renovating an existing home · exterior walls are 2x6 construction with 2 layers of 1” rigid foam...
TRANSCRIPT
![Page 1: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/1.jpg)
Mary KrausAIA, LEED BD&C
Net Zero EnergyRenovating an Existing Home
KRAUS-FITCH ARCHITECTS, INC.Home – Community – Planet © Kraus-Fitch Architects, Inc. 2012
Summary
• What / why net zero?
• Steps for a net zero renovation
• Case study
• Other examples
• Conclusion
![Page 2: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/2.jpg)
Net Zero Energy
•Net zero operational energy
•Net zero including embodied energy / lifecycle
•Ecological footprint
•Remember to look at the whole context!
What does it mean?
Why Net Zero Energy?
![Page 3: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/3.jpg)
4 Examples:
• Renovation of small duplex home in Amherst
• Renovation of historic home in Northampton
• New home in Leverett
• New community in Berlin, MA
Steps for a Net Zero Home Renovation
1. Define your goals
2. Analyze existing conditions
3. Run energy modeling to evaluate different strategies
4. Identify solutions
5. Implement your chosen strategies
6. Evaluate performance and refine over time
![Page 4: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/4.jpg)
A Note of Caution:
A house is a system, with many interrelated parts. Be sure to get expert advice before insulating, air sealing, etc., to avoid possible moisture and/or air quality problems.
My Home
![Page 5: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/5.jpg)
What Was Our Starting Point?
Context: Cohousing, walk & bike commute
Small, energy-efficient home
![Page 6: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/6.jpg)
Small, energy-efficient home
1. Net zero operational energy or net energy producing – heating, ventilation, hot water, electric plug loads
2. Learning: What would we do differently if building new?
Defining Our Goals
![Page 7: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/7.jpg)
Utility Bills
Analyzing Existing Conditions
Specific electric loads
Analyzing Existing Conditions
![Page 8: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/8.jpg)
Energy audit: blower door test
Analyzing Existing Conditions
Input for engineer
Modeling Energy Usage
![Page 9: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/9.jpg)
Engineer’s modeling of existing conditions
Modeling Energy Usage
Modeling Energy Usage
Engineer’s modeling of existing conditions
![Page 10: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/10.jpg)
Modeling Energy Usage
Engineer’s modeling of existing conditions
Modeling Energy Usage
Engineer’s modeling of existing conditions
![Page 11: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/11.jpg)
Modeling Energy Usage
Relative impact of different building components
Comparing different strategies
Modeling Energy Usage
![Page 12: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/12.jpg)
Comparing different strategies
Modeling Energy Usage
•Air tightness: Good, but can be improved.
•Insulation levels: Already good, adding exterior foam would improve further but may not be best bang for buck.
•Windows: Double-glazed, low-e, need improvement.
Findings
![Page 13: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/13.jpg)
• Ventilation: Exhaust-only ventilation has no heat recovery (and is ineffective)
• Heating system: Efficient, but fueled by non-renewable propane
• Hot water: Solar hot water system already in place, backed up with propane
• Electricity: Low usage, but can be improved (dehumidification of basement causing disproportionate use)
Findings
• Air leakage: 500 CFM 50 ( 0.2 air changes / hour)
• Insulation levels: R/24 walls w/ thermal break, R/34 roof
• Windows: Double-glazed, low-e (~R/3)
• Electric usage: 300 kwh/month
• Propane usage: 300 gal/year
Details
![Page 14: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/14.jpg)
Consultant’s Recommendations
1. Targeted air sealing to reduce leakage ~15% EDIT2. High-grade interior storm windows3. Reduce electricity use from 300 to 200 kwh/month4. Replace exhaust-only ventilation with heat recovery
ventilation5. Replace gas boiler with minisplit heat pump6. Install solar electric: 5 kw of photovoltaics
Solution: One Way to Get to Zero
What We Did:
1. Targeted air sealing to reduce leakage ~15% - 20%2. Reduce electricity use (moderately)3. Replace exhaust-only ventilation with heat recovery
ventilation4. Replace gas boiler with minisplit heat pump5. Super insulated hot water tank6. Install solar electric: 5.9 kw of photovoltaics
Solution: One Way to Get to Zero
![Page 15: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/15.jpg)
Setting up the blower door
Strategy 1 – Air Sealing
Feeling for leakage
Strategy 1 – Air Sealing
![Page 16: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/16.jpg)
Removing and sealing around cathedral ceiling penetrations
Strategy 1 – Air Sealing
Stairwell light in cathedral ceiling
Strategy 1 – Air Sealing
![Page 17: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/17.jpg)
Caulking perimeter of second floor
Strategy 1 – Air Sealing
Some tight areas – The joy of air sealing!
