REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour par reaoome. including tha tlma lor reviewing instruct gathering and maintaining tha data naadad, and completing and ravlawlng tha collection o( information. Sand janrchmg nxuti„g ,|nta sources~ comment» regarding this burden estimate or any other aspect of th collection of information. Including suggeatlnna for reducing thli burden to Weahmgton Heedquartara Servicea. Directorate for Information Ooaratlon» and Reports 1215 j,„„ ""* Oavn Highway, Suit. 1204, Arlington, VA 22202-4302, and to tha Office of Management and Budget. Paperwork Reduction Project 10704.01881. Washington. OC 20503. AGENCY USE ONLY (L—vm blank! 2. REPORT DATE 3 September 1997 4. TITLE AND SUBTITLE MERTS Field Research/Integrated Marine Technology Center- construction of buildings and purchase of related equipment 3. REPORT TYPE AND DATES COVERED June 96 - Annual Performance Report j u j y 97 6. AUTHOR(S) John W. Wubben 7. PERFORMING ORGANIZATION NAMES(S) AND ADDRESS(ES) Marine and Environmental Research & Training Station (MERTS) c/o Clatsop Community College 1653 Jerome Avenue Astoria, OR 97103 5. FUNDING NUMBERS G-N00014-96-1-0873 9. SPONSORING / MONITORING AGENCY NAMES(S) AND ADDRESS(ES) Office of Naval Research Program Officer Ronald A. DeMarco ONR 33 Ballston Centre Tower One, 800 North Quincy Street Arlington, VA 22217-5660 11. SUPPLEMENTARY NOTES 3. PERFORMING ORGANIZATION REPORT NUMBER MERTS2-1996-97 10. SPONSORING /MONITORING AGENCY REPORT NUMBER a. DISTRIBUTION / AVAILA8ILITY STATEMENT Available to the public 12. DISTRIBUTION CODE 13. ABSTRACT (Maximum 200 words) The following steps have been taken to date to complete the purposes of the referenced grant: (1) employment of a qualified architect; (2) completion of facility design; (3) selection of a qualified Contract Manager/General Contractor; (4) contracting for completion of the MERTS Field Research/Integrated Marine Technology Center, with a Guaranteed Maximum Price; (5) purchase of related, selected materials and equipment; (6) progress on construction, including: (a) a completion date of 18 December 97; (b) construction progress report covering the period 21 April 97 to 28 August 97, detailing the status of key construction elements; (c) photographs showing the progress of the construction. 14. SUBJECT TERMS 17. SECURITY CLASSIFICATION OF REPORT Unclassified 18. SECURITY CLASSIFICATION OF THIS PAGE Unclassified 19. SECURITY CLASSIFICATION OF ABSTRACT Unclassified DTIC QUALITY INSPECTED 3 15. NUMBER OF PAGES 19. PRICE CODE 20. LIMITATION OF ABSTRACT UL bundard harm mi iH«v. 2-831 PrauntMd by ANISf SM £] -!• 33». to?

Upload: others

Post on 24-Jan-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

REPORT DOCUMENTATION PAGE Form Approved

0M8 No. 0704-0133

Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour par reaoome. including tha tlma lor reviewing instruct gathering and maintaining tha data naadad, and completing and ravlawlng tha collection o( information. Sand

janrchmg nxuti„g ,|nta sources~ comment» regarding this burden estimate or any other aspect of th

collection of information. Including suggeatlnna for reducing thli burden to Weahmgton Heedquartara Servicea. Directorate for Information Ooaratlon» and Reports 1215 j,„„ ""* Oavn Highway, Suit. 1204, Arlington, VA 22202-4302, and to tha Office of Management and Budget. Paperwork Reduction Project 10704.01881. Washington. OC 20503.

AGENCY USE ONLY (L—vm blank! 2. REPORT DATE

3 September 1997 4. TITLE AND SUBTITLE

MERTS Field Research/Integrated Marine Technology Center- construction of buildings and purchase of related equipment

3. REPORT TYPE AND DATES COVERED June 96 -

Annual Performance Report jujy 97

6. AUTHOR(S)

John W. Wubben

7. PERFORMING ORGANIZATION NAMES(S) AND ADDRESS(ES)

Marine and Environmental Research & Training Station (MERTS) c/o Clatsop Community College 1653 Jerome Avenue Astoria, OR 97103

5. FUNDING NUMBERS

G-N00014-96-1-0873

9. SPONSORING / MONITORING AGENCY NAMES(S) AND ADDRESS(ES)

Office of Naval Research Program Officer Ronald A. DeMarco ONR 33 Ballston Centre Tower One, 800 North Quincy Street Arlington, VA 22217-5660

11. SUPPLEMENTARY NOTES

3. PERFORMING ORGANIZATION REPORT NUMBER

MERTS2-1996-97

10. SPONSORING /MONITORING AGENCY REPORT NUMBER

a. DISTRIBUTION / AVAILA8ILITY STATEMENT

Available to the public

12. DISTRIBUTION CODE

13. ABSTRACT (Maximum 200 words)

The following steps have been taken to date to complete the purposes of the referenced grant: (1) employment of a qualified architect; (2) completion of facility design; (3) selection of a qualified Contract Manager/General Contractor; (4) contracting for completion of the MERTS Field Research/Integrated Marine Technology Center, with a Guaranteed Maximum Price; (5) purchase of related, selected materials and equipment; (6) progress on construction, including: (a) a completion date of 18 December 97; (b) construction progress report covering the period 21 April 97 to 28 August 97, detailing the status of key construction elements; (c) photographs showing the progress of the construction.

14. SUBJECT TERMS

17. SECURITY CLASSIFICATION OF REPORT

Unclassified

18. SECURITY CLASSIFICATION OF THIS PAGE

Unclassified

19. SECURITY CLASSIFICATION OF ABSTRACT

Unclassified

DTIC QUALITY INSPECTED 3

15. NUMBER OF PAGES

19. PRICE CODE

20. LIMITATION OF ABSTRACT

UL bundard harm mi iH«v. 2-831 PrauntMd by ANISf SM £]■-!• 33». to?

Page 2: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

GENERAL INSTRUCTIONS FOR COMPLETING SF 298

The Report Documentation Page (RDP) is used in announcing and cataloging reports. It is important that this information be consistent with the rest of the report, particularly the cover and title page Instructions for filling in each block of the form follow. It is important to stay within the lines to meet optical scanning requirements.

