report flyash 240412

18
REPORT ON FLY ASH GENERATION AT COAL/LIGNITE BASED THERMAL POWER STATIONS AND ITS UTILIZATION IN THE COUNTRY FOR 1 st HALF OF THE YEAR 2011-12 (April,’11 to Sep.,’11) CENTRAL ELECTRICITY AUTHORITY NEW DELHI APRIL, 2012

Upload: pengnium

Post on 30-Oct-2014

23 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Report Flyash 240412

REPORT

ON

FLY ASH GENERATION

AT

COAL/LIGNITE BASED THERMAL POWER STATIONS

AND

ITS UTILIZATION IN THE COUNTRY

FOR

1st HALF OF THE YEAR 2011-12 (April,’11 to Sep.,’11)

CENTRAL ELECTRICITY AUTHORITY

NEW DELHI

APRIL, 2012

Page 2: Report Flyash 240412

- 1 -

CENTRAL ELECTRICITY AUTHORITY

THERMAL CIVIL DESIGN DIVISION

REPORT ON FLY ASH GENERATION AT COAL/LIGNITE BASED THERMAL POWER

STATIONS AND ITS UTILIZATION IN THE COUNTRY FOR 1st HALF OF THE YEAR

2011-12 (APRIL, 2011 TO SEPTEMBER, 2011)

1.0 BACKGROUND

Central Electricity Authority is monitoring fly ash generation and its utilization at coal/

lignite based thermal power stations in the country since 1996 on behalf of Ministry of

Power. Data on fly ash generation and utilization including modes of utilization is

obtained from thermal power stations on half yearly and yearly basis. The data obtained

is analyzed and a report bringing out the status of fly ash generation and its utilization is

prepared on yearly/half yearly basis.

2.0 ASH GENERATION & UTILIZATION DURING 1st HALF OF THE YEAR 2011-12

2.1 A Brief Summary

Fly ash generation & utilization data for 1st half of the year 2010-11 has been received

from 90 (Ninety) coal/ lignite based thermal power stations of various power utilities in

the country with a total installed capacity of about 83797 MW. Data received has been

analyzed to derive conclusions on present status of fly ash utilization and compliance of

MoEF Notification of 3rd Nov.,2009. A brief summary of status is given below:

• Nos. of Coal/ Lignite based : 90 nos.

Thermal power Stations from

which data has been received

• Installed capacity : 83797 MW

• Total Ash generated : 66.49 Million-tonne

• Total Ash utilized : 36.26 Million-tonne

• Percentage Utilization : 54.53%

Power Station wise fly ash generation & utilization data including mode of utilization for

all the 90 (Ninety) thermal power stations is given in the statement at Annex-I.

2.2 Power Utility wise Status of Fly Ash Generation & its Utilization for 1st half of

the Year 2011-12

The ash generation & utilization data for various power utilities in the country for 1st half

of the Year 2011-12 is given in Table-I below:

Page 3: Report Flyash 240412

- 2 -

TABLE-I

POWER UTILITY WISE FLY ASH GENERATION AND UTILIZATION for 1st half of

the Year 2011-12

Sl.

No.

Name of Power Utility Nos.

of

TPS

Installed

Capacity

(MW)

Fly Ash

Generation

(mt)*

Fly Ash

Utilization

(mt)*

Percentage

Utilization

(1) (2) (3) (4) (5) (6) (7)

1 Andhra Pradesh Power

Generation Corporation

(A.P.GEN.CO)

6 4592.5 4.91 2.15 43.77

2 Torrent Power Ltd. 1 400 0.24 0.27 115.68

3 Bihar State Electricity

Board

1 220 0.03 0.02 66.66

4 Reliance Infrastructure

Limited (R.I.L)

1 500 0.38 0.29 76.99

5 C.E.S.C. Ltd. 3 1125 1.06 1.06 100.00

6 Chhattisgarh State

Power Generation

Company Ltd.

(C.S.P.G.C.L.)

3 1780 2.03 0.27 13.54

7 Damoadar Valley

Corporation (D.V.C.)

4 2730 2.87 1.93 67.24

8 Durgapur Projects Ltd.

(D.P.L.)

1 641 0.29 0.27 90.70

9 Gujarat Industries

Power Corporation Ltd.

(G.I.P.C.L.)

1 500 0.22 0.22 100.00

10 Gujarat Mineral

Development

Corporation Ltd.

(G.M.D.C.L.)

1 250 0.10 0.10 99.40

11 Gujarat State Electricity

Corporation Ltd.

(G.S.E.C.L.)

5 3720 2.87 1.24 43.39

12 Haryana Power

Generation Corporation

Ltd.(H.P.G.C.L.)

3 3167.8 2.93 0.76 26.00

13 Indraprastha Power

Generation Company

Ltd. (.I.P.G.C.L)

1 135.5 0.12 0.08 66.32

14 Jharkhand State

Electricity Board

(J.S.E.B.)

1 770 0.06 0.01 11.69

15 Karnataka Power

Corporation Ltd.

(K.P.C.L.)

2 2220 1.47 0.54 36.73

Page 4: Report Flyash 240412

- 3 -

Sl.

No.

Name of Power Utility Nos.

of

TPS

Installed

Capacity

(MW)

Fly Ash

Generation

(mt)*

Fly Ash

Utilization

(mt)*

Percentage

Utilization

(1) (2) (3) (4) (5) (6) (7)

16 Madhya Pradesh Power

Generation Corporation

Ltd. (M.P.P.G.C.L.)

3 2932.5 2.06 0.87 42.23

17 Maharashtra State

Power Generation

Corporation Ltd.

(M.SP.G.C.L)

7 7055 5.65 2.36 41.76

18 Neyvelli Lignite

Corporation Ltd.