Strategy 1 – Air Sealing
![Page 18: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/18.jpg)
Interior door connecting to ceiling - an unlikely air path?
Strategy 1 – Air Sealing
Leaks at range hood chase
Strategy 1 – Air Sealing
![Page 19: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/19.jpg)
A closeup. (Duct needs sealing, too!)
Strategy 1 – Air Sealing
Weatherstripping exterior doors
Strategy 1 – Air Sealing
![Page 20: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/20.jpg)
Old refrigerator: 648 kwh/yr.
Replace existing refrigerator with Energy Star model
New refrigerator: 383 kwh/yr.
Strategy 2 – Reduce electric usage
Electricity Usage: Already using compact fluorescent bulbs & fixtures. Next step is to replace with LEDs.
Strategy 2 – Reduce electric usage
![Page 21: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/21.jpg)
Efficient appliances and conserving behaviors
Strategy 2 – Reduce electric usage
Replace exhaust-only with heat recovery ventilation
Graphic: Popular Mechanics
Strategy 3 – Heat recovery ventilation
![Page 22: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/22.jpg)
Replace exhaust-only with heat recovery ventilation
Strategy 3 – Heat recovery ventilation
Driven by PV; eliminates carbon fuel
Strategy 4 – Minisplit heat pump
Interior unit (above)
Exterior units (left)
![Page 23: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/23.jpg)
Increases occupant comfort
Strategy 4 – Minisplit heat pump
Strategy 5
• Superinsulated electric water tank to back up solar hot water
![Page 24: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/24.jpg)
Strategy 6 – Photovoltaics
• PV-ready roof
• 5.9 kW system powers both electric loads & heat pump
• Grid-tied
Results – Air Sealing
• Initial air leakage: 500 CFM 50 ( 0.2 air changes / hour)•Reduction in air leakage: 110 CFM 50
~20% improvement•BUT- Subsequent test after heating system renovations: 640 CFM 50 HMM – WHAT HAPPENED???
![Page 25: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/25.jpg)
Results – Energy DataMonth BEFORE: BEFORE AFTER Difference
Electric Propane Propane TOTAL TOTALkwh gal kwh equiv kwh kwh kwh
Dec 391 55 1485 1876 1090 -786
Jan 357 53.2 1436.4 1793.4 1347 -446.4
Feb 358 74.3 2006.1 2364.1 1053 -1311.1
Mar 346 52.3 1412.1 1758.1 751 -1007.1
Apr 313 33 891 1204 441 -763
May 218 8.3 224.1 442.1 247 -195.1
Jun 222 8.3 224.1 446.1 185 -261.1
]ul 367 8.3 224.1 591.1 187 -404.1
Aug 292 8.3 224.1 516.1 197 -319.1
Sep 253 0 0 253 166 -87
Oct 241 8.3 224.1 465.1 305 -160.1Nov 390 24.8 669.6 1059.6 623 -436.6
Totals 3748 334 9021 12769 6592 -6176.7
Monthly averages 312 28 752 1064 549 -515
Results – Energy Data
Date"4" on Net Meter - Usage from Grid
"10" on net meter - PV to Grid PV production
Net Usage from Grid (#4 - #10)
Total Electric Usage (Grid + PV)
(date of reading) reading
usage for period reading
for period reading
for period
net usage for period
net usage to date for period
12/3/2010 1534start data 1138start data 1354start data
1/1/2011 2428 894 1354 216 1766 412 678 678 10902/1/2011 3557 1129 1545 191 2175 409 938 1616 13473/4/2011 4393 836 1977 432 2824 649 404 2020 10534/4/2011 4961 568 2450 473 3480 656 95 2115 7515/3/2011 5288 327 2903 453 4047 567 -126 1989 4416/4/2011 5456 168 3478 575 4701 654 -407 1582 2477/5/2011 5576 120 4129 651 5417 716 -531 1051 1858/3/2011 5665 89 4783 654 6169 752 -565 486 1879/4/2011 5778 113 5423 640 6893 724 -527 -41 197
10/1/2011 5886 108 5865 442 7393 500 -334 -375 16611/5/2011 6129 243 6319 454 7909 516 -211 -586 30512/3/2011 6650 521 6685 366 8377 468 155 -431 623Totals 5116 5547 7023 -431 6592
![Page 26: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/26.jpg)
Note: A 150-200 SF addition would cost the same.
