REPORT INDICATING STATUS OF CONSTRUCTION OF TRANSMISSION LINES (220 kV & ABOVE) VIS-A-VIS PROGRAMME DURING 2015-2016 As on 30-SEP-2015 Schedule 1. 2. 5. 6. 7. 8. 9. 10. 12. 3. Revised/ Anticipate d 11. Construction progress Status Target Date Remark Towers TL (Nos) STC (Nos) TE (Nos) STG (cKM) Voltage Level 4. Sl No Name of Transmission Lines Total Lengt h cKM Ckts (S/C) & (D/C) DAMODAR VALLEY CORPORATION (DVC) Railway Crossing:SER, Ranchi approved in principle for 3 no.rail crossing on 24.11.2014. Demand note raised by SER has been paid. SER being persued for agreement in this respect.PTCC: proposal submitted to concerned authority on 27.8.14. Matter is being persued with H'bag, BSNL & Ranchi, BSNL. Forest Clearance: Working Clearance issued on 22.5.2015. Progress affected due to non-availability of tower materials. In order to solve fund crisis faced by Contractor (M/s ECI-SEW), approval has been arranged for payment to the sub-vendor directly & subsequently 234 MT of tower materials has been delivered at site. NOV-14 112 Gola - Ranchi (PG) 216 145 91 0 1 D/C SEP-15 220 Commissioned 08/15. FEB-10 212 Kodarma-Giridih 324 324 324 212 2 D/C AUG-15 220 Severe ROW problem in 17 no locations. SE Railway has given in principle clearance of crossing. Around 24 no. locations outside the ISP premises are being diverted again due to severe ROW problem. Contractual issues cropped up due to repeated route diversion. Presently work is held up. 37 LILO of Mejia-Kalyaneswari at Burnpur S/S 79 55 0 0 3 D/C DEC-15 220 Forest: Working clearance obtained on 6.3.2013 from GOJ. Contractual issues cropped up due to delay in obtaining forest clearance as well as theft of materials (100 Ckm.) from erected line. Rectification work of the theft portion of the line has been completed. 54 km (i.e 108 ckm) of line charged at 220 KV from MTPS end on 09.9.15. DEC-08 342 Mejia TPS - Gola 552 541 509 148 4 D/C SEP-15 220 Forest: Working clearance obtained in January 2013.PTCC clearance:issued on 18.2.14. Aviation clearance: Obtained. Slow progress due to non-availability of working gang due to fund crunch of Contractor (M/s Jyoti Structures). Approval has been arranged for payment to the sub-vendor directly to solve above fund crisis of M/s JSL which has subsequently resumed work in Sep 2015 for the balance portion. AUG-10 311 Raghunathpur TPS -Ranchi (PG) 439 439 431 274 5 D/C MAR-15 400 Trasmission Lines: Page 1 of 122 Legends TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Upload: hahanh

Post on 13-Mar-2018

226 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

REPORT INDICATING STATUS OF CONSTRUCTION OF TRANSMISSION LINES (220 kV & ABOVE) VIS-A-VISPROGRAMME DURING 2015-2016 As on 30-SEP-2015

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

DAMODAR VALLEY CORPORATION (DVC)

Railway Crossing:SER, Ranchi approved in principle for 3 no.rail crossing on24.11.2014. Demand note raised by SER has been paid. SER being persued foragreement in this respect.PTCC: proposal submitted to concerned authority on27.8.14. Matter is being persued with H'bag, BSNL & Ranchi, BSNL. ForestClearance: Working Clearance issued on 22.5.2015.Progress affected due to non-availability of tower materials. In order to solvefund crisis faced by Contractor (M/s ECI-SEW), approval has been arranged forpayment to the sub-vendor directly & subsequently 234 MT of tower materialshas been delivered at site.

NOV-14112Gola - Ranchi (PG) 216 145 91 01 D/C SEP-15220

Commissioned 08/15.FEB-10212Kodarma-Giridih 324 324 324 2122 D/C AUG-15220

Severe ROW problem in 17 no locations. SE Railway has given in principleclearance of crossing.Around 24 no. locations outside the ISP premises are being diverted again dueto severe ROW problem. Contractual issues cropped up due to repeated routediversion. Presently work is held up.

37LILO of Mejia-Kalyaneswari at Burnpur S/S 79 55 0 03 D/C DEC-15220

Forest: Working clearance obtained on 6.3.2013 from GOJ. Contractual issuescropped up due to delay in obtaining forest clearance as well as theft of materials(100 Ckm.) from erected line. Rectification work of the theft portion of the linehas been completed. 54 km (i.e 108 ckm) of line charged at 220 KV from MTPSend on 09.9.15.

DEC-08342Mejia TPS - Gola 552 541 509 1484 D/C SEP-15220

Forest: Working clearance obtained in January 2013.PTCC clearance:issued on18.2.14. Aviation clearance: Obtained.Slow progress due to non-availability of working gang due to fund crunch ofContractor (M/s Jyoti Structures). Approval has been arranged for payment tothe sub-vendor directly to solve above fund crisis of M/s JSL which hassubsequently resumed work in Sep 2015 for the balance portion.

AUG-10311Raghunathpur TPS -Ranchi (PG) 439 439 431 2745 D/C MAR-15400

Trasmission Lines: Page 1 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 2: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

NTPC LIMITED. (NTPC Ltd.)

.LILO of Satna - Gwalior at Barethi TPS1 D/C 765

.Lara-I TPS - Raigarh Pooling Station (Kotra)2 D/C 765

Trasmission Lines: Page 2 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 3: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

POWER GRID CORPORATION OF INDIA LIMITED (PGCIL)

Ready for commissioning 09/15.AUG-133506+/- 800KV HVDC Biswanath Chariyali - Agra Bi-poleline

4369 4369 4369 35061 BIPOLE

SEP-15±800

Commissioned 04/15.APR-1520400 kV D/C trans. Line for swapping of Kahalgaon #1bay with Sasaram# 1 bay at Biharshariff S/Stn.

38 38 38 202 D/C APR-15400

Work under progress.JUN-16486Allahabad - Kanpur line 629 370 1923 D/C JUN-16400

.120Alusteng(Srinagar) - Drass 0 0 0 04 S/C MAR-16220

Angul - Dhenkanal5 D/C 765

ROW being faced. Hug forest involvement clearance awaited. CriticalDEC-15570Angul - Jharsauguda line 792 592 240 446 D/C JUN-16765

Forest clearance received in May'14. Severe ROW in 32Loc/50Km at Angul end.Work being executed with police protection.

MAR-13270Angul Pooling Station - Jharsuguda Pooling Stationline-II

510 510 507 2527 S/C NOV-15765

Forest clearance awaited.CriticalAUG-14570Aurangabad (PG) - Padghe (PG) 772 636 595 1428 D/C SEP-16765

Stage-I Forest clearance (138ha.) received in Aug'15. Severe ROW problem(involvement grape garden).

JUL-14654Aurangabad - Boisar line 896 666 561 3009 D/C JUN-16400

Aurangabad - III - Aurangabad (PG)10 2xS/C 765

Commissioned 09/15.MAR-16556Aurangabad - Solapur line 760 760 760 55611 D/C SEP-15765

Work yet to stared.80Bairasuil HEP - Sarna12 D/C 220

Completion matching with varansai S/stn.AUG-14165Balia - Varanasi 463 463 463 16413 S/C OCT-15765

Commissioned 09/15.AUG-13114Balipara - Biswanath Chariyali 165 165 165 11414 D/C SEP-15400

Commissioned 04/15.APR-13202Bareilly - Kashipur line (Quad) 282 282 282 20215 D/C APR-15400

Commissioned 05/15.AUG-14698Barh-II - Gorakhpur 944 944 944 69816 D/C MAY-15400

Work under progress.MAY-16338Betul - Khandwa (Quad) line 440 287 188 3217 D/C MAY-16400

06 ckm stringing held up due to severe ROW problem at Bhiwani end.MAR-16116Bhiwani - Hissar line 159 159 159 10118 D/C OCT-15400

Completion matching with Varanasi Sub station.133Biharshariff - Sasaram line 344 344 317 15819 D/C DEC-15400

NOV-112Bypassing of Bhatapara - Raipur as Bhatapara - Bhilai 420 S/C OCT-13400

Completion matching with Champa HVDC Station. Efforts being made for Pole-Iin Mar'16. Stage-I forest clearance for WR-II portion awaited.

JUN-152573Champa Pooling Station - Kurukshetra (HVDC) 3474 3341 1790 65521 BIPOLE

JUN-16±800

Severe ROW problem in Uttrakhand.NOV-14144Dehradun - Abdullapur 247 211 199 4422 D/C JUN-16400

Trasmission Lines: Page 3 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 4: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Severe ROW problem in western UP.NOV-11249Dehradun - Bagpat 443 409 386 9523 D/C JUN-16400

Ready for Commissioning 09/15.MAR-13848Dharamjaygarh - Jabalpur Pooling Station line 1138 1138 1138 84824 D/C SEP-15765

Severe ROW problem faced in Karnataka. CriticalAUG-14244Dharmapuri (Salem New) - Somanahalli 336 310 265 17125 D/C DEC-15400

60Drass - Kargil26 S/C MAR-16220

Implementation affecetd due to delay in forest clearance(received in Feb'15).NOV-14242Dulhasti - Kishenpur 340 299 263 5827 D/C JUN-16400

Aportion of line (279 Ckm) commissioned in April'12. balance portion under holddue to ECL.

314Durgapur-Jamshedpur (Balance Portion) 434 434 434 31428 D/C JUL-13400

Completion uncertain due to severe ROW problem. Work to start afterassesment of compensation & payment by stateGovt./KSEB. Revised G.O. withenhansed compensation issued in Jan'15.Recently G.O. issued on 30.07.15 inwhich compensation to be done on land value, to be finalised by concern DC.

NOV-08297Edamon (KSEB) - Muvattupuzha (PG) 438 159 105 2929 D/C DEC-16400

Severe ROW problem being encountered.FEB-14450Essar Gujarat TPS - Bachau 605 595 590 41030 D/C DEC-15400

Completion matching with Varansai S/stn.MAY-15251Ext. of one ckt Biharshariff - Sasaram at Varanasi (Q) 344 344 317 15831 D/C DEC-15400

Completion matching with S/stn. Varansi sub station critical due to delay in landacquisation.ROW (Naxalite)problem faced.

AUG-14246Gaya - Varanasi 738 729 712 22132 S/C DEC-15765

112Gola - Ranchi line33 D/C 220

Down strem system being execution by State not available.JUN-14418Gooty - Madhugiri 575 572 572 37034 D/C NOV-15400

Commissioned 08/15.MAR-14305Gwalior - Jaipur (Ckt 1) 834 834 834 30535 S/C AUG-15765

Commissioned 08/15.MAR-14311Gwalior - Jaipur line (Ckt 2) 656 656 656 31136 S/C AUG-15765

Work under progress.APR-18838Jabalpur PS - Orai 2095 5537 D/C APR-18765

ROW problem on 12 nos. location at Bhiwani end.MAR-16277Jaipur (RVPNL) - Bhiwani (IInd Ckt) line 741 585 266 5538 S/C MAR-16765

Commissioned 08/15.MAR-16272Jaipur - Bhiwani line 741 741 741 27239 S/C AUG-15765

Stage-I forest clearance received in Dec'14 & permission to work received inMay'15.

NOV-13372Jharkhand Pool - Gaya (Quad) line 332 305 21740 D/C DEC-15400

Huge forest involvement.CriticaDEC-15312Jharsuguda - Dharamjaygarh line 296 237 110 1041 D/C JUN-16765

work under progress.OCT-1676Kakrapar APP - Navsari line 108 83 5242 D/C OCT-16400

Work under progress.OCT-16208Kakrapar APP - Vapi line 289 275 2243 D/C OCT-16400

Trasmission Lines: Page 4 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 5: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

ATS slowed-down to the extent possible to match with Gen. of Kameng. Gen.proj. delayed. (expected in 2016-17).

AUG-13110Kameng - Balipara 149 136 102 044 D/C DEC-16400

Matching with Kanpur 765KV GIS.OCT-1441Kanpur (new) - Kanpur (exit) 62 62 62 3845 D/C MAR-16400

Matching with Kanpur 765KV GIS.OCT-14483Kanpur - Jhatikara 1265 1265 886 32046 S/C JUN-16765

90Kargil-Khalsti47 S/C MAR-16220

Severe ROW problem in Roorkee end.APR-13302Kashipur - Roorkee line 419 420 418 28248 S/C OCT-15400

74Khalsti - Leh49 S/C MAR-16220

work under progress.AUG-16292Khamam - Nagarjunasagar line (Vzag TCL) 388 340 273 10850 D/C DEC-15400

Work under progress.MAY-16360Khandwa - Indore line 490 428 235 19051 D/C MAY-16400

Khargone TPP-Indore52 D/C DEC-15400

Award for tower pkgs. placed in march 2015. Engg. & survey under progress.MAR-18206Kishanganga - Amargarh 51553 D/C JUL-17220

Award for tower pkgs. placed in march 2015. Engg. & survey under progress.MAR-1878Kishanganga - Wagoora 7854 D/C MAR-18220

Completion matching with Kishanganj s/stn. Land acquired in Aug'13.NOV-13692Kishanganj - Patna line (Quad) 915 914 914 65855 D/C NOV-15400

Final forest clearance to be issu after cabinit meeting. Limited working perioddue to snow-bound area affecting implementation. Critical

JUL-13278Kishenpur - New Wanpoh line (132 KM D/C + 7 KMMulti Ckt)

394 386 342 17356 MC+D/C

JUN-16400

Kishenpur - Ratle, (Dulhasti- Kishenpur Second Cktstringing extending up to Ratle HP)

57 S/C 400

400KV D/C Nellor-Gooty line commissioned in Mar'13. (early K'patnam UMPP -Gooty line)

632Krishnapatnam UMPP - Gooty line (Quad) 788 788 788 57858 D/C MAR-13400

Work under progress.AUG-16119Kurnool (New) - Raichur line 319 318 175 8559 D/C MAR-16765

Completion matching withreadiness of LILO of Abdullapur - Sonepat atKurukshetra.

JUN-15516Kurukshetra - Jallandhar 728 728 646 45560 D/C DEC-15400

Work under progress.MAR-18190Kurukshetra - Jind line (Q) 270 561 D/C MAR-18400

Severe ROW problem. Critical.OCT-1497LILO of Aurangabad - Pune at Pune 67 62 51 2362 D/C NOV-15400

Award placed in May'15.JUL-1717LILO of One Ckt Parbati Pooling Station - Amritsar atJalandhar

4263 D/C JUL-17400

Commissioned 07/15.NOV-1232LILO of One Ckt of Baripada - Mendhasal line at Dubri(OPTCL)

48 48 48 3264 D/C JUL-15400

Ready for Commissioning 08/15.JUL-1546LILO of 2nd ckt of Neyveli - Trichy at Nagapattnam 65 65 65 4665 D/C AUG-15400

Trasmission Lines: Page 5 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 6: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Completion matching with Kurukshetra AC Sub station.JUN-1530LILO of Abdullapur - Sonepat at Kurukshetra (Tripal) 45 45 45 866 D/C DEC-15400

Award placed in Mar'15.JUL-17120LILO of Agra - Bharatpur at Agra 30067 S/C JUL-17220

Award placed in Mar'15.Engg. & survey under progress.APR-18LILO of Agra - Meerut at Aligarh 8768 D/C APR-18765

Package under re-tendering.DEC-1230LILO of Aizwol (PG) - Zemabawk at Melriat (PG) 45 0 0 069 D/C JUN-16132

Completion matching with Sub station. Severe ROW problem being faced.54LILO of Baripada - Mendhasal at Pindiabil 106 90 62 870 D/C DEC-15400

Scpoe deleted.JAN-158LILO of Birpara - Salakati at Alipurduar71 D/C SEP-15220

Gen. Project delayed (ant. in 2016-17).Work under progress.

JAN-1524LILO of Bishwanath Chariali - Agra at Alipurduar 36 19 672 HVDC DEC-16±800

Work under progress.JAN-1513LILO of Bongaigaon - Siliguri at Alipurduar 23 11 473 D/C DEC-16400

Award under progress.MAY-17LILO of Both Ckt of Bawana - Mandola at Rajgarh74 D/C MAY-17400

Severe ROW problem in western UP.Line proposed for deletion as advised byState Govt. (reffered to CEA). Completion Uncertain

NOV-1258LILO of Both Ckt of Dehradun - Bagpat line (QUAD) atSaharanpur

78 35 0 075 D/C MAR-16400

Work under progress.JUN-1650LILO of Dadri - Malerkotla at Kaithal 67 676 D/C JUN-16400

Commissioned 07/15.AUG-1429LILO of Dehar - Bhiwani at Rajpura (PSTCL) 43 43 43 2977 S/C JUL-15400

Award placed in Aug/11. Engg. in progress.19LILO of Gangtok - Melli at Rangpo 3478 S/C 132

Commissioned 11/14.NOV-147LILO of Gangtok - Rangit at Rangpo 21 21 21 779 S/C NOV-14132

Commissioning matching with S/stn.MAY-157LILO of Gaya - Fatehpur at Varanasi line 9 9 9 680 S/C DEC-15765

Scheme under review in view of CERC direction.LILO line canelled in schemen& added another scheme.

JUN-1438LILO of Gazuwaka - Vijayawada at Vemagiri 9581 D/C JUN-16400

Award placed in Mar'15.Engg. & survey in progress.MAR-18LILO of Hyderabad - Kurnool at Maheshwaram 082 D/C MAR-18400

LILO of Jiribam - Aizawl at Turial83 D/C 132

Work under progress.LILO of Kadapa (Cuddapah) - Kolar at Kunta PoolingStation

30 1084 D/C MAY-16400

Award placed in Mar'15.Engg. & survey under progress.APR-18LILO of Kanpur - Jhatikara at Aligarh 8785 D/C APR-18765

Commissioned 03/13.DEC-121LILO of Loktak - Imphal at Imphal (New) line 5 5 5 186 D/C MAR-13132

Balance protion of line using under ground cable. Award placed in Sep'13.ROWproblem for laying of cable continue. Critical

SEP-1018LILO of Lonikhand (MSETCL)- Kalwa at Navi Mumbai 25 25 23 1487 D/C DEC-15400

Completion matching with Bagpat S/Stn. (delay in land acquisation). SevereROW problem.

FEB-12124LILO of Meerut - Kaithal at Bagpat 177 175 162 7188 D/C MAR-16400

Commissioned 06/15.MAR-164LILO of Moga - Bhiwani at Hissar line 4 4 4 489 D/C JUN-15400

Trasmission Lines: Page 6 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 7: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Completion uncertain.ROW problem. Critical.Petition filed in Karnataka High Court for now resolved on31.07.13. Work commenced in Jan'14. However work again stopped due toagitation.

JUL-1234LILO of Neelamangla - Hoddy line and LILO ofSomanhally - Hoddy at Yelahanka

25 25 25 2590 D/C DEC-15400

Award under progress.MAY-17LILO of One Ckt of Bamnoli - Jhattikara at Dwarka-I91 D/C MAY-17400

work under progress.APR-16906LILO of Rajarhat - Purnea at Gokarana 1341 633 242 1292 D/C APR-16400

ROW problem. Completion matching with HVDC link.AUG-1352LILO of Ranganadi - Balipara 400KV D/C line atBiswanath Chariyali (Pooling Point)

77 77 75 4693 D/C OCT-15400

Award placed in Mar'15.Engg. & survey under progress.JUL-1734LILO of Sarna - Hiranagar at Samba 8594 S/C JUL-17220

Completion matching with Varansai S/stn.OCT-14237LILO of Sasaram - Allabhadad at Varanasi (Q) 351 342 275 8095 D/C MAR-16400

Completion matching with kishenganj S/S.JAN-138LILO of Siliguri (Existing) - Purnea at Kishanganj 25 25 25 696 D/C NOV-15400

Completion matching with Kishenganj S/S.JAN-1336LILO of Siliguri - Dalkhola line at New Pooling StationKishanganj

69 69 64 2597 D/C NOV-15220

ROW problem. Critical.State Govt. help required for resolution of compensationissue.

DEC-1525LILO of Somanhally - Hoddy line at Yelahanka 25 25 25 2598 D/C JUN-16400

Work under progress.APR-168LILO of Subhashgram - Jeerat at Rajarhat 16 599 S/C APR-16400

Works was held up. Severe ROW problem issue.Now started. Construction of 01LILO deferred.

NOV-1341LILO of Teesta-III - Kishanganj 400 KV D/C (Q) atRangpo (21 D/C+1.5 M/C)

84 11 9 1100 MC+D/C

DEC-15400

LILO of Tilaiya - Balia line at Gaya101 D/C DEC-16765

Investment approval pending.LILO of Vishnu Prayag - Muzaffarnagar at TapovanVishnugarh HEP

102 D/C MAR-15400

Award placed in May'14 LILO only one ckt is to be carried out scheme has beenrevised.

JUN-1648LILO of boht ckt RAPP - Kankroli at Chittorgarh 54103 D/C JUN-16400

Completion matching with Sub station.APR-15172LILO of both ckt of Kolhapur - Mapusa at Kolhapur(new)

120 120 120 80104 D/C OCT-15400

.LILO of one circuit of Dulhasti - Kishenpur at RatleHEP.

105 D/C 400

Line commissioned in Aug'15.NOV-1234LILO of one ckt Rengali - Baripada at Dubri (OPTCL) 48 48 48 32106 D/C AUG-15400

Award placed in Mar'15.Engg. & survey under progress.APR-18160LILO of one ckt of Satna - Gwalior at Orai107 D/C APR-18765

Work under progress.APR-17224Lara STPS - Champa pooling Station line (Q) 307 14108 D/C APR-17400

Work under progress.APR-1736Lara STPS - Raigarh (Kotra) line 50 20 2109 D/C DEC-15400

Trasmission Lines: Page 7 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 8: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Completion uncertain. Works stand still on a/c of localm disturbance /agitationagainst big dam. Generation uncertain.

AUG-13334Lower Subhansiri - Biswanath Chariyali line -I 444 329 228 64110 D/C MAR-16400

Completion uncertaion.Works stand still on a/c of local disturbancec /agitationagainst big dam. Gen. schedule uncertain.

AUG-13340Lower Subhansiri - Biswanath Chariyali line -II 465 327 196 35111 D/C MAR-16400

Work under progress.JUN-16320Lucknow - Kanpur 454 25 3112 D/C JUN-16400

Completion uncertain due to severe ROW problem in Karnataka.Critical.

