renewable power revamped
TRANSCRIPT
Modification of Solar Street Lights At Vashi
(Project Completion with After installation
ROI calculation)
Prepared By : Giridhari Prakash (AFM-Facility Manager)
Explanation about existing street lights
• We have total 32 Solar Street Light
pole at the Inorbit Vashi premises
• These are all 185AH battery
installed off grid solar PV panels
which has been installed at the out
side parking and passage areas .
• All the street light are not in
working condition due to battery
failure and their accessories
failure. (i.e. Battery Charger,
Battery, Cable, Led Lights)
Prepared By : Giridhari Prakash (AFM-Facility Manager)
Commercial Calculation For existing Off grid
solar street Lights to make operational
• Total No of Solar Street lights = 32 No's
• Batteries including all accessories and installation
expenses =12000 /-
• So its =32x12000 =3,84,000 /-
As it is an off grid system with 2 ft X 3 ft size of PV solar
panels which can generate 160 w per mint from the
one street light, it produces around 160*32 = 5120
Watts (i.e. 5.1 kW per mint in full sun shine ).
Prepared By : Giridhari Prakash (AFM-Facility Manager)
On-grid Solar System On this we can remove all the PV panels and install it in the terrace
open space with On-grid (Grid tied) solar inverter and we can generate some 5.1*8= 40 units per day so its come around 1400 units per year. (We Can Save around 1000 units of co2 emission).we can connect it to the Mall Office DB panel with Single Phase Meter to monitor the Generation of this PV Solar panels.
In off-grid system, it requires batteries and its maintenance, but in on- grid system it do ’t require batteries. It requires only on-grid inverter that will generate direct A/C voltage & can be directly connected to the grid from Mall office DB & get utilized.
Its come with 5 years warranty and no need for any maintenance .
So I’ suggesting to go for on-grid solar system by replacing existing street light PV panels to get the better utilization of solar system .
This on grid system also more cheaper than battery purchase cost and its installation cost.
Prepared By : Giridhari Prakash (AFM-Facility Manager)
Semitic Drawing of On grid system
Prepared By : Giridhari Prakash (AFM-Facility Manager)
Explanation about our existing solar modules
In our panels there is 12*3 cells
at each module which can
generate 80 watts .
We have total 32*2 = 64 No's of
modules to set up an array,
which can generate ~ 5.1 kW.
PV norms
A typical 1kWh System
produces approximately 1600-
2000 kWh energy in India and
Australia
Prepared By : Giridhari Prakash (AFM-Facility Manager)
ROI Calculations.
ROI Calculation for 5 KW On Grid Inverter .
S.NO
Approx. Rate
of 5kW On
Grid Inverter
Removing of
Existing Solar
PV panels
from Street
lights and
installation
Charges.
Total
expenses
Approx. Solar
Panel
Generation
Per Day in
Kwh
Approx. Solar
Panel
Generation
Per Month
Approx. Solar
Panel
Generation
Per Year
Approx.
Savings in Rs.
(per Month)
Approx.
Savings in Rs.
(Per Year)
Approx.
Pay Back
Period in
Years.
1 75000 85000 160000
5 units X 8
hrs
40 units X 30
Days
40 units X 30
Days X 12
Months
As per MSEB
Bill 14.16 per
unit =1200 X
14.16 rs.
16992 X 12
0.8
40 1200 14400 16992 203904
Prepared By : Giridhari Prakash (AFM-Facility Manager)
Execution of solar project
Prepared By : Giridhari Prakash (AFM-Facility
Manager)
Execution of solar project • PO given to SWELECT solar power for the execution of project.
• Solar PV panels had been removed from existing street light Poles.
• Panel structure mounted with standing capacity of 150 kms(wind speed) above mall office.
• Removed 60 PV panels mounted on structure.
• Cabling has been done from PV panels to mall office DB room.
• On Grid/Grid tide inverter has been mounted at mall office DB room.
• PV panels DC single phase source(375 Vdc) has been connected to inverter panel.
• AC output from the inverter has been connected to PDB (R-phase) panel with 32Amps 2-pole MCB.
• Charged the panel with DC source and observed that the On Grid/Grid tide inverter has started generating the A/C voltage .
Prepared By : Giridhari Prakash (AFM-Facility
Manager)
Solar PV panels had been removed from
existing street light poles.
Prepared By : Giridhari Prakash (AFM-Facility
Manager)
Panel structure mounted with standing
capacity of 150 kms(wind speed) above mall
office.
Prepared By : Giridhari Prakash (AFM-Facility
Manager)
Grid Tide inverter has been installed at mall
office DB Room with proper mounting.
Prepared By : Giridhari Prakash (AFM-Facility Manager)
Observations after installation .
• After the installation of the project we have observed
that the panels are generating average of 8.5 kWh per
day due to the weather condition and also due to the
deprecation of panels is very high since its not been
utilized from march 2010 as per the records we have .
• Since the ROI calculation is getting increase we have
calculated and arrived with the average of 16.5 kWh will
be the per day generation of this panels on the year end
considering the Indian weather circumstances .
Prepared By : Giridhari Prakash (AFM-Facility
Manager)
After Observation of unit generation ROI
calculation
ROI Calculation for 5 KW On Grid/Grid Tied Inverter .
S.NO Installation / Commissioning Charges as
per the LOI inclusive of taxes
Approx. Solar
Panel
Generation
Per Day in
Kwh after
installation
Approx. Solar
Panel
Generation
Per Month
Approx. Solar
Panel
Generation
Per Year
Approx.
Savings in Rs.
(per Month)
Approx.
Savings in Rs.
(Per Year)
Approx.
Pay Back
Period in
Years.
1 186832.00 16
16 units X 30
Days
480 X 12
Months
As per MSEB
Bill 14.16 per
unit =480 X
14.16 rs.
6796.8 X 12
2.2 Years.
480 5760 6796.8 81561.6
Prepared By : Giridhari Prakash (AFM-Facility Manager)
Renewable power has been
revamped (Utilized)
Project Completed
Thanks.
Prepared By : Giridhari Prakash (AFM-Facility Manager)