Block 1. Agency Use Only (Leave blank).

Block 2. Report Date. Full publication date including day, month, and year, if available (e.g. 1 Jan 88). Must cite at least the year.

Block 3. Type of Report and Dates Covered. State whether report is interim, final, etc. If applicable, enter inclusive report dates (e.g. 10 June 87 - 30 June 88.

Block 4. Title and Subtitle. A title is taken from the part of the report that provides the most meaningful and complete information. When a report is prepared in more than one volume, repeat the primary title, add volume number, and include subtitle for the specific volume. On classified documents enter the title classification in parentheses.

Block 5. Funding Numbers. To include contract and grant numbers; may include program element number(s), project number(s), task number(s), and work unit number(s). Use the following labels:

C - Contract G - Grant PE - Program

Element

Block 6. Author(s). Name(s) of person(s) responsible for writing the report, performing the research, or credited with the content of the report. If editor or compiler, this should follow the name(s).

B'ock 7. Performing Organization Name(s) and Address(es). Self-explanatory.

Block 8. Performing Organization Report Number. Enter the unigue alphanumeric report number(s) assigned by the organization performing the report.

Block 9- Sponsoring/Monitoring Agency Names(s) and Address(es). Self-explanatory.

PR - Project TA - Task WU - Work Unit

Accession No.

Block 10. Sponsoring/Monitoring Agency Report Number. (If knownj

Block 11. Supplementary Notes. Enter information not included elsewhere such as: Prepared in cooperation with...; Trans, of ...; To be published... When a report is revised, include a statement whether the new report supersedes or supplements the older report.

Block 12a. Distribution/Availability Statement. Denotes public availability or limitations. Cite any availability to the public. Enter additional limitations or special markings in all capitals (e.g NOFORN, REL, ITAR).

DOD

DOE NASA NTIS

See DODD 5230.24, "Distribution Statements on Technical Documents."

See authorities. See Handbook NHB 2200.2. Leave blank.

Block l'2b. Distribution Code.

DOD DOE

NASA NTIS

Leave blank. Enter DOE distribution categories from the Standard Distribution for Unclassified Scientific and Technical Reports. Leave blank. Leave blank.

Block 13. Abstract. Include a brief (Maximum 200 words) factual summary of the most significant information contained in the report.

Block 14. Subject Terms. Keyword or phrases identifying major subjects in the report.

Block 15. Number of Pages. Enter the total number of pages.

Block 16. Price Code. Enter appropriate price code (NTIS only). ""'"

Blocks 17. - 19. Security Classification. Self- explanatory. Enter U. S. Security Classification in accordance with the U.S. Security Regulations (i.e. UNCLASSIFIED). If form contains classified information, stamp classification on the top and bottom of the page.

Block 20. Limitation of Abstract. This block must be completed to assign a limitation to the

abstract. Enter either UL (unlimited) or SAR (same as report). An entry in this block is necessary if

the abstract is to be limited. If blank, the abstract is assumed to be unlimited.

Standard Form 298 Back (Rev. 2-89)

Page 3: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

Marine and Environmental Research and Training Station, Inc,

c/o Clatsop Community College

1653 Jerome Avenue ♦ Astoria, Oregon * 97103 ♦ (503) 325-0910

MEMORANDUM

TO: Ronald A. De Marco, Ph. D., Head of Engineering, Materials, and Physical Sciences, S & T Dept, Office of Naval Research

FROM* John Wubben, Principal InvestigatorAV*"-

SUBJECT: Annual Performance Report for Grant #N00014-96-l-0873

DATE: September 3,1997

The following steps have been taken to date to complete the purposes of the referenced grant:

1. Employment of a qualified architect, Mahlum and Nordfors Smith Gordon.

2. Completion of facility design by the architect.

3. Selection of a qualified Contract Manager/General Contractor (CM/GC), S.D. Deacon, Inc., for the facilities construction project.

4. Agreement between the architect, CM/GC, and MERTS, Inc., on a contract for completion of the MERTS Field Research/Integrated Marine Technology Center, with a Guaranteed Maximum Price (GMP) which is consistent with the terms of the grant.

Page 4: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

5. Purchase of related, selected materials and equipment consistent with the terms of the grant.

6. Progress on construction of the MERTS Field Research/Integrated Marine Technology Center, documented as follows:

a. An agreed-upon completion date of 18 December 97, as reflected in the enclosed CPM chart (Attachment A). This chart also documents progress on all phases of construction as of 20 August 97.

b. Construction progress report covering the period 21 April 97 to 28 August 97 (Attachment B) by Al Jaques, Project Manager. This report details key construction elements and their status as completed, ongoing, or scheduled. As of 28 August 97 construction was 20 days behind schedule, but efforts are being made to make up for the lost time (see page 2 of Attachment B). Given that the projected completion date is 18 December 97, and the grant period runs through 14 February 98, we feel there is more than adequate time to complete the project by the conclusion of the grant period.

c. Photographs taken over a period of days from 15 August 97 to 28 August 97, showing the progress of the construction, which provides graphic illustration of points made in Attachments A and B.

Dr. De Marco, we truly appreciate your excellent assistance and support in progressing toward completion of this grant.

If I make provide additional information or clarification of this report, please contact me.

