Report copyright - April, 2017 · Approval of tariff of Auraiya Gas Power Station (663.36 MW) for the period from 1.4.2014 to 31.3.2019 And In the matter of NTPC Ltd NTPC Bhawan, Core-7, SCOPE Complex,
Please pass captcha verification before submit form