(N.L.C.LTD)

3 2490 0.70 0.30 42.85

19 N.T.P.C.LTD. 15 27535 23.76 11.59 48.78

20 Orissa Power Generation

Corporation Ltd.

(O.P.G.C.L.)

1 420 0.52 0.08 15.72

21 Punjab State Power

Corporation Ltd.

(P.S.P.C.L).

3 2620 1.93 1.45 74.81

22 Rajasthan Rajya Vidyut

Utpadan Nigam Ltd.

(R.R.V.U.N.L.)

2 2740 1.93 1.72 89.37

23 ST-CMS Electric Company

Pvt. Ltd. 1 250 0.08 0.07 88.79

24 Tata Power Company

(T.P.CO.)

2 1177.5 0.47 0.33 70.21

25 Tenughat Vidyut Nigam

Ltd.(T.V.N.L.)

1 420 0.28 0.36 127.87

26 Tamil Nadu Generation

& Distribution Corpn.

Ltd. (T.N.G&D C.L.)

4 2970 2.64 3.66 138.57

27 Uttar Pradesh Rajya

Vidyut Utpadan Nigam

Ltd. (U.P.R.V.U.N.L.)

5 3945 2.71 0.45 16.51

28 West Bengal Power

Development

Corporation Ltd.

(W.B.P.D.C. L)

5 3610 3.33 2.89 86.78

29 LANCO 1 600 0.57 0.16 28.41

30 Kanti Bijlee Utpadan

Nigam Ltd. (K.B.U.N.L)

1 220 0.07 0.58 821.43

31 JSW Energy Ltd. 2 2060 0.19 0.17 89.17

GRAND TOTAL 83796.8 66.49 36.26 54.53

* mt: million tonne (rounded off to two significant figures).

Page 5: Report Flyash 240412

- 4 -

It may be seen from above table that out of 31 power utilities, six utilities have achieved

ash utilization level of 100% or more and seven power utilities have achieved ash

utilization level in the range of 100 to 75%. The performance of these thirteen power

utilities in ash utilization during 1st half of 2011-12 (April to September) has been

excellent.

2.3 State wise Status of Fly Ash Generation & its Utilization during the 1st half of

the Year 2011-12

The state wise status of fly ash generation & utilization is given in Table-II below:

TABLE-II

STATE WISE FLY ASH GENERATION AND ITS UTILIZATION FOR THE 1st half of THE

YEAR 2011 -12

Sl.

No.

Name Of State Nos. of

TPS

Capacity

(MW)

Fly Ash

Generation

(mt)*

Fly Ash

Utilization

(mt)*

Percentage

Utilization

(1) (2) (3) (4) (5) (6) (7)

1 Andhra Pradesh 8 8692.5 8.25 4.00 48.48

2 BIHAR 3 2780 1.92 1.21 62.81

3 CHHATISGARH 5 6640 6.25 1.69 26.97

4 GUJARAT 8 4870 3.43 1.85 53.78

5 HARYANA 3 3167.8 2.93 0.76 26.01

6 JHARKHAND 5 2667.5 1.88 1.69 90.32

7 KARNATAKA 3 3080 1.58 0.64 40.87

8 Madhya Pradesh 4 6192.5 4.98 2.06 41.49

9 MAHARASHTRA 10 9505 6.15 2.74 44.62

10 ORISSA 3 3880 4.10 1.14 27.96

11 PUNJAB 3 2620 1.94 1.45 74.81

12 RAJASTHAN 2 2740 1.93 1.72 89.37

13 TAMILNADU 8 5710 3.42 4.02 117.86

14 UTTAR PRADESH 10 11,255 9.52 4.73 49.75

15 WEST BENGAL 12 9156 7.42 5.87 79.11

16 Delhi 2 840.5 0.79 0.65 82.28

GRAND TOTAL 83796.8 66.49 36.26 54.53

* mt: million tonne (rounded off to two significant figures).

Page 6: Report Flyash 240412

- 5 -

It may be seen from above table that five states out of sixteen have generated more

than 5 million tonne of fly ash during 1st half of the year 2011-12 and the maximum

of more than 9 million tonne was generated in U.P.

3.0 PRESENT STATUS OF FLY ASH UTILIZATION AS PER MOEF’S AMENDMENT

NOTIFICATION DATED 3rd NOVEMBER, 2009.

Fly ash generation and its utilization data received from various power utilities for 1ST

half of the year 2011-12 has been analyzed to ascertain the number of power stations

which have achieved the target of fly ash utilization as per MoEF’s notification of 3rd

November, 2009 i.e.

(i) All thermal power stations in operation on the date of notification should have

achieved the target of 60% fly ash utilization within two years from the date of

notification i.e. by 3rd November, 2011; and

(ii) All new thermal power stations which have come into operation after the date of

notification should have achieved the target of 50% of fly ash utilization within

one year of their commissioning.

The following extension units of existing power plants were commissioned after 3rd

November, 2009. Ash generation and utilization data for these units is not received

separately. As such, their data is reflected in the existing Thermal Power Stations for the

purpose of examining the compliance of MoEF‘s Notification.

(a) Unit – 3: 250MW of B.B.G.S TPS was commissioned on 28.2.2010.

(b) Unit – 4: 75MW of Kutch Lignite TPS was commissioned on 19.12.2009.

(c) Unit – 4: 250MW of Lehra Mohabbat TPS was commissioned on January 2010

(d) Unit – 5: 210MW of Rayalseema TPS was commissioned on 10.2.2011 and

(e) Unit – 7: 250MW of Parli TPS was commissioned on 30.7.2010.

(f) Unit – 2: 300MW of AMARKANTAK TPS was commissioned on 22.2.2010

(g) Unit – 8: 250MW of RAICHUR TPS was commissioned on 9.4.2010.

