1 Report from the Projects Interaction and Review Team (PIRT) Bergen 10/6/12 Clinton Foster PIRT Chair Agenda 10

Upload: vothien

Post on 05-Apr-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Report from the Projects Interaction and Review … · Report from the Projects Interaction and Review Team (PIRT) Bergen 10/6/12 Clinton Foster PIRT Chair Agenda 10 CSLF Technical

1

Report from the Projects Interaction and Review Team (PIRT)

Bergen 10/6/12

Clinton Foster

PIRT Chair Agenda 10

Page 2: Report from the Projects Interaction and Review … · Report from the Projects Interaction and Review Team (PIRT) Bergen 10/6/12 Clinton Foster PIRT Chair Agenda 10 CSLF Technical

CSLF Technical Group Meeting, 11-14 June, 2012, Bergen, Norway 2

Outcomes PIRT 1

1. Three projects recommended to TG for submission to PG for recognition as CSLF Projects Illinois Basin Decatur Project Illinois Industrial Carbon Capture and Storage

Project Air Products CO2 Capture from Hydrogen Facility

Project.

All projects proposed and supported by CSLF Delegates [Agenda 11 – this meeting]

Page 3: Report from the Projects Interaction and Review … · Report from the Projects Interaction and Review Team (PIRT) Bergen 10/6/12 Clinton Foster PIRT Chair Agenda 10 CSLF Technical

CSLF Technical Group Meeting, 11-14 June, 2012, Bergen, Norway 3

Outcomes PIRT 2

2. Action Items and Minutes of PIRT meeting Beijing completed and approved

3. Upcoming CSLF events – Annual Meeting Perth, western Australia 24-26 October – held in conjunction with National CCS Week Task Forces meet Wednesday 24 Policy and TG concurrent – Thursday 25 Joint meeting PG and TG – Friday 26

• National CCS Week site visits Wednesday 24 (PLANNED) ANLEC R&D – CCS Science Day Australian Resources Research Centre Visit to Alcoa ccs plant where CO2 mixed with “red mud” bauxite

residue to reduce alkalinity- plant capacity 70,000 tpa CO2 to be expanded from South West Hub, Flagship Project

Page 4: Report from the Projects Interaction and Review … · Report from the Projects Interaction and Review Team (PIRT) Bergen 10/6/12 Clinton Foster PIRT Chair Agenda 10 CSLF Technical

CSLF Technical Group Meeting, 11-14 June, 2012, Bergen, Norway 4

Outcomes PIRT 3

4. Update and simplification of CSLF Project Submission Form Checklist [to be completed out of session]

5. Review of Plan for updating Technology Road Map

Page 5: Report from the Projects Interaction and Review … · Report from the Projects Interaction and Review Team (PIRT) Bergen 10/6/12 Clinton Foster PIRT Chair Agenda 10 CSLF Technical

CSLF Technical Group Meeting, 11-14 June, 2012, Bergen, Norway 5

Technology Roadmap: Evolution (2)

Progress of CCS and key knowledge gaps and research

2004 TRM ‘Live’

2010 GCCSI Global Status of CCS ‘live’

2006 Formation of PIRT

2005 IPCC Special Report on CCS

2010 Issues Affecting CCS (Gaps Analysis)

2012 New TG TF

TG TF to report directly on Projects

2008 IEA GHG First CO2 Storage Manual

2010 Issues Affecting CCS TF findings feed into TRM

2009 GCCSI established

R&D Development

2009 TRM Update GCCSI RET

Commercial-stage Development

2010 TRM Update RCN

2011 TRM Update DoE

Integration & Demonstration

Page 6: Report from the Projects Interaction and Review … · Report from the Projects Interaction and Review Team (PIRT) Bergen 10/6/12 Clinton Foster PIRT Chair Agenda 10 CSLF Technical

CSLF Technical Group Meeting, 11-14 June, 2012, Bergen, Norway 6

Technology Roadmap: Evolution (3) CSLF IEAGHG/

GCCSI

Global Status of CCS

Technical Roadmap

CCS Manuals Technical

General

Future CSLF Progress Reports

Annual Review

CCS Summary Reports

Strategic Plan Implementation Reports

Project Studies

Regional Studies

Non-scientific Reports

Country-wide Studies

Page 7: Report from the Projects Interaction and Review … · Report from the Projects Interaction and Review Team (PIRT) Bergen 10/6/12 Clinton Foster PIRT Chair Agenda 10 CSLF Technical

CSLF Technical Group Meeting, 11-14 June, 2012, Bergen, Norway 7

Outcomes PIRT 3 5. Review of Plan for updating Technology Road

Map Importance of TRM reaffirmed by Delegates

Agreed that TRM needed upgrading – and under the authority of the TG Chair (previously undertaken for TG by PIRT)

Linkages to new TG Task Forces addressing TG Action Plan and recommendations from prior TFs

Proposed model for new TRM to be presented to TG [Agenda Item 12 – this meeting]