JUN-14122Madhugiri - Yelhanka 177 131 100113 D/C JUN-16400

Ready for Commissioning 06/15.DEC-1297Mariani (New) - Mokikchung (PG) 163 163 163 97114 D/C JUN-15220

Work under progress.MAY-16386Mauda-II - Betul (Quad) line 537 403 200 35115 D/C MAY-16400

Commissioned 05/15.MAR-15337Meerut - Moga line 922 922 922 337116 S/C MAY-15765

Work slowed down to the extent feasible matching with Generation project.JUL-1556Meja - Allahabad line 81 77 29 5117 D/C JUN-16400

Stage-I forest clearance awaited.package under re-tendering.DEC-1212Melriat (New) - Sihmui line 30 0 0 0118 D/C JUN-16132

Line commissioned in Jul'15.DEC-122Mokokchung (PG) - Mokokchung (Nagaland) line 11 11 11 2119 D/C JUL-15132

Ready for Commissioning 09/15.DEC-07420Mysore - Kozhikode 614 614 614 420120 D/C SEP-15400

Work undee progress.FEB-1733NCC gen Sw Yd. - Nellore PS line (Q) 95 95 79 2121 D/C MAR-16400

Work under progress.MAR-15534Nagapattinam Pooling Station - Salem (NMTCL) 543 386 154 36122 D/C DEC-15765

Completion matching with Kudgi S/stn.APR-15376Narendra (New, Kudgi) - Kolhapur (new) 489 489 489 369123 D/C OCT-15765

Completion matching with Kudgi S/stn. Efforts being made to complete earlier.APR-15354Narendra (New, Kudgi) - Narendra (Existing) 464 464 455 332124 D/C SEP-15400

Line is now proposed to be terminated at Boisor S/Stn in place of Mumbai newloc. Forest clearance awaited.Contigrncy arrangement to connect Navsari-Boisarwith Vapi-Navi Mumbai line by passing forest area to form Vapi-Navsari line (212Ckm) commissioned in Mar'13.FC proposal submitted to MoEF on 28.07.14 (57Hac.)

OCT-12432Navsari - Boisor 575 480 447 287125 D/C MAR-16400

Award placed in Mar'15. Engg. & survey under progress.MAY-1822Nizamabad - Dichpali 55126 D/C MAY-18400

Award placed in Mar'15.Engg. & survey under progress.MAY-1822Nizamabad - Dichpali line 55127 D/C MAY-18400

Award Placed in Mar'15.Engg. & survey under progress.APR-18600Orai - Aligarh 1500128 D/C APR-18765

Award placed in Mar'15.Engg. in progress.APR-1876Orai - Orai (Q) 190129 D/C APR-18400

Commissioning of Kuddus S/S/by MSETCL critical. Completion matchingAUG-1434Padghe (PG) - Kudus line 46 44 42 19130 D/C SEP-16400

Trasmission Lines: Page 8 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 9: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

with Aurangabad-Padghe line.

Completion of Kudus S/S by MSETCL critical.Completion matching Aurangabad- Padghe line.

AUG-1450Padghe (PG) - Padhe (PG) 46 44 42 19131 D/C SEP-16400

Work under progress.JUN-16131Panchkula - Patiala 177 157 62 4132 D/C JUN-16400

Readiness of UP & down stream system being implementated by ArunachalPradesh Govt. Critical for commissioning of line.

DEC-1270Pasighat - Roing line. 346 344 344 100133 S/C onD/C

OCT-15132

Pipalkoti HEP - Pipalkoti (THDC) (Kuwari Pass)134 D/C 400

Gen. expected beyound 2017-18. Wild life sanctuary involved. Case underprocess at NBWL.

JAN-15128Punatsangchu-I - Alipurduar 174 152 135 24135 D/C DEC-16400

Forest clearance for Bundi & Kota Div. are awaited.77nos. location are in forest.Critical

MAR-15104RAPP - Kota line 130 40 16136 D/C DEC-16400

Commissioned 05/15.MAY-1496Raigarh Pooling Station (Near Kotra) - ChampaPooling Station line

247 247 247 96137 S/C MAY-15765

Stage-I Forest clearance (295 Ha)received in Jun'15. Permission to workobtained in July 15.

JAN-15713Raipur Pooling station - Wardha line -II 961 715 525 184138 D/C JUN-16765

Permission to work in forest received in May'15.AUG-14341Ranchi (New) - Dharamjaygarh /Near Korba 921 914 911 330139 S/C OCT-15765

Testing under progress. Completion matching with Jharkhand Pool & JharkhandPool bey at line.

NOV-13136Ranchi - Jharkhand Pool line (Quad) 195 195 195 138140 D/C DEC-15400

Commissioned 05/15.NOV-1354Rangpo - New Melli line (Twin Moose) (20.5 D/C & 1.5M/C)

115 115 115 54141 MC+D/C

MAY-15220

Ready for Commissioning in 08/15.NOV-1231Rihand - Vindhyachal Pooling Station (2nd Ckt) 91 91 91 31142 D/C AUG-15765

Progress affected due to severe ROW problem.CriticalAPR-1260Roing - Tezu line 244 196 157 31143 S/C onD/C

MAR-16132

ROW problem in western UP.APR-1376Roorkee - Saharanpur line (Quad) 100 98 98 53144 D/C DEC-15400

Severe ROW being faced in Karnataka.Critical.SEP-14244Salem Pooling Station - Madhugiri Pooling Station line 645 596 482 85145 S/C DEC-15765

Ready for commissioning 08/15.SEP-14120Salem Pooling Station - Salem 165 165 165 120146 D/C AUG-15400

Commissioned 04/15.APR-156Sasan - Vindhyachal (PS) 18 18 18 6147 S/C APR-15765

MAY-154Sasaram - Allahabad line 11 11 10 5148 D/C DEC-15400

Completion matching with Daltanganj S/S delayed due to non-availibility of S/Sland (land acquired in May'15).

NOV-12392Sasaram - Deltonganj line 523 508 460 284149 D/C DEC-16400

Trasmission Lines: Page 9 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 10: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Award placed in May'15.MAR-1722Sholapur STPP - Sholapur line - II 35150 D/C MAR-17400

Ready for commissioning 04/15.OCT-1522Sholapur STPP - Sholapur line-I 35 35 35 22151 D/C APR-15400

Contract reviewed through assignement to JV partner.AUG-12336Sikar - Jaipur line 480 461 425 185152 D/C MAR-16400

Line test charged in Jun'12.50Silchar - Hailakandi (Contingency arrangement) 65 65 65 39153 D/C JUN-12132

Major portion of line in forest. severe ROW in vicinity of Aizwl town due to stiffresistance from influential local owner. package under re-tendering.

DEC-12286Silchar - Melriat (New) line (charged at 132KV) 436 366 211 101154 D/C JUN-16400

Commissioned 07/15.DEC-12254Silchar - Purba Kanchan Bari line (charged at 132KV) 373 373 373 254155 D/C JUL-15400

SEP-13Siliguri - Purnea156 D/C SEP-15400

Work under progress.JUN-16170Singrauli - Allahabad line 422 148 31157 D/C JUN-16400

Work under progress.AUG-16668Srikakulam PP - Vemagiri - II Pooling Station (VizagTCL)

877 691 372 40158 D/C AUG-16765

Stage - I forest clearance awaited (99 Ha.).1 package under re-tended &awarded in Jun'15. Completion matching with Srikakulam - Vimagiri beingexecuted under TBCB route (sch. Aug'16).

JUN-15552Srikakulam Pooling Station - Angul line 726 56 376 116159 D/C AUG-16765

Efforts being made to complete by Dec'15.46Suraj mani nagar - North Comilla (Indian portion) 63 22160 D/C MAR-16400

Investment approval pending.Tapovan Vishnugadh - Kunwari Pass161 D/C MAR-17400

Award placed in Feb'15.NOV-1718Tehri Gen. - Tehri Pooling Station (Q)162 D/C NOV-17400

16Tehri PSP - Tehri Pooling Station163 S/C 400

Award placed in Feb'15. Engg in progress.NOV-174Tehri Pooling Station - Meerut164 D/C NOV-17765

Progress affecetd due to severe ROW problem.DEC-1290Tezu - Namsai line. 332 213 153 32165 S/C onD/C

MAR-16132

Contractual issue.SEP-14739Tuticorin Pooling Station - Salem Pooling Station 1000 992 579 110166 D/C JUN-16765

SEP-1660Unchahar - Fatehpur167 D/C 400

Due to severe ROW problem at Novi Mumbai end, line was decided to beterminatedat Kudus S/stn.of MSETCL.

236Vapi (PG) - Kala - Kudus 346 205 185 90168 D/C JUN-16400

Due to severe ROW portion at Navi-Mumbai end,Line now decided to theterminated at Kudus S/stn. of MSETCL. Contigency arrangement to connectVapi-Navi Mumbai with Navsari-Boisar line by passing ROW area to form Vapi-Navsari line (24 Ckm) commissioned in Mar'13.40KV D/C

SEP-10258Vapi (PG) - Navi Mumbai 346 205 185 90169 D/C JUN-16400

Trasmission Lines: Page 10 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 11: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Vapi-Kala portion (61 Ckm0 commissioned in Mar'14. Balance matching withreadiness of Kudus S/S by MSETCL.Severe ROW problem being faced in Maharastra & DNH on almost all locations.* Completion uncertain.

258Vapi-Boisar 388 149 99 27170 D/C 400

Completion matching with Varansai sub station critical. Balance land for varansaiGIS acquired in Jun'14.

OCT-14652Varanasi - Kanpur 885 882 735 366171 D/C MAR-16765

Commissioned 07/15.NOV-14661Vijayawada - Nellore line 887 887 887 661172 D/C JUL-15400

Commissioned 08/15.271Vindhyachal Pooling Station - Satna Ckt-II 586 586 586 271173 S/C AUG-15765

Contract terminated 01 out of 02 nos due to unsatisfactory performanc and freshtender being taken up.The pkg. has been bifurcated into two pkgs.. 01 pkg.award in Dec'14 & 2nd pkg. awarded in Feb'15.Remaning 01 pkg. alsoterminated in Aug'15due to poor performance & fresh tender is being taken up.

OCT-12700Wardha - Aurangabad (on 1200 kV) 961 856 618 150174 D/C DEC-161200

Work under progress.MAY-181032Wardha - Hyderabad 1474 130 5175 D/C MAY-18765

Work under progress.MAY-181032Wardha - Hyderabad line 1474 130 5176 D/C MAY-18765

Trasmission Lines: Page 11 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 12: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

ASSAM ELECTRICITY GRID CORP. LIMITED (AEGCL)

completed/ Ready to be charged.NOV-1323Agia - Matia (Dudhnoi) line 87 87 87 231 S/C onD/C

MAY-15132

Frequent Bandhs in BTAD area, forest clearance received, RoW at Loc 21,22 inforest area etc. are making the project slipped.

DEC-1310BTPS - Kokrajhar line 39 37 28 52 S/C onD/C

JAN-16132

1. Delay due to re alignment of line such as proposed airport at BTAD area, 800kV line of PGCIL, ROW, Local Problem etc. are attributing to the delay. Nowthere is almost settlement of RoW and compensation related issues, the Erectionwork is going on smoothly. How ever in Mushalpur areas (Baksa) District therehas been serious law and order issues and construction work is carried out bydeploying Security personnel.

JAN-13327Bongaigaon TPS - Rangia (Salakati) 517 491 452 773 D/C JUN-16220

Work in progress. Clearance and RoWSEP-1363Kokrajhar - Bilashipara - Gauripur 203 199 121 224 S/C onD/C

FEB-16132

Check survey done. Profile drawing approved.DEC-115Kukurmara - Azara line 24 0 05 S/C onD/C

MAR-16132

Project has been abandoned25Kukurmara - Boko line 162 0 0 06 S/C onD/C

DEC-14132

Commissioned 08/15.JAN-132LILO of One Ckt Langpi - Sarusajai at Sonapur 1 1 1 27 D/C AUG-15220

Completed on 06.07.2015.NOV-1310LILO of Jorhat - Bokakhat at Jorhat (West) S/S 9 9 9 38 D/C AUG-15132

completed 13.07.2015.NOV-134LILO of Namrup - Tinsukia at Bordubi S/S 9 9 8 59 D/C MAY-15132

in progress.DEC-1314LILO of both ckt of Balipara (PG) Samaguri at Sonabil 6 6 5 210 2xD/C JUN-16220

in progress.NOV-135LILO of both ckt of Depota - Gohapur at Sonabil S/S 6 6 6 111 2xD/C JUN-16132

RoW & Water logging problems adversely affected erection work.DEC-1355LILO of one ckt Samaguri - Sarusajai line at SonapurS/S

41 31 0 012 D/C JUN-16220

commissioned on July 2015.JAN-1359LILO of one ckt of Tinsukia - Margherita at Rupai(Doomdooma) S/S

109 109 109 5913 D/C JUN-16132

Railway Crossing & Gantry is not ready at Namrup GSS.DEC-13141Namrup - Mariani 448 448 448 14514 S/C onD/C

JUN-16220

Trasmission Lines: Page 12 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 13: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

completed.34Nazira - Mariani (Garmur) line 237 237 137 6915 S/C APR-13132

Completed/ Charged on 04.12.2015.NOV-1361Samaguri - Lanka line (2nd Ckt) 205 205 205 6116 S/C JUN-16132

completed in Dec' 2013.JAN-1342Samaguri - Nagaon line 142 142 142 4217 S/C onD/C

DEC-13132

In progress Railway crossing/ ROW/ compensation issue..NOV-1328Sonapur - Chandrapur line 51 39 11 018 D/C JUN-16132

In progress (compensation issue)..NOV-1352Sonapur - Jagirod line 86 40 25 019 D/C JUN-16132

Trasmission Lines: Page 13 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 14: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

BEAS VALLEY POWER CORPORATION LIMITED (BVPCL)

.Uhl-III - Hamir Pur1 S/C onD/C

132

Trasmission Lines: Page 14 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 15: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

BIHAR STATE ELECTRICITY BOARD (BSEB)

Work yet to start.JUN-16200Barauni TPS Exte. - Hazipur 350 0 0 01 D/C JUN-16220

SEP-03366Begusarai-Purnea 564 551 172 162 D/C DEC-14220

No Progress.JUL-1534Bihta (New) - Bihta3 D/C 220

108Bihta - Sipara4 D/C SEP-15220

MAR-1620Darbhanga - Darbhanga 16 3 0 05 D/C MAR-16220

DEC-15200Darbhanga - Motipur 397 230 86 06 D/C DEC-15220

MAR-1650Darbhanga - Samastipur (New) 178 4 0 07 D/C MAR-16220

JUN-16190Darbhanga - Supaul/Lokhi 326 0 0 08 D/C JUN-16220

118Gaurichak - Bihta (New) 207 89 81 119 D/C 220

JAN-16200Gaya (PG) - Sonenagar (New) 299 252 188 010 D/C JAN-16220

Severe ROW issues.101Kanti - Gopalganj (2nd Ckt.)11 S/C MAR-16220

Detailed survey of APO to AP 18 done, rest under progress.JUN-16250Kishanganj (New) - Madhepura12 D/C JUN-15220

FEB-1516Kishanganj (PG) - Kishanganj (New) 29 0 0 013 D/C FEB-16220

Likely to start soon.MAY-154LILO of 2nd ckt Pusouli (PG) - Ara (PG) at Pusouli(New).

14 D/C 220

JAN-1660LILO of Begusarai - Kanti at Samastipur 53 6 0 015 D/C JAN-16220

work yet to be awardedLILO of Both Ckt of Purnea - Begusarai at BTPS Extn16 D/C 220

4LILO of Both ckt of Biharsharif - Begusarai at BTPSExtn.

9 5 2 017 D/C AUG-15220

DEC-15140LILO of Darbhanga - Kanti at Motipur 251 197 142 018 D/C DEC-15220

MAR-1684LILO of Darbhanga - Kanti at Musahari 166 7 0 019 D/C JUN-16220

Ready for Commissioning 08/15.MAY-155LILO of Pusouli (PG) - Ara (PG) at Pusouli (New) 19 19 19 520 D/C AUG-15220

Detailed survey of APO to AP 14 done, rest under progress.150Madhepura - Lokhi21 D/C AUG-16220

Not yet decided due to incorporation of Multi-Ckt. Towers in the scope of work.1Patna (PG) - Gourichak22 D/C AUG-15220

MAY-1562Pusouli (New) - Dehri 199 125 23 523 D/C 220

Trasmission Lines: Page 15 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 16: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

CHHATTISGARH STATE POWER TRANSMISSION CO. LTD. (CSPTCL)

Work is under progress.FEB-11189Chhur - Mopka (bilaspur) 345 345 345 1891 D/C AUG-15220

Work is under progress.JUN-15155Korba (E) - Vishrampur (2nd Ckt.) 482 D/C MAR-16220

Commissioned 05/15.MAR-13116LILO of One ckt of Korba (W) - Khedamara at Marwa 161 161 161 1163 D/C MAY-15400

Commissioned 04/15.JUL-1430LILO of Korba - Vishrampur at Churri 30 30 30 304 D/C APR-15220

Commissioned 08/15.FEB-1418LILO of Raigarh - Budipadar line at Raigarh (PG) 46 46 46 185 D/C AUG-15220

Work is under progress. 2nd Phase forest clearance obtained. Compliance ofAvifauna as per forest office letter no. 1085 dtd. 01.05.2015 is under process.Work in forest is under progress.

MAY-14658Raita - Jagadalpur 901 834 788 3936 D/C MAR-16400

Trasmission Lines: Page 16 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 17: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

DELHI TRANSCO LIMITED (DTL)

Case for extension of time upto 28.02.15 was processed and approval of same isawaited.

12Bawana-Rohini -II (Sec -29) 38 30 19 01 D/C MAR-15220

180Harsh Vihar - Patparganj line2 D/C 220

Commissioned 07/15.11LILO of Kanjhawala - Najafgarh at Mundka 400 kV S/S 35 35 35 113 D/C JUL-15220

Commissioned 04/15.MAY-1126Mundka -Peeragarhi U/G 200 mm, 250 MW 264 D/C APR-15220

.Cable laid in 13 Sections out of 19 Sections. 42 Joints made out of 108 Joints.

.Delay in RBI permission to M/s TBEA to open INR account in India received inNov,13..ROW charges amounting to Rs. 7.6 Crore deposited to Railways . Thepermission is expected within a week.Work has been stopped by TBEA and their sub-contractor for approx. last 4months on account of pending INR payments. Finance deptt. is not releasingpayments amounting to Rs. 2.7 Crore citing WCT/Taxation issues.

17Peeragarhi-Wazirpur U/G 1000 mm, 200 MW5 D/C MAR-15220

Trasmission Lines: Page 17 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 18: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

DEPARTMENT OF POWER ARUNACHAL PRADESH ()

.LILO of Ranganadi - Nirjuli at Pare HEP1 D/C 132

Trasmission Lines: Page 18 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 19: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

GOA ELECTRICITY DEPARTMENT (ED- GOA)

Under planning Stage.30Colvale-Cuncolim1 D/C APR-17220

Administration and expenditure approval has been accorded and placing ofaward likely by March 2015.

90Ponda - Verna 0 0 02 D/C APR-17220

Trasmission Lines: Page 19 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 20: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

GUJARAT ENERGY TRANSMISSION CORP. LIMITED (GETCO)

Line dropped as scheme changed110Amerli-Jasdan 0 0 01 D/C MAR-16220

W I P / Severe RoW problems470Amreli - Kasor line 676 584 471 02 D/C MAR-16400

WIP188BECL (Padva) - Botad line 292 138 87 03 D/C MAR-16220

Yet to award.340Bhachau - Radhanpur 0 0 04 D/C JUN-15220

W I P / Severe RoW problems238Bhatiya-Kalwad line 373 101 59 05 D/C APR-14220

Yet to award240Bhogat-Kalavad 0 0 06 D/C MAR-16400

199Chanranka - Veloda 275 217 192 537 D/C MAR-16400

Ready for Commissioning 06/15.193Charanka - Jangral 302 302 302 1938 D/C JUN-15220

Line test charged on 01.06.2015 from Jangral to AP-13.191Charanka - Langral 302 302 302 1939 D/C JUN-15220

Yet to award200Chhara -Keshod 0 0 010 D/C MAR-17400

Yet to award40Chhatral - Dhanaj 0 0 011 D/C MAR-16220

Yet to award170Chikhli - Bhilad 0 0 012 D/C MAR-17220

WIP160Chorania - Botad 196 36 0 013 D/C OCT-15220

Yet to award71Choraniya - Viramgam 0 0 014 D/C MAR-15220

Yet to award120Fedra - Botad 0 0 015 D/C MAR-15220

Severe ROW Problem.MAR-1294GPPC (Pipavav)- Dhokadva 152 152 152 7016 D/C OCT-15220

wip194Gavasad - Salejada line 313 245 96 017 D/C MAR-16220

Yet to award50Hadala - Rajkot-II 0 0 018 D/C MAR-15220

Yet to award60Halvad - Charadva 0 0 019 D/C MAR-17220

W I P / Severe RoW problems76Halvad-Sadla 124 97 87 3120 D/C DEC-15220

W I P/Row problems111Hazaira (GSEC) - Mota 182 107 94 2021 D/C MAR-16220

Yet to award100Jasdan - Gondal 0 0 022 D/C MAR-17220

W I P / Severe RoW problems112Kalawad-Kangasiyali 191 154 129 5623 D/C DEC-15220

Trasmission Lines: Page 20 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 21: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

WIP37Kasor - Herang 73 71 71 3824 D/C OCT-15400

Yet to award10Keshod - Keshod 0 0 025 D/C MAR-15220

Yet to award140Keshod - Timbdi 0 0 026 D/C MAR-16220

Yet toaward120Keshod - Visavadar 0 0 027 D/C MAR-15220

Yet to award140Kosamba- Achhalia 0 0 028 D/C MAR-17400

Yet to award80LILO of SSP- Asoj & SSP -Kasor lines at AchhaliaS/S

0 0 029 D/C MAR-16400

Commissioned 04/15.15LILO of Asoj - Karamsad at Mogar S/S 1530 D/C APR-15220

Yet to award40LILO of Bhatia - Kalav ad - Kangasiyali at Khambhalia 0 0 031 D/C MAR-15220

Yet to award50LILO of Chorania - Gondal at Rajkot-II 0 0 032 D/C MAR-15220

Yet to award40LILO of Chorania - Gondal at Shapar 0 0 033 D/C MAR-17220

WIP100LILO of Essar-Hadala line at Kalavad S/S 695 26 1 034 D/C MAR-16400

5LILO of Godhra -Kadana line at Lunawada35 D/C MAR-15220

Yet to award50LILO of Hadala - Sartanpar - Halvad at Tankara 0 0 036 D/C MAR-17220