(h) Unit – 4: 250MW of PARAS TPS was commissioned on 31.8.2010 and

(i) Unit – 7: 500MW of VIJAYWADA TPS was commissioned on 28.1.2010.

The status of compliance of MoEF’s amendment notification of 03.11.2009 based on fly

ash generation and utilization data for 1st half of the year 2011-12 received from 90

coal/Lignite based Thermal Power Stations in CEA from power utilities is given in Table-

III below.

TABLE-III

STATUS OF UTILIZATION OF FLY ASH AS PER MOEF’S NOTIFICATION DATED 3rd

NOVEMBER, 2009 FOR THE 1ST HALF OF THE YEAR 2011-12

Sl. No. Description Nos.

(1) (2) (3)

1 Nos. of TPS which have achieved the target of fly ash utilization as

per MoEF’s Amendment Notification of 03.11.2009

49

2 Nos. of TPS which have not been able to achieve the target of fly

ash utilization as per MoEF’s Amendment Notification of 03.11.2009

41

Page 7: Report Flyash 240412

- 6 -

It may be seen from above table that out of 90 thermal power stations for which data

was received, 49 (forty nine) power stations have achieved the ash utilization level of

60% or more during 2011-12 as per target of utilization stipulated in MoEF’s Amendment

Notification of 03.11.2009.

Out of 41 nos thermal power stations, which could not achieve Fly ash utilization target

as per MoEF’s Notification of 3rd November 2009, 39 nos thermal power stations were

commissioned before 3.11.2009.

3.1 Range of Percentage Ash Utilization during the 1st half of the Year 2011-12

Based on the analysis of ash utilization data received from power utilities, range of

percentage of ash utilization and number of stations in that range are given in Table-IV:

TABLE-IV

RANGE OF PERCENTAGE ASH UTILIZATION DURING THE 1st HALF OF THE YEAR

2011-12

Sl. No. Level of ash utilization Nos. of Power Stations

(1) (2) (3)

1 100% and more than 100% 16

2 Less than 100% and up to 75% 19

3 Less than 75% and up to 60% 14

4 Less than 60% (for plants

commissioned before 3rd Nov.2009)

39

5 Less than 50% (for green field plants

commissioned after 3rd Nov.2009).

2

3.2 Thermal Power Stations that have achieved 100% or more ash

utilization during 1st half of the year 2011-12

16 (sixteen) thermal power stations have achieved the ash utilization level of 100% or

more during first half of the year 2011-12. The names of these thermal power stations

and utilities along with level of ash utilization achieved at each power station are given in

Table-V below:

TABLE – V

THERMAL POWER STATIONS WITH ASH UTILIZATION LEVEL OF 100% OR MORE

DURING 1st HALF OF THE YEAR 2011-12

Sl. No

Name of Thermal

Power Stations

Name of Power utilities

Fly ash

utilization in

Percentage

(1) (2) (3) (4)

1 SABERMATI TORRENT POWER LIMITED 115.68

2 METTUR T.N.G.D.C.L 180.21

3 B.B.G.S C.E.S.C. 100.00

Page 8: Report Flyash 240412

- 7 -

Sl. No

Name of Thermal

Power Stations

Name of Power utilities

Fly ash

utilization in

Percentage

(1) (2) (3) (4)

4 S.G.S C.E.S.C. 100.00

5 T.G.S C.E.S.C. 100.00

6 North Chennai T.N.E.B. 264.52

7 Surat Lignite G.I.P.C.L. 100.00

8 Khaperkheda M.S.P.G.C.L 109.51

9 Kutch Lignite G.S.E.C.L. 100.00

10 Muzaffarpur K.B.U.N.L 821.43

11 Bakreshwar W.B.P.D.C.L 122.09

12 Bandel W.B.P.D.C.L 140.68

13 Talchar TPS N.T.P.C.LTD. 100.00

14 Harduaganj U.P.R.V.U.N.L 530.00

15 Panki U.P.R.V.U.N.L 122.41

16 Tenughat T.V.N.L. 127.87

Power Stations which have achieved the level of ash utilization of more than 100%

during 1st half of year 2011-12, have utilized ash stored in ash ponds during previous

years. At Muzaffarpur Thermal Power Station, ash accumulated during last few years has

been utilized within plant for land development work.

3.3 Power Stations in Ash Utilization Range of less than 100% and up to 75%

during 1st half of the year 2011-12

19 (Nineteen) Power Stations have achieved ash utilization level in the range of 100% to

75%. The names of these thermal power stations and utilities along with level of ash

utilization achieved at each power station are given in Table-VI below:

TABLE-VI

THERMAL POWER STATIONS WITH ASH UTILIZATION LEVEL OF LESS THAN

100% AND UP TO 75% DURING 1st HALF OF THE YEAR 2011-12

Sl.

No.

Name of Thermal Power

Stations

Name of Power utilities Fly Ash utilization

in Percentage

(1) (2) (3) (4)

1 Ramagundam'B APGENCO (Andhra Pradesh) 95.24

2 DAHANU Reliance Infrastructure Ltd.

(Maharashtra)

76.99

3 BOKARO 'B' D.V.C. (Jharkhand) 99.14

4 CHANDRAPURA D.V.C.(Jharkhand) 82.59

Page 9: Report Flyash 240412

- 8 -

Sl.

No.

