Report copyright - USING THE ARUP BIM MATURITY MEASURE TO …...Construction (VDC) Scorecard (Kam, 2015) and the BIM Maturity Measure (BIM-MM) (Arup, 2014), have been designed to improve previous models
Please pass captcha verification before submit form