Results – CostCost of RenovationItem Cost Rebates Tax Credit
(Fed)Tax Credit (MA)
PV $48,6010.00 $(10,500.00) $(14,580.30) $(1,000.00)
SDHW changes $3,818.40
Electric assoc. w/ PV & SDHW $750.00
Heat pumps $6,619.00 $(1,000.00)
HRV $3,125.00
Sale of old boiler $(2,300.00)
Misc carpentry $545.00
Gas disconnect $45.00
New refrigerator $736.40
Air sealing $135.00
Weatherstripping (by owner) $13.70
Total Cost $62,088.50
Totals: Rebates & Tax Credits $(11,500.00) $14,580.30) $(1,000.00)
Net Total Cost $35,008.20
Years to Payback: 9
Results – Cost
Payback for Renovation
kWh or gal Cost per unit Savings/year
Electricity Savings 3748 $0.17 $618.42
Propane Savings 334 $2.70 $901.80
SRECs $2,357.76
Total Revenues $3,877.98
![Page 27: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/27.jpg)
Next Steps:
1. High-grade interior storm windows2. Further reduction to electrical usage
1. LED2. Induction Range
3. More air sealing4. Improved monitoring
Next Steps
1 – Interior Storm Windows
![Page 28: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/28.jpg)
Power strip to control “vampire loads”
Graphic: Energy Federation, Inc.
2 – Further reduce electric usage
Change over to LED light bulbs
2 – Further reduce electric usage
Graphics (l-r): GE, Switch, Philips
![Page 29: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/29.jpg)
Change over to induction range
Graphics: GE
2 – Further reduce electric usage
3 – More Air Sealing
![Page 30: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/30.jpg)
4 – Improved Monitoring
http://www.brultech.comECM-1240 Home Monitor
A Review
Starting Point
• Small, energy-efficient duplex home• Built in1994 for approximately $56/SF • Compact fluorescent lighting • Exhaust-only ventilation• Spacious feeling in a compact floor plan• Solar hot water already installed
![Page 31: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/31.jpg)
A Review
Strategies
• Careful modeling to determine strategies• Targeted air sealing• Reducing plug loads (old refrigerator and
dehumidifier were energy hogs)• New air-source heat pumps to replace
propane boiler• New HRV to replace exhaust-only ventilation• Super-insulated electric water tank as new
backup for solar hot water• 5.9 kw PV array to cover all energy uses
A Review
Results
• Exceeded zero net: net energy producing by 430 kwh/year
• Total energy use reduced by 23%• New refrigerator alone saved ~40 kwh/month• Original tight construction (improved, then undermined)• Basement dehumidification using heat pump is
more efficient & effective• Comfort improved (pleasant heating system)
![Page 32: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/32.jpg)
A Review
Costs:
• Total cost before rebates: $62,100• Cost after rebates & tax credits: $35,000• Yearly revenue from SRECs: $2,400• Yearly cost savings on utilities: $1,500• Payback: 9 years
A Review
Next Steps
• Interior storm windows• More air sealing• LED lighting• Magnetic induction range • Further reduction in plug loads• Improved monitoring
![Page 33: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/33.jpg)
Northampton Residence – Gut Renovation
Before & After
![Page 34: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/34.jpg)
Before & After
Complete Gut Renovation
![Page 35: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/35.jpg)
Note: Gas cooktop & open fireplace door not recommended
Interior
Note thick walls
Interior
![Page 36: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/36.jpg)
Interior
Ground-source heat pump fueled by PVs
Mechanical System
![Page 37: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/37.jpg)
Attempting net zero for heating, cooling, hot water & electric loads; appear to be at 50%+.