Merts/phasell/an.report/onr

19970915 131 jmG Quäjum ms¥mmo

Page 5: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

© I Marine ! Environmental i Research ! Traning I Station

| Astoria, Oregon

FIELD F INTE

M; TECH

CE ^^Q H^^^^^^H

NEW PHASE«

■ 1000^^ SITE CLEARING - COMPLETE 0 0 14JUL97 11JUL97 1 SHE CLEARING - COMPLETE

ll020 CUTS AND FILLS - COMPLETE 0 0 14JUL97 11JUL97 1 CUTS AND FILLS - COMPLETE

11040 SITE UTILITIES 5d 5d 15JUL97 21JUL97 ■7 SITE UTILITIES

I1O6O SITE LIGHTING 15d 15d 12AUG97 02SEP97

22AUG97 ] i-^»- /*"«7 CONCRETE 1080 CONCRETE 5d 5d 18AUG97

1090 SIDEWALKS 5d 5d 05AUG97 11AUG97 '-*■ e^mmmu siut WALKS

1100 PAVING 7d 7d 25AUG97 03SEP97 U L-t* -*■■■■ 1140 LANDSCAPING 25d 25d 12AUG97 16SEP97

1160 STRIPING S CURBS 3d 3d 04SEP97 08SEP97

1180 SITE IMPROVMENTS 5d 5d 04SEP97 10SEP97

■ l420 STRUCTURAL STEEL ERECTION 20d 20d 21JUL97 15AUG97 STRUCTURAL STEEL E

?AL DECKING

SEISMIC BRACING a W 11430 STRUCTURAL DECKING 10d 10d 28JUL97 08AUG97

11440 SEISMIC BRACING & WELD 10d 10d 04AUG97 15AUG97 .-*■ ■ 1480 EXTERIOR STRUCTURAL FRAMING 12d 12d 11AUG97 26AUG97

I1SOO ROOFING 45d 45d 04AUG97 06OCT97

Il580 ROLL UP & EXT. MAN DOORS 25d 25d 05SEP97 09OCT97

I2IOO CMU VENEER 12d 12d 28JUL97 12AUG97 CMU VENEER

2540 HORIZONTAL AND VERTICAL CONTROL 0 0 14JUL97 11JUL97 rL' I

i HORIZONTAL AND VERTICAL CONTROL

2560 FOOTING EXCAVATION - COMPLETE 0 0 14JUL97 11JUL97 L V t

V ,

\ FOOTING EXCAVATION - COMPLETE i UNDER S O G ROUGH IN - PLUMBING

v UNDER S.O.G ROUGH IN - ELECTRICAL 1 FORM & POUR FOOTINGS - EXTERIOR

i FORM & POUR FOOTINGS - INTERIOR

1 BELOW'GRADE CMU STEM WALLS

2580 UNDER SOG. ROUGH IN - PLUMBING 0 0 14JUL97 11JUL97

2800 UNDER SOG. ROUGH IN - ELECTRICAL 0 0 14JUL97 11JUL97

2820 FORM ft POUR FOOTINGS - EXTERIOR 0 0 14JUL97 11JUL97 - 2840 FORM ft POUR FOOTINGS - INTERIOR 0 0 14JUL97 11JUL97

^ J-V /

2660 BELOW GRADE CMU STEM WALLS 0 0 14JUL97 11JUL97 -V- l

2680 SAND AND VAPOR BARRIER 0 0 14JUL97 11JUL97 l__L -V 1 \ SAND AND VAPOR BARRIER

1 FORM &'POUR SOG 2700 FORM 4 POUR SOG 0 0 14JUL97 11JUL97 -V t

2720 REINFORCED CMU CONSTRUCTION 0 0 14JUL97 11JUL97 -v . *i REINFORCED CMU CONSTRUCTION

2850 PAINT 4d 4d 14AUG97 19AUG97 £pm«^/ PAIN 1

2860 INSULATION 1d 1d 20AUG97 20AUG97 -*• Bf INSULATION

2880 WALL SHEATHING 4d 4d 21AUG97 26AUG97

2920 MEZZANINE DECK SHEATHING 2d 2d 20AUG97 21AUG97 -*■ a«7 MEZZANINE D

2940 MEZZANINE HVAC EQUIPMENT 2d 2d 22AUG97 25AUG97 L-»- ^WMEZZAt

2970 SPRINKLER ROUGH IN 15d 15d 20AUG97 10SEP97

2980 PLUMBING ROUGH IN 15d 15d 20AUG97 10SEP97

3000 ELECTRICAL ROUGH IN 10d 10d 20AUG97 03SEP97

3020 HVAC ROUGH IN 12d 12d 20AUG97 05SEP97

3040 DOORS a HARDWARE 5d 5d 20AUG97 26AUG97 I-* /^^WUUUK

3060 OWNER FURNISHED/OWNER INSTALLED 5d 5d 20AUG97 26AUG97 <-+■ ^ü*M>/OWNb

3080 HANG LIGHT FIXTURES 5d 5d 04SEP97 10SEP97 ' 3100 FINISHES AND DROPS 4d 4d 11SEP97 16SEP97

3120 FLOOR FINtSHES 1d 1d 17SEP97 17SEP97

3140 OWNERS EQUIPMENT EARLY MOVE 26d 28d 18SEP97 230CT97

3260 HORIZONTAL AND VERTICAL CONTROL 0 0 14JUL97 11JUL97 L

-V- , ,HORIZO MTAl .AND VERTICAL CON rROL

3280 FOOTING EXCAVATION 0 0 14JUL97 11JUL97 -v I i FOOTING EXCAVATION | [ UNDER SOG ROUGH IN - PLUMBING

, UNDER SOG. ROUGH IN - ELECTRICAL 1 FORM a POUR FOOTINGS - EXTERIOR

\ FORM a POUR FOOTINGS - INTERIOR

3300 UNDER SOG. ROUGH IN - PLUMBING 0 0 14JUL97 11JUL97 -V- I -v- , -V- 1

3320 UNDER SOG. ROUGH IN - ELECTRICAL 0 0 14JUL97 11JUL97

3340 FORM a POUR FOOTINGS - EXTERIOR 0 0 14JUL97 11JUL97

3360 FORM a POUR FOOTINGS - INTERIOR 0 0 14JUL97 11JUL97 -v J 3380 BELOW GRADE CMU STEM WALLS 0 0 14JUL97 11JUL97 -V- I

\ SAND AND VAPOR BARRIER [ FORM a POUR S.O.G.

3400 SAND AND VAPOR BARRIER 0 0 14JUL97 11JUL97 I

L -y. )

3420 FORM a POUR SOG 0 0 14JUL97 11JUL97 -pi 3440 REINFORCED CMU CONSTRUCTION 4d 4d 16JUL97 21JUL97 »/F EINFORCED CMU CONSTRUCTIONL

3580 INSULATION 3d 3d 28AUG97 02SEP97 - ■*• ^^K.

3600 WALL SHEATHING 5d 5d 03SEP97 09SEP97

3620 PAINT 4d 4d 10SEP97 15SEP97

3640 MEZZANINE DECK SHEATHING 2d 2d 16SEP97 17SEP97

3660 MEZZANINE HVAC EQUIPMENT 5d 5d 18SEP97 24SEP97

3690 SPRINKLER ROUGH IN 15d 15d 16SEP97 06OCT97

3700 PLUMBING ROUGH IN 5d 5d 16SEP97 22SEP97 -___

Page 6: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

® FIELD RESEARCH

INTEGRATED MARINE

TECHNOLOGY CENTER

TE CLEARING - COMPLETE

JTS AND FILLS - COMPLETE

^■^^ SHE LmLITlES

I"""C SIDE WALKS

CONCRETE

► m

■7 SITE LIGHTING

7 PAVING

mmi^—Kl LANDSCAPING

7 STRIPING & CURBS

■ÜSITE IMPROVMENTS

s L*- /»

