Repairing of hydrostatic water retaining tunnels in Asia Ostrava, 2008 Minova CarboTech GmbH Dipl.-Ing. Dipl.-Wi.-Ing. (FH) Thorsten Tatzki

Upload: others

Post on 12-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Repairing of hydrostatic water retaining tunnels

in AsiaOstrava, 2008

Minova CarboTech GmbHDipl.-Ing. Dipl.-Wi.-Ing. (FH) Thorsten Tatzki

Page 2: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 2Vincent Chien and Thorsten Tatzki

Example tunnel in Japan

Hachioji Joseki Tunnel

Length: 2.4 km

Street tunnel, connection between the highway and beltway network

Tokyo

Project

Membranesupplier

Minova CTChemical Grout

Local Partner

End customer

Communication

Knowledge transfer

Page 3: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 3Vincent Chien and Thorsten Tatzki

Hachioji Joseki Tunnel

Target: First 100% sealed hydrostatic water retained tunnel in Japan!

Low grade

High grade

Drainage tunnelMountain tunnel. It is possible to drain it by the inclination.

e. g. Ujigawa tunnelUse of a plastic waterproofing membrane with drainage pipes in the invert.

Hachioji tunnelHydrostatic water retaining tunnel due to the high value of the environment.

Hachioji tunnelHydrostatic water retaining tunnel due to the high value of the environment.

Example tunnel in Japan

Tokyo

Project

Page 4: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 4Vincent Chien and Thorsten Tatzki

Hachioji Joseki Tunnel

Longitudinal geological Profile

Example tunnel in Japan

Page 5: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 5Vincent Chien and Thorsten Tatzki

Hachioji Joseki Tunnel

Underground water level

Tunnel construction

Example tunnel in Japan

Page 6: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 6Vincent Chien and Thorsten Tatzki

Hachioji Joseki Tunnel

Repair System

Example tunnel in Japan

Page 7: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 7Vincent Chien and Thorsten Tatzki

Injection Work

Railway tunnel / Taiwan

Injection of injection hoses in block joints

Injection of special plate construction, 24 for one tunnel block

Example tunnel in Taiwan

Linkou Tunnel

Page 8: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 8Vincent Chien and Thorsten Tatzki

The special design of the HDPE – membrane

was done with:

Tunnel consultant

Membrane producer

Grout producer

Example tunnel in Taiwan

Linkou Tunnel

Page 9: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 9Vincent Chien and Thorsten Tatzki

Waterstop System

Setup of the Waterstop System

Geomembrane (non-woven) with a plastic waterproofing membrane e.g. VLDPE, HDPE

Joint strips with integrated grouting hoses e.g. PREDIMAX 11

Injection plates fixed in a grid on the membrane surface

Grouting and injection lines

Suitable injection product

e.g. CarboCrack Seal NV

Injection equipment

Trained injection team

Supervising and monitoring of the application

Page 10: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 10Vincent Chien and Thorsten Tatzki

Waterstop System

PREDIMAX Injection hose

Filling hoses for injection plate

Detail Block joint with PVC water stop and HDPE membrane (grey)

PVC water stop with fixing element for PREDIMAX

Reinforcement bars

Page 11: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 11Vincent Chien and Thorsten Tatzki

Detail Block joint with PVC water stop and HDPE membrane (blue) and PREDIMAX

Waterstop System in Japan

Page 12: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 12Vincent Chien and Thorsten Tatzki

Filling hoses, before concreting

Plate, fixed on the membrane

Detail Block with injection plate system and filling hoses

Waterstop System

Page 13: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 13Vincent Chien and Thorsten Tatzki

Filling hoses after concreting, with connectors

Filling hoses before concreting

Detail Block with injection plate system and filling hoses

Waterstop System

Page 14: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 14Vincent Chien and Thorsten Tatzki

Waterstop System

Reasons for faults

Reinforcement: reinforcement steel, spacers, later adjustment of the bars, floating during concreting…

Pouring the concrete: concrete pressure, later adjustment of the formwork, floating of the formwork, vibration during concreting, mistakes during the pouring procedure e.g. gaps in the roof zone of the tunnel…

Installation: missing knowledge, waste during the installation on the membrane, wrong position of the joint strips…

Waterstop System: cheap materialquality, too long injection hose sections,incompatible parts e.g. filling hose withthe injection hose, mistakes during theinjection of the resin…

Page 15: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 15Vincent Chien and Thorsten Tatzki

Final Tunnel shell with wet areas

Detail: Water is behind the concrete shell!

Damaging

Page 16: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 16Vincent Chien and Thorsten Tatzki

Pressure water!

Corrosion because of water in the concrete

Damaging

Page 17: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 17Vincent Chien and Thorsten Tatzki

Injection work – schedule in Japan

Test injection in 18.-22.12.2006

Supervising by Minova-CT

Developed a method statement

Start injection work 15.01.2007

8 teams /24hours

~ 4 tons of product in 12 hours

CarboStop F: Stopping pressure water

CarboCrack Seal NV: Permanent sealing

Example injection work

Page 18: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 18Vincent Chien and Thorsten Tatzki

Example injection work

Page 19: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 19Vincent Chien and Thorsten Tatzki

Example injection work

Injection of the block joint from 22pm to 2am

Page 20: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 20Vincent Chien and Thorsten Tatzki

Injection work with Minova pump

Filling hoses for the injection plates

Example injection work

Page 21: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 21Vincent Chien and Thorsten Tatzki

Injection connector

Training by Minova staff

Example injection work

Page 22: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 22Vincent Chien and Thorsten Tatzki

CarboStop F penetrates outside of the block joint

Example injection work

Page 23: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 23Vincent Chien and Thorsten Tatzki

Injection work

Average pressure: 8-10 kg/cm²

Theoretical gap between

concrete and membrane: 2 mm

Practical gap between

concrete and membrane: 5 mm

Result

Page 24: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 24Vincent Chien and Thorsten Tatzki

Hachioji Joseki Tunnel

Hydraulic pressure measurement

For example:

Point DW 4

Pressure 0.53 MPa

Result

Page 25: Repairing of hydrostatic water retaining tunnels in Asiafast10.vsb.cz/science/seminar2008/pics/36.pdf · 2008-02-27 · Vincent Chien and Thorsten Tatzki Page 3 Hachioji Joseki Tunnel

Page 25Vincent Chien and Thorsten Tatzki

Linkou Tunnel Taiwan

Questions are welcome!