    Monitoring and Maintenance of

    Coastal Infrastructure

    Steven A. Hughes, Ph, PE

    Coastal and Hydraulics Laboratory

    US Army Engineer Research and Develoment Center

    !ater"ays E#eriment Station

    $%&% Halls 'erry Road(ic)sburg, *ississii $%+&-.+%%

    Email! Steven.A.Hughes"erdc.usace.army.mil

    #epair and #eha$ilitation of

    Coastal Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    2/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    Contents

    / 0eneral Asects o1 Reair and Rehabilitation

    / Rubble-*ound Structures

    / 2ther 3yes o1 Coastal Structures

    %ased on! CE* Chater (4- 5Author: Steven A6 Hughes7

    #epair and #eha$ilitation

    of Coastal Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    3/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    efinitions

    #epair! 'i#ing ortions o1 a structure that have beendamaged by "aves, "inds, currents, surges, imacts,

    or seimic activity.

    #eha$ilitation! Renovation o1 deteriorated structurecomonents to original condition or upgrading thestructure to "ithstand greater design loads6

    &eneral Aspects of

    #epair and #eha$ilitation

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    4/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    'hen is #epair (eeded)

    &eneral Aspects of

    #epair and #eha$ilitation

    /A1ter damaging storms or other damagingevents

    / !hen eriodic condition insections indicaterogressive deterioration

    / 41 er1ormance monitoring indicates the ro8ect isnot 1unctioning as lanned

    / !hen there is chronic damage 1romunderestimating design loads

    / !hen structure 1unction is modi1ied

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    5/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    Should Pro*ect $e #epaired)

    &eneral Aspects of

    #epair and #eha$ilitation

    / !hat 1unctions are served by the ro8ect/Are other commerce activities a11ected9

    / Has ris) o1 in8ury increased9

    / Ho" critical is the ro8ect relative to otherro8ects in need o1 reair

    / Economic Considerations

    / Possibility o1 imminent 1ailure or collase

    epends Upon...

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    6/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    ifferences +rom (e esign

    esign Enviroment Considerations!

    &eneral Aspects of

    #epair and #eha$ilitation

    / 4n general, no di11erence in actual designarameters 5"aves, "ater levels, etc67

    / *ay have better estimates o1 designarameters

    / Regulatoryenvironmental restrictionsrobably changed

    / Can dra" on ast er1ormance andmonitoring data

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    7/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    Components for Preparing esign

    -6 Revie" original design criteria

    6 Determine the cause o1 the roblems

    /6 4nvestigate the resent structure relative to the as-built lans

    06 Devise a solution to the roblem

    16 Design a reair that 1i#es roblem "ithout e#tensive modi1ications

    &eneral esign Steps

    It helps if you have: 2riginal lans and secs/As-built lans/ Cororate memory

    &eneral Aspects of#epair and #eha$ilitation

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    8/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    Contents

    / 0eneral Asects o1 Reair and Rehabilitation

    / Rubble-*ound Structures

    / 2ther 3yes o1 Coastal Structures

    %ased on! CE* Chater (4- 5Author: Steven A6 Hughes7

    #epair and #eha$ilitation

    of Coastal Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    9/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #u$$le2Mound Structures

    #epair and #eha$ilitation of

    #u$$le2Mound Structures

    / Relatively 1le#ible "ith tolerance to slightmovement o1 armor

    / Damage is usually/Armor unit brea)age

    / Dislocation o1 armor

    / Removal o1 a section o1 armor

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    10/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #u$$le2Mound Structures

    #epair and #eha$ilitation of

    #u$$le2Mound Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    11/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    3ptions for #u$$le2Mound Structures

    #eplace 3riginal Structure

    Slope and Crest #epair

    Chin)ing, resur1acing/Addition o1 dissimilar armor/ Layer reconstruction/ Crest raising/ ;urial

    4oe and +oundation #epair

    / 3oe reconstruction/ Scour aron/Addition o1 a berm

    Core #epair or 5oid Sealing/ Precast concrete bloc)s/ 'ilter cloth/ 0rout

    #epair and #eha$ilitation of

    #u$$le2Mound Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    12/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair Considerations!