Name of Thermal Power

Stations

Name of Power utilities Fly Ash utilization

in Percentage

(1) (2) (3) (4)

5 D.P.L D.P.L (West Bengal) 90.70

6 AKRIMOTA G.M.D.C.L. (Gujarat) 99.40

7 SANJAY GANDHI M.P.P.G.C.L. 91.85

8 BADARPUR N.T.P.C.LTD (Delhi). 85.07

9 FARAKKA N.T.P.C.LTD. (W.B.) 78.08

10 LEHRA MOHABAT P.S.P.C.L.(Punjab) 76.90

11 ROPAR P.S.P.C.L. (Punjab) 79.57

12 KOTA R.R.V.U.N.L.(Rajasthan) 95.86

13 SURATGARH R.R.V.U.N.L.(Rajasthan) 83.30

14 CUDDALORE ST-CMS(Tamil Nadu) 88.79

15 TROMBAY T.P.CO.(Maharashtra) 79.83

16 ENNORE T.N.E.B.(Tamil Nadu) 99.04

17 KOLAGHAT W.B.P.D.C.L.(West Bengal) 99.80

18 RATNAGIRI JSW Energy Limited

(Maharashtra)

78.59

19 VIJAYANAGAR JSW Energy Limited

(Karnataka)

97.40

3.4 Power Stations in Ash Utilization Range of less than 75% and up to 60% during

1st half of the Year 2011-12

14 (Fourteen) Power Stations have achieved ash utilization in the range of 75% to 60%

during 1st half of year 2011-12. The names of these thermal power stations and utilities

along with level of ash utilization achieved at each power station are given in Table-VII

below:

TABLE-VII

THERMAL POWER STATIONS WITH ASH UTILIZATION LEVEL OF LESS THAN

75% AND UP TO 60% DURING 1st HALF OF THE YEAR 2011-12

Sl.

No.

Name of Thermal Power

Stations

Name of Power utilities Fly ash utilization in

Percentage

(1) (2) (3) (4)

1 RAYALSEEMA APGENCO(Andhra Pradesh) 66.12

2 GANDHINAGAR G.S.E.C.L. 73.30

3 RAJGHAT IPGCL(Delhi) 66.32

4 BHUSAWAL M.S.P.G.C.L. (Maharashtra) 69.83

Page 10: Report Flyash 240412

- 9 -

Sl.

No.

Name of Thermal Power

Stations

Name of Power utilities Fly ash utilization in

Percentage

(1) (2) (3) (4)

5 NASHIK M.S.P.G.C.L. (Maharashtra) 64.11

6 PARLI M.S.P.G.C.L. (Maharashtra) 68.65

7 NEYVELI–I N.L.C.LTD(Tamil Nadu) 74.08

8 NEYVELI -I EXPN N.L.C.LTD(Tamil Nadu) 72.54

9 RIHAND N.T.P.C.LTD.(U.P.) 61.01

10 SINGRAULI N.T.P.C.LTD.(U.P.) 60.06

11 UNCHAHAR N.T.P.C.LTD.(U.P.) 74.21

12 DADRI N.T.P.C.LTD.(U.P.) 62.90

13 JOJOBERA T.P.CO.(Jharkhand) 68.33

14 TUTICORIN T.N.E.B.(Tamil Nadu) 61.32

3.5 Power Stations with Ash Utilization Level of less than 60% during 1st half of the

Year 2011- 12

39 (Thirty nine) Power Stations out of 90 have not been able to achieve target of fly ash

utilization of 60% during 1st half of the year 2011-12 as per MoEF’s notification of 3rd

November, 2009. The names of these thermal power stations and utilities along with

level of ash utilization achieved at each power station are given in Table-VIII below:

TABLE-VIII

POWER UTILITY WISE DETAILS OF THERMAL POWER STATIONS WHICH HAVE

NOT BEEN ABLE TO ACHIEVE THE LEVEL OF FLY ASH UTILIZATION AS PER

MOEF’S AMENDMENT NOTIFICATION OF 3rd NOVEMBER, 2009

Sl.

No.

Name of Thermal

Power Stations

Name of Power utilities Fly ash

utilization in

Percentage

(1) (2) (3) (4)

1 KOTHAGUDEM 4.38

2 KOTHAGUDEM-V

A.P.G.E.N.CO

(Andhra Pradesh) 28.12

3 AMARKANTAK TPS * Lanco Power Ltd.

(Chattisgarh)

28.41

4 KORBA (WEST) C.S.P.G.C.L.(Chhattisgarh) 19.51

5 DSPM C.S.P.G.C.L.(Chhattisgarh) 0.00

6 KORBA (EAST) C.S.P.G.C.L.(Chhattisgarh) 10.76

Page 11: Report Flyash 240412

- 10 -

Sl.

No.

Name of Thermal

Power Stations

Name of Power utilities Fly ash

utilization in

Percentage

(1) (2) (3) (4)

7 DURGAPUR D.V.C. (West Bengal) 22.47

8 SIKKA G.S.E.C.L. (Gujarat) 30.36

9 UKAI G.S.E.C.L. (Gujarat) 30.76

10 WANAKBORI G.S.E.C.L. (Gujarat) 32.60

11 YAMUNANAGAR H.P.G.C.L. (Haryana) 35.80

12 PANIPAT H.P.G.C.L. (Haryana) 33.49

13 PATRATU J.S.E.B. (Jharkhand) 11.69

14 BELLARY K.P.C.L (Karnataka) 25.56

15 RAICHUR K.P.C.L(Karnataka) 39.38

16 SATPURA

M.P.P.G.C.L.

(Madhya Pradesh)

13.40

17 AMARKANTAK M.P.P.G.C.L.

(Madhya Pradesh)

0.57

18 CHANDRAPUR M.S.P.G.C.L. (Maharashtra) 25.77

19 KORADI M.S.P.G.C.L. (Maharashtra) 25.67

20 KAHALGAON N.T.P.C.LTD.(Bihar) 33.85

21 KORBA N.T.P.C.LTD.(Chhattisgarh) 37.79

22 VINDHYACHAL N.T.P.C.LTD.

(Madhya Pradesh)

40.99

23 SIPAT N.T.P.C.LTD.(Chhattisgarh) 24.69

24 TALCHAR(KAN) N.T.P.C.LTD. (Orissa) 15.64

25 IB VALLEY O.P.G.C.L.(Orissa) 15.72

26 BATHINDA P.S.P.C.L. (Punjab) 47.44

27 ANPARA 'A' & 'B' U.P.R.V.U.N.L.(U.P.) 0.36

28 OBRA U.P.R.V.U.N.L.(U.P.) 7.90

29 PARICHA U.P.R.V.U.N.L.(U.P.) 46.74

30 SAGARDIGHI W.B.P.D.C.L(W.B.) 9.38

31 SANTALDIH W.B.P.D.C.L(W.B.) 0.12

32 NEYVELI - II N.L.C.LTD (Tamil Nadu) 29.08

33 VIJAYWADA APGENCO (Andhra Pradesh) 56.44

Page 12: Report Flyash 240412

- 11 -

Sl.