Yet to award2LILO of Jambuva - Karamsad at Asodar 0 0 037 D/C MAR-17220

Yet to be awarded.116LILO of Jamnagar - Jetpur line-I at Sikka 178 0 0 038 D/C APR-15220

WIP120LILO of Jamnagar - Jetpur line-II at Sikka 187 112 83 039 D/C APR-15220

yet to award10LILO of Jetpur - Rajkot at Metoda 0 0 040 D/C MAR-15220

Commissioned 08/15.33LILO of Kangasiyali - Nyara at Hadala 69 69 69 3341 D/C AUG-15220

AT given on 10.07.1520LILO of Karamsad - Vartej at Fedra 33 0 0 042 D/C MAR-16220

Work in Progress.60LILO of Karmsad -Vartej at Dhuvaran 152 143 94 1843 D/C DEC-15220

AT given on 10.07.201520LILO of Kasor - Vertej at Fedra 33 0 0 044 D/C MAR-16220

80LILO of Kasor-Amerli line at Fedra45 D/C MAR-16400

WIP82LILO of Kasor-Boated at Dhuvaran CCPP-III 148 145 144 5846 D/C DEC-15220

Yet to award24LILO of Morbi - Hadala at Tankara 0 0 047 D/C MAR-16220

Trasmission Lines: Page 21 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 22: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

WIP200LILO of Mundra (Adani)- Zerda line at Sankhari 45 0 0 048 D/C MAR-16400

W I P / Severe RoW problems89LILO of Mundra - Hadala at Halvad. 126 124 67 049 D/C APR-16400

17LILO of Navsari - Vav at Popada50 D/C 220

Yet to awardLILO of Navsari-Talangpore line at Utran 0 0 051 D/C APR-15220

Yet to award50LILO of Radhanpur - Mehsana at Sankhari 0 0 052 D/C MAR-15220

Yet to award1LILO of Ranasan - Karamsad at Gatrad 0 0 053 D/C MAR-16220

Yet to award10LILO of Salejada - Bhat at Kerala 0 0 054 D/C MAR-16220

WIP50LILO of Sankhari - Jangral at Sankhar 53 42 2 055 D/C MAR-16220

Yet to award50LILO of Savarkundla - Visavadar at Bagasara 0 0 056 D/C MAR-15220

Sever ROW problem. Tender reinvited for remaining portionAPR-0934LILO of Shivalkha - Nanikhakhar at Kukma 54 40 40 1857 D/C APR-15220

Commissioned 04/15.56LILO of Shivlakha - Deodhar line at PS-2 5658 D/C APR-15220

Yet to award10LILO of Tappar - Hadala at Navlakhi 0 0 059 D/C MAR-17220

Yet to award20LILO of Ukat (Th) - Achhalia at Achhalia 0 0 060 D/C MAR-15220

WIP100LILO of Vadavi-Zerda at Sankhari 45 461 D/C DEC-15400

Yet to award28LILO of Wanakbori -Soja line at Dehgam (PG) S/S 0 0 062 D/C MAR-16400

Ready for Commissioning 08/15.2LILO of one ckt Halvad - Morbi line to Bhimasar (PG)at Charadava S/S

5 5 5 263 D/C AUG-15220

Yet to award80LILO of one ckt Kosamba-Chorania line at Fedra 0 0 064 D/C MAR-16400

Yet to award80LILO of one ckt Wanakbori -Soja line at Prantji S/S 0 0 065 D/C MAR-17400

28LILO of one ckt of Wanakbori - Asoj at Vyankatpura(Jarod)

66 D/C 220

WIP/Severe RoW Issue664Mundra (Adani) - Zerda line 1 997 453 275 067 D/C JUN-16400

WLine terminated at 400kV Varsana S/s (2x80.26kM) on 31.03.2015 under stopgap arrangement. W I P (Severe RoW problems)

664Mundra (Adani) - Zerda line 2 956 956 950 59568 D/C DEC-15400

Yet to award290Nanikhakhar - Varsana - Chitrod 0 0 069 D/C MAR-16220

yet to award90Palitana - Talaja 0 0 070 D/C MAR-15220

Yet to award150Pipavav-Amreli 0 0 071 D/C MAR-17400

Trasmission Lines: Page 22 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 23: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Yet to award50Pirana (PG) - Gatrad 0 0 072 D/C MAR-17220

WIP218Pooling station -Sankhari 275 217 192 5373 D/C MAR-16400

Yet to award60Prantij - Agiyol 0 0 074 D/C MAR-16220

Yet to award70Prantij - Dhansura 0 0 075 D/C MAR-16220

Commissioned 06/15.JUL-1322SSNNL PS-I - PS-2 (ACSR Zebra conductor) 38 38 38 2276 D/C JUN-15220

Will be in line with generation project which is delayed350Salaya (EPGCL generating station )-Halvad 0 0 077 D/C MAR-18400

Yet to award200Sankhari-Prantij 0 0 078 D/C MAR-17400

Generation project is delayed so this evacuation line will be in line with thegeneration project

220Shapoorji Pallonji generating station 0 0 079 D/C MAR-16400

Commissioned 08/15.157Sikka - Moti Paneli line 259 259 259 15780 D/C AUG-15220

Yet to award280Soja-Zerda 0 0 081 D/C MAR-16400

Yet to award140Suva - Achhalia 0 0 082 D/C MAR-15220

Yet to award90Termination of GPEC - Haldarva at Achhalia 0 0 083 D/C MAR-16220

WIP60Termination of one Achhalia- Jambuva line at Jarod 125 88 7084 D/C MAR-16220

DEC-0986Utran - Kosamba Line-II85 D/C 220

WIP13Vadavi - Chhatral 88 39 32 086 D/C MAR-16220

Yet to award38Vadavi - Dhanaj 0 0 087 D/C MAR-16220

Yet to award53Vadavi - Viramgam 0 0 088 D/C MAR-14220

WIP240Vadavi-Halvad 394 127 87 089 D/C DEC-15400

W I PNOV-09239Vadinar(Essar)- Amreli (Balance) 365 309 256 11390 D/C JUN-15400

WIP (For stop gap arrangement, 220 KV Nakhatrana-Akrimota S/C line madeLILO to Jamanwada on date 29.03.2012

346Varsana - Jamanwada line 565 565 561 33291 D/C AUG-15220

W I P,Severe RoW Issue110Varsana - Mokha 230 230 225 9792 D/C DEC-15220

Yet to award60Varsana-Bhachau 0 0 093 D/C APR-16220

WIP220Varsana-halvad 378 110 38 094 D/C MAY-16400

WIP120Visavadar - Timbdi 295 268 251 6495 D/C MAR-16220

Yet to award2Wanakbori S/y -Wanakbori S/y (existing) 0 0 096 D/C APR-16400

Trasmission Lines: Page 23 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 24: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Yet to award200Wanakbori TPS-Soja 0 0 0 097 D/C JUN-15400

Trasmission Lines: Page 24 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 25: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

HARYANA VIDYUT PRASARAN NIGAM LIMITED (HVPNL)

Line almost completed. only stringing pending between tower location no. 46 to48 as the matter pending in Lok Adalat, Faridabad. Forest clearance receivedfrom MoEF, Lucknow.Nomenclature of line has changed as A-5 to A-4,Faridabad line.

15A5(Faridabad) - A4(Faridabad) 33 33 33 151 D/C SEP-15220

Work awarded to Inabensa Bharat Ltd. Contractual problem.Court case.15Bhiwani - Bhiwani 0 0 0 02 D/C 220

Work awarded to Inabensa Bharat Ltd. Contractual problem.Court case.65Bhiwani - Isharwal 218 61 0 03 D/C MAR-16220

Work under progress.5Deepalpur - Sonepat 27 15 7 04 D/C DEC-15220

Due to dismal progress of contractor the firm has been blacklisted. The work wasre-awarded in January 2015 with schedule completion period of one year.Thenomenclature of work is Const. of multi-circuit line emanting from 400 kV Substation Deepalpur -RGEC enrouting 220 kV HSIIDC Rai & 132 kV HSIIDC Rai,Khewra.(RS Infra)

MAY-1342Deepalpur-Sonepat HSIIDC Rai 113 96 13 05 M/C JAN-16220

Commissioned 04/15.1Gurgaon Sector 72 (PGCIL) - Gurgaon Sector 72(HVPNL)

16 D/C APR-15220

Commissioned 04/15.7Gurgaon Sector 72 (PGCIL) - Gurgaon Sector 33(HVPNL)

19 19 19 77 D/C APR-15220

Commissioned 09/15.APR-11146Gurgaon Sector 72 - Nuh - Rangla Raipur (Ckt-I & II) 318 318 318 1468 D/C SEP-15220

Commissioned 04/15.3LILO of Badshahpur - Bhiwadi - Mau line atPanchgaon

39 D/C APR-15220

Due to dismal progress of contractor the firm was blacklisted. Contract forbalance work has been re-awarded. Work under progress.work awarded to m/sIsolex. Work is held up due to financial constraints at firm's end.

JUL-1384LILO of Chormar - Fathebad line at Hukmawali 165 132 16 010 D/C DEC-15220

Work is to be re-awarded as the contractor to whom the work was awarded hasbeen blacklisted

5LILO of Madnpur - Kunihar line at Panchkula sector-3211 D/C JUN-16220

Ready for Commissioning 08/15.JAN-112LILO of Moga-Hisar line at RGTPS Khedar 212 D/C AUG-15400

Work awarded to Inabensa Bharat Ltd. Contractual problem.Court case.44LILO of Narwana - Mund at Khatkar (Jind) 0 0 0 013 2xD/C MAR-16220

work under progressJUL-1380LILO of both Ckt of Cheeka - Durala at Sonta 128 102 56 014 D/C NOV-15220

Work yet to be award.1LILO of gurgaon Sec -72 - Sector 52 (A) at Sector 5715 D/C SEP-15220

Commissioned 05/15.91Masudpur-Samain line 182 182 182 9116 D/C MAY-15220

Commissioned 07/15.37Mau - Balwal 64 64 64 3717 D/C JUL-15220

Trasmission Lines: Page 25 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 26: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Work in progress.52Palwal (Meghpur) - Meerpur Kurali 106 106 106 5318 D/C SEP-15220

The contractor has been blacklisted. Work is yet to be re-awarded.15Panchkula (PGCIL)- Panchkula Sector 3219 D/C AUG-16220

Trasmission Lines: Page 26 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 27: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

HIMACHAL PRADESH POWER TRANSMISSION CORP. LTD. (HPPTCL)

Delay FAC approval.MAR-17100Barsaini -Banala1 D/C MAR-17220

MAR-18110Dehan-Hamirpur2 D/C MAR-17220

Delay FAC approval.MAR-1754Hatkoti-Pragati Nagar3 D/C MAR-16220

OCT-154Kairan-Chamera II (PG) 20 11 7 04 D/C OCT-15220

out of 2 ckt, one ckt completed and charged on 7/2011.OCT-1578Kashang - Bhaba 100 100 100 625 D/C OCT-15220

Jhangi Pooling Station yet to be awarded.Kashang - Jangi Pooling Station6 D/C 220

Delay FCA approval.35Koti-Karian7 S/C MAR-17220

.6LILO Jhakri A/Pur8 D/C MAR-14400

8LILO of Nalagarh-Baddi at Mandhala S/S9 D/C SEP-14220

Commissioned 07/15.13LILO of AD Hydro-Nalagarh at Fozal 24 24 24 1310 D/C JUL-15220

Work yet to startLILO of Kasang - Bhbaba at Tidong-I11 D/C DEC-16220

Yet to award.LILO of Parbati III - Parbati Pooling station at Sainj12 D/C APR-14400

Delay FAC approval pending for the lest three year. Stage -I clearance in July2015.

MAR-17LILO of one ckt of Nathpa Jhakri - Abdullapur at SwaraKuddu

13 D/C JUL-16400

Delay FCA approval.OCT-163Lahal -Budhil HEP14 D/C SEP-16220

Delay FCA approval.OCT-1872Lahal-Chamera15 D/C MAR-17400

.33Nalagarh -Kunihar16 S/C APR-14400

28Rauri-Kunihar17 D/C APR-14220

MAR-1724Snail -Hatkoti (Swara Kudu)18 D/C MAR-16220

Delay FCA approval.MAR-1754Sunda-Hatkoti19 D/C DEC-16220

Trasmission Lines: Page 27 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 28: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

J&K POWER DEVELOPMENT DEPARTMENT (JKPDD)

Commissioned.31Alachi - Khalsi S/S 140 140 140 311 S/C JUN-1466

Commissioned.5Chutak HEP-Gramthong -II 29 29 29 52 S/C SEP-1266

Commissioned.10Chutak HEP-Kargil-I 55 55 55 103 S/C OCT-1266

Fund yet to be tied up.80Delina - Wahipora-Kishanganga4 D/C 220

Rerouting of line and ganglas s/s droped. Leh Army S/S shall be connected withLeh S/S.

9Ganglas - Leh Army base 46 22 0 05 S/C SEP-1566

Commissioned.27Gramthong -II - Sankoo 154 154 154 276 S/C SEP-1466

Commissioned23Khangral - Mulbek -II 117 117 117 237 S/C SEP-1466

Slow progress.51Kharu S/S - Himya S/S 242 239 204 368 S/C SEP-1466

Fund yet to be tied up.12LILO of Wagoora - Mirbazar at Lassipora9 D/C 220

Work yet to start.LILO of one ckt of Kishanpur - New wanpoh atBaglihar HEP

10 D/C DEC-15400

Commissioned.25Leh (C.P.) - Kharu S/S 107 107 107 2511 S/C SEP-1466

Rerouting of line and ganglas s/s droped. Leh Army S/S shall be connected withLeh S/S.

10Leh III - Ganglas 53 29 8 212 S/C SEP-1566

Commissioned.28Mulbek-II - Kargil -I 124 124 124 2813 S/C SEP-1466

Stringing completed.The line could not be charged due to dipute betweenPSTCL and JKPDD on sharing of cost of bay at Shahpur Khadi.

MAR-0840Thein (RSD)-Hiranagar (2nd ckt) 117 117 117 4014 S/C SEP-14220

Severe RoW and Court case.APR-0848Udhampur- Gladni 165 165 165 4815 S/C SEP-14220

ROW issue at Dangarpora.Original Project provision exhausted.MAR-0960Wagoora-Budgam- Zainkote 118 103 82 1716 D/C SEP-14220

ROW issues and slow pace of execution of work by contractor due to paddycultivation.

104Wagoora-Mirbazar 177 175 170 4917 D/C SEP-14220

Slow pace of execution of work in Zainkote-Alusteng section. Original Projectcost provision exhausted, For Alusteng - Miarbazar section contract case sent toGovt for approval.

MAR-10254Zainkote-Alusteng-Mirbazar 441 410 68 018 D/C SEP-14220

Trasmission Lines: Page 28 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 29: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

JHARKHAND STATE ELECTRICITY BOARD (JSEB)

Due to poor progress of working agency, the work order is cancelled.APR-0980Chaibasa -Ramchandrapur 130 109 88 181 D/C MAR-16220

Delay due to Forest Clearance, Coal Block of TUBED coal mines undertransmission corridor, ROW, non-availability of fund.

208Chatra - Latehar 320 187 82 02 D/C AUG-15220

Delay due to Forest Clearance, ROW, non- availability of fund.114Chatra - PBCMP (Barkagaon) 171 34 10 03 D/C AUG-15220

Delay due to Coal Block of Usha Martin under transmission corridor, ROW, non -availability of fund.

66Daltonganj - Garhwa 111 24 0 04 D/C MAR-15220

160Dumka - Jasidih5 D/C SEP-16220

Ready for commissioning 06/15.147Dumka - Rupnarayanpur 242 242 242 1476 D/C JUN-15220

82Essar (Latehar) - Latehar 114 98 79 217 D/C DEC-15400

ROW problems.204Govindpur - Dumka 330 266 192 08 D/C APR-16220

Critical ROW.66Hatia - Namkum (PGCIL) 125 51 39 09 D/C MAR-16220

180Jasidih - Giridih10 D/C SEP-16220

70LILO of one ckt TTPS - Govindpur at Phase-III11 D/C SEP-16220

Latehar & PTPS end S/S not finalized and forest clearance in process.218Latehar (JSEB) - PTPS 305 251 216 5412 D/C DEC-15400

PTPS end S/S not finalized and forest clearance in process.100PTPS - Bero (New Ranchi) 139 129 125 7013 D/C APR-15400

180TTPS - Govindpur 282 117 69 014 D/C MAR-16120

Trasmission Lines: Page 29 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 30: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

KARNATAKA POWER TRANSMISSION CORP. LIMITED (KPTCL)

Tender invited on 7.3.2015. Detailed survey under progress.Bellary (PS) - C.N. Hally1 D/C MAR-17400

Work under progress.437Bellary (PS) - New Madhugiri (near Tumakur) 498 313 251 512 D/C DEC-16400

LOI issued on 25-Aug-15.5Bellary (TPS) - Bellary (PS)3 D/C AUG-16400

Work short closed.SEP-0670Chikkodi-Kudachi 120 120 90 404 D/C JUN-15220

21/21 sections laid. 20/20 joints completed. Cable testing to be taken up by theagency for which opening of link boxes is required. BBMP has given permissionto open link boxes. Balance Works:1. OFC cable to be laid in 11 th section (approx 510 Mtrs).2. Jointing and termination of OFC cable.3. Fixing of balance link box at JB-1.4. Testing and commissioning of cable.

11HSR Layout - Nimhans S/S 0 0 0 95 UGCable

SEP-15220

Work under progress.65Ittagi - Kudligi line 119 59 49 06 D/C DEC-15220

Tender invited on 28.4.2015.20JSW TPS - Bellary (PS)7 D/C MAR-16400

Work under progress.8LILO of Arasikere -Kanthenahalli at Arasikere S/S 21 21 19 108 D/C NOV-15220

Detailed survey under progress.LILO of Both ckt of Nelamangala - Talaguppa at CNHalli

9 D/C DEC-16400

Work short closed vide O.M No. CEE/TZ/GLB/SEE(O)/AEE-3/2014-15/3830.37dtd 12.09.2014 of Chief Engineer, Elec, Transmission zone, Gulbarga . To beretendered.

1LILO of Gadag - Lingapur at Koppal 2 110 D/C MAR-15220

Work under progress.(1) ROW problems at corridor between 4 & 5 pending inJMFC, Hoskote, Additional Civil Judge(Junior division) since 9.12.10.(2)Loc 4 & 5: Case filed by party at High court vide Writ Petition: 46532-533/2012 dtd: 19.11.2012 seeking injunction.(3) Loc 4 : The petitioner has obtained stay order vide WP 32606-32607/2013from the Hon'ble High Court against the proceedings in the OS No: 253/2010 on02.09.13.(4) Loc 36 : Case No: MAG(CR)/1/13-14 at DC Court, B'lore Rural. Posted forOrders. Being pursued.

SEP-0726LILO of Hoody-Kolar at Hoskote 55 35 31 011 D/C MAR-16220

Commissioned 06/15.33LILO of RTPS - Btps at YTPS 43 43 43 3312 D/C JUN-15400

Work under progress.6LILO of RTPS - Lingasugur S/C line at Mallat 13 12 12 613 D/C NOV-15220

Trasmission Lines: Page 30 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 31: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

(Manvi)

Forest clearance required for 3.836 hectares in locations 25,34 &35. Stage-Iapproval received on 20.04.11.NPV & compensatory afforestation charges of Rs.28,01,923/- paid on June-2011.Additional NPV & compensatory afforestation charges of Rs.4,04,973/-paid on 01.10.2011.Demarkation of the line corridor in the forest land done on01.04.2013.Letter addressed on 01.04.2013 to forest authorities to process forstage-II. Payment of Rs.7,61,404 made on 06.11.2014 to KFDC, Chikkamagalurfor stage-II clearance. The file was forwarded to DCF, Hassan on 14.11.2014and from there to CCF, Hassan on 08.12.2014 and then to APCCF , AranyaBhavan, Bengaluru on 23.12.2014.Intimation received from the Principal Chief Conservator of forest, Hassan toaccord Stage-II clearance in view of clearing the required payments by KPTCLon 20.04.2015.Stage-II clearance approval awaited.

FEB-0835LILO of Shimoga - Mysore at Dandiganahally 70 62 61 2214 D/C FEB-16220

Work under progress. (1) Local ROW problems atlocations: (i)9,10,14A,16,- being pursued.(2) DC COURT:For corridor 8-9 & 10-11: Case filed in DC court on 27.05.2013. Being pursued.(ii) Loc 16: Case filed at DC Court on 26.11.2014. Being pursued.

JUN-119LILO of Somanahalli - Malur at Vikas Tech Park 32 27 29 015 D/C NOV-15220

Work under progress.

Railway crossing :There is a Tumkur -Rayadurga railway corridor problem.Correspondence made with the railway authorities. A meeting was held byDeputy Commissioner, Tumkur with Railway authorities and KPTCL and directedto shift the line from the railway track. (loc No 2 to 5, Loc No 30 to 37, Loc No 62to 81). Total 9 towers to be deviated (Loc 63,64,65,75,76,77,78,80 erected to bedeviated and Loc 79 concreted to be deviated). Revised survey submitted byagency on 23.08.14. Cost implication and revised detailed survey is underapproval.

120Madhugiri - Pavagada 214 155 140 1816 D/C MAR-16220

Work under progress.

Constraints : (i) ROW problem at loc 15 & 16 being pursued.(ii) Case filed in DC Court, Hassan for ROW problems at loc. 15 & 16

SEP-0915Shanthigrama - B4 line ( near Hedanahalli limits) 34 34 32 917 D/C OCT-15220

Trasmission Lines: Page 31 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 32: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

during March 2013. Being pursued.

Malur-Kolar line charged (42 Ckm). The line from Malur end upto Loc 137charged (68.98 Ckm).The line from Somanahalli end upto Loc 55 charged (23.64Ckm). Total line charged 134.62 Ckm. Balance work under progress.Casepending in High Court: (i) At Loc 59 (for stub concreting) : Case pending in HighCourt since 31.08.2013. Being pursued.(ii)Loc 84,85,86,88 & 89: Case filed by KPTCL in DC Court on 27.01.2014. Beingpursued.(iii) Loc 84,85,86,88 & 89 : Case filed by party in Court of Junior Civil Judge ,Bangalore Rural district on 11.02.2014. Being pursued.(iv) Loc 135,135A,135B, 135C & 136 : case filed in High Court by party (IndiaInternational School) on 19.06.2013. Being pursued.