    Availability o1 construction materials

    / E

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    13/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    Construction

    E6uipmentfor #u$$le2

    MoundStructure#epairs

    #epair and #eha$ilitation of

    #u$$le2Mound Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    14/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair and #eha$ilitation of

    #u$$le2Mound Structures

    #epair of Armor and Underlayers

    &eneral Categories of Armor 7ayer #epair/ Sot relacement o1 bro)en or dislodged

    units

    / 2verlaying e#isting armor layers

    / Relacing armor layers/ Rebuilding the structure

    esign guidance is sparse8mostly common sense rules2of2thum$

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    15/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    Spot #eplacement of Units

    / Damage consists o1 individual dislacedarmor units

    / >o large sections o1 armor dislaced/ >o evidence o1 general sloe 1ailure/ Percentage o1 dislaced units is ?@ or less

    'hen to Use Spot #eplacement #epair

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    16/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    Spot #eplacement of Units

    / Relace dislodged armor units "ith units o1similar tye and si=e

    / Reuse dislaced units I+ sound and notbro)en into smaller ieces

    / Sulement "ith ne" units

    #epair Method

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    17/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    Spot #eplacement of Units

    / Reair underlayer i1 necessary/Achieve good interloc)ing o1 armor units

    / 41 undamaged armor interloc)ing is good, relace

    dislodged units "ith good contact "ith neighbors

    / 41 undamaged matri# is loose, rehandle armor as

    necessary so reair section has interloc)ing

    #oc9 Armor #epair 4echni6ue

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    18/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    Spot #eplacement of Units

    0ood interloc)ing is essential 1or stability

    / Remove and relace undamaged armor layer 1rom

    the damage location all the "ay u the sloe

    / Reair section should resemble a (B

    /Assure good interloc)ing "ith undisturbed ortions

    Concrete Armor #epair 4echni6ue

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    19/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    Spot #eplacement of Units

    / Least e#ensive/ Shorter time on site/ Less ne" material costs

    / Less rehandling o1 e#isting armor

    Advantages

    Caveat

    4mortant to establish damage caused by design

    event and not by a lesser storm event

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    20/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    3verlaying amaged Armor 7ayers

    'hen to Use Armor 3verlays

    /Armor layer damage is "ide-sread

    / Large sections are dislaced or slumed

    / Damage "as caused by the design storm ora more severe condition 5but not al"ays7

    21ten damaged structure has lo"er crest and

    milder sloes than originally built

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    21/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    3verlaying amaged Armor 7ayers

    / Single-layer stone overlays/ Uses less material

    / >o design guidance, must test in hysical model

    / 3"o-layer stone overlays/ Use ne" construction guidance

    / *odel test large ro8ects

    / 2verlays using dissimilar armor units/ Usually concrete armor units over stone

    / Design guidance available

    / *odel test large ro8ects

    #epair Methods

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    22/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    Sta$ilityCoefficients

    for issimilar

    Armor 7ayer3verlays

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    23/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    Armor 7ayer 3verlay Concerns

    /Armor inter1ace "ith e#isting underlying armor

    / E#tra e11ort to achieve interloc)ing bet"een armor layers/ Under"ater ortion is very di11icultuneven sloe

    / Leeside crest armor units/ ey into e#isting structure 5overtoing stability7

    / 2verlay toe

    / *ust be secured and rotected 5may need ne" toe berm7/ Dislodged armor stones may litter the bottom

    / Construction methods/ ;egin at toe and "or) usloe

    / *ay need to build u uneven underlayer

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    24/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    25/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    3verlaying amaged Armor 7ayers

    / Less e#ensive than relacing armor layer/ Can be used to raise crest and reduce sloe/ Larger armor stones can be used

    Advantages

    isadvantages/ Large

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    26/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    #eplacing Armor 7ayers

    'hen to #eplace Armor 7ayers

    / 2riginal armor layer is inade23 caused by armor instability

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    27/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    #eplacing Armor 7ayers

    / Remove e#isting armor layer on a section/ *ay need to ad8ust or relace e#isting 1irst underlayer

    / 4ncrease underlayer si=e to accommodate larger

    relacement armor

    /Assure roer thic)ness and comaction

    / ;uild 1rom the toe and roceed usloe/ Plan construction se

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    28/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    #eplacing Armor 7ayers

    / Provides a more stable structure "ith less 1uturemaintenance cost/ Provides intended 5or enhanced7 1unctionality/ Use ne" construction design guidance

    Advantages

    isadvantages/ (ery e#ensive/ Long construction times "hich may imact activities

    at the ro8ect site

    / Site stoc)iling o1 construction materials

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    29/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    #e$uilding the Structure

    'hen to #e$uild

    / Structure sustains catastrohic damage/ Structure integrity has been lost

    / Reair ree" 1unctionality re

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    30/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    #e$uilding the Structure

    #epair Method

    / #e$uild at the same location/ *ay need to bury or comletely remove e#isting structure/ Preare relic structure to serve as base 1or ne" structure