No.

Name of Thermal

Power Stations

Name of Power utilities Fly ash

utilization in

Percentage

(1) (2) (3) (4)

34 BARAUNI B.S.E.B. (Bihar) 50.95

35 MEJIA D.V.C. (Jharkhand) 55.83

36 PARAS M.S.P.G.C.L. (Maharashtra) 55.20

37 RAMAGUNDAM N.T.P.C. LTD.

(Andhra Pradesh).

53.41

38 SIMHADRI N.T.P.C. LTD.

(Andhra Pradesh).

58.85

39 TANDA N.T.P.C. LTD. (U.P.) 54.45

3.6 Power Stations commissioned after 3rd November, 2009

2 nos. of green field Power Stations have been commissioned after 3rd Nov. 2009. These

Power Stations have not been able to achieve target of fly ash utilization as per MoEF’s

notification of 3rd November, 2009. The names of these thermal power stations and

utilities along with level of ash utilization achieved at each power station are given in

Table-IX:

TABLE-IX

POWER UTILITY WISE DETAILS OF THERMAL POWER STATIONS WHICH HAVE

NOT BEEN ABLE TO ACHIEVE THE LEVEL OF FLY ASH UTILIZATION AS PER

MOEF’S AMENDMENT NOTIFICATION OF 3rd NOVEMBER, 2009

Sl.

No.

Name of Thermal

Power Stations

Name of Power utilities Fly ash

utilization in

Percentage

(1) (2) (3) (4)

1 KAKATIA A.P.G.E.N.CO

(Andhra Pradesh)

23.88

2 HISAR H.P.G.C.L. (Haryana) 0.01

4.0 MODES OF ASH UTILIZATION DURING 1ST HALF OF THE YEAR 2011-12

The major modes in which ash was utilized during 1st half of the year 2011-12 along with

utilization in each mode are given in Table-X below.

Page 13: Report Flyash 240412

- 12 -

TABLE-X

MAJOR MODES OF FLY ASH UTILIZATION DURING 1ST HALF OF THE

YEAR 2011-12

Sl.

No.

Mode of utilization Utilization in

(mt)

Percentage

utilization

(1) (2) (3) (4)

1 Cement 17.45 48.13

2 Reclamation of low lying area 3.16 8.72

3 Roads & Embankments 4.72 13.02

4 Mine filling 2.45 6.76

5 Bricks & Tiles 2.36 6.51

6 Agriculture 0.37 1.02

7 0thers 5.74 15.83

Total 36.26 100

A pie diagram showing the modes of utilization of ash during 1st half of the year 2011-12

is given in Figure-1 below:

FIGURE - 1

Mode of Fly Ash Utilization during the period

April'11 to Sept'11

OTHERS (15.83%)

AGRICULTURE

(1.02%)

MINEFILLING

(6.76%)

RECLAIMATION

(8.72%)

ROADS &

EMBANKMENTS

(13.02%)

BRICKS (6.51%)

CEMENT (48.13%)

CEMENT BRICKS

ROADS & EMBANKMENTS RECLAIMATION

MINEFILLING AGRICULTURE

OTHERS

Page 14: Report Flyash 240412

- 13 -

5.0 CONCLUSION

• Overall utilization of fly ash in the 1st half of the year 2011-12 has been about

55% in comparison to 56% during 2010-11.

• The maximum utilization of fly ash to the extent of 48.13% has been in Cement

sector. 13.02% was utilized in roads & embankments, 8.72% in reclamation of

low lying areas, 6.76% in mine filling, 6.51% in bricks etc.

• The utilization of fly ash in mine filling was 6.76% and in making fly ash based

building products like bricks, tiles etc was only 6.51%. These two areas have

large potential of ash utilization which needs to be explored for increasing overall

ash utilization in the country.

*****

Page 15: Report Flyash 240412

ANNEX

Coal

consumed

Ash content Installed Capacity Fly Ash

Generation

Fly Ash

Utilization

% age

Utilization

Cement Bricks Roads,

Embankments, &

Ash Dykes

Reclamation Minefilling Agriculture Others Remarks

mtpa % age (MW) mtpa mtpa % mtpa mtpa mtpa mtpa mtpa mtpa mtpa mtpa

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)

1 KOTHAGUDEM 2.06 44.65 720.00 0.92 0.04 4.38 0.03 0.01 - - - - 0.01 0.04 -

2 KOTHAGUDEM-V 1.25 49.14 500.00 0.45 0.13 28.12 0.10 0.02 - - - - - 0.13 -

3 RAMAGUNDAM'B' 0.06 42.93 62.50 0.03 0.03 95.24 0.01 0.01 - - - - - 0.03 -

4 RAYALSEEMA 2.63 42.16 1050.00 1.11 0.73 66.12 0.48 0.25 - - - - - 0.73 U-5:210MW,10.2.2011

5 VIJAYWADA 4.76 42.04 1760.00 2.00 1.13 56.44 0.61 0.31 0.05 0.08 - - 0.07 1.13 U-7:500MW 28.1.2010

6 KAKATIA * 0.89 46.30 500.00 0.41 0.10 23.88 - 0.10 - - - - - 0.10 Com.on 31.03.2011,

500MW

7 SABARMATI Torrent Power Ltd.

(Gujarat)

