    oooo  

    With increasing height of buildings respectively increasing loads the depicted raft

    foundation is not suitable or even not sufficient to transfer the loads properly into

    the ground. Therefore a pile foundation is often used. The main function of a pilefoundation is to transfer the loads into the ground with an adequate factor of

    safety.

    The load is transferred by end bearing and the skin friction of the piles into the

    ground.

    The ultimate limit state (ULS) and for the serviceability limit state (SLS) for a pile

    foundation must be proved with the following calculations:

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    5/20

    oooo  

    The Commerzbank is situated in Frankfurt, Germany

    within the banking district. The building reaches a height

    of 299 m. The building is founded on a pile foundation.

    The building was constructed directly next to an existing

    high-rise building. The existing building reaches a height

    of 103 m and is founded on a raft.

    A total of 111 telescopic piles with diameter of 1.8 mwithin the first 20 m beneath the raft, followed by a di-

    ameter of 1.5 m were installed. All piles were constructed

    with a jet grouted shaft as well as jet grouting 10 m un-

    derneath the piles in the cavernous limestone.

    Up to a depth of 5 m beneath the surface fillings were

    encountered underlying by quaternary sands and gravels

    in depth of 10 m. Underneath the ground layers of the

    Hydrobien (Frankfurt clay) is found up to a depth of 35 to

    40 m. The ground layers of the Inflaten (Frankfurt limestone) and Certithien

    (marl) were encountered beneath the Hydrobien. The Frankfurt clay consists of

    clay interbedded with sand and limestone. The thickness of the Inflaten layer is

    approx. 25 m. The Inflaten consists of limestone, sand, silt and marl.

    Two groundwater level were found in the project site: An unconfined groundwa-

    ter level in the quaternary sands and gravels as well as a confined groundwater

    level circulating in the sands and limestone of the Hydrobien.

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    6/20

    The calculations were carried out in consideration of the symmetry of the build-

    ing. A sixth part of the building was modelled by Finite- and Infinite-Elements.

    The extent of the model is 200 m x 180 m x 120 m. Infinite elements were used

    to model the ground outside the tower area. The used material law for the finite

    elements is a elastic-plastic stress-strain behaviour with the yield conditions of

    Drucker-Prager with cap. An elastic material law was implemented for the struc-

    tural elements (piles and raft).

    The maximum settlements of the building add up to 2.1 cm. The minimum set-

    tlements were encountered with 1.5 cm. This leads to a tilting of smaller than

    1/2000. These results cause no negative effect on the serviceability of the build-

    ing.

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    7/20

    The monitoring shows that the 111 piles of the Commerzbank carry approx.

    96 % of the total load of the building. This indicates that not all loads are trans-

    ferred by the piles into the ground.

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    8/20

    oooo  

    In addition to the presented and often used raft or pile foundation, the combined

    pile-raft-foundation is nowadays often used to transfer the loads into the ground.

    In comparison to a pile foundation, the combined pile-raft-foundation both thepiles and the raft transfer the loads into ground. The loads are transferred by

    skin friction and end bearing as well as contact pressures of the raft foundation

    (bearing pressure). The piles are used up to their ultimate bearing capacity (load

    level) which is higher than the permissible design value for a comparable single

    pile The combined pile-raft-foundation represents a complex foundation system,

    which requires a qualified understanding of the soil-structure interactions.

    The task for the geotechnical engineer is to evaluate the load distribution be-

    tween the piles and the raft. The distribution of the total load between the raft

    and the piles is described by the coefficient of CPRF (αCPRF).

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    9/20

     

    The ultimate limit state (ULS) and for the serviceability limit state (SLS) for a

    combined pile-raft-foundation must be proved with the following calculations:

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    10/20

     

    The proof of the ultimate limit state of the combined pile-raft-foundation can be

    carried out by means of the Finite-Element-Method with the following calculation

    steps:

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    11/20

    oooo  

    The Drehscheibe is situated in Frankfurt, Germany. The new high-rise building

    Drehscheibe is currently under construction. The building area of approx. 5400

    m² consists of a 77 m high rise tower with 19 floors which is connected to sur-

    rounding low buildings with max. 6 floors like shown on the site plan. Below the

    whole area an underground parking with 3 basement floors on a continuous

    foundation slab is currently under construction.