1=-

L STRUCTURAL STEEL ERECTION STRUCTURAL DECKING

57 SEISMIC BRACING & WELD.

^^■■■■^i* EXTERIOR STRUCTURAL FRAMING -*■ M

RIZONTAL AND VERTICAL CONTROL 3TING EXCAVATION - COMPLETE

DER S.O.G. ROUGH IN - PLUMBING

DER S.O.G. ROUGH IN - ELECTRICAL -!M a POUR FOOTINGS - EXTERIOR

^M a POUR FOOTINGS - INTERIOR OWGRADE CMU STEM WALLS

ID AND VAPOR BARRIER <M a POUR SOG

NFORCED CMU CONSTRUCTION

T^T

■7 ROOFING

^■■■■■^^ METAL SIDING a WINDOWS

wmmj ROLL UP a EXT MAN DOORS

STlCMU VENEER

PAINT

(-*■ q INSULATION

*r m—**7 WALL SHEATHING

• m> MEZZANINE DECK SHEATHING L-- mm? MEZZANINE HVAC EQUIPMENT

• /VMM^H^BMH^MMB? SPRINKLER ROUGH IN

' /9HMMMaHHHHM^^B*VPLUMBING ROUGH IN "!

7 ELECTRICAL ROUGH IN -*■ /VHM^B^^MB^>HVAC ROUGH IN

7 DOORS a HARDWARE

7 OWNER FURNISHED/OWNER INSTALLED U- mamim HANG LIGHT FIXTURES

^ • *■ amma^ FINISHES AND DROPS

6[ FLOOR FINISHES

■7 OWNERS EQUIPMENT EARLY MOVE ITEMS

1ZONTAL AND VERTICAL CONTROL TING EXCAVATION |

ER SOG. ROUGH IN - PLUMBING

ER SOG. ROUGH IN - ELECTRICAL * a POUR FOOTINGS - EXTERIOR

* a POUR FOOTINGS - INTERIOR

W GRADE CMU STEM WALLS

3 AND VAPOR BARRIER I * a POUR SOG I

7 REINFORCED CMU CONSTRUCTION

I INSULATION

#■■■* WALL SHEATHING

- «M^^ PAINT

'-*■ Off MEZZANINIE DECK SHEATHING n+r &—^^7 MEZZANINE HVAC EQUIPMENT

■ - m

^^■■■■^^^ SPRINKLER ROUGH IN PLUMBING ROUGH IN

& ELECTRICAL ROUGH IN

Page 7: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

D S.D. DEACON

Pat Mahoney - PM Chris Crothers - SUPT

'LANDSCAPING CURBS

'ROVMENTS

PROOFING

■^^■^■■^ METAL SIDING & WINDOWS ■■tf ROLL UP & EXT. MAN DOORS

i ROUGH IN ROUGH IN N

ALLED

T FIXTURES

NISHES AND DROPS

"LOOR RNISHES

DOWNERS EQUIPMENT EARLY MOVE fTEMS

HING r EZZANINIE DECK SHEATHING

^^m? MEZZANINE HVAC EQUIPMENT

^^■^■■■^■^■17 SPRINKLER ROUGH IN ■* PLUMBING ROUGH IN

i ELECTRICAL ROUGH IN

Page 8: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

M3140 | OWNERS EQUIPMENT EARLY MOVE 1 26d | 26d |18SEP97 |230CT97 J

3260 HORIZONTAL AND VERTICAL CONTROL 0 0 14JUL97 11JUL97 -V 1 HORIZONTAL AND VERTICAL CONTROL

3280 FOOTING EXCAVATION 0 0 14JUL97 11JUL97 L-V A FOOTING EXCAVATION |

A UNDER SOG. ROUGH IN - PLUMBING 3300 UNDER SOG ROUGH IN - PLUMBING 0 0 14JUL97 11JUL97 --V-

3320 UNDER SOG. ROUGH IN - ELECTRICAL 0 0 14JUL97 11JUL97 --V A UNDER SOG. ROUGH IN-ELECTRICAL

3340 FORM * POUR FOOTINGS - EXTERIOR 0 0 14JUL97 11JUL97 --V- A FORM a POUR FOOTINGS - EXTERIOR

A FORM a POUR FOOTINGS - INTERIOR

A BELOW GRADE CMU STEM WALLS

3360 FORM S POUR FOOTINGS - INTERIOR 0 0 14JULB7 11JUL97 L-v 3380 BELOW GRADE CMU STEM WALLS 0 0 14JUL97 11JUL97 -L ■U-

3400 SAND AND VAPOR BARRIER 0 0 14JUL97 11JUL97 -L-y. A SAND AND VAPOR BARRIER

A FORM a POUR SO G 3420 FORM & POUR SOG 0 0 14JUL97 11JUL97 L-V-

3440 REINFORCED CMU CONSTRUCTION 4d 4d 16JUL97 21JUL97 m REINFORCED CMU CONSTRUCTION

3580 INSULATION 3d 3d 28AUG97 02SEP97 ' -** ^^ 3600 WALL SHEATHING 5d 5d 03SEP97 09SEP97

3620 PAINT 4d 4d 10SEP97 15SEP97

3640 MEZZANINE DECK SHEATHING 2d 2d 16SEP97 17SEP97

3660 MEZZANINE HVAC EQUIPMENT 5d 5d 18SEP97 24SEP97

3690 SPRINKLER ROUGH IN 15d 15d 16SEP97 06OCT97

3700 PLUMBING ROUGH IN 5d 5d 16SEP97 22SEP97

3720 ELECTRICAL ROUGH IN 10d 10d 16SEP97 29SEP97

3740 HVAC ROUGH IN 6d 6d 16SEP97 23SEP97

3760 DOORS & HARDWARE 5d 5d 16SEPB7 22SEP97

3780 OWNER FURNISHED/OWNER INSTALLED 5d 5d 16SEP97 22SEP97

3800 HANG LIGHT FIXTURES 5d 5d 19SEP97 25SEP97

3820 FINISHES AND DROPS 3d 3d 24SEP97 26SEP97

3840 FLOOR FINISHES 5d 5d 29SEP97 03OCT97

3860 OWNERS EQUIPMENT EARLY MOVE 25d 25d 06OCT97 07NOV97