MAR-08180Somanahalli - Malur - Kolar 272 267 267 14018 D/C MAR-16220

Work under progress.

Due to severe ROW problems for the earlier awarded line routes, new proposalof converting SC Singarpet line to MC line from crossing point of Somanahalli-Malur line to Yerandanahalli S/s & DC line from Bommasandra I/A to Jigani s/sin the KIADB road median has been submitted. Estimate for MC line submitted toP&C on 25.10.2014 and for UG cable on 08.01.2015. DPR approved for 220kVMC line on 01.06.2015.

23Somananahalli Malur I & II lines - Jigani 34 6 4 019 D/C MAR-16220

Detailed survey under progress.Termination of Nelamangala - Talaguppa at CN Halli20 D/C DEC-16400

220 kV DC line from 220 kV Tubinakere S/s to Kothipura S/s :(1) (i) ROWproblems pending in JMFC Ramanagara for- (a) Loc 81 since 2009(ii) ROW problems pending in JMFC Channapatna for - (a) Loc 129-130 since2009(2)ROW problems pending in DC Court Ramanagar for (a) Loc 133: Case filedon 24-08-2011.Reserved for orders.(3)ROW problems at locations 208: being pursued locally.

220-66 kV MC line from 220 kV Kothipura to Bidadi S/s:(1) ROW problems pending in DC Court Ramanagar for Loc 15 : Case filed on19-07-2012.

JUN-09137Tubinakere- Kothipura 278 278 256 8721 D/C MAR-16220

Trasmission Lines: Page 32 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 33: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

(2) ROW problems to be solved locally at 8 locations 2,3,4,4A,5,6,33 & 77

Work under progress.39Vajamangala - Kadakola 55 49 45 022 D/C AUG-15220

Varahi-Khemar 150 Ckm (75 km route length) charged on 22.07.2010. 220kVline portion completed. Pending Work: 1 No of Tower erection, 2 spans DC line stringing.ROW problem pending at Civil court :

(i) For Corridor between 2-3A-2A, case filed in Civil Judge ( Jr. Division)Mangalore, Interim order received against KPTCL on 24.01.2014. Miscellaneousappeal filed at the Court of Civi Judge (Sr. Division), Mangalore, MA no. 11/2014.Being pursued.

JUL-08226Varahi -Khemar- Kavoor in the existing 110 kVcorridor(balance portion)

420 419 419 24523 D/C MAR-16220

Proposal is before Central Purchase Committee for acceptance of Tender.284Yermarus TPS - Bellary Pooling Station24 D/C 400

Line survey work completed.Yermarus TPS - Gulbarga25 D/C DEC-15400

Trasmission Lines: Page 33 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 34: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

KERALA STATE ELECTRICITY BOARD (KSEB)

ATS of Pallivasal Extension HEP. Work is yet to start.LILO of Idukki-Udumalpet at Pallivasal HEP 5 0 0 01 D/C MAR-16220

ATS of Thottiar HEP.May be deleted, as the work is not targeted in the Annual Plan of 2015-16.

LILO of Ldukki - Kozikode at Kodakpara2 D/C 220

Spill Over. Turnkey contract terminated. Work is being re-tendered.57Pothencode - Kattakkada 108 103 72 03 D/C MAR-16220

ATS of Thottiar HEP. May be deleted, as the work is not targeted in the AnnualPlan of 2015-16.

Thottiyar - Kodakpara4 D/C 220

Trasmission Lines: Page 34 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 35: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

M.P. POWER TRANSMISSION CORPORATION LIMITED (MPPTCL)

Work under progress.About 12% work completed.95Ashta - Shajapur 72 17 13 321 D/C MAR-16220

80Dada Dhuniwale TPP - Moondi Pooling Point2 D/C 400

Commissioned 06/15.158Damoh - Tikamgarh (2nd Ckt) 1583 D/C JUN-15220

180Handia - Ashta(2nd stage)4 D/C 400

160Julwania - Kukshi5 D/C 220

220Katni - Damoh6 D/C 220

Work under progress.8LILO of Bina - Guna at Ashoknagar 14 14 13 07 D/C DEC-15220

30LILO of Bhilai - Seoni at Balaghat / Kirnapur8 D/C 400

Commissioned 04/15.2LILO of Bina - Gwalior at Datia 29 D/C APR-15220

40LILO of Both ckt of Badod - Ujjain at Ujjain10 D/C 220

40LILO of Damoh - Bhopal at Sagar11 D/C 400

40LILO of Handia - Barwaha at Handia12 D/C 220

40LILO of Indira Sagar - Satpura at Handia13 D/C 400

40LILO of Indore - Itarsi at Handia14 D/C 400

20LILO of Indore-II - Ashta at Shankargarh15 D/C 220

4LILO of Jabalpur - Amarkantak at Gorabazar16 D/C 220

.20LILO of Khandwa (PGCIL) - Rajgarh at Chhegaon17 D/C 400

40LILO of Nagda - Rajgarh at Badnawar18 D/C 400

40LILO of Ratlam - Badnagar at Badnawar19 D/C 220

Ready for Commissioning 06/15.10LILO of Rewa - Ton at Sirmour 20 20 20 1020 D/C JUN-15220

8LILO of both ckt Indore - Pithampur at Indore21 D/C 220

40LILO of both ckt Nagda - Ujjain at Ujjain22 D/C 220

40LILO of both ckt of Ratlam - Badnagar at Badnawar23 D/C 220

Work under progress.About 45% work completed.10LILO of one ckt of Bina - Gwalior at Datia 7 6 5 024 D/C MAR-16220

40LILO of one ckt Bhopal - Ashta at Mugalia Chhap.25 D/C 220

Trasmission Lines: Page 35 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 36: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

2LILO of one ckt of Bansagar (Tons) - Satna at Sirmour26 D/C 220

10LILO of one ckt of Bina - Sagar at Bina27 D/C 220

13LILO of one ckt of Indore - Barwaha at Simrol28 D/C 220

20LILO of one ckt of Khandwa (PGCIL) - Rajgarh(PGCIL) at Chhegaon

29 D/C 400

4LILO of one ckt of Pithampur - Rajgarh (PGCIL) atDhar

30 D/C 220

.LILO of one ckt of Vindhychal - Satna at Nigrie31 D/C 400

6LILO of second ckt of Auraiya - Malanpur at Mehgaon32 D/C 220

10LILO of second ckt of Damoh - Tikamgarh at Damoh 0 0 0 033 D/C 220

Double entrypreviously as Maheshwar - Rajgarh

230Maheshwar (HEP) - Rajgarh (Dhar)34 D/C 220

240Moondi Pooling Point - Handia35 D/C 400

80Morena - Malapur36 D/C 220

Double entrypreviously as Nagda - Ujjain

150Nagda - Ujjain line37 D/C 400

Nigri TPP - Satna38 D/C 400

150Pithampur - Badnawar DCDS39 D/C 400

60Pithampur - Gandhinagar40 D/C 220

280Pithampur - Moondi Pooling Point41 D/C 400

70REVA TPP - Moondi Pooling Point42 D/C 400

160Satna - Chhatarpur (2nd ckt) 1543 S/C MAR-16220

.40Shri Singaji TPP - Moondi Pooling Point44 D/C 400

90Ujjain - Dewas45 D/C 220

Trasmission Lines: Page 36 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 37: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

MAHARASHTRA STATE ELEC. TRANSMISSION COMPANY LTD. (MSETCL)

Commissioned 04/15.53Ahmednagar - Jeur (Kaudgaon) 531 S/C APR-15220

Agency is not ready to carry out the work.Order awaited for U/G cable (3.7 KM)

44Ambazari - Mankapur 37 0 0 02 M/C MAR-16220

line is to be deleted. As line is not possible due to major ROW problem as linepasseing through N.A. and defence land only.

184Ambazari - New Buttibori-II 0 0 0 03 M/C APR-16220

Arbitral award- Group C. Tender being processed for balance work.104Apatapa - Anjangaon 172 77 63 04 D/C MAR-16220

Commissioned 05/15.5Aurangabad (Ektuni - III) - Aurangabad -II(Thaptitanda) Ckt-II

55 S/C MAY-15400

Commissioned 04/15.87Babhaleshwar - Jeur (Kaudgaon) 876 S/C APR-15220

Line is 447 CKm long.Forest: Total 26 Loc. Nos are in Forest. Proposal submitted at forest office.ROW Issue: 39 Locs. - Cases filed at Collector Pune.Cases refered to SDO ,Revenue , Manchardtd. 17.07.14.Hon Collctor Pune delegated power to SDO , Manchar.Hearingcarried on dtd . 25.11.14.22 Nos Loc Pending at Collector Office Thane.Railway - 4 loc NOC awaited Highway - 4 Loc, Loc.No. 26-27foundation & erection completed.Loc No. 221 &222, 304 & 305, 247-248,297/2-297/3 Proposal submitted on dt12.09.2014 to highway authority.

447Babhaleshwar - Kudus 683 572 481 1757 D/C MAR-16400

Court cases-2 nos. Next hearing on 21.12.13. Contract of M/s. M.M.Ghatge isclosed at Zone office & that of M/s. B. N. Chaudhari closed at C.O. After closureof contract, fresh tenderisation will be done for balance work the estimate ofwhich was already submitted.

MAR-0753Boisar (PG)-Wada 211 173 165 288 S/C onD/C

MAR-16220

Work in Progress.DEC-11329Boisar II-Borivali 259 259 256 3229 M/C NOV-15220

Work in Progress.24Bridgestone-II - Chakan-II 23 22 11 010 M/C DEC-15220

Manpower not available at site. Material shortage. Railway status :For Loc No 53 & 54 Proposal submitted on 12.12.12 & Revised Proposalsubmitted ondtd.26.09.2013Way leave charges paid on dt. 05.02.2015.

40Chandrapur II - MIDC - Ballarshah 66 66 60 2011 D/C MAR-16220

Railway Crossing - Proposal preparation in process.PTCC approval is awaited.

40Chandrapur II - Tadali 79 57 36 512 D/C SEP-15220

Trasmission Lines: Page 37 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 38: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

ROW-16 Nos: Order received from District Magistrate Chandrapur under section16(1).Police protection- Letter submitted to The S.P.Chandrapur for police Protectionvide letter no.452Dtd.31.03.2015 for which Collector Order received.Remainder request lettergiven to SP Chandrapurvide T.O. Letter No. 980 Dtd 19.05.2015. Follow up being done.Commissioned 06/15.30Chinchwad - Apta 3013 M/C JUN-15220

Collector order received for balance foundations. Police protection letter issuedto concerned police station for balance works. WIP

87Eklahare - Pimpalgaon 157 133 119 614 D/C MAR-16220

Work in Progress. Forest- 0.94 Ha- NOC received. Balance stringing workcompleted. Letter submitted vide no. 2389 on dt. 14.09.2015 to S.E, Electrical(PWD) Nagpur & Aurangabad, permission awaited.

MAR-1185Ghatodi - Hingoli line 269 269 269 8615 S/C OCT-15220

ROW Issues: Loc. No. 32 to 36 (Sec A), 1 to 10(Sec B), 17,18, 21 to 25 (Sec B),28:Opposition from Local MLALoc. No. 53 (Sec B): Pending in Court.Loc. No. 56 to 77 (Sec B): ROW problems from members of Grampanchayat &ZP & local farmers of village Shivre & Khopi.Highway Crossing:Involved however, Loc No. are not identified as survey ispending due to ROW.Total no of locations are tentative as the survey from Loc No. 59 to 69 is to becarried out. WIP

93Jejuri - Hinjewadi - I 137 105 94 2716 D/C MAR-16400

Forest Involved Loc. between AP8-A9 (Velhe) & AP44-AP52 (Mulshi). Proposalsubmitted on Dt. 13.04.2015.Row Invovled: Negotiation under Process.

114Jejuri - Hinjewadi -II 128 87 71 1317 D/C DEC-15400

1) Forest: Proposal online submitted on dt: 5.11.2014by reference no.FP/MH/Trans/7908/2014. Letter from DCF Nagpur received vide No.Desk-11/forestconsevation/Case No. 434/5106/14-15 dtd21/1/2015

2) ROW: 17 cases filed on dt: 20.10.2014 3) Railway: Proposal send to Railwayofc Nagpur 1. AP-10 to AP-11 (Kal-Katol section) vide ltr no. 3002 dt: 20.09.14 2. AP-04 to AP-05 (Katol-Warud) vide ltr no. 3003dt: 20.09.14Demand for Joint site visit received on dt: 20.10.2014 vide rly letter dt:

170Kalmeshwar - Warud 298 163 73 018 D/C MAR-16220

Trasmission Lines: Page 38 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 39: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

08.10.2014Joint inspection charges paid vide this office letter No. 3482, 3841 dt: 26.11.2014

Forest NOC received.ROW: Loc no. 24 & 25 - Execution proposal pending with BMC.PTCC proposal is initiated by C.O. vide L.No. 9730 dt. 23.07.2013.NOC received for Railway crossing.

68Kalwa-Borivali 53 52 17 219 M/C NOV-15220

L.No. 2133 dt. 13.11.13 has given to agency to start the work. But agency hasgiven a letter for cancellation of work on 13.11.13.

42Koradi II - Ambazari 27 0 0 020 D/C onM/C

MAR-16220

10.36 Ha Received FRA certificate & submitted to DCF Nagpur vide ltr no. 946dt:16.04.2015.ROW Issues: 17 nos cases filed under 16(1) is under hearing at DistrictMagistrate Nagpur. Hearing held on 16.03.2015Next date of hearing not intimated.Railway:Demand for trafficblock for 2 hrs paid vide no. 3659 dt: 12.12.14 of Rs. 3093360/-

MAR-11106Koradi II - Butibori 189 133 117 2221 D/C onM/C

DEC-15220

Forest: 16.9392 Ha (Wardha :3.85 & Nagpur:13.0892 )FRA certificate received from Nagpur collector on dt: 18.02.2015 & FRACertificate from wardhacollector received vide ltr no. AK/land/FRA/ws-140/15 dt: 29.04.2015.ROW: 6 cases are under hearing at Collector office Nagpur, for Loc no. 11/1 (3leg),11/1 (1leg),11/2,36/6, AP-15 (2 leg) & AP-1305 case for Loc No.11/1 (1leg),11/2,36/6, AP-15 (2 leg) & AP-13 solved throughnegotiation01 case for Loc No, 11/1 (3 leg) order received on dt: 06.04.2015Railway:For Loc. No. AP 18 - AP 19 WORK NOT TAKEN UP.Approval received from from SRDEE, TRD, Central Rly Nagpur & Traffic Blockcharges paid. Traffice block on22.07.2014 differed due to heavy rains.National highway: : 'National Highway crossing proposal submitted to projectmanager NHAI Amravatifor crossing NH-6 (near village Gondkhairi) vide letter No 255 dt 21.01.2012 &Nagpur for NH-69 near Village Koradi vide letter No 256

APR-11239Koradi TPS - Wardha 336 336 334 22422 D/C DEC-15400

Trasmission Lines: Page 39 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 40: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

dt.21.01.2012.

Forest area involved 4.122 Ha. Final Compliance (FRA) submitted to Addl PCCF(Central) from Addl PCCF & nodal officer forapproval vide ltr no. 172 dt: 06.05.2015.PTCC aprroval is awaited from Mumbai office.

DEC-1329Koradi TPS-New Khaparhkeda 72 68 65 2223 D/C DEC-15220

Forest: Area involved 0.5523 Ha Proposal Submitted to DCF Nagpur vide ltr no.1159 dt: 06.05.2015NHAI: NH-69 between Loc No. AP-1A to AP-2 near village panjara tehsil nagpur(R) of Nagpur DistrictProposal Submitted to Project Director NHAI, Ramnagar Nagpur, vide ltr no.1243 dt: 15.05.2015PTCC : Submitted to Construction Circle office vide letter no. 1436 on dt:03.06.2015 for onward submission to Corporate office, Mumbai

239Koradi-II - Koradi-III 110 77 48 024 D/C DEC-15400

Commissioned 06/15.5LILO (Tapping) of Dhule - Malegaon at Sayne 18 18 18 525 S/C JUN-15220

Work in progress.62LILO of Amravati - Badnera line at Nandgaon Peth. 98 98 98 926 D/C NOV-15220

ROW: , 03 cases closed on dt: 15.11.2014 for Loc No. 1/2,(1/0,1/3 &2/0), 2/110 cases under hearing For Loc No. (,(H1,H2,H3,H4), ,10/0,9/0,(H1,H2,H3,H4,10/0), ,(2/4 & 2/5), ,3/2,5/0,6/0,5/1,(7/0 & 8/0).Next date of hearingnot intimated.PTCC: Submitted to Construction Circle office vide letter no. 1220 on dt:22.04.2014 for onwardsubmission to Corporate office, Mumbai.

14LILO of Bhugaon - Pusad at Wardha (PG) 33 14 13 027 D/C DEC-15220

NOC for non- involvement of forest received on dtd. 05.12.2014.ROW Issues: 13 Nos Order received from District Magistrate Chandrapurunder section 16(1) of Indian Telegraph Act to this office on dated 27.03.2015 .Police Protection:Letter submitted to The S.P.Chandrapur for police Protection vide letter no. 550Dtd.31.03.2015 for 13 locations.PTCC: Approval received vide letter no.IC/MBI/PTCC/MRA-2168 Dated atMumbai, the 30.08.2014.Railway Crossing: The joint site inspection done on dtd:-05.02.15Highway Crossing- Proposal preparation in progress.

50LILO of Bhugaon - Warora-I at Warora 42 22 12 228 D/C DEC-15220

Trasmission Lines: Page 40 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 41: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Work in Progress.

Ready for Commissioning 08/15.1LILO of Chinchwad - Phursungi at Kondhwa 129 D/C AUG-15220

Commissioned 07/15.8LILO of Kandalgaon - Lonand at Lonand MIDC 11 11 11 830 D/C JUL-15220

Work in progress. ROW issues pending for 2, 32, 42 locations.26LILO of Kolhapur - Sawantwadi at Mudhaltitta 44 42 39 431 D/C SEP-15220

Commissioned 08/15.20LILO of Mhaisal - Jath at Mendhegiri S/S (Ckt-I) 2032 D/C AUG-15220

Arbitral award- Group B. Work order for balance works of line are awarded toM/S Vishwas Elect, Nanded on 26.02.14.

12LILO of Sawangi - Bhokardan at Phulambri 20 16 8 033 D/C DEC-15220

Forest land involved in the route at Loc. No. 16A, proposal yet to be approved.The proposal is returned by Nodal Officer, Nagpur to Dahanu forest dn. forcompliances of Dwellers Act. Obtaining of NOC under Dwellers Act is in processfrom concerned Grampanchayats.

MAR-0716LILO of Tarapur-Borivli at Boisar II 15 15 12 1134 D/C MAR-16220

Commissioned 04/15.26LILO of Waluj Bahaleshwar - Deogaon Rangari S/S 2635 D/C APR-15220

13 Nos Order received from District Magistrate Chandrapurunder section 16(1) of Indian Telegraph Act to this office on dated 27.03.2015 .Police Protection:Letter submitted to The S.P.Chandrapur for police Protection vide letter no. 550Dtd.31.03.2015 for 13 locations.Railway Crossing: The joint site inspection done on dtd:-05.02.15Highway Crossing- Proposal preparation in progress.

50LILO of Warora - Wardha at Warora 42 22 12 236 D/C DEC-15220

MAY-12154LILO of both ckt Bhusawal II - Aurangabad I atAurangabad-II (Ckt-II)

37 D/C NOV-15400

.LILO of both ckt Parli (GCR) - Beed at Parli38 D/C 220

Commissioned 05/15.97LILO point of IEPL to LILO point of Warora-Wardhaline

9739 D/C MAY-15400

Slow Work by agency..97Malegaon - Kalwan 171 154 124 040 D/C DEC-15220

Work is carried out by M/s JSW under ORC. Fresh tenderisation is held up dueto non receipt of assurance payment from ISPAT.

30Nagothane - Wadkhal 93 56 44 041 D/C MAR-16220

Slow work by agency. Forest NOC received.73Nanded - Bhokar 122 120 111 3042 D/C MAR-16220

Arbitral award- Group C. Tender for balance work to be refloated136Nanded - Krishnoor 51 28 0 043 M/C MAR-16220

Arbitral award- Group C. Tender for balance work to be refloated.32Nanded - Narsi 50 22 0 044 D/C MAR-16220

Trasmission Lines: Page 41 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 42: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Ready for Commissioning 08/15.30Nanded - Waghala 52 51 51 3045 D/C AUG-15220

Work yet to be started by MSETCL.Nasik TPP - Nasik (MSETCL)46 D/C MAR-15400

Tree cutting & punch point rectification work in progress.MAR-11247New Bhusawal - Chalisgaon 431 431 428 24547 D/C OCT-15220

ROW for remaining 9 locations.PTCC Proposal initiated by C.O. Approval awaited.

30Padghe - Tarapur 12 3 0 048 D/C MAR-16400

Commissioned 09/15.134Sawangi - Bhokardhan 224 224 224 13449 D/C SEP-15220

Commissioned 06/15.37Shedyal - Jath line 3750 D/C JUN-15220

Commissioned 06/15.114Shivajinagar - Malegaon 11451 S/C JUN-15220

Commissioned 06/15.96Shivajinagar - Satana 9652 S/C JUN-15220

Commissioned 04/15.1Tapping on Lonand Kandalgaon for Lonand MIDC 153 S/C APR-15220

Work not started since land not available.Forest involved (Loc. No. 1, 7, & 8) .railway:- Loc No. 3-4 & 5-6

32Uppalwadi - Mankapur 28 1 0 054 M/C MAR-16220

Work not started. Shifting of U/G cable involved o start work.Railway status:Loc No.3-4 & 21-22 involved

54Uppalwadi - New Pardi 46 0 0 055 M/C MAR-16220

Work in progress.322Wardha (PGCIL) - Ghatodi 510 338 204 056 D/C MAR-16220

Work in progress.165Warora - Wardha 280 251 242 9557 D/C MAR-16220

Trasmission Lines: Page 42 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 43: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

MEGHALAYA ENERGY CORP. LTD. (MeECL)

No issues of forest clearance and no court cases. Work held up due to nonpayment of compensation to the land owners.At the present the assessment isprepared and likely to be cleared within this financial year.