    The raft of the whole building complex had to be designed continuously without

    any joints because of the groundwater situation. The eccentric loading of the

    building complex with a raft foundation causes large differential settlements and

    angular displacements. Thus a raft foundation was not advisable.

    It was decided to carry out a combined pile-raft-foundation (CPRF) underneath

    the high-rise building. The surrounding low buildings are constructed by means

    of a raft foundation.

    The design of the CPRF consists of a foundation raft with a thickness of 2.5 m

    and an area of approx. 900 m². The 31 foundation piles with a diameter of 1.2 m

    and length between 10.5 and 16.5 m are installed underneath the high loaded

    core section of the high-rise building.

    The explored ground consists of fills, sand and gravel underlying by tertiary

    sandy, silty clay (congerien and prososthenien layer). Below this sequence fossil

    limestone (Landschneckenmergel) and hydrobien layer was found.

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    12/20

    The reef structures of the fossil limestone consist of an alternating sequence of

    layered facies of clay and silt (marl) as well as vertical extending columns (fossil

    reef structures). The experience in the local area gained from former projects

    like the construction of subway tunnels showed diameters of up to 3 m for these

    reef structures. The reef structures are described as cavernous and compressi-

    ble and arose of former coral reefs.

    The groundwater conditions are characterized by two groundwater levels. One

    unconfined groundwater table in the Quaternary fills and one confined table in

    the tertiary fossil limestone. The two levels show approximately the same pres-

    sure head of 4 m beneath the surface.

    The calculations were carried out by means of the Finite-Element-Method. The

    chosen numerical model represents the realistic geometry of the foundation raft

    of the high-rise building and a strip of 20 m width of the raft of the bordering low

    rise buildings, the positioning of the piles as well as the pile length.

    For the modelling of the soil behaviour an elastic-plastic constitutive law with

    isotropic hardening was implemented. The used material law for the ground

    elements is a elastic-plastic stress-strain behaviour (Mohr-Coulomb). An elastic

    material law was implemented for the structural elements (piles and raft).

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    13/20

     

    The maximum settlements of the building add up to 3.0 cm. The minimum set-

    tlements were encountered with 2.2 cm. This leads to a tilting of smaller than

    1/1000. These results cause no negative effect on the serviceability of the build-

    ing.

    The results of the calculation shows that the 31 piles of the Drehscheibe carry

    approx. 64 % of the total load of the building (αCPRF = 0.64).

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    14/20

     

    The Skyper is situated in Frankfurt, Germany. The high-rise building Skyper has

     just been constructed and consists of a 153 m high tower which is connected to

    surrounding low buildings. Below the whole area an underground parking with 3

    floors on a continuous foundation slab was planned.

    The eccentric loading of the building complex with a raft foundation causes large

    differential settlements and angular displacements and negative interactions with

    the existing neighbouring Villa as well as other neighbouring structures. Thus a

    raft foundation was not advisable.

    It was decided to carry out a combined pile-raft-foundation (CPRF). The sur-

    rounding low buildings are constructed by means of a raft foundation.

    Up to a depth of 3 to 6 m beneath the surface fillings were encountered underly-

    ing by quaternary sands and gravels in depth of 10 m. Underneath the ground

    layers of the Hydrobien (Frankfurt clay) is found up to a depth of 50 to 60 m. The

    ground layers of the Inflaten (limestone) and Certithien (marl) were encountered

    beneath the Hydrobien.

    The Frankfurt clay consists of clay interbedded with sand and limestone. The

    dark grey clay was encountered as stiff to very stiff. The limestone within the

    Hydrobien layer are encountered with a thickness of a few decimetre to 2.0 m.

    Two groundwater level were found in the project site: An unconfined groundwa-

    ter level in the quaternary sands and gravels as well as a confined groundwater

    level. The unconfined groundwater level was found 3 to 4 m beneath the sur-

    face. The confined level’s pressure head shows approximately the pressurehead.

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    15/20

    For the modelling of the soil behaviour an elastic-plastic constitutive law with

    isotropic hardening was implemented. The used material law for the ground

    elements is a elastic-plastic stress-strain behaviour (Mohr-Coulomb). An elastic

    material law was implemented for the structural elements (piles and raft).