    F Remove material 5ma8or e#ense7

    F Preare ne" toe

    F Lay do"n bedding material

    / Probably "ill result in larger cross section/ Reuse materials or cost "ill be greater than ne" construction

    / #e$uild ad*acent to old a$andoned structure/ Re

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    31/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of Armor and Underlayers

    / *ore robust structure/ Less long-term maintenance costs/ 4mroved 5or ne"7 1unctionality

    Advantages

    isadvantages/ (ery e#ensive to remove e#isiting structure/ (ery e#ensive to build ne" structure/ Disrution to ro8ect activites

    #e$uilding the Structure

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    32/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    / Damage occurs "hen/ Concrete sections are dislodged by "ave action/ Underlying suort stones are lost

    / Di11erential settlement

    / Concrete sections may remain intact or theymay brea) because o1 loading, movement orinade

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    33/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    / Correct minor dislacements "ith hydraulic8ac)s or cranes

    / Remove ca sections and relace missingunderlying armor unitsG relace ca section

    / Relace bro)en sections "ith ne" elements/ Remove damaged cast-in-lace sections and

    cast ne" sections

    #epairing Caps and Cron 'alls

    #epair and #eha$ilitation of

    #u$$le2Mound Structures

    #epair Methods

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    34/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    / 4oes and %erms

    / 'or minor damage add ne" material o1 same si=eas needed

    / 'or ma8or damage redesign berm

    / Scour holes and $edding/ 'ill and rotect scour areas according to guidance

    / 5oid sealing/ Reduces "ave and sand transmission

    / Cors guidance available

    3ther Aspects of #epair

    #epair and #eha$ilitation of

    #u$$le2Mound Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    35/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    Contents

    / 0eneral Asects o1 Reair and Rehabilitation

    / Rubble-*ound Structures

    /2ther 3yes o1 Coastal Structures

    %ased on! CE* Chater (4- 5Author: Steven A6 Hughes7

    #epair and #eha$ilitation

    of Coastal Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    36/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair and #eha$ilitation of

    3ther 4ypes of Coastal Structures

    / >ot very tolerant to movement or settlement/ Damage is usually

    / Di11erential settlement

    / Dislocation o1 sections

    / ;rea)age o1 sections or comonents

    / Concrete salling

    / Comonent deterioration

    Caissons

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    37/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    Caissons

    / islocation! Li1t and reseat sections 1or smallstructures, remove and relace large sections

    / Settlement!Add to to o1 caisson to achieve crestelevation

    / 7ocali:ed damage! Patch, reair and relaceaccording to circumstances

    #epair and #eha$ilitation of

    3ther 4ypes of Coastal Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    38/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    4ypes of Concrete #epair

    / Concrete #eplacement

    / Relace de1ective concrete "ith machine-mi#ed concrete o1roer tye

    / ;est 1or large reairs "here damage is beyond rein1orcement

    / ry Pac9/ Sti11 mi#ture rammed into lace in thin layers

    / >arro" slots and cavities

    / Shotcrete/ ;onds "ell "ith ne" or old concrete

    / 0ood 1or shallo" reairs and vertical or overhead sur1aces

    #epair and #eha$ilitation of

    3ther 4ypes of Coastal Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    39/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    Categories of #epair

    / Class -! eterioration %arrier Systems

    /Acts as a barrier to revent or delay 1urther deterioration/ Comleted as maintenance item

    / Reair is non-load bearing

    / Class ! Structural #einforcing

    / Strengthens e#isting, "ea)ened load-bear members

    / Part o1 rehabilitation

    / Class /! Structural #eplacement

    / Partial or comlete relacement o1 structural member

    #epair and #eha$ilitation of

    3ther 4ypes of Coastal Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    40/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    / Class -! eterioration

    %arrier Systems

    / Class /! Structural

    #eplacement

    / Class ! Structural

    #einforcing

    #epair and #eha$ilitation of

    3ther 4ypes of Coastal Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    41/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair of

    Pilings

    #epair and #eha$ilitation of

    3ther 4ypes of Coastal Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    42/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair and #eha$ilitation of

    3ther 4ypes of Coastal Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    43/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    #epair and #eha$ilitation of

    3ther 4ypes of Coastal Structures

  • 7/24/2019 Repair and Rehabilitaytion of Coastal Structures

    44/44

    US Army Corps

    of Engineers

    CHL: Steven Hughes, PhD

    Conclusions

    #epair and #eha$ilitation

    of Coastal Structures

    / 4mortant to )no" "hen reair or rehabilitation is needed

    / Understand di11erences bet"een RR and ne" design

    / ;ase decisions on structure 1unctionality andconse