0.92 25.43 400.00 0.24 0.27 115.68 0.17 0.00 - - - 0.10 - 0.27 -

8 BARAUNI B.S.E.B.

(Bihar)

0.07 48.96 220.00 0.03 0.02 50.95 - 0.02 - - - - - 0.02 -

9 DAHANU Reliance Infrastructure Ltd.

(Maharastra)

1.39 27.36 500.00 0.38 0.29 76.99 - 0.00 0.16 - - - 0.13 0.29 -

10 B.B.G.S. 1.88 35.30 750.00 0.75 0.75 100.00 0.56 0.01 - - - - 0.18 0.75 U-3:250MW,28.2.2010

11 S.G.S. 0.40 29.60 135.00 0.14 0.14 100.00 0.12 - - - - - 0.02 0.14 -

12 T.G.S. 0.62 25.93 240.00 0.17 0.17 100.00 0.01 0.03 0.03 - - - 0.10 0.17 -

13 Amarkantak TPS Lanco Power Ltd.

(Chhatishgarh)

1.36 41.80 600.00 0.57 0.16 28.41 0.04 - 0.06 - - - 0.07 0.16 U-2:300MW,22.2.2010

14 KORBA (WEST) 2.48 41.08 840.00 1.08 0.21 19.51 - - 0.18 0.03 - - - 0.21 -

15 DSPM 0.95 45.20 500.00 0.35 0.00 0.00 - - - - - - - 0.00 -

16 KORBA (EAST) 1.36 44.50 440.00 0.60 0.07 10.76 - - 0.07 - - - - 0.07 -

17 Muzaffarpur TPS K.B.U.N.L

(Bihar)

0.16 44.87 220.00 0.07 0.58 821.43 - - - - - - 0.58 0.58 -

18 BOKARO 'B' D.V.C.

(Jharkhand)

1.53 48.59 630.00 0.74 0.74 99.14 0.03 - - - 0.70 - - 0.74 -

19 CHANDRAPURA D.V.C.

(Jharkhand)

0.72 50.95 420.00 0.37 0.30 82.59 - 0.00 - - 0.30 - - 0.30 -

20 DURGAPUR 0.64 44.43 340.00 0.28 0.06 22.47 - 0.00 - - 0.06 - - 0.06 -

21 MEJIA 3.27 45.20 1340.00 1.48 0.83 55.83 0.27 0.02 - - 0.53 - - 0.83 -

22 D.P.L D.P.L (West

Bengal).

0.71 41.33 641.00 0.29 0.27 90.70 0.01 0.00 0.04 - - 0.22 - 0.27 -

Total

Utilization

D.V.C.

(West Bengal)

Name of TPS

C.S.P.G.C.L.

(Chhatishgarh)

Power Utility & State

HALF YEARLY FLY ASH GENERATION AND ITS UTILIZATION AT COAL/LIGNITE BASED THERMAL POWER STATIONS IN THE COUNTRY DURING THE YEAR

2011-12 (APRIL-SEPTEMBER)

MODES OF UTILIZATION FLY ASH GERNERATION AND ITS UTILIZATION

A.P.GENCO (Andhrapradesh)

C.E.S.C.

(West Bengal)

Sl. No.

Page 1

Page 16: Report Flyash 240412

ANNEX

Coal

consumed

Ash content Installed Capacity Fly Ash

Generation

Fly Ash

Utilization

% age

Utilization

Cement Bricks Roads,

Embankments, &

Ash Dykes

Reclamation Minefilling Agriculture Others Remarks

mtpa % age (MW) mtpa mtpa % mtpa mtpa mtpa mtpa mtpa mtpa mtpa mtpa

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)

Total

Utilization

Name of TPS Power Utility & State

HALF YEARLY FLY ASH GENERATION AND ITS UTILIZATION AT COAL/LIGNITE BASED THERMAL POWER STATIONS IN THE COUNTRY DURING THE YEAR

2011-12 (APRIL-SEPTEMBER)

MODES OF UTILIZATION FLY ASH GERNERATION AND ITS UTILIZATIONSl. No.

23 SURAT LIGNITE G.I.P.C.L.

(Gujarat)

1.29 17.30 500.00 0.22 0.22 100.00 0.16 - - - 0.04 - 0.03 0.22 -

24 AKRIMOTA G.M.D.C.L.

(Gujarat)

0.52 20.11 250.00 0.10 0.10 99.40 0.00 - - - 0.10 - - 0.10 -

25 GANDHINAGAR 1.71 35.00 870.00 0.60 0.44 73.30 0.42 0.00 - - - 0.01 0.44 -

26 KUTCH LIGNITE 0.75 15.94 290.00 0.12 0.12 100.00 - - - 0.12 - 0.12 U-4:75MW,19.12.2009

27 SIKKA 0.42 40.31 240.00 0.17 0.05 30.36 0.03 0.02 - - - - - 0.05 -

28 UKAI 1.76 35.50 850.00 0.63 0.19 30.76 0.11 0.00 - - - - 0.08 0.19 -

29 WANAKBORI 3.39 39.97 1470.00 1.36 0.44 32.60 0.35 - - - - - 0.09 0.44 -

30 HISAR * 1.86 37.13 1200.00 0.69 0.00 0.01 - - - - - - - 0.00 Com. On 1.4.10 &

1.10.2010 ,

600X2MW

31 YAMUNANAGAR 1.32 40.01 600.00 0.53 0.19 35.80 0.19 - - - - - 0.00 0.19 -

32 PANIPAT 4.06 42.09 1367.80 1.71 0.57 33.49 0.57 - - - - - - 0.57 -

33 RAJGHAT IPGCL

(Delhi)