m220 HORIZONTAL AND VERTICAL CONTROL 0 0 14JUL97 11JUL97 A i HORIZONTAL AND VERTICAL CONTROL

■ 1240 FOOTING EXCAVATION 0 0 14JUL97 11JUL97 i FOOTING EXCAVATION 1

ll260 UNDER SOG. ROUGH IN - PLUMBING 0 0 14JUL97 11JUL97 -V A UNDER SOG. ROUGH IN - PLUMBING

-V A UNDER SOG. ROUGH IN • ELECTRICAL 11280 UNDER SOG ROUGH IN ■ ELECTRICAL 0 0 14JUL97 11JUL97

■ 1300 FORM & POUR FOOTINGS - EXTERIOR 0 0 14JUL97 11JUL97 ▲ i A , A i

A i

' A -

i FORM a POUR FOOTINGS - EXTERIOR

i FORM a POUR FOOTINGS - INTERIOR

i BELOWGRADE CMU STEM WALLS Il320 FORM & POUR FOOTINGS - INTERIOR 0 0 14JUL97 11JUL97

Il340 BELOW GRADE CMU STEM WALLS 0 0 14JUL97 11JUL97

■ 1360 SAND AND VAPOR BARRIER 0 0 14JUL97 11JUL97 i SAND AND VAPOR BARRIER

i FORM a POUR SOG Il380 FORM & POUR SOG 0 0 14JUL97 11JUL97

■ 1400 REINFORCED CMU CONSTRUCTION 5d 5d 14JUL97 18JUL97 V^ REINFORCED CMU CONSTRUCTION

■ 1445 SOG REMOVAL 12d 12d 24JUL97 08AUG97 L-». Rb MOVAL

SOG. FORM a POUR ■ 1450 SOG. FORM & POUR 5d 5d 11AUG97 15AUG97 ■=» m^K llS22 INSULATION 1d 1d 12SEP97 12SEP97

Il525 WALL SHEATHING 4d 4d 15SEP97 18SEP97

1530 PAINT 3d 3d 19SEP97 23SEP97

1540 MEZZANINE DECK SHEATHING 2d 2d 24SEP97 25SEP97

02OCT97 1560 MEZZANINE HVAC EQUIPMENT 5d 5d 26SEP97 l

1590 SPRINKLER ROUGH IN 20d 20d 24SEP97 21CCT97

1640 PLUMBING ROUGH IN 30d 30d 24SEP97 04NOV97

1680 ELECTRICAL ROUGH IN 20d 20d 24SEP97 210CT97

1680 HVAC ROUGH IN 10d 10d 24SEP97 07OCT97

1700 DOORS & HARDWARE 5d Sd 24SEP97 30SEP97

1740 OWNER FURNISHED OWNER INSTALLED 5d 5d 24SEP97 30SEP97

1760 HANG LIGHT FIXTURES 15d 15d 01OCT97 210CT97

1770 FINISHES AND DROPS 4d 4d 05NOV97 10NOV97

1780 FLOOR FINISHES 5d 5d 11NOV97 17N0V97

1800 OWNERS EQUIPMENT EARLY MOVE 1d 1d 18NOV97 18NOV97

1860 HORIZONTAL AND VERTICAL CONTROL 0 0 14JUL97 11JUL97 —V- , v. HORIZONTAL AND VERTICAL CON- ■ROL

1880 FOOTING EXCAVATION 0 0 14JUL97 11JUL97 LV ) i FOOTING EXCAVATION |

^ UNDER SOG. ROUGH IN - PLUMBING

\ UNDER SOG ROUGH IN - ELECTRICAL 1900 UNDER SOG. ROUGH IN - PLUMBING 0 0 14JUL97 11JUL97 -V- /,

1920 UNDER SOG ROUGH IN - ELECTRICAL 0 0 14JUL97 11JUL97 L-v ; 1940 FORM & POUR FOOTINGS - EXTERIOR 0 0 14JUL97 11JUL97 H-V A FORM a POUR FOOTINGS - EXTERIOR

1960 FORM S POUR FOOTINGS - INTERIOR 0 0 14JUL97 11JUL97 -"-v- 4 \ FORM a POUR FOOTINGS - INTERIOR

\ BELOW GRADE CMU STEM WALLS 1980 BELOW GRADE CMU STEM WALLS 0 0 14JUL97 11JUL97

2000 UNDER SOG. PREP 0 0 14JUL97 11JUL97 > UNDER S.O.G PREP

2020 FORM a POUR SOG 1d 1d 14JUL97 14JUL97 L*. } 7FORM a POUR SOG

2040 RSNFORCED CMU CONSTRUCTION 5d 5d 21JUL97 25JUL97 ■-1-*- ^■""Y REINFORCED CMU CONSTRUCTION

2120 INTERIOR CMU VENEER 2d 2d 28JUL97 29JUL97 E»- mj INTERIOR CMU VENEER 1—- Off MEZZANINE DECK SHEATH 2140 MEZZANINE DECK SHEATHING 2d 2d 11AUG97 12AUG97

2160 MEZZANINE HVAC EQUIPMENT 5d 5d 13AUG97 19AUG97 >-•» it^m^m^ MEZZANINE HW

2250 FRAMING 14d 14d 27AUG97 16SEP97 ^** ^^™^ 2280 INSULATION 3d 3d 17SEP97 19SEP97

2270 SPRINKLER ROUGH IN 15d 15d 17SEP97 07OCT97

2300 PLUMBING ROUGH IN 10d 10d 17SEP97 30SEP97

2320 ELECTRICAL ROUGH IN 6d 6d 17SEP97 24SEP97

2340 HVAC ROUGH IN 10d 10d 20AUGB7 03SEP97

2360 SHEET ROCK 10d 10d 01OCT97 140CT97

2380 MUD a TAPE 10d 10d 08OCT97 21CCT97

2390 ACOUSTICAL CEILINGS 5d 5d 290CT97 04NOV97

2400 PAINT 5d 5d 220CT97 280CT97 *»

2410 LOW VOLTAGE & FIRE ALARM 15d 15d 290CT97 18NOV97

2420 DOORS a HARDWARE 5d 5d 290CT97 04NOV97

2440 FOLDING PARTITIONS 5d 5d 290CT97 04NOV97

2460 OWNER FURNISHED/OWNER INSTALLED 5d 5d 290CT97 04NOV97 X~\ 2470 SPRINKLER FINISHES 5d 5d 290CT97 04NOV97 /A) 2500 PLUMBING FINISHES 5d 5d 290CT97 04NOV97 (ny 2520 ELECTRICAL FINISHES 5d 5d 290CT97 04NOV97

