report for work-package 1 „integrated workspace“

12
Report for Work- Package 1 „Integrated workspace“

Upload: shannon-moore

Post on 17-Jan-2016

218 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Report for Work-Package 1 „Integrated workspace“

Report for Work-Package 1

„Integrated workspace“

Page 2: Report for Work-Package 1 „Integrated workspace“

T1.2 WORKSPACE ARCHITECTURE & IMPLEMENTATION

Deliverable no. 11, D1.2 Workspace demonstration v.1 Delivered: July 2007

Mock-ups of user interface first proposal (after Fabriano)

http://bernstein.iicm.tugraz.at/bernstein second proposal (after Vienna) third proposal (December 2007)

Page 3: Report for Work-Package 1 „Integrated workspace“

T1.2 WORKSPACE ARCHITECTURE & IMPLEMENTATION

Implementation of SRU-Gateway Search/Retrieval via URL version 1.2 HTTP: GET, POST, SOAP searchRetrieve with sortBy scan (for indices) configurable mapping of 13 fields MySQL and MS Access databases

Page 4: Report for Work-Package 1 „Integrated workspace“

T1.2 WORKSPACE ARCHITECTURE & IMPLEMENTATION

Bernstein Portal 2nd prototype of the integrated workspace Simple Search (select DBs, number of hits) Advanced Search (general and specific) Result list (cont. update, 2nd sort criterium) Indices

Ref. Number, Depository, Motif, Place

Page 5: Report for Work-Package 1 „Integrated workspace“

T1.2 WORKSPACE ARCHITECTURE & IMPLEMENTATION

Discussions with database providers access to their database

POL: integrated since Feb 2008 WZMA: integrated since May 2008 NIKI: connected since June 2008

some changes necessary WILC: own SRU-gateway

detailed analysis next weeks

Article “Bernstein-Technik”

Page 6: Report for Work-Package 1 „Integrated workspace“

T1.3 UPGRADING OF DATABASES & TOOLS

Component model prototype first version with search-interface

import of corrected watermark descriptions http://bernstein.iicm.tugraz.at/bernstein

second version with input-interface authentication (sign in for database

providers) upload / edit / delete watermark

components and thumbnails

Page 7: Report for Work-Package 1 „Integrated workspace“

MEETINGS PARTICIPATION

Vienna: 2007 11 21-22 Bibliography technical meeting Workspace meeting

Leipzig: 2008 05 15 Bibliographical database

administrative and technical meeting

Page 8: Report for Work-Package 1 „Integrated workspace“

WP1 NEXT STEPS

Deliverable D1.3 Workspace demonstration version 2 July 31st 2008

Integrating WILC Analysis and modifications

Integrating NIKI Modifications

Page 9: Report for Work-Package 1 „Integrated workspace“

WP1 NEXT STEPS

Automatic translation of search terms with “Bernstein Thesaurus”

Implementation of bookmarks Realization of the export-functionality Integration of maps

Interface-specification Improvement of the performance

Caching

Page 10: Report for Work-Package 1 „Integrated workspace“

WP1 NEXT STEPS

Transfer from the development server to Bernstein-server

Integration of the final design Proposal ?

Realizing the multilingual user interface Translations ?

Inserting help-pages + documentation

Page 11: Report for Work-Package 1 „Integrated workspace“

Open Issues

Country / Geographical coordinates available in the databases ?

Browse Motif Bernstein-Mapping ?

Integration of image processing tools?

Page 12: Report for Work-Package 1 „Integrated workspace“

Issues for BernsteinPlus?

Component model Multilingual ? Integrated into portal ? Input of descriptions ?

...