17Killing (Byrnihat)-EPIP-I 19 19 19 81 M/C DEC-15132

Work completed and line charged on 28.01.2014.5LILO of Agia - Nangal at Mendipathar 9 9 9 52 D/C JAN-14132

No issue on forest clearance and no court cases.Work held up due to ROWproblem. The PHED,GOMe has complained and filed and FIR against Loc No. 3to 8. Overall status is 90% completed.

10LILO of Mawlai - Cherra at Mawngap. 16 15 15 53 D/C MAR-16132

No issues on forest clearance. Work is completed. Line & Substation was testcharged on 07.08.2015

4LILO of NEHU - Khliehriat line at Mustem 4 4 4 14 D/C AUG-15132

No issues on forest clearance. Materials procurement is in process.6LILO of NEIGRIHMS - Khliehriat at Lad Nongkrem 9 0 0 05 D/C JUL-16132

Land for the substation has been identified and procurement of the same is inprogress.

20LILO of Rongkhon - Ampati at Praharinagar 34 0 0 06 D/C DEC-16132

Commissioned 05/15.4LILO of one ckt Palatana - Bongaigaon at Byrnihat line 10 10 10 47 D/C MAY-15400

Work completed and line charged on 21.12.2011.66Mawngap - Sumer 102 102 102 668 D/C DEC-11132

Work Completed and line charged on 06.08.2013.92Nangalbibra - Agia 316 316 316 929 S/C AUG-13132

No issues of forest clearance. Survey completed. Re-survey carried out due toconstruction of a new building in the corridor of the approved profile survey &due to crossing of 132 kV D/C Killing-EPIP-II line. Materials procurement is inprocess. Inspections for manufacture of column & beams for extension ofswitchyard at old Umtru done on 31.03.2015.

6New Umtru HEP - Norbong (EPIP-II) 9 0 0 010 D/C DEC-15132

No issues on forest clearance and no court cases. ROW problem resolved. Workdelayed presently due to fund constraint.

33Rongkhon S/S - Ampati 102 97 86 1211 D/C MAR-16132

Trasmission Lines: Page 43 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 44: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

ORISSA POWER TRANSMISSION CORPORATION LTD. (OPTCL)

Commissioned 06/15. (By passing Pandiabil S/S)APR-1545Atri - Pandiabil 88 88 88 451 D/C JUN-15220

Work for river bed piling was held up due to flood in the river.However work hasalready resumed

DEC-0920Bidanasi -Cuttack 38 31 30 22 D/C DEC-15220

Forest clearance pending with DFO Bolangir & Kalahandi North for Demarcationof forest land and enumeration of trees coming in the corridor of 220 kV Kesinga-Bolangir D/C line.

JAN-15160Bolangir - Kesinga 315 189 0 03 D/C SEP-16220

The project is likely to be taken up on a later date. Tendering not done60Brkote - Deogarh.4 D/C MAR-17220

Re-routing required due to acute ROW proble. Survey completed. Locationdetails is being worked out

64Cuttack (OPTCL) - Pratapsasan5 D/C MAR-16220

As informed by SLDC Odisha, 50 KM. OPGW work is in progress. Line is readyand has been test charged.

470Ib-Meramundali 625 625 625 4706 D/C SEP-15220

Severe ROW problem.17Jayanagar (OPTCL) - Jayanagar (PGCIL) 37 0 0 07 D/C MAR-16220

Both the Transformers was charged on T connecttion. The LILO line is alreadycompleted and charged on 21.03.2015.

16LILO of (Existing) Budhipadar-Burla at Lapanga 19 19 19 68 D/C DEC-15220

The survey work is in progress8LILO of (Existing) Bhanjanagar - Meramundali atNarasinghpur

9 D/C MAR-14220

Work offloaded from Contractors scope.29LILO of (Existing) Budhipadar - Tarkera atKuanrmunda.

10 D/C SEP-13220

Survey in progress. Location details is being worked out79LILO of Duburi - Balasore at Dhamara11 D/C DEC-16220

The line work will be taken through other modalities. Survey in progress.However S/s order already placed on M/s Alsthom

11LILO of IB- Thermal-Meramandali at Lapanga12 D/C JUN-13400

Work order just placed for S/s. The line work tendering not done. The completionschedule mentioned is for S/s.

4LILO of Indravati - Theruvali at Kasipur13 D/C AUG-16220

Work order just placed for S/s. The line work tendering not done. The completionschedule mentioned is for S/s.

10LILO of Katapalli - Bolangir at Bargarh (New)14 D/C MAR-17220

The project is likely to be taken up on a later date. Tendering not done10LILO of Meramundali - Duburi at Dhenkanal (New)15 D/C MAR-17220

Work in progress.7LILO of Narendrapur - Mendhasal at Attri (OldKaradagadia)

8 8 7 016 D/C DEC-15220

The project is not taken up200LILO of Pratapsasan - Cuttack at Jagatsinghpur17 D/C MAR-17220

Work is deffered36LILO of Rengali - TTPS at Chendipada18 D/C MAR-16220

All foundation work completed. Since the balance work of S/s is re-6LILO of Rengali - Tarkera at Bonai 17 17 0 019 D/C MAR-16220

Trasmission Lines: Page 44 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 45: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

tendered even though line is completed total project can not becompleted.However line work is taken up through OPTCL empanelled contractor

The project is not taken up right now.44Lapanga (PGCIL) - Sundergarh.20 D/C MAR-15400

62Malibrahmani - Angul 108 100 80 2021 D/C MAR-16400

Ready for Commissioning 08/15.192Meramundali-Duburi (1st Ckt) 279 279 279 19222 D/C AUG-15400

Work order just placed for S/s. The line work tendering not done. The completionschedule mentioned is for S/s.

28Mukhiguda (OHPC) - Jaypatna.23 D/C DEC-17220

Commissioned 07/15. (By passing Pandiabil S/S ).92Puri (Samangra) - Pandiabil 155 155 155 9224 D/C JUL-15220

Trasmission Lines: Page 45 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 46: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

POWER AND ELECTRICITY DEPARTMENT, MIZORAM (P&ED Mizo)

5LILO of Zemabawk - W.Phaileng at Sihhmui 0 0 01 S/C DEC-13132

Turial HEP - Aizawl2 S/C MAR-14132

Trasmission Lines: Page 46 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 47: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

POWER TRANSMISSION CORP. OF UTTARAKHAND LTD. (PTCUL)

DPR prepared. DPR submission to funding agency is in progress.146Almora-Pithoragarh 0 0 0 01 D/C JUN-16220

Construction of line as per Connectivity Schedule of Generators in YamunaValley.

94Arakot -Mori and LILO of Arakot -Mori at Hanol Tuni 0 0 0 02 D/C MAR-18220

Construction of line as per Connectivity Schedule of Generatiors in YamunaValley.

52Devsari-Karanprayag 0 0 0 03 D/C NOV-17220

Construction of line as per Connectivity Schedule of Generators in YamunaValley.

76Jakhol -Sankri -Mori and LILO of Jakhol -Sankri -Moriat Natwar Mori

0 0 0 04 D/C MAR-18220

Contract has been awarded on 06.05.11 to M/s TATA Project Ltd., contracteffective date is 14.10.11 and GMVN has not given the permission to cross theAuli Ropeway, hence crossing by underground cable is proposed at Joshimath.Land sliding zone being encountered at village Malli Tangri and Talli Tangri thesurvey and forest case yet to be completed. Forest Case of 51.3 Hect. is underpreparation. Total Progress 6%.

40Joshimath - Kunwari Pass (Pipalkoti)5 D/C JUN-18220

Retendering is under Process.184Kuwari Pass (Pipalkoti)-Karanprayag -Srinagar 0 0 0 06 D/C JUN-16400

Contract has been awarded on 06.05.11 to M/s TATA Project Ltd. contracteffective date is 03.09.11 and will be taken after award of 400 KV Pipalkoti S/s.Total Progress 11%.

2LILO of Muzaffarnagar - Vishnu Prayag at KuwariPass (Pipalkoti)

6 0 0 07 D/C DEC-15400

Construction of line as per Schedule of construction of Singoli HEP and to beconstructed by L&T.

5LILO of Baramwari - Srinagar at Singoli Bhatwari 0 0 0 08 D/C OCT-16220

Tendering is under process.12LILO of Kashipur - Pantnagar line at Jaffarpur9 D/C JUN-15220

The work at Pala Maneri HEP stopped as per GOI order.10LILO of Loharinagpala - Koteshwar at Pala - Maneri 0 0 0 010 D/C 400

Construction of line as per connectivity schedule of generatiors in Yamuna Valley10LILO of Mori - Dehradun line at Nogaon11 D/C MAR-18220

Construction of line as per Schedule of construction of Langrasu.16LILO of Nandprayag -Karanprayag at Langrasu 0 0 0 012 D/C NOV-17220

Tendering is under process.1LILO of Rishikesh-Dehradun at Harrawala 0 0 0 013 D/C MAR-15220

10LILO of Roshanabad - Puhana line at Imlekhera(Pirankaliyar)

14 D/C MAR-16220

LoA is to be issued.10LILO of Roshnabad -Puhana at Pirankaliyar S/S 0 0 0 015 D/C JUN-15220

Tender has been floated.70LILO of Vyasi HEP - Dehradun at Dehradun (PG) 0 0 0 016 D/C APR-16220

Trasmission Lines: Page 47 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 48: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

S/S

Regarding Forest land Transfer proposal nodal officer Dehradun raised queriesvide letter no 3042 dated 01-06-2013. Reply of the same is being done. Totalprogress 10%

24Lata Tapovan- Joshimath 36 0 0 017 D/C DEC-15220

The work at Loharinagpala HEP stopped as per GOI order.180Loharinagpala-Koteshwar line 0 0 0 018 D/C 400

Construction of line as per Connectivity Schedule of Generators in YamunaValley.

200Mori -Dehradun 0 0 0 019 D/C MAR-18220

Forest approval granted on 02.04.2013.Tender scrapped retendering is underprogress

182Rudrapur(Brahmwani) - Ghansali-Srinagar line 248 0 0 020 D/C DEC-16220

28Srinagar HEP - Sringar 400 kV S/S. 39 9 0 021 D/C FEB-16400

Survey work is in progress in the alternative route proposed by M//s cobra.Thego ahead was issued through this alternate route on dated 24/12/2014.detailedsurey of 168 Km completed.Forest case preparation in progress and profilepotting in progress

304Sringar - Kashipur 0 0 0 022 D/C DEC-18400

Tower foundation-1/21 and Tower erection-0/21.Total progress-11%12Twin Zebra - Dehradun (PGCIL) 21 1 023 D/C DEC-15220

Contract has been awarded on 06.05.11 to M/s TATA Project Ltd. contracteffective date is 03.09.11 Forest case prepared for 43.694 Hect. and submittedto DFO Joshimath/ DM Chamoli. NOC from 04 Nos. village panchyat NaurakhAgthalla, Tangri Talli and Tangri Malli is pending. Matter is being pursuedGOU/District Administration.

40Vishnugad - Kuwari Pass (Pipalkoti) 62 0 0 024 D/C DEC-15400

Trasmission Lines: Page 48 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 49: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

PUNJAB STATE TRANSMISSION CORPORATION LIMITED (PSTCL)

Work is in progress.71Bajakhana - Bagha Purana 103 103 103 641 D/C NOV-15220

Work is in progress.33Balchak - Naraingranth 58 58 53 122 D/C NOV-15220

Commissioned 05/15.23Bhatinda - Mukatsar (2nd CKt) 233 D/C MAY-15220

Work is in progress.80Goindwal Sahib - Bottianwala 201 152 121 04 D/C MAR-16220

Work in progress.55Goindwal Sahib - Chola Sahib 92 92 92 545 D/C NOV-15220

Work is in progress. Forest case cleared. Railway case pending.29Kanjali - Jalandhar 54 53 326 D/C MAR-16220

Commissioned 04/15.12LILO of Both Ckt Malerkotla - Barnala at Sandhaur 25 25 25 127 D/C APR-15220

Commissioned 04/15.13LILO of Both Ckt Malerkotla - Pakhowal at Sandhaur 25 25 25 138 D/C APR-15220

Commissioned 07/15.29LILO of Dhuri - Bangan at Chhajali (Loop in) 299 D/C JUL-15220

Work is in progress.48LILO of Ferozepur - Talwandi Bhai line at Sadiq 80 80 79 4810 D/C NOV-15220

Forest case pending. loop in work in progress.loop out work is held up due tostay by court in some portion of line.

21LILO of GGSSTP - Jsmsher at Jadla 41 21 19 611 D/C DEC-15220

Work is in progress.21LILO of Ganguwal - Mohali at Majra 40 40 32 812 D/C DEC-15220

Work is in progress. Forest case pending.Railway case cleared.50LILO of Malout - GNDTP Bhatinda at Badal 82 75 47 313 D/C DEC-15220

Loop out work completed.Further work is in progress.68LILO of Patial - Mondi Gobindgarh at Rajpura 109 109 109 6714 D/C DEC-15220

Work is in progress. Shut down / ROW problem at Doraha end.28Ludhiana - Doraha 95 95 78 1215 D/C DEC-15220

Work is in progress. Forest & Railway cases pending101Makhu - Algaon 159 47 40 016 D/C MAR-16220

Work is in progress.Work also exist at sr. no 31.92Makhu - Rashiana 146 121 73 2017 D/C DEC-15220

Also exist at Sr.no.11. Work is in progress.60Makhu - Taran |Tarn 146 121 73 2018 D/C DEC-15220

Work is in progress. Forest and Railway cases pending.30Malout - Abohar 95 40 1119 D/C JUN-16220

Work is in progress. forest case pending.105Moga - Mehal Kalan 170 105 7220 D/C MAY-16220

Commissioned 08/15.87Mukatsar - Abohar 134 134 134 8721 D/C AUG-15220

Forest and railway cases pending.76Mukatsar - Kotkapura 126 58 38 022 D/C MAR-16220

Work is in progress. Forest case pending.Railway case not involved.47Mukatsar - Malout 84 69 3823 D/C JUN-16220

Work is in progress.71Nakodar - Rehana 121 121 92 1224 D/C DEC-15220

Work in progress. Forest case pending.37Rajpura - Devigarh 114 98 31 025 D/C MAR-16220

Trasmission Lines: Page 49 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 50: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Work is in progress.59Rajpura - Lalru 98 98 85 4526 D/C DEC-15220

Work deferred for the time being62Sarana- Kotli Surat Malli line 185 70 0 027 S/C onD/C

APR-13220

Commissioned 06/15.63Talwandi - Dharamkot 113 113 113 6328 D/C JUN-15220

Trasmission Lines: Page 50 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 51: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

RAJASTHAN VIDYUT PRASARAN NIGAM LIMITED (RVPNL)

80Ajmer (400 kV) - Bherunda (TK)1 D/C 220

50Akal (1)- Jaisalmer -22 D/C MAR-15400

480Akal -Jodhpur (New) 650 190 1123 D/C MAR-17400

W.O. earlier placed to M/s Trans- Era has been cancelled45Anta -Kota (PG) (Extension) 141 234 D/C MAR-16400

100Badisid-Aau 196 196 160 375 D/C MAR-16220

30Badisid-Bap6 D/C MAR-15220

140Banswara (Switching Station) - Pratapgarh 3137 D/C MAR-16220

SEP-0920Banswara TPS - Banswara8 D/C 220

360Banswara TPS- Chittorgarh9 D/C MAR-17400

320Banswara TPS- Udaipur10 D/C MAR-17400

280Barmer-Bhinmal (PG)11 D/C MAR-16400

1. Forest Clearance required at 22 locations (Indira Gandhi Canal crossings).Case is pending at DFO (Bikaner, Jaisalmer, Jodhpur).2. Aviation clearance issue is pending at Delhi Airport Authority.3. Severe ROW issues.

360Bhadla-Bikaner 511 491 468 22912 D/C MAR-16400

50Bhadla-Kanasar 83 4113 D/C MAR-16220

300Bhilwara TPS -Ajmer 432 424 404 1514 D/C MAR-16400

Work held up due to court stay. 2 No bays at 400 kV GSS Bhinmal are to beprovided by PGCIL.

JAN-1278Bhinmal - Sayla line 132 131 129 7315 D/C JUL-15220

420Bikaner -Sikar (PG)16 D/C MAR-17400

172Bikaner- Merta 465 465 465 17217 S/C AUG-15400

120Chatrail-Ramgarh 149 140 132 3018 D/C MAR-16220

53Chittorgarh - Sawa 91 89 88 3819 D/C 220

Delayed on Contractor part, likely to be completed up to Oct,15.99Chittorgarh-Bhilwara 134 134 127 1220 D/C OCT-15400

.Dahanu - Degchu GSS21 D/C 132

Commissioned 09/15.DEC-1364Debari - Salumber (2nd Ckt) 5 5 5 6422 D/C SEP-15220

35Dhod-Danta Ramgarh 101 4423 S/C MAR-16220

Trasmission Lines: Page 51 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 52: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Stringing completed.APR-093Extension of Bikaner- Barsinghsar at Barsinghsar TPS 10 10 10 324 S/C APR-14220

30Gajner -Kolayat25 D/C MAR-16220

14Heerapura -Chambal (Cable)26 D/C MAR-16220

Likely to be completed up to Sept'15.110Hindaun -Chonkarwada 122 122 122 3527 D/C SEP-15220

AUG-1312Indira Gandhi Nagar - Jawahar Nagar28 S/C 220

18Indira Gandhi Nagar -Sitapur (Upgradation) 29 29 19 029 D/C OCT-15220

JAN-1362Jaipur North (400 kV GSS) - Manoharpur (Turnkey) 140 137 108 030 D/C MAR-16220

260Jaisalmer -2 -Barmer31 D/C MAR-16400

JAN-1261Jalore - Sayla 177 177 177 5132 S/C MAR-16220

DEC-12120Jethana - Ajmer line 203 196 188 9233 D/C MAR-16220

OCT-1221Jodhpur (400 kV GSS) - Banar 35 33 2534 D/C 220

APR-1090Jodhpur (New) - Barli (TK) 142 136 116 1835 D/C 220

APR-1040Jodhpur (New) - Jhalamand (TK) 65 61 60 3436 D/C 220

12Jodhpur - NPH Jodhpur37 D/C 220

22Jodhpur -Bhadwasia 0 0 0 038 D/C MAR-16220

M/s Classic Coal, work stopped due to ROW problem.16Jodhpur CHB - Soorsagar 31 19 0 039 D/C MAR-16220

Ready for Commissioning 08/15.84Kotputli (PG) - Bansur 141 141 141 8440 D/C AUG-15220

14Kunda ki dhani-Purana Ghat (upgradation)41 D/C MAR-15220

20LILO of Kolayat -Bajju at Kolayat42 D/C MAR-16220

6LILO of 2nd Ckt Sikar (RVPN), Ratnagarh at Sikar43 D/C MAR-14220

10LILO of Aau -Phalodi at Aau44 D/C MAR-16220

Ready for commissioning 06/15.MAR-1411LILO of Ajmer -Kishangarh line at Ajmer 15 15 15 1145 D/C JUN-04220

Line work completed on 16.7.154LILO of Alwar -Kotputli at Bansur 5 5 5 246 D/C MAR-16220

10LILO of Amberi - Debari at Udaipur47 D/C 220

W.O order earlier placed to M/s Trans- Era has been cancelled2LILO of Chabra TPS -Dahra at Anta (2nd ckt) 4 4 348 D/C MAR-16400

20LILO of Chandan- Pokaran at Pokaran49 D/C MAR-16220

Trasmission Lines: Page 52 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 53: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

10LILO of Chittorgarh - Debari at Udaipur50 D/C 220

JUL-131LILO of Heerapura - Babai at Niwana 4 4 4 151 D/C 220

work held up due to court stay on 132kV line6LILO of Jodhpur (GSS) - Jodhpur at Barli 6 6 4 252 D/C MAR-16220

AUG-0999LILO of Jodhpur - Merta line at Jodhpur (New) 139 139 134 10053 D/C DEC-15400

2LILO of Jodhpur -Jodhpur interconnectorl atJhalamand

54 D/C MAR-16220

.320LILO of Jodhpur -Merta at Pooling station Badla 608 63 2455 D/C MAR-16400

Ready for Commissioning 08/15.11LILO of KTPS - Sanganer line at Vatika 21 21 21 1156 D/C AUG-15220

30LILO of Kankroli (PG) -Debari at Amberi 60 59 58 2757 D/C SEP-15220

Ready for Commissoioning 06/15.5LILO of Khetri - Heerapura line at Babai 13 13 13 558 D/C JUN-15220

36LILO of Kota (PG) -Bhilwara at Mandalgarh 76 76 76 3959 D/C DEC-15220

Commissioned 06/15.88LILO of Kuchamancity -Dhod at Deedwana 146 146 146 8860 D/C JUN-15220

Commissioned 07/15.5LILO of Mandawar -Nadbai- Bharatpur atChonkarwada

10 10 10 561 D/C JUL-15220

24LILO of Nagaur -Merta at Kuchera62 D/C MAR-14220

20LILO of PS 1- Bajju at PS 1/Bajju63 D/C MAR-16220

LILO of VKIA - Kukas at Jaipur (North) (Turnkey)64 D/C 220

1LILO of both ckts Ramgarh GTPS -Dechu at Ramgarh 1 1 1 165 D/C APR-15220

20LILO of both ckts Ramgarh GTPP -Dechu line atPokaran

66 D/C MAR-16220

16LILO of existing Jodhpur GSS - Pali at Jodhpur (New) 18 18 1267 D/C 220

56LILO of one ckt Jaipur (South) to Chaksu at Goner 101 101 37 068 D/C MAR-16220

Commissioned 05/15.12LILO of one ckt Kotputli -Manoharpur at Kotputli (PG) 26 26 26 1269 D/C MAY-15220

Commissioned 05/15.31LILO of one ckt Neemrana -Kotputli at Behror 53 53 53 3170 D/C MAY-15220

200LILO of one ckt Raj west -Jodhpur at Jodhpur (New) 138 138 138 10271 D/C MAR-17400

5Mansarovar - Chambal (Cable System)72 D/C 220

AUG-1311Mansarovar - Jawahar Nagar73 S/C 220

Trasmission Lines: Page 53 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 54: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

work pending due to pipe line exist, subject to NOC from IOCL54Neemrana-(PG)-Behror 100 100 100 5474 D/C SEP-15220

40PS 1 /Bajju -Bhadla 105 98 7675 D/C MAR-16220

Work order withdrawn from M/s. GET and placed to M/s Varsana Ispat on02.02.15. Likely to be completed up to Dec,15.