Page 9: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

V OWNERS EQUIPMENT EARLY MOVE fTEMS

L AND VERTICAL CONTROL

<CAVATlON | G. ROUGH IN - PLUMBING

G ROUGH IN - ELECTRICAL

JR FOOTINGS - EXTERIOR

JR FOOTINGS - INTERIOR

>DE CMU STEM WALLS

APOR BARRIER JR SOG

ENFORCED CMU CONSTRUCTION k INSULATION

«BMB% WALL SHEATHING

«- jaaiii« PAINT

■-*■ OB MEZZANINE DECK SHEATHING

'-*• Om^^7 MEZZANINE HVAC EQUIPMENT

-*■ £ilJJJJJJ"««IJJiJJJJJJJJJJJJJJJJJJJJJJJJJ»M«B™7 SPRINKLER ROUGH IN

PLUMBING ROUGH IN

■■■■m ELECTRICAL ROUGH IN

HVAC ROUGH IN

DOORS & HARDWARE

OWNER FURNISHED/OWNER INSTALLED

HANG LIGHT FIXTURES

FINISHES AND DROPS

J^W^ FLOOR FINISHES

4k OWNERS EQUIPMENT EARLY MOVE I

AND VERTICAL CONTROL

;AVATION I ROUGH IN - PLUMBING

ROUGH IN - ELECTRICAL

? FOOTINGS • EXTERIOR

=i FOOTINGS - INTERIOR

)E CMU STEM WALLS

«FOR BARRIER

? SOG

5RCED CMU CONSTRUCTION

7 SOG REMOVAL z* SOG. FORM & POUR k INSULATION

- m*%. WALL SHEATHING

►• ^H« PAINT

-*• mf MEZZANINE DECK SHEATHING c»r m—^m? MEZZANINIE HVAC EQUIPMENT

p SPRINKLER ROUGH IN ■■■■■■■■■■^ PLUMBING ROUGH IN

► m - m

£ ■^■■■■■■■■■■■■^ ELECTRICAL ROUGH IN ■■■■IMBBm HVAC ROUGH IN

■■■7 DOORS & HARDWARE tmm} OWNER FURNISHED OWNER INSTALLED

► mtmmmmm^mm^m^m^ HANG LIGHT FIXTURES

I k FINISHES AND DROPS

i^UHUHH» FLOOR FINISHES ; ► A OWNERS EQUIPMENT

VND VERTICAL CONTROL

WATION |

ROUGH IN - PLUMBING

ROUGH IN - ELECTRICAL

FOOTINGS - EXTERIOR

FOOTINGS • INTERIOR

H CMU STEM WALLS

PREP

:S.O.G

TK7 REINFORCED CMU CONSTRUCTION

*■ /W INTERIOR CMU VENEER

7 MEZZANINIE DECK SHEATHING

WD MEZZANINIE HVAC EQUIPMENT "i#5 k FRAMING

7 INSULATION

UUHBHBK7 SPRINKLER ROUGH IN

« PLUMBING ROUGH IN

k ELECTRICAL ROUGH IN

m? HVAC ROUGH IN

"' V" m SHEET ROCK! HHMHMfc MUD & TAPE

Q

k ACOUSTICAL CEILINGS

k PAINT

► m ■■■^■■■■H^k LOW VOLTAGE & FIRE

DOORS & HARDWARE

FOLDING PARTITIONS

OWNER FURNISHED/OWNER INSTALLED

SPRINKLER FINISHES

PLUMBING FINISHES

Page 10: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

y- FLOOR FINISHES

W? OWNERS EQUIPMENT EARLY MOVE fTEMS

»THING »INT

MEZZANINIE DECK SHEATHING

^mmmt MEZZANINE HVAC EQUIPMENT

f^mma^i^^m^m SPRINKLER ROUGH IN

MB« PLUMBING ROUGH IN

k ELECTRICAL ROUGH IN k HVAC ROUGH IN

7 DOORS & HARDWARE

7 OWNER FURNISHED/OWNER INSTALLED

k HANG LIGHT FIXTURES

k FINISHES AND DROPS

■k aOOR FINISHES

k OWNERS EQUIPMENT EARLY MOVE ITEMS

ION

WALL SHEATHING Ml PAINT

-»• M7 MEZZANINE DECK SHEATHING

<-*■ '/mmmm MEZZANINE HVAC EQUIPMENT

"♦ /^■■■^^^^^■■^iBBBBII^B^^ SPRINKLER ROUGH IN ' •" «■^■■■■■■■■■■■■i^HiHHH« PLUMBING ROUGH IN

!- m ■■■■■■■■■■■■■■■■■■fL ELECTRICAL ROUGH IN

^^m HVAC ROUGH IN

7 DOORS »HARDWARE" "

7 OWNER FURNISHED OWNER INSTALLED

^■■■■IMHi^^BBiM^ HANG LIGHT FIXTURES

I k FINISHES AND DROPS

gmm^mtk. FLOOR RNISHES

► A OWNERS EQUIPMENT EARLY MOVE ITEMS

MING

INSULATION

1^MMMHB^H^M7 SPRINKLER ROUGH IN

k PLUMBING ROUGH IN

k ELECTRICAL ROUGH IN

k SHEET ROCK!

