renewable energy in ireland greenstar network, mantychore 2012
DESCRIPTION
Renewable Energy in Ireland Greenstar Network, Mantychore 2012. Andrew Mackarel, HEAnet for GEANT NA3-T3 Workshop 2012. Agenda. Quick overview of changing environment Rational Background to investigating Renewable Energy Technologies Greenstar Mantychore Questions and Answers. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Renewable Energy in Ireland Greenstar Network, Mantychore 2012](https://reader031.vdocuments.us/reader031/viewer/2022021401/56815b92550346895dc99650/html5/thumbnails/1.jpg)
connect • communicate • collaborate
Renewable Energy in Ireland Greenstar Network, Mantychore
2012
Andrew Mackarel, HEAnetfor
GEANT NA3-T3 Workshop 2012
![Page 2: Renewable Energy in Ireland Greenstar Network, Mantychore 2012](https://reader031.vdocuments.us/reader031/viewer/2022021401/56815b92550346895dc99650/html5/thumbnails/2.jpg)
connect • communicate • collaborate
Agenda
Quick overview of changing environmentRational Background to investigating Renewable Energy TechnologiesGreenstarMantychoreQuestions and Answers
![Page 3: Renewable Energy in Ireland Greenstar Network, Mantychore 2012](https://reader031.vdocuments.us/reader031/viewer/2022021401/56815b92550346895dc99650/html5/thumbnails/3.jpg)
connect • communicate • collaborate
Changes in GHG emissions(source: UNFCCC)Country GHG emission
2004 (Mtonne of CO2)
GHG emission change 1990-
2004
Kyoto Treaty obligation 2008-
2012
Austria 79 15.7% -13%Canada 599 26.6% -6%Denmark 70 -1.1% -8%European Comm 4253 -0.6% -8%
Finland 71 14.5% -8%Germany 1226 -17.2% -8%Hungary 123 -31.8% -6%Iceland 3 -5.0% +10%Ireland 56 23.1% -8%Poland 564 -31.2% -6%Sweden 72 -3.5% -8%USA 6103 15.8%
![Page 4: Renewable Energy in Ireland Greenstar Network, Mantychore 2012](https://reader031.vdocuments.us/reader031/viewer/2022021401/56815b92550346895dc99650/html5/thumbnails/4.jpg)
connect • communicate • collaborate
European and Irish Wind Resource
Average PoP 6KW 11KW Windmill at 15m HeightArea size 20m by 20mCost approx 50k EurosPayback 8-10 Years at full load 14-16 Years for Normal PoPBattery and Inverter facility needed
![Page 5: Renewable Energy in Ireland Greenstar Network, Mantychore 2012](https://reader031.vdocuments.us/reader031/viewer/2022021401/56815b92550346895dc99650/html5/thumbnails/5.jpg)
connect • communicate • collaborate
Wind Power Installations in Europe 2010
2010 84 Gw Europe, 194Gw World
![Page 6: Renewable Energy in Ireland Greenstar Network, Mantychore 2012](https://reader031.vdocuments.us/reader031/viewer/2022021401/56815b92550346895dc99650/html5/thumbnails/6.jpg)
connect • communicate • collaborate
Wind Generation targets for 2020
Portugal
Spain
France
Ireland
UK
Belgium
Germany
Denmark
Sweden
Finland
Poland
Hungary
Austria
Italy
Greece
0 5 10 15 20 25 30 35 40
23
21
10
37
20
5
19
30
8
6
15
4
6
5
25
15
14
2
10
3
2
9
24
3
1
2
1
3
3
4
20102020
National Wind Generation targets introducesnew challenges for Power Generators and NRENS
![Page 7: Renewable Energy in Ireland Greenstar Network, Mantychore 2012](https://reader031.vdocuments.us/reader031/viewer/2022021401/56815b92550346895dc99650/html5/thumbnails/7.jpg)
connect • communicate • collaborate
Ireland’s Annual Solar Resource(kWh/m2 per year)
Annual Solar Energy on 1m2surface at 30 degree inclination900 KWh/m2 – 1200 KWh/m2
Average PoP 6KW => approx 50 Solar PanelsArea size 20m by 20mCost approx 50k EurosPayback 20 - 30 YearsBattery and Inverter facility needed
![Page 8: Renewable Energy in Ireland Greenstar Network, Mantychore 2012](https://reader031.vdocuments.us/reader031/viewer/2022021401/56815b92550346895dc99650/html5/thumbnails/8.jpg)
connect • communicate • collaborate
The GreenStar Network Map
8
Green Star consortium universities , data centresand renewable power generators
![Page 9: Renewable Energy in Ireland Greenstar Network, Mantychore 2012](https://reader031.vdocuments.us/reader031/viewer/2022021401/56815b92550346895dc99650/html5/thumbnails/9.jpg)
connect • communicate • collaborate
GSN Architecture
9
• Follow the Sun/Follow the Wind– Optimize distribution of VMs according to availability of intermittently available green power
Device level Interface
Firmware Intelligence
![Page 10: Renewable Energy in Ireland Greenstar Network, Mantychore 2012](https://reader031.vdocuments.us/reader031/viewer/2022021401/56815b92550346895dc99650/html5/thumbnails/10.jpg)
connect • communicate • collaborate
On demand provisioning of network resources.Recursive delegation of access right over managed resources.Lightweight Abstracted operational model.
Decoupled from actual vendor-specific details.Flexible enough to accomodate different designs and orientationsFixed enough so common tools can be build and reused across plugins.– Security– Lifecycle– Monitoring– Deployment and upgrade.
![Page 11: Renewable Energy in Ireland Greenstar Network, Mantychore 2012](https://reader031.vdocuments.us/reader031/viewer/2022021401/56815b92550346895dc99650/html5/thumbnails/11.jpg)
connect • communicate • collaborate
Service integration Test Case
Mantychore/GSN use case“As a GSN administrator, I want to provision a tunnel between my cloud and a remote cloud for VM migration”
Draft API and messagingclass Universe { Cloud myCloud Vector<Clouds> remoteClouds}
class Cloud { String id; String gatewayIP; String location; Vector<String> hostIPs;}
pubic String tunnelUp(String cloudId, String targetHostIP) throws SomeException {
Cloud cloud = remoteClouds.getCloud(cloudId); String targetGatewayIP = cloud.getGateway(hostIP);
String connectionID = mantychoreWrapper.setupConnection(myCloud.getSourceGatewayIP(), targetGatewayIP) return connectionID.}
public void tunnelDown(String connectionId) throws SomeException { mantycoreWrapper.teardownConnection(connectionId);}
![Page 12: Renewable Energy in Ireland Greenstar Network, Mantychore 2012](https://reader031.vdocuments.us/reader031/viewer/2022021401/56815b92550346895dc99650/html5/thumbnails/12.jpg)
connect • communicate • collaborate
Network integration 2012
Current network status• Connectivity to CANARIE/GSN via private routed networks• Irish sites at EPA and DKIT and New Euro GSN Hub servers• Nordunet , i2CAT
3 Logical Routers in Canada, Ireland and Iceland aligned for Mantychore provisioning
![Page 13: Renewable Energy in Ireland Greenstar Network, Mantychore 2012](https://reader031.vdocuments.us/reader031/viewer/2022021401/56815b92550346895dc99650/html5/thumbnails/13.jpg)
connect • communicate • collaborate
Questions and
Answers Thank You