Report copyright - NATIONAL TREASURY PPP MANUAL - GTAC 04.pdf · 16.4.4 If at any time after Treasury Approval: I has been granted in respect of the feasibility study of a PPP, but before the grant
Please pass captcha verification before submit form
Please pass captcha verification before submit form