^^■■A MUD & TAPE

k ACOUSTICAL CEILINGS

► m m—^^m^m. LOW VOLTAGE & FIRE ALARM k DOORS & HARDWARE

k FOLDING PARTITIONS

k OWNER FURNISHED/OWNER INSTALLED

k SPRINKLER FINISHES

k PLUMBING FINISHES ^

Page 11: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

1525 WALL SHEATHING 4d 4d 15SEP97 I18SEP97 1530 PAINT 3d 3d 19SEP97 I23SEP97 1540 MEZZANINE DECK SHEATHING 2d 2d 24SEP97 25SEP97 1560 MEZZANINE HVAC EQUIPMENT 5d 5d 26SEP97 02OCT97 1590 SPRINKLER ROUGH IN 20d 20d 24SEP97 210CT97 1640 PLUMBING ROUGH IN 30d 30d 24SEP97 04NOV97 1660 ELECTRICAL ROUGH IN 20c 20d 24SEP97 210CT97 1680 HVAC ROUGH IN 10c 10c 24SEP97 07OCT97 1700 DOORS ft HARDWARE 5d 5c 24SEP97 30SEP97 1740 OWNER FURNISHED OWNER INSTALLED 5o 56 24SEP97 30SEP97 1760 HANG LIGHT FIXTURES 15d 15cJ 01OCT97 210CT97 1770 FINISHES AND DROPS 4d 4d 05NOV97 10NOV97 1780 FLOOR FINISHES 5d 5d 11NOV97 17NOV97

11800 OWNERS EQUIPMENT EARLY MOVE 1d 1d 18NOV97 18NOV97

1860 HORIZONTAL AND VERTICAL CONTROL 0 0 14JUL97 I11JUL97 -V A HORIZONTAL AND VERTICAL CONTROL 1880 FOOTING EXCAVATION 0 0 14JULB7 11JUL97 Ly. A FOOTING EXCAVATION I

A UNDER SOG ROUGH IN - PLUMBING

\ UNDER SOG. ROUGH IN - ELECTRICAL \ FORM a POUR FOOTINGS ■ EXTERIOR

{ FORM a POUR FOOTINGS ■ INTERIOR k BELOW GRADE CMU STEM WALLS

1900 UNDER SOG. ROUGH IN - PLUMBING 0 0 14JUL97 11JUL97 -V 1820 UNDER SOG. ROUGH IN - ELECTRICAL 0 0 14JUL97 11JUL97 Ly 1940 FORM S POUR FOOTINGS - EXTERIOR 0 0 14JUL97 11JUL97 Fv~ 1960 FORM S POUR FOOTINGS - INTERIOR 0 0 14JUL97 11JUL97 -v-

:y— -V

1980 BELOW GRADE CMU STEM WALLS 0 0 14JULB7 11JUL97 2000 UNDER SOG. PREP 0 0 14JUL97 11JUL97 kUNDER SOG PREP

y FORMS POUR SOG 2020 FORM a POUR SO G 1d 1d 14JUL97 14JUL97 -»■ t

2040 REINFORCED CMU CONSTRUCTION 5d 5d 21JUL97 25JUL97 |-L*' ^""^ REINFORCED CMU CONSTRUCT £*- /W INTERIOR CMU VENEER

'—»- Ä7MEZ

ION 2120 INTERIOR CMU VENEER 2d 2d 28JUL97 29JUL97 2140 MEZZANINE DECK SHEATHING 2d 2d 11AUG97 12AUG97 ZANINIE DECK SHEATHI' 2160 MEZZANINIE HVAC EQUIPMENT 5d 5d 13AUG97 19AUG97 ■■W MEZZANINE HVAC 22S0 FRAMING 14d 14d 27AUG97 16SEP97 2260 INSULATION 3d 3d 17SEP97 19SEP97 2270 SPRINKLER ROUGH IN 15d 15d 17SEP97 07OCT97 2300 PLUMBING ROUGH IN 10d 10d 17SEP97 30SEP97 2320 ELECTRICAL ROUGH IN 6d 6d 17SEP97 I24SEP97 2340 HVAC ROUGH IN 10d 10d 20AUG97 03SEPB7 2360 SHEET ROCK 10d 10d 01OCT97 140CT97 2380 MUD a TAPE 10d 10d 08OCT97 210CT97 2390 ACOUSTICAL CEILINGS 5d 5d 290CT97 04NOV97 2400 PAINT 5d 5d 220CTB7 280CT97 2410 LOW VOLTAGE a FIRE ALARM 15d 15d 290CT97 18NOV97 2420 DOORS a HARDWARE 5d 5d 290CT97 I04NOV97 2440 FOLDING PARTITIONS 5d 5d 290CT97 I04NOV97 2480 OWNER FURNISHED/OWNER INSTALLED 5d 5d 290CT97 |04NOV97 2470 SPRINKLER FINISHES 5d 5d 290CT97 I04NOV97 2500 NUMBING FINISHES 5d Sd 29CCT97 J4NOV97 2520 ELECTRICAL FINISHES 5d 5d 290CT97 ( J4NOV97 2530 1 ■IVAC FINISHERS 3d 3d . 290CTB7 : i10CT97 2550 ! SUBSTANTIAL COMPLETION 1d 1d 8NOV97 1 8NOV97 2570 [ 'UNCHUST 20d 20d 1 9NOV97 1 7DEC97

|2590 C JERTIFICATE OF OCCUPANCY 1d 1d 1 8DEC97 1 8DEC97

1 A Early «tart pant V Early finish point saaV Earty bar

■aaaal Progress bar ■■ Critical bar —— Summary bar

A Progress point ▲ Cnbcai point

W Summary point

♦ Start milestone point ♦ Finish milestone poin |

@

Page 12: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

IIUOÜLAIION

- 4BB* WALL SHEATHING :- -»■ JBBB* PAINT

7 MEZZANINE DECK SHEATHING

■7 MEZZANINIE HVAC EQUIPMENT ^BBBBBBBBBBBBBBBBBBi

*Ä S7 SPRINKLER ROUGH IN BBBBBBBBBBBBfc PLUMBING ROUGH IN

-»- m - m

E {■■■■■■■■■■■■■■■■■■■■■■■Ik ELECTRICAL ROUGH IN ■■■■■■■I HVAC ROUGH IN

K DOORS &'HARDWARE" " " V OWNER FURNISHED OWNER INSTALLED

«■BBBBBBBBBBBBBBB* HANG LIGHT FIXTURES k FINISHES AND DROPS

JBBBBBi FLOOR FINISHES

•- A OWNERS EQUIPMENT E

ID VERTICAL CONTROL

MTION I

OUGH IN - PLUMBING

OUGH IN - ELECTRICAL

OOT1NGS • EXTERIOR

0OT1NGS - INTERIOR

CMU STEM WALLS

=?EP

i.O.G

' REINFORCED CMU CONSTRUCTION

- /W INTERIOR CMU VENEER 1—»• ffiy MEZZANINIE DECK SHEATHING

7 MEZZANINIE HVAC EQUIPMENT

■ •- *BBBBBBBB ■A FRAMING

/BB7 INSULATION

/■BBBBBBI m

BBBBBBK? SPRINKLER ROUGH IN

■»PLUMBING ROUGH IN

k ELECTRICAL ROUGH IN L* m K HVAC ROUGH IN

/ k SHEET ROCK!