0.35 33.81 135.50 0.12 0.08 66.32 0.08 - - - - - - 0.08 -

34 PATRATU J.S.E.B.

(Jarkhand)

0.16 37.34 770.00 0.06 0.01 11.69 0.00 0.00 - - 0.00 - - 0.01 -

35 BELLARY 0.93 30.51 500.00 0.28 0.07 25.56 0.07 - - - - - 0.07 -

36 RAICHUR 3.40 34.98 1720.00 1.19 0.47 39.38 0.39 0.08 - - - - 0.47 U-8:250MW,9.4.2010

37 SANJAY GANDHI 2.66 39.33 1340.00 0.80 0.73 91.85 0.73 0.00 - - - - 0.73 -

38 SATPURA 2.56 40.33 1142.50 1.03 0.14 13.40 0.01 0.12 - - 0.00 0.14 -

39 AMARKANTAK 0.66 35.72 450.00 0.23 0.00 0.57 0.00 - - - - - - 0.00 -

40 BHUSAWAL 1.08 33.72 475.00 0.36 0.25 69.83 0.15 0.08 - - - 0.00 0.02 0.25 -

41 CHANDRAPUR 5.24 38.92 2340.00 2.06 0.02 25.77 0.00 0.02 - - - - - 0.02 -

42 KHAPARKHEDA 2.37 30.13 840.00 0.71 0.78 109.51 0.12 0.25 0.39 - - - 0.02 0.78 -

43 KORADI 1.55 39.33 1100.00 0.64 0.16 25.67 0.01 0.09 0.07 - - - - 0.16 -

44 NASHIK 1.71 40.71 630.00 0.70 0.37 64.11 0.23 0.11 - - - 0.03 - 0.37 -

45 PARAS 0.95 39.74 500.00 0.38 0.21 55.20 0.07 0.14 - - - - - 0.21 U-4:250MW, 31.8.2010

46 PARLI 1.97 40.93 1170.00 0.81 0.55 68.65 0.37 0.17 - - - 0.01 - 0.55 U-7:250MW,30.7.2010

M.S.P.G.C.L. (Maharastra)

M.S.P.G.C.L. (Maharastra)

K.P.C.L

(Karnataka)

M.P.P.G.C.L.

(MadhyaPrasesh)

G.S.E.C.L.

(Gujarat)

H.P.G.C.L.

(Haryana)

Page 2

Page 17: Report Flyash 240412

ANNEX

Coal

consumed

Ash content Installed Capacity Fly Ash

Generation

Fly Ash

Utilization

% age

Utilization

Cement Bricks Roads,

Embankments, &

Ash Dykes

Reclamation Minefilling Agriculture Others Remarks

mtpa % age (MW) mtpa mtpa % mtpa mtpa mtpa mtpa mtpa mtpa mtpa mtpa

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)

Total

Utilization

Name of TPS Power Utility & State

HALF YEARLY FLY ASH GENERATION AND ITS UTILIZATION AT COAL/LIGNITE BASED THERMAL POWER STATIONS IN THE COUNTRY DURING THE YEAR

2011-12 (APRIL-SEPTEMBER)

MODES OF UTILIZATION FLY ASH GERNERATION AND ITS UTILIZATIONSl. No.

47 NEYVELI - I 2.77 5.90 600.00 0.13 0.10 74.08 0.09 0.01 - - - - 0.00 0.10 -

48 NEYVELI -I EXPN 1.74 8.02 420.00 0.09 0.06 72.54 0.06 0.00 - - - - - 0.06 -

49 NEYVELI - II 6.05 7.95 1470.00 0.48 0.14 29.08 0.06 0.01 - - - - 0.06 0.14 -

50 RAMAGUNDAM - - 2600.00 2.09 1.12 53.41 0.63 0.00 0.11 - - - 0.37 1.12 -

51 SIMHADRI - - 1500.00 1.24 0.73 58.85 0.22 0.41 0.00 - - 0.10 0.73 -

52 KAHALGAON N.T.P.C.LTD.

(Bihar)

- - 2340.00 1.82 0.62 33.85 0.06 0.00 0.49 0.06 - - 0.00 0.62 -

53 KORBA N.T.P.C.LTD (Chhatishgarh). - - 2600.00 2.66 1.00 37.79 0.06 0.01 0.01 0.93 - - 0.00 1.00 -

54 BADARPUR N.T.P.C.LTD

(Delhi).

- - 705.00 0.67 0.57 85.07 0.27 0.00 0.30 0.01 - - - 0.57 -

55 VINDHYACHAL) N.T.P.C.LTD.

(Madhyapradesh)

- - 3260.00 2.91 1.19 40.99 0.37 0.01 0.21 0.03 - - 0.58 1.19 -

56 SIPAT N.T.P.C.LTD. (Chhatishgarh) - - 1660.00 1.00 0.25 24.69 0.24 0.00 0.00 - - 0.00 0.25 -

57 TALCHAR(KAN) - - 3000.00 2.98 0.47 15.64 0.04 0.01 0.17 0.07 - - 0.17 0.47 -

58 TALCHAR(TPS) - - 460.00 0.60 0.60 100.00 0.00 0.00 - - 0.59 - - 0.60 -

59 RIHAND - - 2000.00 1.56 0.95 61.01 0.04 0.00 - 0.91 - - - 0.95 -

60 SINGRAULI - - 2000.00 1.89 1.13 60.06 0.12 0.00 - 0.50 - - 0.51 1.13 -

61 UNCHAHAR - - 1050.00 1.22 0.91 74.21 0.82 0.00 - 0.00 - - 0.08 0.91 -

62 TANDA - - 440.00 0.59 0.32 54.45 0.14 0.00 0.02 0.04 - - 0.12 0.32 -

63 DADRI - - 1820.00 1.55 0.98 62.90 0.77 0.00 0.11 0.10 - - 0.98 -

64 FARAKKA N.T.P.C.LTD.

(W.B.)