New Leverett Home
Interior
![Page 38: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/38.jpg)
Interior
Ground-source heat pump fueled by PVs
Mechanical System
![Page 39: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/39.jpg)
New Community in Berlin, MA
Simple massing simplifies air sealing and insulation details
![Page 40: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/40.jpg)
14” TJI roof rafters provide for 14” of dense packed cellulose insulation
Penetrations for bathroom, kitchen and plumbing vents need to be detailed to ensure air tightness
Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding.
Exterior sheathing is the air barrier –so it is taped at all seams and sealed at all edges and rough openings.
Insulated rim joists and window headers
Triple glazed windows are detailed carefully for air tightness with pre-fabricated corner flashing.
Fully insulated slab and slab edge
Wall Section
OSB sheathing is taped for air sealing prior to the installation of rigid exterior insulation, strapping (right) and exterior siding.
Detailing
![Page 41: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/41.jpg)
What makes a tight, well-insulated building envelope?(Some general information)
Double stud wall for thicker insulation
Wall Construction
![Page 42: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/42.jpg)
Triple-glazed window w/insulated fiberglass frame & sash
High-Performance Windows
And don’t forget air sealing!
![Page 43: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/43.jpg)
Comparison of a 1,400 SF home (2,700 SF including conditioned basement & attic) in New England with four levels of insulation & air-tightness:
Base case (better than Energy Star)• R-16 walls, R-35 roof, R-3 windows, R-5 foundation walls, 0.30 CFM50 infiltration39,000 BTU / hour design heat loss
• Annual heat load of 71 million BTU • ~640 gallons of fuel at 80% efficiency.
Well insulated & very tight (equal to that at Mosaic Commons Cohousing)• R-31 walls, R-48 roof, R-5 windows, R-10 foundation walls, 0.18 CFM50 infiltration• 24,600 BTU / hour design heat loss • Annual heat load of 44 million BTU • ~400 gallons of fuel at 80% efficiency.• 62% of base case
Super insulation & even tighter• R-40 walls, R-55 roof, R-5 windows, R-30 foundation walls, 0.10 CFM50 infiltration15,500 BTU / hour design heat loss
• Annual heat load of 20 million BTU • ~185 gallons of fuel at 80% efficiency.• 29% of base case
German “passivhaus”• Estimated at approximately 15% of base case
Calculations provided by Marc Rosenbaum, Energysmiths
Insulation & Air Tightness Levels
Closing Thoughts
![Page 44: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/44.jpg)
What does a hero look like?
(You know, the kind of person who is helping to “save the world” . . .)
![Page 45: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/45.jpg)
![Page 46: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/46.jpg)
YOU
Whether you go all the way to net zero, or substantially improve your home’s performance, whatever you do will reduce your footprint and help us all learn more.
The strategies you select will depend upon your home and your personal goals.
Net Zero?
![Page 47: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/47.jpg)
It’s not just the house, it’s how you live there!
Remember
Technical Credits:Mary KrausLaura Fitch
Photo Credits:Mike AprilJanice DoyamaJohn FabelLaura FitchMary KrausJen LuckRebecca Reid
© Kraus-Fitch Architects, Inc. 2006
![Page 48: Renovating an Existing Home · Exterior walls are 2x6 construction with 2 layers of 1” rigid foam on the outside, further enhanced with a rain screen detail under the siding. Exterior](https://reader033.vdocuments.us/reader033/viewer/2022050104/5f4281920df6b43a795c49cf/html5/thumbnails/48.jpg)
KRAUS-FITCH ARCHITECTS, INC.
Home – Community – Planet
Mary Kraus, AIA, [email protected]
110 Pulpit Hill Road
Amherst, MA 01002
413-549-5799
www.krausfitch.com
Center for Ecological Technology (CET), energy audit & air sealing, (413) 586-7350, www.cetonline.org
Solar Store of Greenfield, (413) 772-3122, http://solarstoreofgreenfield.com/
Energy Federation, Inc., www.efi.org
North Quabbin Energy, “Winserts” interior storm windows, www.northquabbinenergy.org/wordpress/
Northeast Solar Design Associates (PV), www.nesolardesign.com
Kraus-Fitch Architects, Inc., (413) 549-5799,
Resources