■■■■■*. MUD & TAPE

«■■■■% ACOUSTICAL CEILINGS k PAINT

«■■■■■■■■■■■■■■■■a LOW VOLTAGE S FIRE Al k DOORS & HARDWARE

k FOLDING PARTITIONS

k OWNER FURNISHED/OWNER INSTALLED

k SPRINKLER FINISHES k PLUMBING FINISHES

k ELECTRICAL FINISHES k HVAC FINISHERS

"'► A SUBSTANTIAL COMPLETE

Page 13: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

ANINE DECK SHEATHING

me MEZZANINIE HVAC EQUIPMENT

^^^^^^^M^^l^^K? SPRINKLER ROUGH IN

^■■■■■■■■■■»^■^■■■^■■■■■fc PLUMBING ROUGH IN

■■■■■■■■■■■■■■■■■■■■■■■■L ELECTRICAL ROUGH IN ■■^■m HVAC ROUGH IN

DOORS »HARDWARE"

OWNER FURNISHED OWNER INSTALLED

•■^^^^■■^^^■^^ HANG LIGHT FIXTURES

I FINISHES AND DROPS

J^B^^i FLOOR FINISHES

' +■ A OWNERS EQUIPMENT EARLY MOVE fTEMS

■^^■7 SPRINKLER ROUGH IN NUMBING ROUGH IN

AL ROUGH IN

mk SHEET ROCK.

■MH^M MUD & TAPE

k ACOUSTICAL CEILINGS L PAINT

► m L LOW VOLTAGE & FIRE ALARM DOORS & HARDWARE

FOLDING PARTITIONS

OWNER FURNISHED/OWNER INSTALLED SPRINKLER FINISHES

PLUMBING FINISHES

ELECTRICAL FINISHES

HVAC FINISHERS

"~ '► Jk SUBSTANTIAL COMPLETION

L PUNCH LIST

Jk CERTIFICATE OF OCCUPANCY

»DEACON OEMERAl CONTNACTDR

s

®.

Page 14: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

CLATSOP COMMUNITY COLLEGE MERTS Campus Construction

Field Research & Integrated Marine Technologies Center Project Date: 8/28/97 To: CCC Board Members & Staff From: Al Jaques, Project Manager

Re: Construction Progress Report 4/21/97-8/28/97, 130 Contract Days to Date

Status Legend: Completed / Ongoing / Scheduled

O Owner's testing representative Braun/lntertec on-site for inspection & testing requirements

O CCC & Astoria Police Department providing random security patrols

O Site cuts/fills (excavation/grading to design specs) 80% to date

S Final sub-grading preparation prior to paving

C Roof drain underground piping runs w/cleanouts

C Foundation perimeter drains

C SOG replacement in Fabrication shop

C All main structure SOG poured

C First coat of sealer & hardener applied to all interior SOG

S Fabrication shop exterior SOG

S Sidewalks

S Asphalt paving

O Site-lighting conduit runs & light pole bases, 90% complete

C Electrical transformer pad/vault and pull (junction) boxes set

C Excavate & install primary electrical conduits

O Communications tie-conduits between phase 1 & 2 bldgs

O Fire alarm interface phase 1 & 2 bldgs

C Northwest Natural Gas, mains & services to campus buildings

C Exterior / Interior structural masonry walls

C Damproofing application on CMU walls prior to veneer lay-up

C Rigid insulation installation on CMU walls prior to veneer lay-up

O Exterior veneer block installation, 95% complete

O Structural steel erection & roof decking, 95% complete

O Membrane built-up roofing @ flat roofs, 95% complete

Q Insulation & metal roofing installation

Q Exterior / Interior gauge framing (metal studs)

Q Field verification for rough opening of windows prior to fabrication

MERTS Phase 2 Progress Report #3

Page 15: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

Q CMU wall filler (base paint) & misc. painting preparation

<2 Interior piping infrastructure

Q HVAC infrastructure

Q Interior electrical infrastructure

Contractors on site

Workforce on-site at present: approx. 50

> Electrical, Wadsworth Electric Co.

> Plumbing, J P Plumbing Co.

> Testing & Inspection, Braun Intertec

> Masonry Grout Supplier, A1 Ready Mix

> Concrete Supplier, Fisher Ready Mix

> Steel Fabrication & Erection, Fisher Fabrication

> Gauge Framing, Landco

> Metal Roofing & Siding, Architectural Metal Works

> Painting, Black Oak Construction

> Masonry, B & B Tile and Masonry

> Concrete Slab Cleaning & Application of Hardener/Sealer, Brightway Inc.

> Earthwork, Jim Wilkins Co.

> Glazing (Windows), Culver Glass

> HVAC, HVAC Inc.

Coordination Activities

> Weekly scheduled team meetings, (General Contractor, Architect & Owner's Rep.)

> Weekly scheduled sub-contractors meetings, providing review of project status in terms of three week outlook, safety issues and project coordination requirements.

> 8/19/97, Mechanical & Electrical infrastructure coordination meeting with all relevant subcontractors > 8/25/97, OSHA consultation on-site w/General and Subcontractors

Schedule Status

> Overall schedule status to date: approximately 20 days behind due to weather, late steel deliveries & erection delays. Coordination efforts are ongoing with all subcontractors to rectify any schedule deviation.

Budget Status

> Ten add/deduct CO's to date resulting in savings of $16,289 below the original GMP > Contract GMP $3,706,469, Current GMP with CO's to-date, $3,690,180 > Overall project expenditures to-date approximately $1,800,000 > Overall construction contract expenditures to-date approximately $1,002,000

Legend SOG Slab-on-Grade

GMP Guaranteed Maximum Price (General Contractor's Construction Contract with Owner) CO's Change Orders

OSHA Occupational Safety & Health Administration

MERTS Phase 2 Progress Report #3 2

Page 16: REPORT DOCUMENTATION PAGE · REPORT DOCUMENTATION PAGE Form Approved 0M8 No. 0704-0133 Public reporting burden (or Ihn collection of Information >• eetimeteri to average 1 hour

Construction of MERTS Field Research/ Integrated Marine Technology Center

as of 28 August 1997