    The maximum settlements of the building add up to 5.5 cm. The minimum set-

    tlements were encountered with 3.0 cm. This leads to a tilting of smaller than

    1/2000. These results cause no negative effect on the serviceability of the build-

    ing. The results of the calculation shows that the 46 piles of the Skpyer carry

    approx. 63 % of the total load of the building (αCPRF = 0.63).

    The result of the numerical calculations shows a rather good agreement with the

    measurement. The measured settlements are still increasing due to consolida-

    tion of the clay.

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    16/20

     

    The Treptowers is situated in Berlin, Germany directly next to the river Spree.

    The building reaches a height of 121 m. The building is founded on a combined

    pile-raft-foundation. The bordering low-rise building with 10 floors is founded on

    the raft.

    A total of 54 piles with a diameter of 88 cm were installed. All piles were con-

    structed with a jet grouted shaft. The length of the piles vary from 12.5 m to 16

    m. The bottom of the raft is up to 8 m beneath the surface.

    The ground and groundwater conditions were explored by boreholes up to adepth of 40 m. Up to a depth of 4m beneath the surface fillings and organic soils

    were encountered underlying by loose to medium dense sands of the Pleisto-

    cene. These sands were found up to depth of approx. 19 m. Dense sands were

    encountered in depth of > 19 m. Locally a layer of boulder clay with a thickness

    of 1.5 m was found.

    The groundwater level is approx. 3 to 4 m beneath the surface.

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    17/20

    The calculations were carried out in consideration of the symmetry of the build-

    ing. The used material law is an elastic-ideal-plastic stress-strain behaviour with

    the yield conditions of Mohr-Coulomb. The jet-grouting of the pile shaft is mod-

    elled by an expansion of the pile elements.

    An elastic material law was implemented for the structural elements (piles andraft).

    The maximum settlements of the building add up to 7.3 cm. The minimum set-tlements were encountered with 5.0 cm. This leads to a tilting of smaller than

    1/2000. The mean value of settlement is 6.3 cm. These results cause no nega-

    tive effect on the serviceability of the building.

    The monitoring shows that the 54 piles of the Treptowers carry approx. 55 % of

    the total load of the building. The αCPRF factor, the summation of the piles loadsdivided by the total load, amount therefore to 0.55 (αCPRF  = 0.62). The factor

    αCPRF of the numerical calculation is 0.62.

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    18/20

     

    The Jumeirah Lake Tower is situated in Dubai, U.A.E. A first study of different

    foundation systems has been evaluated for:

    • pile foundation

    • combined pile-raft-foundation

    The ground and groundwater conditions were explored by boreholes up to a

    depth of 75 m. Up to a depth of 8 m beneath the surface dense sand was en-

    countered underlying by weak sandstone, which reaches a depth of 24 m be-

    neath ground surface. In depth of > 24 m weak siltstone was encountered.

    The groundwater level is approx. 2 m beneath the surface.

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    19/20

    The maximum settlements of the building on piles add up to 4.5 cm. The maxi-

    mum settlements of the building on CPRF add up to 6.9 cm.

    oooo  

    The presentation on foundation design shows customary foundation systems for

    high-rise buildings such as raft and pile foundation. In addition the foundation

    system of combined pile-raft-foundation is introduced. For all three foundation

    systems the required proof of the ultimate limit and serviceability limit state has

    been presented.

    However, the choice of the adequate system is often not depending on the proof

    of the ultimate limit state (e.g. base failure, etc.). A raft foundation suits often the

    according required factors of safety. But the serviceability of the high-rise build-

    ing and / or neighbouring structures can often not be guaranteed by a raft foun-

    dation.

    For this, pile foundations have been constructed to reduce the settlements and

    to satisfy the ultimate limit state and what is more the serviceability. The calculai-

    ton of the pile foundation is an idealisation, where only the piles carry the loads

    of the structure. This does not reflect the realistic behaviour.

    Where piles are primarily used to reduce settlements (satisfy the serviceability)

    and where an adequate factor of safety against failure (e.g. base failure) is pro-vided, the combined pile-raft-foundation (CPRF) has been put forward in the

    past. In this case the loads of the structure are transferred into the ground by

    piles and raft. This approach is able to reflect the realistic soil-structure-

  • 8/20/2019 Report on Foundation Design of HR Bldgs

    20/20

    behaviour. Calculations can be carried out with numerical methods, such as the

    Finite-Element-Method. This successful design and construction has been veri-

    fied by many structures including many high-rise buildings and bridges.