89Phagi GSS (Jaipur) - Heerpura 123 121 100 1776 D/C DEC-15400

Work order withdrawn from M/s. GET and placed to M/s Varsana Ispat on02.02.15. Likely to be completed up to Dec,15.

DEC-11213Phagi(Jaipur south-765 kV)-Ajmer line 283 257 184 077 D/C DEC-15400

240Pratapgarh- Chittorgarh 314 8378 D/C JAN-16220

200Ramgarh (Jaisalmer)-Akal (Jaisalmer ) 293 9179 D/C MAR-16400

360Ramgarh -Bhadla 440 347 15680 D/C MAR-16400

28Renwal -Danta Ramgarh 113 111 6781 S/C MAR-16220

Commissioned 04/15.MAR-1411Sanganer- Sitapura (Upgradation) Ckt-II 40 40 40 1182 D/C APR-15220

balance work under progress.220 KV D/C line one portion of 7.955 Km from 400KV PGCIL-Chaksu to 220 KV GSS Chaksu is completed on 24.10.2013.railwaycrossing work balance

MAR-1484Sanganer-Chaksu (Upgradation) 144 144 144 8183 D/C JUN-15220

25Sirohi-Pindwara 106 5984 S/C MAR-16220

shifting of 11kV & 33kV lines required for further execution of work.Pursuance isbeing made with Jaipur discom.Line Commissioned/completed on 132 KV Levelvoltage on 24.7.15

1Sitapura- Sitapura (Existing) (Upgradation) 3 3 3 185 D/C JUN-15220

AUG-1111Soorpora - Banar line 35 33 25 086 D/C MAR-16220

case for diverting route due to air force is under process480Suratgarh TPS - Babai ( Jhunjhunu) 640 542 512 10187 D/C MAR-16400

340Suratgarh TPS- Bikaner88 D/C MAR-17400

40Tehandesar(proposed)-Bandnu 111 111 111 3289 S/C JUL-15220

140Undoo - Pokaran90 D/C 220

Trasmission Lines: Page 54 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 55: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

SIKKIM POWER DEVELOPMENT CORPORATION LTD. (SIKKIM)

.Dikchu - Gangtok1 D/C 132

Dikchu - Mangan2 D/C 132

Trasmission Lines: Page 55 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 56: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

TAMILNADU TRANSMISSION CORPORATION LTD. (TANTRANSCO)

Koladi - PH Road: OH Line work under progress. Stub: 47/76, TE:46/76completed. Stringing: 15/23.For cable laying from PH road to Koyambedu,Onecircuit to be terminated at Koyembedu (CMRL) for which work awarded and to betaken up and another one circuit to be terminated at Alandur(CMRL) for whichrevised administrative approval is accorded and tender is under process.

Alamathy - Koyembedu1 D/C MAR-16400

Commissioned 06/15.JUN-1239Arasur 400 kV S/S - Karamadai 230 kV S/S 169 169 169 392 S/C JUN-15220

Cable energised on 01.09.153Avadi-Ayappakkam line 0 0 0 03 S/C SEP-15220

Tender is to be floated23Basin Bridge - TNEB HQ (UG Cable) 0 0 0 04 S/C DEC-15220

Commissioned 04/15.14Kadapperi - Guindy (UG Cable) 145 S/C APR-15220

Issues involved and is being followed up.(i) 2 locations : severe ROW issue. Work will be taken up under DCW basis.(ii) 12 Locations: Case at National Green tirubunal. Case cleared and work isbeing taken up. Subsequently stay obtained by the villagers and hearing on14.07.15 postponed and next hearing date is awaited. (iii) 4 locations:Court case. Status quo maintained.

52Kalivanthapattu - Sholinganallur 88 72 67 276 S/C DEC-15400

Works are under progress. ROW issues at 3 locations. Work held up by thecontrator.

24Kanarpatty - Kayathar 39 36 33 137 D/C SEP-15400

Issues involved at 3 locations : (i) Sincethe land owner has objected for erecting the tower at loc.No.137, representationhas been sent to the District Collector/Madurai and enter upon permission isawaited.(ii) Due to severe objections/threatening by the land owners, tower foundationwork at loc.No.215 & loc.No.249 are pending. Representation sent to localPolice for protection and they assured to give police protection at the time oftaking up the work.Further,the contractor M/s.GET has not turned up for work. Hence one monthnotice issued to contractor for termination. Balance work will be carried out byGCC.

DEC-11140Karaikudi - Sembatty 554 548 491 848 S/C SEP-15220

Commissioned 06/15.320Karaikudi-Pugalur 460 460 460 3209 D/C JUN-15400

work under progress for 2 reaches and work awarded and to be taken up for 3rdreach.

23Koladi - PH Road 76 47 46 1510 D/C DEC-15220

Trasmission Lines: Page 56 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 57: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Commissioned 07/15.2LILO of Alamathy - Koyembedut Thiruverkkadu 1 1 1 211 D/C JUL-15220

Work awarded and is being commenced6LILO of Arasur (PG) - Karamadai at Karuvalur12 D/C 220

Tender finalised and work is being awarded.12LILO of Chekkanurani - Kayather at Kinnimangalam13 D/C 220

Tender finalised and work is being awarded.8LILO of Chekkanurani - TTPS-I at Kinnimangalam14 D/C MAR-16220

Not related to TANTRANSCOLILO of Chilakallu - Narketpally at Huzumnagar.15 D/C DEC-15220

Works are under progress. Objections cleraed at Loc 41. Meanwhile, the landowner got injunction order from High court chennai and work stopped. Lasthearing on 15.09.15. It is being followed up.

32LILO of K.R. Thoppur - Ingur at Thingalur 99 99 98 2116 D/C NOV-15220

Commissioned 07/15.39LILO of Kalivanthapattu - Veerapuram at OMEGA 75 75 75 3917 D/C JUL-15220

Work under progress.20LILO of Kalpakkam - Arani at Purisai 49 2018 D/C APR-16220

Commissioned 08/15.6LILO of Korattur - Koyambedu at Alamathy 619 D/C AUG-15220

Commissioned 09/15.23LILO of Korattur - Koyambedu at Alamathy (BalancePortion)

2320 D/C SEP-15220

Works are under progress.6LILO of Korattur - Koyembedu at Ambattur (3rd MainRoad)

5 321 D/C DEC-15220

Ready for Commissioning 08/15.1LILO of Manali - Basin Bridge (BBGTP) at Vyasarpadi 6 6 6 122 D/C AUG-15220

Work under progress. Objection encounted from loc.1 to 119. Action is beingtaken for getting entry permission from District Collector/Tiruppur and DC/Karur.Objection involved at entire line work vide WP No:23265/2015 and is beingfollowed up. Enquiry conducted on 10.09.15 and orders awaited.

62LILO of Myvady - Pugalur at Kurukathi 124 81 56 523 D/C FEB-16220

Commissioned 07/15.52LILO of Neyveli Zero unit - Neyveli - TS-II atUlundurpet

90 90 90 5224 S/C JUL-15220

Commissioned 07/15.2LILO of Shoolagiri - Singarapet at Gurabarapally 3 3 3 225 D/C JUL-15220

Work under progress.2LILO of Siruseri - Tharamani at Sholinganallur 14 14 13 226 D/C NOV-15220

Due to long penging Court case, revised route is under study.DEC-1012LILO of Sriperumbadur- Arni at Sunguvarchatram 28 10 3 027 D/C MAR-16220

Work awarded and to be commenced.Road cut advice received from High waysand HR submitted.

18LILO of Sriperumbudur - Koyambedu at Guindy (UGCable)

0 0 0 028 D/C MAR-16220

Work awarded on 03.09.1520LILO of Thatchankurichi - Eachangadu at Poiyur29 D/C 220

Tender finalised and work is being awarded.40LILO of Thiruvarur - Kadalangudi at Kumbakkonam30 D/C MAR-16220

Trasmission Lines: Page 57 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 58: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Cable already laid.1LILO of Tonidapet - Mylapore at TNEB HQ (UG Cable) 0 0 0 031 D/C DEC-15220

Commissioned 07/15.68LILO of Ulundurpet - STCMS at Ulundurpet 153 153 153 6832 D/C JUL-15220

Dharmapuri 400 KV SS has been sanctioned. Hence, work will be taken upaccording to that BP.

200MTPS St.III - Singarpet 0 0 0 033 D/C JUN-16400

Commissioned 05/15.338MTPS Stage-III - Thiruvalam (Ckt-II) (Balance) 33834 D/C MAY-15400

Work completed.39MTPS-Malco 50th tower-New common point towardsThingalur

0 0 0 3835 D/C SEP-14220

Work under progress. Cable laying work completed in 20/26 sections.25Mylapore - Tharamani (UG Cable) 0 0 0 036 D/C DEC-15220

At present,SC line works are under progress.70Ottiyambakkam - Omega 153 141 131 2637 D/C MAR-16220

One circuit to be terminated at Koyembedu (CMRL) for which work awarded andto be taken up and another one circuit to be terminated at Alandur(CMRL) forwhich revised administrative approval is accorded and tender opened on17.07.15. Evaluation is under process.

6PH Road - Koyambedu (UG Cable) 0 0 0 038 D/C MAR-16220

Work under progress. Objection by land owners involved atlocations 160 to 190.Isuues are being followed up. Multi circuit tower involved atloc.236 to 249. Loc 94: ROW issue involved and enter upon permission awaitedfrom District Collector. Location :187court case. Last hearing on 20.08.15. Issuesare being followed up.

62Palladam - Ingur 249 236 20839 S/C onD/C

MAR-16220

Line work completed. Will be energised along with the commissioning of the SS.86Rasipalayam - Anaikadavu 115 115 115 7740 D/C SEP-15400

Works are under progress. ROW issues involved at 14 locations. Distictcollectors Tiruppur, Erode and Dharmapuri approached for solving the issues.

390Rasipalayam - Salem 556 544 539 31241 D/C MAR-16765

Stub setting and tower erection is under progress.1Sholinganallur - KITS 50 34 23 242 D/C DEC-15220

Line work is under modification. Revised administrative approval is underprocess.

SEP-0620Sriperumbudur -Korattur (Changing of conductor) 70 0 0 1243 S/C MAY-13220

works are under progress.Court case and Railway crossing involved and issuesare being followed up.

358Thappakundu - Anaikadavu 499 498 494 32644 D/C DEC-15400

Line work completed.17Thingalur Common point - MTPS & MALCO line 39 39 39 945 D/C NOV-14220

Work completed40Thingalur Common Point-Gobi46 S/C MAR-14220

Ready for Commissioning 08/15.143Thiruvalam - Almathy 198 198 198 14347 D/C AUG-15400

Work under progress. ROW issue at one location. Enter upon permission16Tirunelveli (Abishekapatty) - Kanarpatty 49 41 35 1148 S/C SEP-15400

Trasmission Lines: Page 58 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 59: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

awaited from District collector/Tirunelveli. 7 nos. Locations are under waterlogging area.Due to poor progress by the contractor, termination notice issued for terminationof the contract.

55Villupuram - Ulundurpet 183 164 8 049 S/C DEC-15220

Trasmission Lines: Page 59 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 60: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED. (APTRANSCO)

Works Under Progress. Work delayed due to Natural calamities LYLA, HUDHUD and Row ,standing crops.

163Appannadorapalem - Bobbili 269 269 269 1621 D/C OCT-15220

130Chittoor 400 kV SS-Mananapalli2 D/C MAR-15220

Works under progressDEC-109Gaddamvaripalli- Goddumari 31 31 29 43 D/C DEC-15220

70Garividi - Garividi4 D/C 220

100Garividi - Pydibhimavaram5 D/C 220

Works terminated due to poor progress. Tenders to be called for balance works.75Garividi-Bobbili 125 86 0 06 D/C MAR-16220

136Jammalamadugu - Betamacherla7 D/C 220

Works are under progress. AP Transco deposited land cost to district collector,Kadapa for handing over site for erection of SS. Substation site yet to be handedover by the Revenue Department,Govt. of AP is under process.

JAN-15172Jammalamadugu - Chakrayapet 296 282 277 1618 D/C DEC-15220

Works under progress.JUL-15202Jammalamadugu - Narnur Kurnool Dist 282 281 279 1829 D/C DEC-15400

Works are under progress.Forest Cleanrence : DGPS Survey completed forforest clearence for laying 2.5 km of transmission lines in 9.05 Hectres of forestland. Field report from the FRO along with DGPS survey report of APTranscowere submited at Divisional Forest officer, Proddutur . Further the report fromDFO is to be submitted to the Higher Authorities of Forest Departement forclearence.

JAN-15198Jammalamadugu - Porumamilla 338 318 314 17310 D/C NOV-15220

works are under progress.JUL-1454Jammalamadugu - Tirumalayapalli 88 69 4711 D/C MAR-16220

Works under progress.JUL-15264Jammalamadugu - Uravakonda 347 280 221 7712 D/C DEC-15400

Works under progress.300Kalpaka - Proposed Garividi S/S 358 135 24 013 D/C MAR-16400

61Kalyandurg-Anantapur14 S/C MAR-14220

30Kamavarapukota - Kamavarapukota15 D/C 220

90Kamavarapukota - Nuziveedu16 D/C 220

Due to standing crops and people are demanding hug compensation than thecompenasation fixed up by Revenue authories and not allowing the works to becarried out in their locations. The frequent rains are also the reason for dlealy totake up the line works.

SEP-15212Kamavarrapukota - Surypet (Kamavarrapukota -Chinnakorukondi)

248 142 111 3517 D/C DEC-15400

Commissioned 07/15.180Krishnapatnam TPS- Chittoor(Balance) 18018 D/C JUL-15400

Trasmission Lines: Page 60 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 61: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

The Check survey is in progress.60Kurnool (Narnoor) - Gani S/S 5019 D/C 400

Works are under progress.DEC-14200LILO of Both ckt Pulivendula - Hindupur at Gollapuram 122 34 0 020 D/C 220

140LILO of Pendurthy - Garividi at Garividi21 D/C 220

80LILO of Podili - Nellore at Atmakur22 D/C 220

Shadnagar - Yeddumailaram line commissioned on 07.03.201412LILO of Shadnagar - Yeddumailaram atYeddumailaram

19 19 19 1223 D/C MAR-14220

22LILO of Uravakonda - Kalyandurga at Borampalli24 D/C 220

200Muddanur (RTPP) - Dharmavaram25 D/C 220

100Muddanur-Anantapur (3rd line)26 S/C onD/C

MAR-14220

60Narketpally_Suryapet27 S/C onD/C

MAR-14220

15Narsapur-Doultabad28 S/C MAR-15220

15Narsapur-Manoharabad29 S/C MAR-15220

20Nirmal-Nandipeta30 S/C MAR-15220

10Nizamabad-Janakampeta31 S/C MAR-15220

112Numa - Juyarni 166 165 162 7032 D/C SEP-15400

20Oddugudem-Koyagudem33 D/C MAR-15220

36Oglapur(Warangal 400 kV SS)-Warangal 220 kV SS34 D/C MAR-15220

Works are under progress, severe ROW at 5 location , I, IA, IA/I, IA/2,IB . SewaMandhir pargi Mandal Dist - Anantpur.

JUN-11250Pulivendula-Hindupur 393 393 389 24535 D/C DEC-15220

DEC-15112Purushottapatnam (Nunna) - Jujjuru36 D/C 400

repeated420Rayalaseema Stage-IV - Chittoor 0 0 0 037 D/C MAR-15400

Commissioned 3/13.17Rentachintala - Macherla S/S 58 58 58 1538 S/C MAR-13132

Commissioned 08/14.16Rentachintala - Nagarjuna Sagar Plant 34 34 34 1639 S/C AUG-14132

110Sattenapalli - Guntur40 D/C 220

20Somayajulapalli - Gani/Panyam S/S41 D/C 220

Trasmission Lines: Page 61 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 62: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Charged on 09/15. ( Reported late).NOV-108Thimmapuram- Yellanur 27 27 27 842 D/C SEP-15220

Works under progress.JUL-1543Tungabhadra river - Yemmiganur 58 54 54 3343 D/C OCT-15400

MAR-1572Uravakonda - Borampalli 111 12 0 044 D/C 220

Line is re-routed through the 220/132 kV SS Borampally SS and hence linelength increased.

NOV-14100Uravakonda - Kalyanduring 160 112 93 045 D/C MAR-16220

Works under progress.DEC-1432Uravakonda - Vajrakarur 57 44 33 046 D/C NOV-15220

LOI issued on 04.09.2015.Vemagiri - Kamavarapukota47 D/C 400

The works are getting delayed due to severe resistance from farmers and landOwners through their lands. These people are demanding huge compensationthat the compenasation fixed up by Revenue authories and not allowing theworks to be carried out. Water logged areas, collasable soil, existing crops andfrequent rains are also the reasons for delay to take up the line works. However,construction activity is being continued with the help of Revenue and otherconerned authorites.

NOV-15712Vizag TPP - KamavarapukotaKota 964 380 138 1048 D/C MAR-16400

Commissioned 07/15.14Vizag TPP - Kalpaka 1449 D/C JUL-15400

Works under progress.JUL-15205Yemmiganur - Uravakonda 271 270 266 18350 D/C OCT-15400

Trasmission Lines: Page 62 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 63: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

TRANSMISSIPN CORPORATION OF TELANGANA (TSTRANSCO)

14Budidampadu - Bhongiri (2nd Ckt) 24 24 24 141 D/C DEC-14220

25Chilakallu - Narketpally2 D/C 220

170Chinnakorukondi - Suryapet 234 209 173 283 D/C NOV-15400

Preliminary survey completed. Detailed survey to be awarded.Estimates under scrutiny.

200Gajwel - Narsapur 0 0 0 04 D/C MAR-15400

Works are under progress36Ghanapur - Marripally 72 71 67 105 D/C OCT-15220

145Jagityal - Nirmal 216 0 0 06 D/C MAY-15400

328Jaipur TPP - Gajwel (Quad) 459 459 455 3107 D/C OCT-15400

144Jaipuram - Jagityal 233 0 0 08 D/C MAY-15400

24Kalwakurthy-Dindi 3rd line9 S/C MAR-14220

15Kamareddy-Bhumpally10 S/C MAR-15220

SEP-15212Kamavarrapukota - Surypet ( Chinnakorukondi -Suryapet)

234 188 141 1811 D/C NOV-15400

8LILO of VTS - Malkaram (Ckt-I) at Suryapet 12 8 2 012 D/C NOV-15400

Commissioned 04/15.2LILO of 1st ckt of Shapurnagar - Gachibowlly line atMiyapur

213 D/C APR-15220

2LILO of Bhoothpur - Kalwakurthy at Thimmajipet 4 4 0 014 D/C SEP-15220

2LILO of Bhoothpur - Kalwakurthy at Thimmajipet (Ckt-II)

4 4 0 015 D/C SEP-15220

DEC-1314LILO of Budidampadu - Bhongiri at Waddekothapally16 D/C 220

Cable laying and jointing completed. OFC cable works in progress.18LILO of Ghanapur - Malkaram at Moulali17 D/C 220

34LILO of Kalpaka - Khammam at Asupaka 49 49 49 3418 D/C OCT-15400

60LILO of RSS - Warangal at Manthani19 D/C 220

Commissioned 05/15.19LILO of Shapur Nagar - Gachilbowli feeder at GISErragadda SS

1920 DC UGcable

MAY-15220

OCT-14160LILO of Srisailam - Hyderabad atYeddumailaram(Shankarapally)

221 221 221 15821 D/C OCT-15400

P.O.issued on 18.05.2013.Work completed.Substation works yet to becompleted.

34LILO of Vizag - Khammam (Ckt-I) at Asupaka 49 49 49 3422 D/C JAN-16400

Trasmission Lines: Page 63 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 64: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Works are under progress.11LILO of Wanaparthy - Ragimanagadda at Singotam XRoad SS

17 15 1423 D/C OCT-14220

Commissioned 07/15.2LILO of both ckt Dindi - Chandrayangutta at Bonguloor 224 D/C JUL-15220

Works are under progress. JC foundation works are under progress.22Lower Jurala HEP - Upper Jurala 36 29 25 325 D/C AUG-14220

Commissioned 04/15.6Mamidipally - Fab city 626 D/C APR-15220

All works completed and line commissioned on 03.11.201411Mamidipally S/S M/s K.S.K. Photo Voltaic near FabcityRavirala (V)

37 37 37 1127 D/C JUL-14220

Works are under progress.13/14 Nos Cable joints completed and remainingworks are under progress

14Marripally common point- Hayatnagar S/S XLPE cable 828 DC UGcable

MAR-15220

Works are under progress.Cable laying work completed. Joint works completed.cable along with substation is expeced to be charged by October-2015

18Moulali - Osmania University (Chilakalaguda) SS 1829 DC UGcable

AUG-14220

36Nagole - Ghanapur30 M/C OCT-15220

222Nandiwanaparthi - Shankarpalli 313 285 216 031 D/C NOV-15400

Pulichintala - Huzumnagar32 D/C DEC-15220

112Pulichintala - Huzurnagar33 D/C 220

298Singareni - Nirmal 17434 D/C JUN-17400

325Singareni TPS - Gajwel 460 451 444 21835 D/C AUG-15400

240Suryapet - Nandiwanaparthi 343 342 341 23636 D/C OCT-15400

462Suryapet - Shankarpalli 656 623 546 22037 D/C NOV-15400

240Vadarevu - Amangal 0 0 0 038 S/C AUG-15765

147Veltoor - Thungabhadra 200 184 158 839 D/C NOV-15400

84Veltur-Thimmajipet 129 52 0 040 S/C MAY-15220

Works are in progress135Yeddumailram - Pargi 137 137 137 9041 D/C 220

Trasmission Lines: Page 64 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 65: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

TRIPURA STATE ELECTRICITY CORPORATION LIMITED (TSECL)

AGTP - Agartala line1 D/C 132

AGTP - Kumarghat line2 S/C 132

ROW problems affected the work31Gamai Tilla - Dhalabil 107 101 78 173 S/C SEP-13132

20LILO of Rokia - Udaipur at Melaghat for connection toMonoarchak

40 0 0 04 D/C JUN-15132

Work in progress.42Monarchak - Surajmani Nagar 150 49 38 65 D/C MAR-15132

All works completed in non forest land. Stage- I clearance received andcompliance for conditions completed.