- - 2100.00 0.98 0.76 78.08 0.39 0.00 0.33 0.04 - - 0.76 -

65 IB VALLEY O.P.G.C.L.

(Orissa)

1.26 40.87 420.00 0.52 0.08 15.72 0.00 0.01 - - - - 0.08 0.08 -

66 BATHINDA 0.69 33.68 440.00 0.23 0.11 47.44 0.10 0.00 - - - - 0.11 -

67 LEHRA MOHABAT 2.12 31.58 920.00 0.67 0.52 76.90 0.51 - - - - 0.00 0.52 U-4:250MW, Jan. 2010

68 ROPAR 3.11 33.31 1260.00 1.04 0.82 79.57 0.82 0.00 - - - - 0.82 -

N.T.P.C.LTD.

(U.P.)

N.T.P.C.LTD

(Orissa).

N.T.P.C.LTD

(Andhra Pradesh).

N.L.C.LTD

(Tamilnadu)

P.S.P.C.L.

(Punjab)

Page 3

Page 18: Report Flyash 240412

ANNEX

Coal

consumed

Ash content Installed Capacity Fly Ash

Generation

Fly Ash

Utilization

% age

Utilization

Cement Bricks Roads,

Embankments, &

Ash Dykes

Reclamation Minefilling Agriculture Others Remarks

mtpa % age (MW) mtpa mtpa % mtpa mtpa mtpa mtpa mtpa mtpa mtpa mtpa

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)

Total

Utilization

Name of TPS Power Utility & State

HALF YEARLY FLY ASH GENERATION AND ITS UTILIZATION AT COAL/LIGNITE BASED THERMAL POWER STATIONS IN THE COUNTRY DURING THE YEAR

2011-12 (APRIL-SEPTEMBER)

MODES OF UTILIZATION FLY ASH GERNERATION AND ITS UTILIZATIONSl. No.

69 KOTA 3.03 30.72 1240.00 0.93 0.89 95.86 0.82 0.05 - - - 0.00 0.02 0.89 -

70 SURATGARH 3.35 29.80 1500.00 1.00 0.83 83.30 0.76 0.06 0.01 - - - - 0.83 -

71 CUDDALORE ST-CMS

(Tamil Nadu)

0.99 7.77 250.00 0.08 0.07 88.79 0.07 - - - - - 0.07 -

72 JOJOBERA T.P.CO.

(Jarkhnad)

0.98 44.42 427.50 0.43 0.30 68.33 0.18 0.00 0.12 - 0.00 - - 0.30 -

73 TENUGHAT T.V.N.L.

(Jarkhnad)

- - 420.00 0.28 0.36 127.87 - - - 0.36 - - - 0.36 -

74 TROMBAY T.P.CO.

(Maharashtra)

1.32 2.70 750.00 0.04 0.03 79.83 0.03 0.00 0.00 - - - 0.03 -

75 ENNORE 0.63 43.30 450.00 0.27 0.27 99.04 0.05 0.02 0.06 - - - 0.14 0.27 -

76 METTUR 2.34 32.66 840.00 0.76 1.38 180.21 1.28 0.10 - - - - - 1.38 -

77 NORTH CHENNAI 1.61 31.40 630.00 0.51 1.34 264.52 0.22 0.04 1.08 - - - - 1.34 -

78 TUTICORIN 3.00 36.47 1050.00 1.10 0.67 61.32 0.58 0.09 0.00 - - - - 0.67 -

79 ANPARA 'A' & 'B' 3.84 35.00 1630.00 1.34 0.00 0.36 0.00 - - - - 0.00 - 0.00 -

80 HARDUAGANJ 0.05 39.90 165.00 0.00 0.01 530.00 - - 0.01 - - - - 0.01 -

81 OBRA 1.76 43.45 1300.00 0.77 0.06 7.90 0.06 - - - - - - 0.06 -

82 PANKI 0.38 31.51 210.00 0.12 0.15 122.41 0.04 - 0.11 - - - - 0.15 -

83 PARICHA 1.40 33.79 640.00 0.48 0.22 46.74 0.21 - 0.01 - - 0.00 - 0.22 -

84 KOLAGHAT 3.10 40.13 1260.00 1.24 1.24 99.80 0.23 0.08 - - - - 0.93 1.24 -

85 SAGARDIGHI 1.76 42.16 600.00 0.60 0.06 9.38 0.04 0.01 - - - - 0.00 0.06 -

86 BANDEL 0.78 38.12 450.00 0.30 0.42 140.68 - 0.01 - - - - 0.40 0.42 -

87 SANTALDIH 0.63 35.57 250.00 0.22 0.00 0.12 - 0.00 - - - - - 0.00 -

88 BAKRESWAR 2.51 38.39 1050.00 0.96 1.18 122.09 0.41 0.01 0.00 - - - 0.75 1.18 -

89 RATNAGIRI JSW Energy Limited

(Maharashtra)

1.29 6.55 1200.00 0.08 0.07 78.59 0.03 0.04 - - - - - 0.07 -

90 VIJAYANAGAR JSW Energy

Limited(Karnataka)

0.97 11.15 860.00 0.11 0.10 97.40 0.10 0.01 - - - - - 0.10 -

- - 83796.80 66.49 36.26 54.53 17.45 2.36 4.72 3.16 2.45 0.37 5.74 36.26

Note : * New Thermal Power Stations i.e Sl.no.6 & 30

W.B.P.D.C.L

(W.B.)

U.P.R.V.U.N.L.

(U.P.)

T.N.G&D C.L.

(Tamil Nadu)

R.R.V.U.N.L.

(Rajasthan)

GRAND TOTAL

Page 4