47P.K. Bari - Kanchanpur 113 109 99 176 S/C MAR-15132

Completed 9/1318Surajmani Nagar - Agartala 79 Tilla Grid S/S 71 71 71 187 D/C SEP-13132

Fund proposed in World Bank.6Surajmani Nagar - Badarghat 0 0 08 D/C MAR-15132

Completed 9/133Surajmani Nagar - Rabindra nagar 13 13 13 39 D/C SEP-13132

3.598 KM line in forest land for which TSECL will apply for forest clearance. LOAissued

20Surajmani Nagar - Rokhia 80 32 5 010 D/C DEC-14132

Proposed under NEC.50Surajmani Nagar - Udaipur 50 0 0 011 D/C JUN-15132

Fund not yet tied up. Proposed under World Bank Financing /SPA/NEC.260Surajmani nagar-P.K.Bari 0 0 0 012 D/C MAR-15400

Trasmission Lines: Page 65 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 66: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

U.P. POWER TRANSMISSION CORPORATION LTD. (UPPTCL)

Commissioned 09/15.20220 kV LOC 49 of Roza-Hardoi to 220 Shahjehanpur 201 D/C SEP-15220

WIP.AUG-16142Agra (UP) - Mathura line 388 223 19 02 S/C MAY-16400

Foundation WIP.AUG-16142Agra(UP) - Agra (South) 190 139 39 03 D/C MAY-16400

Tower material reached at site.69Aligarh - Atrauli 125 80 68 24 D/C OCT-15220

Line energised date not issued due to incomplition of Aligarh substation. Balancework of line on hold due to DFCC work. Restoration work is in progress on 9towers. The proposed date of energization is 10.10.2015

190Aligarh - Sikandarabad 258 254 254 1675 D/C OCT-15400

Work yet to be awarded.Allahabad (PG) - Rewa Road (Allahabad)6 D/C 400

Contract of the firm M/s Maharashtra Power Transmission Structures Ltd. hasbeen terminated on 20.05.2014 and LOI issued on 30.12.14 by SE, Mirzapur forthe balance work. Work in progress.

10Anpara B-Anpara D 23 23 21 67 D/C OCT-15400

1.Apnara D - Jhusi section.(a) Wild life approval: line passes through Kaimpur Wild Life Sanctuary (45.132Ha). Govt. of U.P. forwarded recommendation to MOEF on 24-12-2013.Proposal has been approved by National Wild Life Board. Writ Petition IA no.3846-3847/2015, dated- 24.02.2015, has been filed at Supreme Court, NewDelhi.Case was listed on 5 & 6 May, 2015 but could not be heard and court closed.After summer vacation court has been opened however hearing of the case ispending in Green Bench.(b). Forest Clearance: 765 kV S/C Anpara D - Jhusi line (315.716 Ha) Proposalhas been submitted by Secretary (Forest), Govt. of U.P. to MOEF on 21-06-2013.Regional empowered committee in meeting dated 28.05.2015 has deferred thecase due to non receipt of essential document sought from Nodal Officer,Lucknow and also instructed to get fresh site inspection done to know the statusof violation and to submit list of trees to be felled.

JAN-12416Anpara D - Unnao 1215 1034 989 3008 S/C DEC-15765

Termination point at 400kv s/s Aurai not yet decided. Severe ROW at 15 loc'sbeing pursued.

43Aurai - Mizapur 147 129 82 09 S/C OCT-15220

Termination point at 400kV s/s Aurai(PPP) not yet decided. Last 2 Sectionswork held up due to this. ROW at loc. 2/1 , 3/0, 4/0, 5/0, 12/0,

71Aurai - Phoolpur 216 210 195 4810 S/C OCT-15220

Trasmission Lines: Page 66 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 67: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

12/1, 12/2,17/5, 39/3,53/0,53/3, 53/2 being persued.

Work completed except 12 km OPGW stringing. WIP86Badaun - Sambhal 250 250 250 8611 S/C OCT-15220

It was decided by DM to make payment to farmers on pro rata basis of PGCILcompensation which is not tenable, matter taken up by MD, UPPTCL with DM,Bagpat for resolving.

13Baghpat - Baghpat 49 45 33 012 S/C OCT-15220

19Balrampur - Utraula 56 56 56 1913 S/C 132

M/s Larsen and Tubro Ltd. Chennai is allotted for the balance work on 'as iswhere is basis' on 10.12.14. Foundation work is in progress on Banda -Allahabad line. Proposal of Profile and tower scheduling is handed over to theEE (Banda) after the survey of Banda - Orai line.

350Banda - Allahabad (Rewa Road) DCQ 484 375 55 014 D/C OCT-15400

M/s Larsen and Tubro Ltd. Chennai is allotted for the balance work on 'as iswhere is basis' on 10.12.14.Survey is in progress. The physical verification ofMs. MPTL store is pending on the reconcillation field level.

216Banda - Orai DCQ 295 211 130 015 D/C OCT-15400

Line energized on 26.05.14. Barkhera-pilibhit Section,I ckt. Energisedon10.02.12.II ckt. On 14.2.12

Barkhera (Bajaj) - Dohna 203 203 203 12916 D/C MAR-15132

Bayas - Dohna17 D/C 132

Bayas - Pilibhit18 D/C 132

.Bhognipur - Gatampur19 S/C 765

Bhognipur - Jawarharpur20 S/C 765

Bhognipur - Moradabad/Rampur21 S/C 765

.Bhognipur - Orai (PG)22 2xS/C 765

Bilhaur - Sandila23 S/C 765

Bilhaur - Kanpur (PG)24 D/C 400

Joint Survey of line done by EE, ETD, Mathura & M/s ECI, foundation work tostart immediately.

60Chhatta - Mathura 114 11 0 025 D/C MAR-16220

40Dasna (400) - Faridnagar 0 0 0 026 S/C OCT-15220

Shifting of 11KV line to be done by Distribution wing is awaited for balance work.83Deoria - Rasra 253 253 252 8227 S/C OCT-15220

Rly xing approval pending for loc 26-27, Crop compensation cases pending,work stop at loc. No. 61 &25 due to crop compensation not paid .

48Dohna - C.B. Ganj 92 92 82 2928 S/C OCT-15220

.Dopaha - Anpara29 D/C 765

Trasmission Lines: Page 67 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 68: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Dopaha - Ghazipur30 D/C 765

Dopaha - Varanasi / Jaunpur31 D/C 765

FdnWIP,Fdn ROW at Loc-32 shall be resolved by month end, under court case,anchor tower excavation work will start on 15.10.15. The proposed date ofcomplition is 31.10.15.

Dumariaganj- - Utraula 114 108 107 3232 S/C OCT-15132

01 Er. and 02 Str gang working at site, Rly block approval awaited being persuedat local level.

AUG-0937Gajokhar-Jaunpur 132 132 132 3233 S/C onD/C

OCT-15220

.Ghatampur - Moradabad / Rampur34 2xS/C 765

Ghatampur - Kanpur (PG)35 D/C 400

Ghazipur - Varanasi / Jaunpur36 S/C 400

Tower material reached at site.41Gokul-Mitai(Hathras) 135 128 123 637 S/C OCT-15220

.460Gonda - Shahjehanpur (PG)38 D/C 400

23Gr. Noida - JPSK 0 0 0 039 S/C 220

Land of Pratap Vihar Sub-station not finalised.16Indirapuram - Pratap Vihar 0 0 0 040 D/C 220

Jawaharpur - G Noida41 D/C 765

Jawaharpur - Agra (UP)42 D/C 765

Jawarpur - Mainpuri43 D/C 765

Khurja - Hapur44 S/C 765

LILO Mainpuri (PG) - Harduaganj at Jwrpur45 D/C 220

patrolling completed but Erection work has not started, Firm asked toimmediately take up work.

67LILO of 1st Ckt Bhogaon-Mainpuri at Sirsaganj 111 107 46 046 D/C OCT-15400

WIP.AUG-1664LILO of Agra - Muradnagar at Mathura 88 47 0 047 D/C MAR-15400

LILO of Agra - Muradnagar at Kurja48 D/C 4.4

Line energised date not issued due to incomplition of Aligarh substation. Balancework of line on hold due to DFCC work. Restoration work is in progress on 9towers.

LILO of Aligarh - Sikandarabad 258 254 254 16649 D/C OCT-15400

LILO of Anpara - Mau at Ghazipur50 D/C 400

Work not Started.120LILO of Azamgarh - Sultanpur at Tanda51 D/C 400

FDN WIP.90LILO of Bhauti - Orai at Sikandara 105 25 0 052 D/C DEC-15220

Trasmission Lines: Page 68 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 69: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

LILO of Bhognipur - Mbd at Bilhaur53 D/C 765

LILO of Ghatampur - Mbd at Sandila54 D/C 765

Work stopped due to rain as low lying area due to Terai region.40LILO of Gorakhpur - Basti at Bansi 155 53 12 055 S/C OCT-15220

01 no Erection & 01 no stringing gang working at site, ROW resolved, Erection atLOC-2 & stringing at LOC AP7-AP8 WIP

43LILO of Harduagani - Hathras at Aligarh 70 70 66 1756 D/C OCT-15220

Commissioned 09/15.6LILO of Harduaganj- Khair (Aligarh) line at Boner 657 D/C SEP-15220

Route Survey under progress and expected to be completed by 10.10.1530LILO of Hathras - Gokul at Mathura58 D/C OCT-15220

LILO of Mainpur (765) Aligarh (400) at Jwrpur59 D/C 400

LILO of Mainpur - Etah at Jwrpur60 D/C 220

LILO of Mainpuri - Gr Noida at Khurja61 D/C 765

.104LILO of Mohanpur - Behat line62 S/C 220

WIP.30LILO of Muradnagar - Loni at Ataur 91 9 0 063 S/C OCT-15220

It was decided by DM to make payment to farmers on pro rata basis of PGCILcompensation which is not tenable, matter taken up by MD,UPPTCL with DM,Bagpat for resolving.

9LILO of Muradnagar - Shamli at Baghpat 20 15 12 064 S/C OCT-15220

Commissioned 04/15.20LILO of Muzaffarnagar - Nara II at Jansath Ckt-II 2065 D/C APR-15220

Rly Xing Case at Loc. 17 - 18. submitted to DRM jhansi. Work stopped fromseveral month.Contract terminate of M/s Hythro vide SE, ETDC lucknow letterno. 2055 dtd. 03.06.15

6LILO of Orai - Bhauti at Orai 15 13 8 066 S/C OCT-15220

Line charged on 14.02.14100LILO of Orai - Mainpuri at Bah 258 258 258 15467 S/C MAY-14220

.LILO of Panki - Muradnagar at Jwrpur68 D/C 400

1 Stringing gang working at site,1 no Er gang present at site, firm asked toincrease str gang and deploy erection gang immediately.

42LILO of Sarnath (400) - Azamgarh at Harhua 75 75 70 2069 S/C OCT-15220

Work not Started.LILO of Sarnath - Azamgarh at Varanasi / Jaunpur70 D/C 400

Line completed on 11.09.2015 at 20.55 Hrs.MAR-1118LILO of Shajahanpur - Hardoi line at Rosa 52 52 52 1771 S/C SEP-15220

Str ROW 76-78, being persued , Str (2 no. gangs) WIP.48LILO of Sultanpur - Phoolpur at Pratapgarh 80 80 80 4672 D/C OCT-15220

12LILO of Unnao - Bareilly at Shahjahanpur73 D/C 400

.LILO of Unnao - Mainpur at Bilhaur74 D/C 765

WIP.AUG-1668LILO of existing Agra (UP) - Agra (PG) at Agra (UP) 100 31 11 075 D/C MAY-16400

Trasmission Lines: Page 69 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 70: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

WIP.AUG-16158LILO of existing Agra (UP) - Muradnagar at Agra (UP) 212 62 11 076 D/C MAY-16400

Commissioned 09/15.1LILO of khurja-NAPP-I line at Debai 177 D/C SEP-15220

Commissioned 04/15.19Lalitpur - Lalitpur TPS (Ckt-II) 1978 D/C APR-15220

Foundation and Tower erection work in progress.Stringing work may be start inOct 2015.

AUG-16332Lalitpur TPS - Agra (UP) Ckt-I 955 701 319 079 S/C MAY-16765

Fdn & Ere work is in progress. The proposed date of completion is Oct 2015.AUG-16334Lalitpur TPS - Agra (UP) Ckt-II 889 715 321 080 S/C MAR-15765

Erection work in progress.50Lucknow PG (400) - Kursi Road 66 66 14 081 D/C DEC-15220

220Mathura - Jawaharpuram82 D/C 400

Meja - Bargarh83 D/C 765

Land of Pratap Vihar Sub-station not finalised.36Morti - Pratap Vihar 0 0 0 084 D/C 220

Completed 09/15.0Muradnagar-Agra line 085 D/C SEP-15400

Commissioned 04/15.12Muzaffarnagar - Nara Ckt-II 1286 D/C APR-15220

Line completed OPGW work under progress216Rosa - Dohna 340 340 340 21687 D/C OCT-15220

Profile Submitted.104Saharanpur (PG)-Behat88 D/C OCT-15220

Higher water level of river(river crossing).18Sahupuri-Bhelupur 39 39 38 1589 D/C SEP-15220

Sandila - Farrukhabad90 S/C 400

Sandila - Lucknow Hardoi Road91 S/C 400

ROW at 1location -32/2, matter in court ,crop compensation yet to be paid , EESitapur adviced to more interest for completion of line.S/s Ready.The proposeddate of complition 31.12.15.

121Shahjahanpur - Nighasan 369 368 358 10492 S/C OCT-15220

Row in Foundation at loc no. 84, under court case. S/s Ready.The proposeddate of complition 31.10.15.

110Sitapur - Nighasan 336 335 317 8293 S/C OCT-15220

FDN, ROW at 10 locs loc no- 11,12,23,29,157,183,190,248,249,250 Er ROW atloc no 145, Str ROW at loc no.-92, crop compensation cases pending.

185Sohawal - Tanda 348 335 216 2494 D/C OCT-15220

200Tanda - Gonda95 D/C 400

Varanasi / Jaunpur - Gorakhpur96 D/C 400

Varanasi/Jaunpur - Aurai97 D/C 400

Trasmission Lines: Page 70 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 71: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Varanasi/Jaunpur - Azamgarh98 D/C 400

Varanasi/Jaunpur - Meja99 D/C 765

Trasmission Lines: Page 71 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 72: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

WEST BENGAL STATE ELECTRICITY TRANSMISSION CO. LIMITED (WBSETCL)

MAY-1713Alipurduar - Alipurduar (PG) 0 0 0 01 D/C MAR-16220

JUN-14210Gokarna - Krishnanagar 389 388 382 1922 D/C SEP-15220

JAN-17340Gokarna - N. Chanditala 514 167 0 03 D/C FEB-16400

APR-16107Kharagpur - Egra 205 152 135 204 D/C APR-16220

SEP-16277Kharagpur - N. Chanditala 405 357 232 145 D/C FEB-16400

Work under progress. Progress delayed due to ROW problem and court cases.APR-1492Kharagpur - Vidyasagar Park 133 126 114 706 D/C SEP-15220

Server RoW issue rerouting line is proposed.AUG-0820LILO of Arambagh -Rishra at Singur 37 10 2 07 D/C MAR-16220

SEP-1613LILO of Bakreswar - Gokarna at Sadaipur 27 1 0 08 D/C MAR-16220

9LILO of Jeerat - Rishra at Dharampur 21 0 0 09 D/C FEB-16220

JUL-1589Sagardighi - Gokarna 154 130 52 010 D/C FEB-16400

PGCIL is executing the work as a deposit work of WBPDCL.The work is stalled due to repeated theft. WBPDCL asked PGCIL to take up withthe present vendor for resumption of work or deploy a new vendor by cancellingthe existing contract.

OCT-08224Santaldhi TPS-Bishnupur 347 347 325 19311 D/C 220

Line commissioned on 02/12/2014.MAR-1025Sushasgram- Saintala 51 51 51 2512 D/C NOV-14220

SEP-0821Teest LDP -III - Teesta LDP-IV 94 83 67 613 S/C DEC-15220

SEP-08145Teesta LDP - III - New Jalpaiguri (NJP) 250 250 250 13814 D/C SEP-15220

Trasmission Lines: Page 72 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 73: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

XYZ ()

.Bhavanapaddu TPP - Sri Kakulam1 D/C 400

Bilaspur (PS) - Dhanwahi (PS)2 D/C 765

.CSPL TPS - Raigarh Pooling Station (Near Kotra)3 D/C 400

Champa (Pool) - Dharamjaigarh 2nd Ckt4 S/C 765

.Chitrangi TPS - Vindhyachal Pooling Station5 D/C 765

Dwarkesh Energy TPP - Indore6 D/C 765

Ellora TPP - Seoni7 D/C 765

Gadarwara STPS - Jabalpur Pool8 D/C 765

Gadarwara STPS - Warora9 D/C 765

Gwalior - Morena10 D/C 765

110HEGCL TPP - Pune (AIS) (PG)11 D/C 400

Karchanna - Rewa Road Allahabad12 D/C 400

LILO of Both ckt Jabalpur - Orai at Dhanwahi (PS)13 2xD/C 765

LILO of Both ckt Wardha - Parli (PG) at Warora14 D/C 400

LILO of Gazuwaka - Behrampure at BhavanapadduTPP

15 D/C 400

LILO of Lonikhand - Kalwa at HEGCL TPP16 D/C 400

LILO of Raipur/Bhilai - Bhadrawati at Rajnandgaon17 D/C 400

.LILO of Tuticorin - Madurai at Ind Barath TPP(madras)

18 D/C 400

LILO of Vindhyachal - Jabalpur at Dhanwahi (PS)19 2xD/C 400

LILO of one ckt of Aurangabad - Padghe at Pune20 D/C 765

Maheshwaram (PG) - Mahboob Nagar21 D/C 400

Mohindergarh - Bhiwani22 D/C 400

.NCC Power TPP - Nellore Pooling Station (PG)23 D/C 400

NNTPS - Villupuram (Ginjee)24 D/C 400

Trasmission Lines: Page 73 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 74: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Nizamabad - Yeddumailaram (Shankarapalli)25 D/C 400

.Orrisa UMPP - Jharsuguda Pooling Station26 D/C 765

.PLNGL TPP - Vadodra27 D/C 400

Parli (New) - Parli (PG)28 D/C 400

Parli (New) - Solapur29 D/C 765

Raigarh (Kotra) - Champa (Pool) 2nd Ckt30 S/C 765

.Raigarh TPS - Raigarh Pooling Station (Near Tamnar)31 D/C 400

Raipur (Pool) - Rajnandgaon32 D/C 765

Rajnadgaon - Warora33 D/C 765

.Reliable TPP - Vindhyachal Pooling Station34 D/C 765

.107SJK TPS - Jabalpur Pooling Station 339 330 292 5935 D/C 400

Sasan UMPP - Vindhyachal (PS)36 S/C 765

Sipat - Bilaspur (3rd PS)37 S/C 765

.Suzlon wind farm - Bhachau (PG)38 D/C 220

Line under construction.30TRN TPP - Raighar (near Tamnar) Pooling Station39 D/C JUN-15400

Vindhyachal (PS) - Jabalpur (PS)40 D/C 765

Vindhyachal STPP - Vindhyachal (2nd Quad)41 D/C 400

Warora (PS) - Parli (New)42 D/C 765

Welspun Anuppur TPS - Vindhyachal Pooling Station43 D/C 400

Trasmission Lines: Page 74 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 75: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

ADANI POWER LTD. (APL)

CommissionedLILO of Korba-Mopka at Swastic TPP 1321 D/C 132

Trasmission Lines: Page 75 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 76: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

ATHENA CHHATTISGARH POWER LIMITED ()

50Athena Singhitarai - Raigarh Pooling Station (nearKotra)

75 75 73 401 D/C SEP-15400

.LILO of one ckt of MSCTL - Chandrapur at Singhitrai2 D/C 400

Trasmission Lines: Page 76 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 77: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

BAJAJ ENERGY PVT. LTD. (BEPL)

Existing line.Balrampur-Utraula line1 D/C 132

Trasmission Lines: Page 77 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 78: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

BHARAT ALUMINIUM CO. LTD. (BALCO)

Stage-I Clearance is awaited.46Balco - Dharamjaygar Pooling Station 72 72 70 421 D/C OCT-15400

Trasmission Lines: Page 78 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 79: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

CORPORATE POWER LTD. (CPL)

6Corporate TPP - Jharkhand Pooling Station 111 D/C DEC-12400

.216Latehar - Namkum 320 293 274 1322 D/C DEC-12400

Trasmission Lines: Page 79 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 80: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Costal Energen Private Limted (CEPL)

The total length of line is 38 KM and line will be extended from 22 ckm iscompleted of Mudrai - Tuticorin LILO line.

76Mutiara TPP - Tuticorin Pooling Station 32 32 32 221 D/C DEC-15400

Trasmission Lines: Page 80 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 81: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

D.B.POWER CORP. LTD. (DBPCL)

Line completed. (Interim)30LILO of Raigarh - Raipur (3rd Ckt) at Baradhara TPP (Interim arrangement)

44 44 44 301 D/C MAY-13400

Trasmission Lines: Page 81 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 82: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

DANS ENERGY PVT. LTD. (DEPL)

220 kv line from Jorethang switchyard to interconnection point has beencompleted as in interim arrangement.

20Jorethang HEP - New Melli 35 35 35 201 S/C AUG-15220

Trasmission Lines: Page 82 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 83: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Darbhanga Motihari Transmission Company Limited ()

1) As per RFP, there was no forest in the route of transmission line. Involvementof forest is a deviation from RFP Documents.

2) Line has approx. 9 Km. of river bed. The unexpected increase in water levelhas affected the site work.

3) The no of power line crossings increased from 8 Nos. to 14 nos. w.r t RFPdocument.

4) ED increased to 12.5% from 12.36% and service tax to 14% from 12.35%.

JUL-16152LILO of both ckt Barh - Gorakhpur at Motihar 209 109 32 01 D/C AUG-16400

1) As per RFP, there was no forest in the route of transmission line. Involvementof forest is a deviation from RFP Documents.

2) There is change in co-ordinates at Muzaffarpur S/S end.

3) The no of power line crossings increased from 2 Nos. to 8 nos. w.r t RFPdocument.

4) ED increased to 12.5% from 12.36% and service tax to 14% from 12.36%.

JUL-16129Muzaffarpur - Darbhanga line 173 128 106 152 D/C JUN-16400

Trasmission Lines: Page 83 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 84: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

ESSAR POWER TRANSMISSION CO. LTD. (EPTCL)

Due to monsoon the work progress of MSTL is very slow.670Mahan -Sipat 942 938 909 3941 D/C MAR-16400

.Navbharat TPP - Angul P.S. (PG)2 D/C 400

.Tori - Jhharkhand Pooling Station3 D/C 400

Trasmission Lines: Page 84 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 85: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

GATI INFRASTRUCTURE LTD. (GATI)

Line commissioned.Chujachen HEP - Rangpo PS1 D/C 132

Commissioned 04/13. (Interim arrangement)47LILO of Melli - Gantok at Chuzachen (LILO point atnamthang)

91 91 91 472 D/C APR-13132

.LILO of one circuit of Rongnichu - Randpo at Bhasmay3 S/C APR-13220

Trasmission Lines: Page 85 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 86: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

GMR ENERGY LIMITED (GMR ENERG)

.Alaknanda HEP - Joshimath1 D/C 220

For start up power,work completed 5/12.1LILO of Talchar -Meramundli at Kamalanga TPP 3 3 3 12 D/C MAY-12400

Commissioned in February 2014. Reported in July 2015.131Raikheda (GMR) - Raipur Pooling Station 181 181 181 1313 D/C JUL-15400

Trasmission Lines: Page 86 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 87: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

GUPTA ENERGY PVT. LTD. (GEPL)

.LILO of one ckt of Bhadrawati -Parli at GEPL TPS1 D/C 400

Trasmission Lines: Page 87 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 88: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

HIMACHAL SORANG POWERGEN PVT. LIMITED (HSPPL)

LILO connection is pending.6LILO of one ckt Karcham wangto - Abdullapur atSorang

11 11 11 61 D/C AUG-15400

Trasmission Lines: Page 88 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 89: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

IDEAL ENERGY PROJECTS LTD. (IEPL)

The progress of Koradi-Wardha line is slow . Forest clearence awaited.50LILO of Koradi II- Wardh(PG) at Bela TPP 75 75 75 501 D/C DEC-15400

Completed (Interim)0LILO of Mouda - Wardha at Bela 2 2 2 02 D/C NOV-12400

Trasmission Lines: Page 89 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 90: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

IND BHARATH POWER INFRA LIMITED (IBPIL)

84Ind Barath - Jharsuguda pooling Station 125 119 115 601 D/C AUG-15400

47LILO of Rouekila - Raigarh at Ind Barath 72 72 72 472 D/C JUN-15400

Trasmission Lines: Page 90 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 91: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

INDIABULLS POWER LTD. (IBPL)

Ready for commissioning 08/15.57Nasik - Bobleshwar (2nd Ckt) 152 152 152 571 D/C AUG-15400

Trasmission Lines: Page 91 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 92: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

JAIN ENERGY TRADING LTD (JAIN ETL)

.Jain Energy TPS - Dharamjaygarh Korba Poolingstation

1 D/C 400

Trasmission Lines: Page 92 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 93: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

JHABUA POWER LTD. (JHAPL)

Commissioned 05/15.131Jhabua Power TPS - Jabalpur Pooling Station. 207 207 207 1311 D/C MAY-15400

Trasmission Lines: Page 93 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 94: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

JINDAL POWER LTD. (JPL)

Interim arrangement removed.110LILO of Meramundali - Jaypore at Derang 163 163 163 1101 D/C JUN-14400

Trasmission Lines: Page 94 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 95: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

KORBA WEST POWER COMPANY LIMITED (KWPCL)

There are RoW issues involved at 8 locations.42Avantha Bhandar TPS (Korba West) - Raigarh (Kotra) 64 64 60 221 D/C NOV-15400

Interim arrangement.10LILO of on Ckt of Raigarh - Raipur at AvanthaBhandar (Korba west ) TPS

22 22 22 102 D/C DEC-13400

Trasmission Lines: Page 95 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 96: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

KSK ENERGY VENTURE LTD. (KSK LTD.)

Ready for Commissioning 06/15.105KSK Mahanadi (Warda Power) - Champa PoolingStation

164 164 164 1051 2xD/C JUN-15400

Commissioned 04/15. (Interim)71LILO of both ckt, of Raigarh - Raipur at Akaltara TPP 118 118 118 712 2xD/C APR-15400

Trasmission Lines: Page 96 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 97: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

KVK ENERGY PVT. LTD. (KVK)

Work yet to Start.16LILO of Mendasal - Baripada at Nilanchal TPP 0 0 0 01 D/C JUN-16400

Trasmission Lines: Page 97 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 98: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Kudgi Transmission Company Limited (KTCL)

Ready for Commissioning 08/15.FEB-1536Kudgi TPS - Narendra 46 46 46 361 2xD/C AUG-15400

The villagers are not allowing for any construction work at the respectivelocations and asking for huge compensation.Matter is brought to the notice of District Administration. These locations arenearer to 400/220 kV POWERGRID Bidadi substation. Being terminating point,no alternatives available for re-routing the line.

DEC-15186Madhugiri - Bidadi 256 221 189 362 D/C DEC-15400

DEC-15758Narendra (New) - Madhugiri 870 789 720 3843 D/C DEC-15765

Trasmission Lines: Page 98 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 99: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

LANCO ENERGY (P) LTD,. (LEPP)

Work yet to start.48Babandh TPP - Angul Pooling Station 72 0 0 01 D/C DEC-16400

15LILO of Seoni - Wardha at Lanco Vidarbha TPS 162 D/C DEC-13765

.95Lanco Amarkantak - Champa Pooling Station 158 96 12 03 D/C APR-16400

8Phata HEP-Baramwari (Rudrpur) 20 0 0 04 D/C DEC-16220

.Routing of one circuit of Jorthong - New Melli viaRangit - IV

5 D/C DEC-13220

Detail survey completed section 164 approval received. Work yet to started.25Teesta VI HEP - Rangpo Pooling Station6 D/C 220

Trasmission Lines: Page 99 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 100: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

MALANA POWER COMPANY (MPCL)

Chango Yangthang - Ka Dogri Pooling Station1 D/C 220

.Ka Dogri - Jangi Pooling Station2 D/C 400

Trasmission Lines: Page 100 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 101: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

NORTH EAST TRANSMISSION CO. LTD. (NETC)

Stringing Completed but cannot be commissioned since loop out arrangement byMeghalaya State Electricity Board is not ready at Byrnihat 400 kV S/S.

42Byrnihat - Azara (1st ckt) 124 124 124 421 D/C JUL-14400

Trasmission Lines: Page 101 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 102: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

NORTH KARANPURA TRANSMISSION CO. LTD. (NKTCL)

NOV-13220Agra - Gurgaon1 D/C SEP-15400

NOV-13240Bareilly - Meerut2 S/C SEP-15765

NOV-1320Gurgaon - Gurgaon (PG)3 D/C SEP-15400

NOV-13220Lucknow - Bareilly4 S/C SEP-15765

NOV-13334Seoni - Sipat / Korba (Pooling).5 S/C SEP-15765

Trasmission Lines: Page 102 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 103: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

NRSS XXXI (B) Transmission Limited (NRSSXXXI(B))

1)Due to change in co-ordinate at Malerkotla end, the line length increased by1.5 Km.2)Double level Gantry is to be considered at Malerkotla end for termination ofKurukshetra and Amritsar Lines which was not specified in RFP Document.3)As per RFP Documents, no forest was involved in the route of line. However,involvement of forest is a deviation from RFP document.4)Increase in Power line crossing from 15 to 19 nos w.r.t RFP Document.5)Court Case at Location no. 35/0 and 13/2.6)Severe ROW near Malerkotla S/S end.

SEP-16278Kurukshetra - Malerkotla line 375 216 100 21 D/C SEP-16400

1)Double level Gantry is to be considered at Malerkotla end for termination ofKurukshetra and Amritsar Lines which was not specified in RFP Document.2)As per RFP Documents, no forest was involved in the route of line. However,involvement of forest is a deviation from RFP document.3)Severe ROW near Malerkotla S/S end.4)Increase in water level in Beas river has affected the Pile Work.

SEP-16298Malerkotal - Amritsar line 412 198 108 12 D/C SEP-16400

Trasmission Lines: Page 103 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 104: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

NSL NAGAPATNAM POWER PVT. LTD. (NSLNPPL)

Project Authority intimated that PGCIL yet to award construction of work.46NSL TPP - Angul 0 0 0 01 D/C 400

Trasmission Lines: Page 104 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 105: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

PATRAN TRANSMISSION COMPANY LIMITED (PATRANTCL)

LILO of both ckt of Patiala - Kaithal at Patran1 D/C MAR-16400

Trasmission Lines: Page 105 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 106: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

RELIANCE POWER TRANSMISSION LTD. (RPTL)

.Moti Khavdi TPP - Jam Nagar1 D/C 400

Progress stalled due to non-availability of MP state Forest Clearance (Stage-II) &Wildife Clearance.

JUN-11486Rajgarh (PG) - Karamsad (GETCO) 654 651 651 4822 D/C MAR-16400

Commissioned in March 2012. reported in july 2015.(Line Charged by passingShahjehanpur S/S).

16Rosa - Shahjehanpur (PG) 163 D/C JUL-15400

Trasmission Lines: Page 106 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 107: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

RKM POWERGEN PVT. LIMITED (RKMPPL)

Commissioned (Interim Arrangement)LILO of Raigarh (Kotra) - Raipur at Uchpinda (InterimArrangement)

1 D/C 400

1. Server ROW Issue.2. Bay at Dharmjaygard completed.

57Uchpinda - Raigarh line 96 96 96 562 D/C SEP-15400

Trasmission Lines: Page 107 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 108: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

SHIGA ENERGY PVT. LTD. ()

20Legship - New Malli 33 0 0 01 D/C MAR-16220

Preliminary survey for selection of the final transmission line route as well asdetailed survey along the selected transmission line route has been completed.Actions for land acquisition and obtaining various clearances as well as finalizingthe design consultant are in progress. Prior approval from CEA for installation ofoverhead transmission line has also been received.

14Tashiding - Legship 21 0 0 02 D/C 220

Trasmission Lines: Page 108 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 109: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

SKS POWER GENERATION LTD. (SKS)

Commissioned 05/15.55Binjkote - Raigarh (Kotra) Pooling Station 93 93 93 551 D/C MAY-15400

Interim arrangement removed.LILO of one ckt of Raigarh - Raipur at Binjkote TPP2 D/C 400

Trasmission Lines: Page 109 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 110: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

SPECTRUM COAL & POWER LTD. (SCPL)

Commissioned.24Ratija-Kasiapalli 241 D/C 132

Trasmission Lines: Page 110 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 111: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

STERLITE ENERGY LIMITED (SEL)

Construction of line yet to be started from LILO Point to Jhasugda S/S.Sterlite TPP - Jharsuguda1 2xD/C 400

Trasmission Lines: Page 111 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 112: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

STERLITE GRID LTD. (SGL)

Commissioned 09/15.MAR-14758Dhramjaygarh - Jabalpur (JTCL) 992 992 992 7581 D/C SEP-15765

Commissioned 06/15.MAR-14274Jabalpur - Bhopal (BDTCL) 665 665 665 2742 S/C JUN-15765

Commissioned 06/15.MAR-14245Jabalpur - Bina (JTCL) 610 610 610 2453 S/C JUN-15765

Transmission licensee granted by CERC. Tariff adoption done by CERC. Stage-II is pending with Regional MoEF Chandigarh.Force mejure events flood ,BorderCeasefire violation, unseasonal heavy snow fall, rain fall and land slides noticessent to all LTTC's. As per notification SRO-105 by Dept. of Finance, Govt. of J&KGST has been changed from 10% to 12 % w.e.f 1st April 2015. Central Exciseduty has been increased 12.36% to 12.5 % w.e.f 1st March 2015. Service taxhas been increased 12.36% to 14% w.e.f 1st June 2015. Custom duty has beenchanged due to Finance Act.line expected to commission by February, 2016.

AUG-18270Jullandhar - Samba line 356 221 152 14 D/C FEB-16400

Force Majeure event: Delay in forest clearance.Transmission licensee grantedby CERC. Tariff adoption done by CERC.Project execution plan submitted to CEA & lead LTTC.Kharagpur S/s &Chaibasa S/s bays orientation has been shifted & project has been delayed dueto shifting of bays.Resurvey has to be done for route & forestidentification.Central Excise duty has been increased 12.36% to 12.5 % w.e.f1st March 2015. Service tax has been increased 12.36% to 14% w.e.f 1st June2015. Custom duty has been changed due to Finance Act. The same has beenintimated to all LTTCs.

MAR-16Kharagpur (WBSETCL) - Chaibasa (PG) 421 318 279 385 D/C 400

Transmission licensee granted by CERC. Tariff adoption done by CERC.Forcemejure events flood ,Border Ceasefire violation, unseasonal heavy snow fall,rain fall and land slides notices sent to all LTTC's. As per notification SRO-105by Dept. of Finance, Govt. of J&K GST has been changed from 10% to 12 %w.e.f 1st April 2015. Central Excise duty has been increased 12.36% to 12.5 %w.e.f 1st March 2015. Service tax has been increased 12.36% to 14% w.e.f 1stJune 2015. Custom duty has been changed due to Finance Act.Substation Landis identified near Village Sri Wara Pora, District-Baramula and land acquisition isin progress.line expected to commission by August,2017.

AUG-186LILO of Both ckt Uri - Wagoora at Amargarh6 D/C AUG-17400

Force Majeure event: Delay in forest clearance. Transmission licensee grantedby CERC. Tariff adoption done by CERC. Project execution plan submitted toCEA & lead LTTC. Bays at Purulia S/s & Ranchi S/s has been

MAR-16370Purulia PSP (WB) - Ranchi (PG) 302 35 14 07 D/C APR-16400

Trasmission Lines: Page 112 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 113: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

shifted by the respective Utilities due to which project has been delayed asresurvey has to be done again for route & forest identification. In this regardNotice has been served to LTTC's.Multiple changes in substation gantrycoordinates and Issues are pending with CTU & WBSETCL. Forest DiversionProposal is pending with CF/CCF.FAC is pending.Central Excise duty has beenincreased 12.36% to 12.5 % w.e.f 1st March 2015. Service tax has beenincreased 12.36% to 14% w.e.f 1st June 2015. Custom duty has been changeddue to Finance Act. The same has been intimated to all LTTCs.

Force Majeure event: Delay in forest clearance.Transmission licensee grantedby CERC. Tariff adoption done by CERC.CERC has granted Liberty for extension of COD and additional tariff.TSP hasstarted the work.Project execution plan submitted to CEA & lead LTTC. Critical RoW Issues inLocation No- 11/10, 23/2, and between location no. 25/0-26/0 (Dist. Kota &Jhalawar in Rajasthan) and 26/6, 26/8, 26/10, 37/6, 37/9(Dist. Agar Malwa &Rajgarh in Madhya Pradesh).Central Excise duty has been increased 12.36% to12.5 % w.e.f 1st March 2015. Service tax has been increased 12.36% to 14%w.e.f 1st June 2015. Custom duty has been changed due to Finance Act. Thesame has been intimated to all LTTCs. line expected to commission by Nov.2015.

FEB-16310RAPP - Shujalpur 521 501 482 2778 D/C NOV-15400

Transmission licensee granted by CERC. Tariff adoption done by CERC. ForestDiversion & Wild Life Clearance Proposals submitted.Force mejure events flood,Border Ceasefire violation, unseasonal heavy snow fall, rain fall and land slidesnotices sent to all LTTC's.Wild Life proposal is pending with Honorable ForestMinister(Chairman State Wildlife Board) for fixing the date for SBWL Meeting .Asper notification SRO-105 by Dept. of Finance, Govt. of J&K GST has beenchanged from 10% to 12 % w.e.f 1st April 2015. Central Excise duty has beenincreased 12.36% to 12.5 % w.e.f 1st March 2015. Service tax has beenincreased 12.36% to 14% w.e.f 1st June 2015. Custom duty has been changeddue to Finance Act.Line expected to commission by August,2017.

AUG-18574Samba - Amargarh line9 D/C AUG-17400

Trasmission Lines: Page 113 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 114: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

Shekhawati Transmission Service Company Limited (SKHWTTSCL)

court case pending, severe ROW problem, Railway crossing pending.FEB-1532Jhunjhunu - Nawalgarh line 108 77 68 01 S/C DEC-15220

court case pending, severe ROW problem, Railway crossing pending.FEB-1522Sikar - Nawalgarh line 76 55 40 02 S/C DEC-15220

Trasmission Lines: Page 114 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 115: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

South East UP Power Transmission Company Limited (SEUPPTCL)

Karchana gantry not finalised80Bara - Karchana 124 0 0 01 D/C FEB-16400

442Gonda - Shahjanpur 542 279 140 02 D/C FEB-16400

2/0 2A/0 stringing under hold due to construction of engineering college in theline corridor. Matter is pending with DM Mainpuri.

92LILO 400 Orai - Mainpur at Bah 135 133 131 513 D/C FEB-16400

1LILO of Obra - Sultanpur at Aurai 5 0 0 04 S/C FEB-16400

Completed.1LILO of Panki - Obra at Rewa Road 2 2 2 15 S/C FEB-16400

14LILO of Sarojini Nagar - Kursi RD at Sultanpur RD 186 D/C FEB-16400

186Mainpuri - Aligarh 219 214 193 187 D/C FEB-16400

3 locations are under hold since long due to land allocated for women PAC campin line corridor at Mainpuri. Matter has been taken up with DM Mainpuri.Approx 3.8 km route of each line passing through proposed refinery of BPCLnear Bara. Matter is pending with High Power committee as per directives ofHigh Courte Allahabad.

375Mainpuri - Bara Ckt-I 889 608 315 08 S/C FEB-16765

3 locations are under hold since long due to land allocated for women PAC campin line corridor at Mainpuri. Matter has been taken up with DM Mainpuri.Approx 3.8 km route of each line passing through proposed refinery of BPCLnear Bara. Matter is pending with High Power committee as per directives ofHigh Courte Allahabad.

750Mainpuri - Bara Ckt-II 1788 1422 939 1169 S/C FEB-16765

3 locations are under hold since long due to land allocated for women PAC campin line corridor at Mainpuri. Matter has been taken up with DM Mainpuri.

188Mainpuri - Unnao (Quad) 449 380 254 010 S/C FEB-16765

Completed.64Meja - Bara 83 83 83 6411 D/C FEB-16400

Karchana gantry not defined.58Rewa Road - Karchana 10212 D/C FEB-16400

Completed68Rewa Road - Meza 91 91 91 6813 D/C FEB-16400

188Tanda - Gonda line 241 92 54 014 D/C FEB-16400

Trasmission Lines: Page 115 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 116: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

TALCHER TRANSMISSION CO. LTD. (TTCL)

OCT-12290Behrampur - Gazuwaka1 D/C SEP-13400

OCT-12220Talcher II - Behrampur2 D/C SEP-13400

OCT-12161Talcher II - Rourkela3 D/C SEP-13400

Trasmission Lines: Page 116 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 117: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

TEESTA URJA LTD. (TUL)

Stage-II clearance for WB portion is pending. Kishanganj S/S of PGCIL isexpected to commission by Dec.15.

424Teesta III - Kishanganj 569 393 366 1601 D/C MAR-16400

Work in progress.72Teesta III - Rangpo line 98 94 91 262 D/C DEC-15400

Trasmission Lines: Page 117 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 118: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

TORRENT POWER LTD (TOR. POW. (UNOSUGEN))

Work awarded to M/s Instalaciones. Inabemsa. Spian on May 2014. Routechanged after survey observations.

DGEN - Vadodara1 D/C 400

.DGEN TPS - Bharuch/Dahej Pooling Station2 D/C 400

Work awarded to M/s Instalaciones. Inabemsa. Spian on May 2014. Routechanged after survey observations.

Navseri - Bhasten3 D/C 220

Sandila TPP - ATS not defind4 D/C 400

Trasmission Lines: Page 118 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 119: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

VANDANA VIDYUT LTD. (VVL)

Yet to start construction of 400 kV D/C line from Salora TPS - Dhranjaygarh (70KM). Interim arrangement available. LOI has been issued to M/s EBPL VenturesPvt. Ltd. , Bhilai. The line is expected to be completed by March, 2017.

60Salora TPS - Dharamjaigarh (Korba) (PGCIL) PoolingStation

841 D/C MAR-17400

Trasmission Lines: Page 119 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 120: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

VEMAGIRI TRANSMISSION SYSTEM LIMITED (VTSL)

Bidding process to be taken upAPR-15410Khammam - Hyderabad line -I1 D/C 765

Bidding process to be taken upAPR-15455Vemagiri Pooling Station - Khammam line -I2 D/C 765

Trasmission Lines: Page 120 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 121: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

VISA POWER LTD (VISA)

Work is under Construction.26Visa Power TPP - Raigarh Pooling Station 37 33 26 01 D/C JUN-15400

Trasmission Lines: Page 121 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed

Page 122: REPORT INDICATING STATUS OF CONSTRUCTION …cea.nic.in/reports/monthly/transmission/2015/construction_tx-09.pdfREPORT INDICATING STATUS OF CONSTRUCTION OF ... of line charged at 220

Schedule

1. 2. 5. 6. 7. 8. 9. 10. 12.3.

Revised/Anticipate

d

11.

Construction progress StatusTarget Date

RemarkTowers

TL(Nos)

STC(Nos)

TE(Nos)

STG(cKM)

VoltageLevel

4.

SlNo

Name ofTransmission

Lines

TotalLengt

hcKM

Ckts(S/C)

&(D/C)

WESTERN U.P. POWER TRANSMISSION CO. LTD. (WUPPTCL)

Approval u/s 164 received16Ataur-Indirapuram 58 4 0 01 D/C OCT-15400

Approval u/s 164 received46Greater Noida-Noida (Sec -148) 130 38 7 02 D/C DEC-15400

Approval u/s 164 received17Greater Noida-Sikandrabad 53 53 53 163 D/C OCT-15400

Approval u/s 164 received53Hapur-Ataur 154 127 64 04 D/C DEC-15400

66Hapur-Greater Noida 184 159 37 05 S/C DEC-15765

Approval u/s 164 received14Hapur-dasna 44 23 5 06 D/C OCT-15400

11LILO of Meerut -Agra at Greater Noida 35 35 35 117 S/C SEP-15765

Approval u/s 164 received2LILO of Moradabad-Muradnagar at Hapur 7 7 0 08 D/C SEP-15400

Approval u/s 164 received15LILO of Muradnagar -Muzzafarnagar at Ataur 48 17 0 09 D/C OCT-15400

Approval u/s 164 yet received15LILO of Rishikesh -Kashipur at Nehtaur (Bijnor) 44 0 0 010 D/C DEC-15400

180Mainpuri-Greater Noida 494 494 494 18011 S/C SEP-15765

217Mainpuri-Hapur 602 589 463 8812 S/C OCT-15765

Trasmission Lines: Page 122 of 122

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed