Renewable Energy Development Plan Phase I 2019-2025 July 2019 Sri Lanka Sustainable Energy Authority Ministry of Power, Energy & Business Development

Upload: others

Post on 30-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

Renewable Energy Development Plan

Phase I

2019-2025

July 2019

Sri Lanka Sustainable Energy Authority Ministry of Power, Energy & Business Development

Page 2: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

1

Content

Page

1.0 Introduction 03

2.0 Scope 03

3.0 Approach 04

4.0 Prospective Power Plant Capacity Additions using Renewable Energy Sources 05

4.1 Solar Power Plant Capacity Additions 05

4.2 Wind Power Plant Capacity Additions 06

4.3 Biomass Power Plant Capacity Additions 07

4.4 Mini Hydro Power Plant Capacity Additions 07

5.0 Renewable Energy Resource Development Locations 08

Page 3: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

2

List of Tables

Table 01: Solar Power Plant Capacity Additions 05

Table 02: Wind Power Plant Capacity Additions 06

Table 03: Biomass Power Plant Capacity Additions 07

Table 04: Mini Hydro Power Plant Additions 07

Table 05: Identified Lands for Solar Power Development 09

Table 06: Identified Locations for Floating Solar Power Development 103

Table 07: Identified Lands for Onshore Wind Power Development 104

Table 08: Identified Locations for Offshore Wind Power Development 106

Table 09: Identified Lands for Biomass Power Development 107

Table 10: Identified Lands for Waste to Energy Project Development 107

Page 4: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

3

1.0 Introduction

Sri Lanka Sustainable Energy Authority (SLSEA), which is a statutory authority of the Ministry

of Power, Energy & Business Development, is the focal national entity for developing

renewable energy resources of the country.SLSEA was established by Act No. 35 of 2007,

and it is mandated to prepare Renewable Energy Resource Development Plan by the Act.

Directives have been given in section 8 of the Act to publish Renewable Energy Resource

Development Plan, and it shall come into operation from the date of publication or on such

later date as may be specified therein. It is further mentioned that the Plan shall be revised

in every three years commencing from the date of coming into operation of the Plan.

SLSEA hasdevelopedRenewable Energy Resource Inventory and Resource Maps according to

the provisions given in section 7 of the Act for the four major renewable energy resources -

solar, wind, hydro and biomass,considering the seasonal variations and geographic

segmentation. Renewable Energy Resource Development Plan is developed based on the

resource inventory. In view of the fact that planning for much longer periods for the fast

developing subject of renewable energy would not be practical and also as provision is there

to publish revised plans, this compilation is limited to the planning horizon of 2025 and

designated as the Renewable Energy Development Plan – Phase 1. In the practical

implementation of projects, key attributes such as social & environmental issues and land

ownership need to be taken into account; however, no consideration has been given to such

at the stage of compilation of this Plan.

2.0 Scope

Renewable Energy Resource Development Plan is compiled in order to meet the statutory

requirement spelt out in section 8 of Sri Lanka Sustainable Energy Authority Act as follows.

Section 8: Renewable Energy Resource Development Plan

The Director General shall not later than three years after the appointed date,

submit to the Board a comprehensive Renewable Energy Resource development

Plan (hereinafter referred to as ‘the Plan’) based on the results of the survey and the

renewable resource assessment carried out under section 7.

The Board shall, within thirty days from the date of receipt of such Plan, make

modifications, if any, to such Plan and submit the same to the Minister.

The Minister shall by a notice published in one newspaper each in the Sinhala, Tamil

and English languages, notify the place and times at which the Plan submitted to him

Page 5: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

4

is available for inspection by the public and invite the public to make its comments, if

any, thereon, within thirty days of the publication of such notice.

At the end of the period of thirty days, the Minister may, having regard to any

comments submitted to him by the public, provisionally approve the Plan subject to

such modifications, if any, as he may consider necessary and shall submit the same

to the Cabinet of Ministers for its approval.

Upon approval of the Plan by the Cabinet of Ministeres, the Minister shall cause such

Plan to be published in the Gazette and it shall come into operation on the date of

such publication or on such later date as may be specified therein.

The Plan shall be revised by the Board once in every three years commencing from

the date of coming into operation of the Plan.

The Minister may on the recommendation of the Board, prescribe such measures as

may be necessary to give effect to the Plan and to the strategies referred to therein.

3.0 Approach

An integrated approach has been taken to draft the Plan considering the present state of

renewable energy development in Sri Lanka. Both Sri Lanka Sustainable Energy Authority

and Ceylon Electricity Board have taken certain measures to add renewable energy to the

National Grid as per the provisions in the respective Acts. Any shortcomings that are

prevalent in the development process will also be rectified through this Plan. The approach

is briefed as follows.

1. Gazetting the areas included in Long Term Generation Expansion Plan that has been

published by the CEBand facilitating the development of such projects

2. Addition of solar rooftop systems under the Soorya Bala Sangramaya

projectaccording to the targets given inthe Cabinet Decision No. CP

19/1185/113/040 dated 09.04.2019

3. Gazetting the areas identified in the resource inventory developed by the SLSEA and

facilitating the development of such projects

4. Gazetting areas and developing projects for addition of off shore wind power plants

and floating solar systems on existing reservoirs

Page 6: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

5

4.0 Prospective Power Plant Capacity Additions using Renewable Energy Sources

4.1 Solar Power Plant Capacity Additions

25 projects of 1 MW X 60 Nos.solar power tender will be added in 2019, and the balance will

be added in 2020. Projects under 1 MW X 90 Nos. solar power tender will be added in 2020,

2021 and 2022. Further, the already tendered 10 MW projects of Valachchanai and

Vaunathivu will be added in 2020. Apart from these, atotal capacity of 360 MW will be

added from 2021 to 2025 from this type of projects other than solar parks. Monaragala,

Pooneryn, Polonnruwa and Mahiyanganaya have been identified for establishing solar

parks. Out of these, 100 MW from Monaragala and 130 MW from Pooneryn will be added

by 2021. 100 MW each will be added from Polonnaruwa, Monaragala and Mahiyanganaya in

the period 2023-2025. Apart from these, Maduru Oya floating solar project will be added in

2021.Solar roof top systems will be added through the Soorya Bala Sangramaya project.

Table 01: Solar Power Plant Capacity Additions

Year Capacity (MW)

Large Rooftop Floating Total

2019 25

(1 MW x 25 Nos.) 70 - 95

2020

129

(Valachchenei - 10 MW, Vaunathivu – 10

MW, Pooneryn – 80 MW, 1 MW X 29 Nos.)

30 - 159

2021

270

(Monaragala – 100 MW, Pooneryn – 50 MW,

1 MW X 50 Nos., 70 MW from other projects)

30 100 400

2022

90

(1 MW x 20 Nos., 70 MW from other

projects)

26 15 131

2023

180 MW

(Monaragala – 100 MW, 80 MW from other

projects)

25 15 220

2024

170 MW

(Polonnaruwa – 100 MW, 70 MW from other

projects)

45 50 265

2025

170 MW

(Mahiyanganaya – 100 MW, 70 MW from

other projects)

104 20 294

Total 1,034 330 200 1,564

Note: ‘Other projects’ means any prospective projects islandwide other than those

specified herein.

Page 7: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

6

4.2 WindPower Plant Capacity Additions

Wind power plants with a total capacity of 210 MW will be added in 2020,2022 and

2023.Other wind power plants will be added giving priority to the areas with high wind

energy resource potential identified in the RE resource inventory. A pilot project on offshore

wind energy will be connected to the national grid in 2025.

Table 02: WindPower Plant Capacity Additions

Year Capacity (MW)

Offshore Onshore Total

2019 -

20

(Chunnakkam - 10 MW X 2 Nos.) 20

2020 -

100

(Mannar - 100 MW) 100

2021 -

50

(10 MW X 5Nos. - Trincomolee,

Monaragala, Kilinochchi…) 50

2022 -

290

Pooneryn 240 MW

Mannar 50 MW 290

2023 -

160 MW

(Mannar 60 MW, Mannar mainland 100

MW) 160

2024 -

50

(Kokilai - 50 MW) 50

2025 5

130

(Puttalam - 100 MW, Jaffna - 30 MW) 135

Total 5 800 805

Page 8: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

7

4.3 Biomass Power Plant Capacity Additions

Biomass projects will be added giving priority to the areas with high Biomass energy

resource potential identified in the RE resource inventory.Waste to Energy Projects are also

included in the Biomass category.

Table 03: Biomass Power Plant Capacity Additions

Year Capacity (MW)

2019 13 (Monaragala – 10 MW, Deattakandiya – 3 MW)

2020 10 (Kerawalapitiya – 10 MW)

2021 14 (Baticaloa – 4 MW, Karadiyana – 10 MW)

2022 4 (Kurunegala – 4 MW)

2023 5 (Rathnapura – 5 MW)

2024 5 (Anuradhapura – 5 MW)

2025 5 (Badulla – 5 MW)

Total 56

4.4 Mini HydroPower Plant Capacity Additions

Major part of the mini hydro potential has already been harnessed, and most of the projects

have been commissioned. Rest of them have been identified through the resource inventory

and will be added to the grid according to table 04.

Table 04: Mini Hydro Power Plant Additions

Year Capacity (MW)

2019 20

2020 25

2021 15

2022 20

2023 10

2024 10

2025 10

Total 110

Page 9: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

8

5.0 Renewable Energy Resource Development Locations

Locations are identified using the usual coordinates used in the topographic maps. In cases

of more than 1 set of lands are available in a particular DS Division, it is included with a Set

Number under each DS Division for easy reference. For Biomass resource, a 25 km radius

around a 10 MW power plant is designated as the prospective land area for biomass

plantations.

Page 10: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

9

Table 05: Identified Lands for Solar Power Development

Ampara District

DS Division East

(m)

North

(m)

Land

area

(Acre)

Capacity

(MW)

Samanthurai 303733 237195 51.82 10.36

304229 237338

304243 236974

303644 236769

303733 237195

Uhana 295877 236553 58.13 11.63

295910 236104

295434 235978

295434 236547

295877 236553

Eragama 309471 229511 55.90 11.18

(Set 1) 310004 229511

309916 229092

309369 229092

309471 229511

Damana 302540 213453 66.09 13.22

(Set 1) 302832 213129

302292 212646

302185 213180

302540 213453

Damana 300046 216844 84.44 16.89

(Set 2) 300354 216432

299700 216045

299536 216520

300046 216844

Mahaoya 269306 262959 70.26 14.05

(Set 1) 268931 262565

268525 262892

268871 263288

269306 262959

Mahaoya 267452 249807 50.46 10.09

(Set 2) 267897 249807

267916 249331

267491 249343

267452 249807

Page 11: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

10

DS Division East

(m)

North

(m)

Land

area

(Acre)

Capacity

(MW)

Mahaoya 266350 250391 51.33 10.27

(Set 3) 267032 250384

267013 250092

266338 250070

266350 250391

Padiyathalawa 251621 242575 69.05 13.81

(Set 1) 251702 243022

252439 242912

252194 242541

251621 242575

Padiyathalawa 251705 247106 37.35 7.47

(Set 2) 252106 246915

251950 246597

251581 246772

251705 247106

Mahaoya 263861 252596 70.32 14.06

(Set 4) 263985 252253

263052 252240

263068 252392

263144 252413

263164 252452

263162 252539

263142 252600

263861 252596

Ampara 284912 228418 4.11 0.82

285039 228418

285039 228291

284912 228283

284912 228418

Eragama 307069 228981 3.06 0.61

(Set 2) 307181 228980

307181 228872

307069 228869

307069 228981

Eragama 306857 228984 3.08 0.62

(Set 3) 306973 228985

306973 228876

306856 228878

306857 228984

Page 12: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

11

DS Division East

(m)

North

(m)

Land

area

(Acre)

Capacity

(MW)

Dehiattakandiya 231068 268618 12.43 2.49

231245 268367

231097 268264

230947 268539

231068 268618

Pothuvil 321749 202633 25.81 5.16

(Set 1) 321994 202568

321939 202209

321651 202236

321749 202633

Damana 293128 216430 18.15 3.63

(Set 3) 293274 216252

293036 216020

292905 216207

293128 216430

Thirukkovil 317586 207510 11.21 2.24

(Set 1) 317759 207510

317757 207248

317586 207247

317586 207510

Thirukkovil 317561 207415 11.87 2.37

(Set 2) 317563 207080

317419 207082

317419 207418

317561 207415

Thirukkovil 317419 207418 11.59 2.32

(Set 3) 317419 207082

317279 207082

317279 207418

317419 207418

Thirukkovil 317586 207247 11.68 2.34

(Set 4) 317757 207248

317759 206974

317584 206974

317586 207247

Pothuvil 321558 202781 27.67 5.53

(Set 2) 321770 202720

321651 202236

321431 202298

321558 202781

Page 13: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

12

DS Division East

(m)

North

(m)

Land

area

(Acre)

Capacity

(MW)

Pothuvil 316231 186567 8.19 1.64

(Set 3) 316454 186559

316453 186416

316231 186413

316231 186567

Pothuvil 316454 186559 8.55 1.71

(Set 4) 316686 186561

316729 186434

316453 186416

316454 186559

Damana 298366 220759 16.34 3.27

(Set 4) 298620 220759

298620 220499

298366 220499

298366 220759

Padiyathalawa 251543 242149 50.32 10.06

(Set 3) 251621 242575

252194 242541

251923 242131

251543 242149

Padiyathalawa 251621 242575 52.07 10.41

(Set 4) 251543 242149

251063 242171

251131 242605

251621 242575

Padiyathalawa 251702 243022 58.12 11.62

(Set 5) 251621 242575

251131 242605

251208 243097

251702 243022

Mahaoya 268871 263288 64.05 12.81

(Set 5) 268525 262892

268143 263200

268462 263597

268871 263288

Mahaoya 268871 263288 65.82 13.16

(Set 6) 268462 263597

268791 264007

269196 263660

268871 263288

Page 14: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

13

DS Division East

(m)

North

(m)

Land

area

(Acre)

Capacity

(MW)

Mahaoya 269306 262959 65.44 13.09

(Set 7) 268871 263288

269196 263660

269625 263293

269306 262959

Anuradhapura District

DS Division East

(m)

North

(m)

Land

area

(Acre)

Capacity

(MW)

Nuwaragam Palatha East 168081 347344 11.79 2.36

(Set 1) 168081 347518

168353 347518

168353 347344

168081 347344

Nuwaragam Palatha East 166526 340480 18.84 3.77

(Set 2) 166520 340204

166249 340227

166278 340532

166526 340480

Nuwaragam Palatha East 166274 340532 16.11 3.22

(Set 3) 166249 340227

166026 340260

166090 340579

166274 340532

Kahatagasdigiliya 183214 351012 1.47 0.29

(Set 1) 183122 351009

183116 351078

183208 351071

183214 351012

Maha Vilachchiya 142818 376159 75.77 15.15

(Set 1) 142809 376803

143241 376779

143362 376163

142818 376159

Maha Vilachchiya 145224 376130 78.50 15.70

(Set 2) 144441 375924

144350 376351

145104 376483

145224 376130

Page 15: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

14

DS Division East

(m)

North

(m)

Land

area

(Acre)

Capacity

(MW)

Nuwaragam Palatha East 165944 340951 50.81 10.16

(Set 4) 166123 341359

166590 341250

166420 340860

165944 340951

Thirappane 170055 341035 27.35 5.47

(Set 1) 170474 341080

170468 340815

170055 340767

170055 341035

Maha Vilachchiya 142557 358189 70.24 14.05

(Set 3) 143158 358183

143183 357752

142550 357700

142557 358189

Palugaswewa 197292 312124 5.23 1.05

(Set 1) 197424 312124

197425 311965

197290 311966

197292 312124

Maha Vilachchiya 140919 358036 64.63 12.93

(Set 4) 141432 358275

141521 357689

141254 357509

140919 358036

Nuwaragam Palatha East 164602 342214 26.80 5.36

(Set 5) 164840 342214

164784 341752

164543 341778

164602 342214

Kahatagasdigiliya 193233 359793 6.39 1.28

193373 359923

193454 359837

193324 359679

193233 359793

Ipalogama 164820 322429 71.46 14.29

165554 322661

165582 322143

164968 322122

164820 322429

Page 16: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

15

DS Division East

(m)

North

(m)

Land

area

(Acre)

Capacity

(MW)

Maha Vilachchiya 142076 355992 47.32 9.46

(Set 5) 142400 356197

142672 355779

142341 355576

142076 355992

Thambuttegama 152087 329216 88.95 17.79

(Set 1) 152158 328596

151656 328411

151497 329034

152087 329216

Thambuttegama 150761 328983 62.89 12.58

(Set 2) 151261 329103

151378 328596

150898 328506

150761 328983

Thambuttegama 150898 328506 65.23 13.05

(Set 3) 151483 328614

151542 328139

150997 328071

150898 328506

Galenbidunuwawe 188152 346521 43.10 8.62

188390 346221

188041 345924

187813 346258

188152 346521

Galnewa 166099 307737 67.18 13.44

(Set 1) 165683 307358

165406 307517

165840 308194

166099 307737

Nuwaragam Palatha East 165950 342166 37.63 7.53

(Set 6) 166145 342328

166608 341951

166439 341769

165950 342166

Nuwaragam Palatha East 165628 341932 18.95 3.79

(Set 7) 166047 341758

165756 341513

165628 341932

Page 17: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

16

DS Division East

(m)

North

(m)

Land

area

(Acre)

Capacity

(MW)

Nuwaragam Palatha East 165756 341513 27.91 5.58

(Set 8) 166081 341786

166351 341635

166023 341394

165756 341513

Nuwaragam Palatha Central 150544 342941 12.27 2.45

150726 342941

150722 342668

150540 342672

150544 342941

Thirappane 176801 339953 21.35 4.27

(Set 2) 177072 339953

177071 339632

176804 339632

176801 339953

Horowpothana 203433 369499 17.91 3.58

203656 369499

203655 369169

203433 369178

203433 369499

Nuwaragam Palatha Central 162636 359678 12.42 2.48

162821 359678

162821 359406

162636 359406

162636 359678

Kebithigollewa 192150 379617 9.34 1.87

192442 379595

192403 379418

192150 379525

192150 379617

Medawachchiya 162462 373631 58.56 11.71

(Set 6) 162655 373222

162201 372983

161996 373404

162462 373631

Thirappane 173055 339821 54.61 10.92

(Set 3) 172212 339795

172212 340033

173062 340105

173055 339821

Page 18: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

17

DS Division East

(m)

North

(m)

Land

area

(Acre)

Capacity

(MW)

Thirappane 171532 339890 7.25 1.45

(Set 4) 171531 340032

171740 340032

171747 339896

171532 339890

Palugaswewa 196702 311890 9.58 1.92

(Set 2) 196694 312046

196960 312042

196952 311898

196702 311890

Palugaswewa 196806 312357 7.29 1.46

(Set 3) 196836 312510

197022 312476

196991 312322

196806 312357

Maha Vilachchiya 145069 358295 9.41 1.88

(Set 7) 145246 358549

145356 358494

145212 358262

145069 358295

Maha Vilachchiya 142400 356197 43.31 8.66

(Set 8) 142076 355992

141850 356348

142127 356616

142400 356197

Galnewa 165683 307358 54.95 10.99

(Set 2) 166099 307737

166338 307314

166222 307050

165683 307358

Maha Vilachchiya 141432 358275 63.67 12.73

(Set 9) 140919 358036

140727 358339

141364 358726

141432 358275

Maha Vilachchiya 142809 376803 75.68 15.14

(Set 10) 142818 376159

142273 376155

142422 376824

142809 376803

Page 19: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

18

DS Division East

(m)

North

(m)

Land

area

(Acre)

Capacity

(MW)

Maha Vilachchiya 144441 375924 78.06 15.61

(Set 11) 145224 376130

145350 375758

144516 375565

144441 375924

Nuwaragam Palatha East 165817 341293 42.54 8.51

(Set 9) 165569 340852

165314 340921

165520 341501

165817 341293

Badulla District

DS Division East (m) North

(m)

Land

area

(Acre)

Capacity

(MW)

Mahiyanganaya 239950 246184 36.65 7.33

(Set 1) 239807 245731

239505 245832

239665 246285

239950 246184

Rideemaliyadda 228463 236145 54.88 10.98

(Set 1) 228920 236495

229260 236104

228737 235947

228463 236145

Mahiyanganaya 227467 236450 9.29 1.86

(Set 2) 227670 236442

227670 236270

227445 236270

227467 236450

Rideemaliyadda 241579 241171 62.89 12.58

(Set 2) 242023 241680

242416 241514

242068 241200

241724 240994

241579 241171

Rideemaliyadda 237720 238722 77.42 15.48

(Set 3) 237719 239613

238096 239600

238059 238740

237720 238722

Page 20: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

19

DS Division East (m) North

(m)

Land

area

(Acre)

Capacity

(MW)

Rideemaliyadda 235221 240007 44.32 8.86

(Set 4) 235530 240007

235475 239471

235144 239410

235221 240007

Rideemaliyadda 241739 238900 51.69 10.34

(Set 5) 242045 238599

241728 238228

241420 238422

241739 238900

Mahiyanganaya 242791 243221 70.02 14.00

(Set 3) 242778 242660

242246 242712

242275 243230

242791 243221

Mahiyanganaya 228206 232174 45.32 9.06

(Set 4) 228686 232162

228678 231773

228206 231793

228206 232174

Rideemaliyadda 229294 236596 25.32 5.06

(Set 6) 229628 236743

229737 236499

229378 236334

229294 236596

Rideemaliyadda 238666 239158 74.50 14.90

(Set 7) 238659 239794

238853 239788

239272 239388

239201 239128

238666 239158

Mahiyanganaya 238852 242990 3.82 0.76

(Set 5) 238955 242990

238954 242840

238850 242841

238852 242990

Rideemaliyadda 227581 236098 12.98 2.60

(Set 8) 227782 236097

227799 235843

227587 235842

227581 236098

Page 21: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

20

DS Division East (m) North

(m)

Land

area

(Acre)

Capacity

(MW)

Mahiyanganaya 246876 236888 5.31 1.06

(Set 6) 246994 236884

246993 236704

246876 236702

246876 236888

Mahiyanganaya 246993 236704 7.01 1.40

(Set 7) 247136 236704

247136 236505

246993 236505

246993 236704

Mahiyanganaya 246876 236702 5.71 1.14

(Set 8) 246993 236704

246993 236505

246876 236503

246876 236702

Mahiyanganaya 246994 236884 6.18 1.24

(Set 9) 247132 236881

247136 236704

246993 236704

246994 236884

Mahiyanganaya 246876 236808 5.75 1.15

(Set 10) 246761 236801

246761 237007

246876 237006

246876 236808

Mahiyanganaya 247036 236505 7.38 1.48

(Set 11) 247181 236500

247180 236297

247036 236295

247036 236505

Mahiyanganaya 227192 259766 25.20 5.04

(Set 12) 227480 259437

227355 259242

227037 259610

227192 259766

Haldummulla 227833 153154 8.42 1.68

227789 152973

227616 152971

227633 153155

227833 153154

Page 22: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

21

DS Division East (m) North

(m)

Land

area

(Acre)

Capacity

(MW)

Rideemaliyadda 237532 228743 69.60 13.92

(Set 9) 238049 229284

238313 229010

237786 228473

237532 228743

Rideemaliyadda 237904 231005 82.32 16.46

(Set 10) 238309 230989

238150 230124

237779 230181

237904 231005

Rideemaliyadda 242965 240909 31.66 6.33

(Set 11) 243440 241209

243550 241005

243070 240711

242965 240909

Rideemaliyadda 236610 229845 18.03 3.61

(Set 12) 236832 229845

236833 229516

236611 229516

236610 229845

Rideemaliyadda 243356 241314 27.58 5.52

(Set 13) 243586 241647

243798 241478

243579 241140

243356 241314

Rideemaliyadda 228826 237334 21.08 4.22

(Set 14) 229156 237351

229249 237156

228932 237042

228826 237334

Rideemaliyadda 227714 236715 10.39 2.08

(Set 15) 227403 236653

227387 236753

227599 236790

227574 236919

227654 236939

227714 236715

Rideemaliyadda 229249 237156 26.86 5.37

(Set 16) 229361 236791

229073 236753

228932 237042

229249 237156

Page 23: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

22

DS Division East (m) North

(m)

Land

area

(Acre)

Capacity

(MW)

Rideemaliyadda 228252 236201 12.58 2.52

(Set 17) 228111 236340

228347 236445

228518 236313

228252 236201

Mahiyanganaya 224901 233125 26.13 5.23

(Set 13) 225177 233267

225362 232987

225258 232896

225115 232844

224901 233125

Mahiyanganaya 242373 242081 45.55 9.11

(Set 14) 242023 241680

241672 241829

241930 242173

242373 242081

Rideemaliyadda 242023 241680 64.35 12.87

(Set 17) 242373 242081

242919 241968

242416 241514

242023 241680

Rideemaliyadda 242023 241680 50.11 10.02

(Set 18) 241579 241171

241370 241426

241672 241829

242023 241680

Mahiyanganaya 241668 241824 49.92 9.98

(Set 15) 241370 241426

241016 241860

241018 242065

241668 241824

Mahiyanganaya 241668 241824 69.14 13.83

(Set 16) 241018 242065

241022 242361

241930 242173

241668 241824

Mahiyanganaya 243214 243214 51.67 10.33

(Set 17) 242791 243221

242803 243717

243245 243684

243214 243214

Page 24: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

23

DS Division East (m) North

(m)

Land

area

(Acre)

Capacity

(MW)

Mahiyanganaya 243214 243214 58.58 11.72

(Set 18) 243175 242622

242778 242660

242791 243221

243214 243214

Mahiyanganaya 242791 243221 64.14 12.83

(Set 19) 242275 243230

242304 243754

242803 243717

242791 243221

Mahiyanganaya 239250 240517 66.98 13.40

(Set 20) 240000 240501

240000 240146

239244 240152

239250 240517

Rideemaliyadda 238672 238562 49.91 9.98

(Set 19) 238666 239158

239201 239128

239139 238901

238672 238562

Rideemaliyadda 238666 239158 67.02 13.40

(Set 20) 238672 238562

238303 238294

238303 239178

238666 239158

Rideemaliyadda 238659 239794 56.06 11.21

(Set 21) 238666 239158

238303 239178

238303 239805

238659 239794

Rideemaliyadda 237409 239623 84.02 16.80

(Set 22) 237020 239636

237056 240493

237420 240574

237409 239623

Rideemaliyadda 237409 239623 93.42 18.68

(Set 23) 237398 238704

236980 238682

237020 239636

237409 239623

Page 25: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

24

DS Division East (m) North

(m)

Land

area

(Acre)

Capacity

(MW)

Rideemaliyadda 237719 239613 62.63 12.53

(Set 24) 237718 240255

238123 240255

238096 239600

237719 239613

Rideemaliyadda 237718 240255 74.28 14.86

(Set 25) 237719 239613

237409 239623

237420 240574

237718 240641

237718 240255

Rideemaliyadda 237719 239613 70.62 14.12

(Set 26) 237720 238722

237398 238704

237409 239623

237719 239613

Rideemaliyadda 235852 240508 47.57 9.51

(Set 27) 235911 241215

236090 241080

236271 240462

235852 240508

Rideemaliyadda 235584 240537 51.08 10.22

(Set 28) 235671 241395

235911 241215

235852 240508

235584 240537

Rideemaliyadda 235671 241395 65.12 13.02

(Set 29) 235584 240537

235293 240569

235423 241582

235671 241395

Rideemaliyadda 235811 240007 52.24 10.45

(Set 30) 236278 240007

236281 239620

235770 239526

235811 240007

Rideemaliyadda 236278 240007 52.60 10.52

(Set 31) 235811 240007

235852 240508

236271 240462

236274 240451

236278 240007

Page 26: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

25

DS Division East (m) North

(m)

Land

area

(Acre)

Capacity

(MW)

Rideemaliyadda 235811 240007 35.17 7.03

(Set 32) 235530 240007

235584 240537

235852 240508

235811 240007

Rideemaliyadda 235530 240007 35.87 7.17

(Set 33) 235811 240007

235770 239526

235475 239471

235530 240007

Rideemaliyadda 235530 240007 40.73 8.15

(Set 34) 235221 240007

235293 240569

235584 240537

235530 240007

Batticaloa District

DS Division East (m) North

(m)

Land

area

(Acre)

Capacity

(MW)

Koralai Pattu (Valach.) 273747 304305 10.95 2.19

(Set 1) 273747 304133

273489 304159

273489 304331

273747 304305

Koralai Pattu (Valach.) 273489 304159 13.08 2.62

(Set 2) 273747 304133

273747 303926

273499 303946

273489 304159

Manmunai West 292978 263306 53.96 10.79

(Set 1) 292732 262964

292329 263324

292645 263640

292978 263306

Koralai P. W. (Oddamavadi) 278081 304349 2.69 0.54

(Set 1) 278081 304429

278217 304429

278217 304349

278081 304349

Page 27: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

26

DS Division East (m) North

(m)

Land

area

(Acre)

Capacity

(MW)

Koralai P. W. (Oddamavadi) 278224 304341 3.25 0.65

(Set 2) 278224 304435

278363 304435

278363 304341

278224 304341

Koralai P. W. (Oddamavadi) 277932 304350 2.46 0.49

(Set 3) 277932 304418

278078 304418

278078 304350

277932 304350

Koralai Pattu (Valach.) 286640 294898 29.09 5.82

(Set 3) 286955 294898

286860 294535

286528 294535

286640 294898

Koralai Pattu (Valach.) 269990 305447 56.31 11.26

(Set 4) 270400 305447

270479 304997

269891 304984

269990 305447

Manmunai P. (Araipattai) 308651 268145 34.30 6.86

(Set 1) 308969 268259

309112 267912

308770 267756

308651 268145

Koralai Pattu (Valach.) 272873 304900 57.95 11.59

(Set 5) 273402 304907

273402 304503

272873 304417

272873 304900

Koralai Pattu (Valach.) 265558 302633 56.37 11.27

(Set 6) 266055 302707

266098 302278

265558 302188

265558 302633

Koralai Pattu (Valach.) 270055 305826 61.75 12.35

(Set 7) 269562 305066

269377 305181

269691 305926

270055 305826

Page 28: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

27

DS Division East (m) North

(m)

Land

area

(Acre)

Capacity

(MW)

Koralai Pattu (Valach.) 273749 304826 88.45 17.69

(Set 8) 274503 304671

274384 304100

273618 304556

273749 304826

Manmunai P. (Araipattai) 306738 272976 3.72 0.74

(Set 2) 306849 272976

306849 272841

306738 272841

306738 272976

Koralai Pattu (Valach.) 286583 294699 14.97 2.99

(Set 9) 286674 295012

286881 294990

286786 294715

286583 294699

Koralai Pattu North 280876 309687 12.57 2.51

(Set 1) 281107 309800

281268 309664

281021 309546

280876 309687

Koralai Pattu North 281058 309507 13.69 2.74

(Set 2) 281283 309639

281408 309501

281165 309324

281058 309507

Koralai Pattu North 281165 309324 20.90 4.18

(Set 3) 281433 309520

281591 309294

281314 309131

281165 309324

Koralai Pattu North 277737 304951 10.92 2.18

(Set 4) 277933 304948

277929 304717

277739 304725

277737 304951

Manmunai West 291747 274005 19.58 3.92

(Set 2) 291954 273997

291916 273623

291704 273622

291747 274005

Page 29: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

28

DS Division East (m) North

(m)

Land

area

(Acre)

Capacity

(MW)

Manmunai West 291954 273997 27.21 5.44

(Set 3) 292192 273992

292165 273543

291909 273558

291954 273997

Koralai Pattu (Valach.) 285877 301979 13.78 2.76

(Set 10) 286163 301886

286123 301703

285832 301804

285877 301979

Koralai Pattu (Valach.) 285877 301979 13.95 2.79

(Set 11) 285832 301804

285534 301884

285578 302063

285877 301979

Koralai Pattu (Valach.) 284101 297345 22.66 4.53

(Set 12) 284252 297372

284525 297080

284207 296967

284101 297345

Koralai Pattu (Valach.) 284252 297372 9.98 2.00

(Set 13) 284461 297444

284525 297080

284252 297372

Manmunai West 295883 275905 8.73 1.75

(Set 4) 296048 275907

296047 275692

295883 275692

295883 275905

Koralai Pattu North 281522 308711 20.98 4.20

(Set 5) 281686 308453

281484 308266

281312 308545

281522 308711

Koralai Pattu North 281243 309064 15.22 3.04

(Set 6) 281573 309230

281668 309089

281351 308927

281243 309064

Page 30: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

29

DS Division East (m) North

(m)

Land

area

(Acre)

Capacity

(MW)

Koralai Pattu North 277738 313297 61.85 12.37

(Set 7) 277329 312926

277011 313260

277517 313625

277738 313297

Koralai Pattu North 275969 315138 30.47 6.09

(Set 8) 276235 315293

276394 314930

276118 314769

275969 315138

Koralai Pattu North 276586 313028 44.61 8.92

(Set 9) 276895 313218

277118 312815

276806 312577

276586 313028

Koralai Pattu North 276773 314028 34.53 6.91

(Set 10) 277079 314272

277258 313975

276941 313711

276773 314028

Koralai Pattu North 271116 324998 17.88 3.58

(Set 11) 271502 325000

271505 324812

271117 324813

271116 324998

Koralai Pattu North 270830 325005 12.92 2.58

(Set 12) 271079 325003

271081 324792

270837 324793

270830 325005

Koralai Pattu North 277329 312926 59.49 11.90

(Set 13) 277738 313297

278003 312903

277654 312585

277329 312926

Page 31: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

30

Galle District

DS Division East

(m)

North

(m)

Land

area

(Acre)

Capacity

(MW)

Habaraduwa 150977 88149.6 7.71 1.54

151089 88149.7

151089 88036.7

150977 88036.7

150977 88149.6

Akmeemana (Set 1) 149019 97613 5 1

149019 97368

148748 97382

148741 97607

149019 97613

Akmeemana (Set 2) 148747 97377 5 1

148455 97371

148455 97580

148734 97593

148747 97377

Imaduwa 153961 92926 5 1

153961 93112

154157 93112

154157 92926

153961 92926

Gampaha District

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Divulapitiya (Set 1) 114927 232075 35.23 7.04

115063 232061

114886 231623

114769 231632

114927 232075

Katana 100994 214946 9.60 1.92

101107 214945

101106 214806

100993 214807

100994 214946

Wattala 104427 202547 6.86 1.37

104515 202471

104439 202395

104369 202452

104427 202547

Page 32: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

31

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Divulapitiya (Set 2) 114918 231915 4.52 0.90

115003 231913

114968 231827

114885 231827

114918 231915

Hambantota District

DS Division East

(m)

North (m) Land area (Acre) Capacity (MW)

Hambantota 237116 121406 63.40 12.68

(Set 1) 237015 121198

236221 122147

236389 122289

237116 121406

Tangalle 207852 97683 0.72 0.14

(Set 1) 207852 97725

207921 97725

207921 97683

207852 97683

Tangalle 202904 96661 6.82 1.36

(Set 2) 202904 96815

203084 96815

203084 96661

202904 96661

Tangalle 202904 96809 6.62 1.32

(Set 3) 202904 96963

203079 96963

203079 96809

202904 96809

Beliatta 196130 97950 20.03 4.01

195691 97931

195677 98122

196121 98126

196130 97950

Hambantota 237175 113842 50.39 10.08

(Set 2) 236884 113635

236481 113968

236732 114250

237175 113842

Sooriyawewa 233219 114765 40.19 8.04

(Set 1) 233678 114754

233678 114410

233219 114400

233219 114765

Page 33: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

32

DS Division East

(m)

North (m) Land area (Acre) Capacity (MW)

Hambantota 233132 112372 68.74 13.75

(Set 3) 233138 112727

233906 112724

233906 112357

233132 112372

Hambantota 235111 113853 6.33 1.27

(Set 4) 235207 113864

235219 113619

235099 113625

235111 113853

Hambantota 234449 114349 10.27 2.05

(Set 5) 234592 114417

234746 114183

234620 114120

234449 114349

Hambantota 234635 113617 19.42 3.88

(Set 6) 235114 113835

235178 113690

234732 113495

234635 113617

Hambantota 235528 114204 68.59 13.72

(Set 7) 235531 114200

235523 114200

235528 114204

235528 114204

235122 114764

235458 114999

235851 114407

235528 114204

Hambantota 234706 114518 47.69 9.54

(Set 8) 234942 114686

235359 114159

235126 113994

234706 114518

Hambantota 235156 113564 62.53 12.51

(Set 9) 235331 113716

235269 113778

235847 114197

236068 114011

235292 113432

235156 113564

Page 34: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

33

DS Division East

(m)

North (m) Land area (Acre) Capacity (MW)

Hambantota 235182 113535 57.88 11.58

(Set 10) 235968 114146

236154 113970

235340 113383

235182 113535

Hambantota 235246 112524 74.26 14.85

(Set 11) 235881 113310

236139 113135

235498 112376

235246 112524

Sooriyawewa 229663 118167 51.69 10.34

(Set 2) 230285 118173

230285 117832

229667 117833

229663 118167

Hambantota 235643 115485 8.69 1.74

(Set 12) 235753 115534

235904 115318

235767 115256

235643 115485

Hambantota 236623 112215 55.50 11.10

(Set 13) 237013 112555

237303 112251

236946 111890

236623 112215

Hambantota 234430 115157 52.24 10.45

(Set 14) 234627 115182

234849 114945

234612 114879

234612 114668

234390 114476

234234 114713

234435 114920

234244 115157

234430 115157

Hambantota 237013 113677 67.07 13.41

(Set 15) 237302 113694

237318 112731

237044 112714

237013 113677

Page 35: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

34

DS Division East

(m)

North (m) Land area (Acre) Capacity (MW)

Sooriyawewa 233697 115546 44.32 8.86

(Set 3) 234276 115566

234377 115472

234208 115263

233710 115250

233697 115546

Sooriyawewa 233650 115580 26.03 5.21

(Set 4) 233656 115856

233831 115869

234215 115586

233650 115580

Hambantota 234346 114794 40.31 8.06

(Set 16) 234965 114794

234963 114638

234999 114640

234999 114439

234821 114460

234813 114555

234344 114583

234346 114794

Hambantota 235924 112831 71.56 14.31

(Set 17) 236740 113285

236925 113026

236060 112573

235924 112831

Angunukolapelessa 208119 113321 11.42 2.28

208407 113306

208400 113142

208135 113150

208119 113321

Hambantota 233274 105774 26.20 5.24

(Set 18) 233588 105761

233582 105397

233318 105403

233274 105774

Hambantota 234458 116167 4.99 1.00

(Set 19) 234588 116162

234587 116014

234452 116011

234458 116167

Page 36: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

35

DS Division East (m) North (m) Land area (Acre) Capacity (MW)

Hambantota 234472 116738 2.71 0.54

(Set 20) 234524 116738

234524 116528

234472 116528

234472 116738

Hambantota 234443 117189 5.17 1.03

(Set 21) 234533 117190

234537 116958

234447 116956

234443 117189

Hambantota 238941 111127 68.20 13.64

(Set 22) 238389 111127

238389 111632

238938 111625

238941 111127

Hambantota 232759 113727 57.82 11.56

(Set 23) 232162 113752

232174 114146

232777 114111

232759 113727

Hambantota 237682 109818 36.41 7.28

(Set 24) 238149 109804

238124 109460

237755 109455

237682 109818

Sooriyawewa 227413 114754 45.98 9.20

(Set 5) 227874 114843

227881 114366

227440 114407

227413 114754

Lunugamvehera 238008 134799 78.31 15.66

(Set 1) 238468 134852

238476 134185

238098 133984

238008 134799

Lunugamvehera 240534 130804 60.78 12.16

(Set 2) 241018 130804

241018 130273

240534 130320

240534 130804

Sooriyawewa 228701 114577 48.63 9.73

(Set 6) 229251 114698

229351 114301

228859 114259

228701 114577

Page 37: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

36

DS Division East (m) North (m) Land area (Acre) Capacity (MW)

Lunugamvehera 244179 124699 66.43 13.29

(Set 3) 244708 124751

244708 124233

244179 124201

244179 124699

Hambantota 234506 123313 44.11 8.82

(Set 25) 234625 122976

234268 122863

234010 123313

234506 123313

Hambantota 231697 114200 49.38 9.88

(Set 26) 231361 114198

231367 114777

231723 114777

231697 114200

Embilipitiya 206808 119298 13.73 2.75

206984 119291

206977 118974

206805 118974

206808 119298

Hambantota 240938 114307 62.73 12.55

(Set 27) 241469 114597

241685 114261

241249 113931

240938 114307

Hambantota 237503 115397 43.23 8.65

(Set 28) 237922 115382

237970 115029

237450 115005

237503 115397

Hambantota 236634 120213 61.41 12.28

(Set 29) 236604 119775

236058 119832

236061 120278

236634 120213

Hambantota 239577 115998 75.74 15.15

(Set 30) 240270 116009

240270 115564

239571 115561

239577 115998

Page 38: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

37

DS Division East (m) North (m) Land area (Acre) Capacity (MW)

Hambantota 234624 122664 52.92 10.58

(Set 31) 235124 122865

235253 122497

234775 122277

234624 122664

Hambantota 235239 122857 46.34 9.27

(Set 32) 235696 123072

235838 122714

235411 122513

235239 122857

Hambantota 234677 116328 10.71 2.14

(Set 33) 234675 116229

234218 116136

234223 116229

234677 116328

Hambantota 234214 115873 12.88 2.58

(Set 34) 234666 115974

234661 115852

234214 115762

234214 115873

Hambantota 234224 116354 13.72 2.74

(Set 35) 234681 116447

234677 116328

234223 116229

234224 116354

Ambalantota 220156 101519 16.33 3.27

(Set 1) 220364 101670

220347 101304

220156 101209

220156 101519

Hambantota 236146 114957 79.87 15.97

(Set 36) 236715 114957

236715 114396

236142 114386

236146 114957

Hambantota 235166 111524 80.70 16.14

(Set 37) 235627 111278

235358 110720

234892 110952

235166 111524

Page 39: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

38

DS Division East (m) North (m) Land area (Acre) Capacity (MW)

Hambantota 234611 115263 46.16 9.23

(Set 38) 234808 115509

235213 115056

235031 114812

234611 115263

Hambantota 243614 108632 20.09 4.02

(Set 39) 243820 109039

243982 108937

243763 108550

243614 108632

Hambantota 232188 107820 12.63 2.53

(Set 40) 232360 107951

232431 107707

232242 107585

232188 107820

Hambantota 232954 123902 28.16 5.63

(Set 41) 233138 123631

233141 123503

233101 123437

233064 123398

232982 123348

232905 123354

232788 123364

232954 123902

Hambantota 237432 114864 43.30 8.66

(Set 42) 237760 114862

237756 114331

237426 114331

237432 114864

Hambantota 237231 114805 17.81 3.56

(Set 43) 237429 114816

237429 114447

237231 114447

237231 114805

Hambantota 236418 113327 6.49 1.30

(Set 44) 236562 113428

236662 113330

236511 113211

236418 113327

Hambantota 236332 113427 5.71 1.14

(Set 45) 236466 113528

236562 113428

236418 113327

236332 113427

Page 40: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

39

DS Division East (m) North (m) Land area (Acre) Capacity (MW)

Hambantota 236332 113427 3.89 0.78

(Set 46) 236271 113488

236403 113604

236466 113528

236332 113427

Hambantota 236271 113488 4.01 0.80

(Set 47) 236213 113557

236337 113675

236403 113604

236271 113488

Hambantota 236140 113632 4.46 0.89

(Set 48) 236261 113750

236337 113675

236213 113557

236140 113632

Lunugamvehera 238691 125924 14.39 2.88

(Set 4) 238695 125659

238473 125659

238474 125925

238691 125924

Lunugamvehera 230627 133665 8.50 1.70

(Set 5) 230775 133664

230775 133434

230627 133431

230627 133665

Thanamalwila 230383 134032 7.46 1.49

(Set 1) 230383 133841

230226 133839

230226 134034

230383 134032

Lunugamvehera 230449 133698 9.15 1.83

(Set 6) 230453 133471

230288 133472

230288 133699

230449 133698

Thanamalwila 230548 134035 8.84 1.77

(Set 2) 230698 134033

230699 133798

230548 133796

230548 134035

Page 41: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

40

DS Division East (m) North (m) Land area (Acre) Capacity (MW)

Thanamalwila 230383 133926 9.44 1.89

(Set 3) 230548 133926

230553 133698

230384 133695

230383 133926

Ambalantota 221235 104237 16.97 3.39

(Set 2) 221445 104273

221441 103930

221233 103922

221235 104237

Hambantota 233906 113340 37.33 7.47

(Set 49) 234397 113343

234399 113025

233896 113050

233906 113340

Hambantota 234396 113210 36.84 7.37

(Set 50) 234726 113210

234723 112756

234396 112756

234396 113210

Hambantota 234882 112718 26.84 5.37

(Set 51) 235104 112718

235106 112233

234882 112230

234882 112718

Hambantota 234818 113274 37.89 7.58

(Set 52) 235136 113274

235145 112803

234812 112803

234818 113274

Hambantota 240946 115427 26.93 5.39

(Set 53) 241203 115427

241203 115003

240945 115003

240946 115427

Hambantota 240666 114841 27.95 5.59

(Set 54) 240580 115366

240810 115366

240882 114899

240666 114841

Page 42: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

41

DS Division East (m) North (m) Land area (Acre) Capacity (MW)

Hambantota 241266 115459 23.32 4.66

(Set 55) 241514 115458

241513 115045

241306 115042

241266 115459

Hambantota 239451 116016 50.82 10.16

(Set 56) 239443 115484

239022 115489

239099 116021

239451 116016

Lunugamvehera 243521 128300 57.43 11.49

(Set 7) 243983 128288

243979 127788

243517 127794

243521 128300

Sooriyawewa 233695 115208 39.25 7.85

(Set 7) 234181 115228

234027 114726

233793 114835

233695 115208

Hambantota 233822 113864 45.38 9.08

(Set 57) 233452 113754

233417 114259

233777 114342

233822 113864

Hambantota 231939 104760 26.86 5.37

(Set 58) 231943 105102

232281 105090

232244 104756

231939 104760

Hambantota 239461 116105 69.15 13.83

(Set 59) 239826 116147

239775 115328

239447 115305

239461 116105

Hambantota 235725 112169 14.84 2.97

(Set 60) 235847 112026

235609 111825

235487 111994

235725 112169

Page 43: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

42

DS Division East (m) North (m) Land area (Acre) Capacity (MW)

Hambantota 235588 112152 13.75 2.75

(Set 61) 235539 112216

235643 112302

235778 112120

235533 111928

235447 112045

235588 112152

Hambantota 235599 112334 10.20 2.04

(Set 62) 235425 112196

235262 112370

235334 112445

235431 112358

235527 112427

235599 112334

Hambantota 231939 104760 26.86 5.37

(Set 63) 231943 105102

232281 105090

232244 104756

231939 104760

Hambantota 236238 121644 63.79 12.76

(Set 64) 235729 121732

235788 122228

236231 122228

236238 121644

Hambantota 236238 121644 66.23 13.25

(Set 65) 236243 121185

235668 121208

235729 121732

236238 121644

Hambantota 236634 120213 57.73 11.55

(Set 66) 236061 120278

236063 120642

236665 120642

236634 120213

Hambantota 235097 121279 66.27 13.25

(Set 67) 234644 121250

234610 121571

234567 121979

234984 121812

235038 121558

235097 121279

Page 44: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

43

DS Division East (m) North (m) Land area (Acre) Capacity (MW)

Hambantota 241469 114597 51.69 10.34

(Set 68) 240938 114307

240704 114592

241302 114856

241469 114597

Hambantota 233272 113706 41.84 8.37

(Set 69) 233202 113368

232743 113370

232759 113727

233272 113706

Hambantota 233272 113706 51.05 10.21

(Set 70) 232759 113727

232777 114111

233349 114079

233272 113706

Hambantota 232759 113727 54.20 10.84

(Set 71) 232743 113370

232151 113372

232162 113752

232759 113727

Sooriyawewa 233766 114680 29.14 5.83

(Set 8) 234099 114674

234120 114331

233781 114322

233766 114680

Hambantota 233861 114236 35.98 7.20

(Set 72) 234253 114236

234284 113855

233935 113834

233861 114236

Hambantota 233990 113770 21.57 4.31

(Set 73) 234295 113781

234321 113490

234041 113469

233990 113770

Hambantota 234332 113940 22.98 4.60

(Set 74) 234623 113966

234635 113617

234385 113606

234332 113940

Page 45: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

44

Jaffna District

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Maruthnkerny 164048 486016 63.68 12.74

164077 485480

163413 485998

163690 486281

164048 486016

Chavakachcheri 131389 498573 43.09 8.62

(Set 1) 130975 498567

130975 498986

131394 498991

131389 498573

Chavakachcheri 131632 498947 32.15 6.43

(Set 2) 131958 498945

131955 498537

131632 498553

131632 498947

Chankanai 107135 506627 15.61 3.12

107459 506747

107530 506562

107244 506463

107135 506627

Kalutara District

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Dodangoda 121061 148134 60.01 12.00

121264 148330

121555 148087

121277 147931

121061 148134

Mathugama 120929 144227 5 1

120929 144373

121126 144373

121126 144227

120929 144227

Millaniya (Set 1) 118972 156869 5 1

118972 157071

119265 157071

119265 156869

118972 156869

Page 46: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

45

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Millaniya (Set 2) 114884 164878 5 1

114732 164878

114727 165070

114874 165065

114884 164878

Walallawita (Set 1) 125606 135507 5 1

125392 135372

125273 135483

125479 135634

125606 135507

Walallawita (Set 2) 125683 135347 5 1

125540 135236

125390 135363

125548 135490

125683 135347

Palindanuwara 134745 146404 5 1

134518 146411

134504 146646

134733 146639

134745 146404

Kaluthara 110041 158974 5 1

110041 159147

110261 159147

110261 158974

110041 158974

Kandy District

DS Division East(m) North

(m)

Land area

(Acre)

Capacity

(MW)

Kundasale 195990 229689 5 1

195990 230067

196504 230067

196504 229689

195990 229689

Medadumbara (Set 1) 201618 236446 5 1

201541 236440

201541 236533

201612 236538

201618 236446

Medadumbara (Set 2) 201619 236441 5 1

201619 236383

201547 236385

201545 236436

201619 236441

Page 47: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

46

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Medadumbara (Set 3) 201497 236283 5 1

201346 236271

201342 236468

201497 236474

201497 236283

Kilinochchi District

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Karachchi 158475 472680 5.64 1.13

(Set 1) 158610 472680

158610 472512

158475 472511

158475 472680

Pachchilaipalli 147531 486954 21.72 4.34

(Set 1) 147783 487243

148025 487155

147725 486863

147567 486939

147531 486954

Pachchilaipalli 148505 486832 23.60 4.72

(Set 2) 148233 486567

148093 486659

148011 486705

148297 486972

148505 486832

Pachchilaipalli 149441 486647 25.56 5.11

(Set 3) 149198 486366

148972 486518

149250 486824

149289 486784

149413 486671

149441 486647

Pachchilaipalli 147405 487807 26.35 5.27

(Set 4) 147059 488148

147161 488236

147285 488194

147593 488074

147405 487807

Pachchilaipalli 146135 492355 26.56 5.31

(Set 5) 145819 492505

145966 492804

146252 492629

146135 492355

Page 48: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

47

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Pachchilaipalli 148738 486676 26.91 5.38

(Set 6) 148464 486391

148263 486548

148233 486567

148505 486832

148738 486676

Pachchilaipalli 147783 487243 27.38 5.48

(Set 7) 147531 486954

147319 487047

147259 487075

147583 487393

147779 487244

147783 487243

Pachchilaipalli 149198 486366 27.68 5.54

(Set 8) 148931 486057

148699 486218

148972 486518

149198 486366

Pachchilaipalli 148972 486518 28.26 5.65

(Set 9) 148699 486218

148575 486304

148464 486391

148738 486676

148972 486518

Pachchilaipalli 149503 486161 29.57 5.91

(Set 10) 149699 486420

149791 486353

149985 486233

149832 485939

149503 486161

Pachchilaipalli 149250 486824 30.23 6.05

(Set 11) 148972 486518

148738 486676

149078 487031

149111 486980

149199 486877

149250 486824

Pachchilaipalli 149699 486420 30.50 6.10

(Set 12) 149503 486161

149198 486366

149441 486647

149540 486562

149686 486430

149699 486420

Page 49: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

48

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Pachchilaipalli 148297 486972 31.47 6.29

(Set 13) 148011 486705

147757 486848

147725 486863

148025 487155

148297 486972

Pachchilaipalli 144690 490203 32.40 6.48

(Set 14) 144501 489819

144267 490010

144444 490414

144690 490203

Pachchilaipalli 145819 492505 33.37 6.67

(Set 15) 145498 492657

145617 493018

145966 492804

145819 492505

Pachchilaipalli 147137 487408 34.58 6.92

(Set 16) 146630 487779

146826 487947

147259 487590

147137 487408

Pachchilaipalli 148924 487242 35.64 7.13

(Set 17) 148505 486832

148297 486972

148747 487393

148815 487345

148910 487258

148924 487242

Pachchilaipalli 149078 487031 35.82 7.16

(Set 18) 148738 486676

148505 486832

148924 487242

149008 487142

149053 487070

149078 487031

Pachchilaipalli 148153 487665 36.36 7.27

(Set 19) 147867 487339

147783 487243

147779 487244

147583 487393

147910 487834

148000 487743

148098 487684

148153 487665

Page 50: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

49

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Pachchilaipalli 147405 487807 36.37 7.27

(Set 20) 147359 487741

147259 487590

146826 487947

147059 488148

147405 487807

Pachchilaipalli 158012 483217 36.39 7.28

(Set 21) 158347 483209

158373 482788

158021 482779

158012 483217

Pachchilaipalli 147783 487243 36.93 7.39

(Set 22) 147867 487339

148153 487665

148227 487640

148390 487589

148448 487565

148025 487155

147783 487243

Pachchilaipalli 155700 485937 37.05 7.41

(Set 23) 155998 486330

156239 486109

155958 485762

155700 485937

Pachchilaipalli 149503 486161 37.78 7.56

(Set 24) 149264 485847

149017 485997

148931 486057

149198 486366

149503 486161

Karachchi 156412 471239 38.65 7.73

(Set 2) 155983 471180

155893 471544

156294 471602

156412 471239

Pachchilaipalli 146630 487779 39.26 7.85

(Set 25) 146392 487574

146002 487811

146129 487969

146190 488101

146630 487779

Page 51: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

50

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Pachchilaipalli 144908 490648 39.50 7.90

(Set 26) 144690 490203

144444 490414

144642 490867

144908 490648

Pachchilaipalli 149264 485847 39.62 7.92

(Set 27) 149503 486161

149832 485939

149669 485626

149308 485820

149264 485847

Pachchilaipalli 146135 492355 39.93 7.99

(Set 28) 145967 491963

145612 492083

145819 492505

146135 492355

Karachchi 156412 471239 40.06 8.01

(Set 3) 156294 471602

156725 471664

156833 471297

156412 471239

Pachchilaipalli 146630 487779 40.13 8.03

(Set 29) 146190 488101

146219 488162

146263 488264

146329 488357

146826 487947

146630 487779

Karachchi 156535 470859 41.01 8.20

(Set 4) 156412 471239

156833 471297

156946 470911

156535 470859

Pachchilaipalli 145819 492505 41.28 8.26

(Set 30) 145612 492083

145290 492192

145466 492558

145498 492657

145819 492505

Page 52: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

51

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Pachchilaipalli 147137 487408 41.51 8.30

(Set 31) 147136 487407

146882 487271

146494 487512

146392 487574

146630 487779

147137 487408

Karachchi 158608 474683 42.82 8.56

(Set 5) 158946 474656

158984 474169

158624 474175

158608 474683

Pachchilaipalli 145612 492083 42.84 8.57

(Set 32) 145370 491589

145077 491762

145188 491979

145290 492192

145612 492083

Pachchilaipalli 145370 491589 43.18 8.64

(Set 33) 145138 491116

144853 491322

145077 491762

145370 491589

Karachchi 156535 470859 43.22 8.64

(Set 6) 156077 470801

155983 471180

156412 471239

156535 470859

Pachchilaipalli 145138 491116 43.36 8.67

(Set 34) 144908 490648

144642 490867

144767 491153

144853 491322

145138 491116

Pachchilaipalli 147583 487393 46.32 9.26

(Set 35) 147259 487075

147033 487178

146882 487271

147136 487407

147275 487614

147461 487569

147583 487393

Page 53: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

52

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Pachchilaipalli 148747 487393 49.11 9.82

(Set 36) 148297 486972

148025 487155

148448 487565

148525 487534

148670 487448

148747 487393

Pachchilaipalli 147910 487834 50.97 10.19

(Set 37) 147583 487393

147461 487569

147275 487614

147359 487741

147593 488074

147732 487991

147892 487851

147910 487834

Pachchilaipalli 145075 489872 52.20 10.44

(Set 38) 144910 489486

144501 489819

144690 490203

145075 489872

Pachchilaipalli 146723 488478 54.58 10.92

(Set 39) 147059 488148

146826 487947

146329 488357

146412 488475

146468 488601

146597 488538

146723 488478

Pachchilaipalli 155294 482462 56.26 11.25

(Set 40) 154990 482119

154618 482449

154919 482791

155294 482462

Karachchi 154123 471348 56.40 11.28

(Set 7) 154354 471413

154652 470552

154390 470495

154123 471348

Pachchilaipalli 145967 491963 56.73 11.35

(Set 41) 145719 491382

145370 491589

145612 492083

145967 491963

Page 54: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

53

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Pachchilaipalli 145719 491382 56.73 11.35

(Set 42) 145495 490856

145138 491116

145370 491589

145719 491382

Karachchi 149865 468719 57.22 11.44

(Set 8) 150388 468767

150449 468329

149941 468272

149865 468719

Karachchi 150388 468767 59.18 11.84

(Set 9) 149865 468719

149793 469139

150322 469238

150388 468767

Pachchilaipalli 145277 490345 59.26 11.85

(Set 43) 145075 489872

144690 490203

144908 490648

145277 490345

Pachchilaipalli 145495 490856 59.40 11.88

(Set 44) 145277 490345

144908 490648

145138 491116

145495 490856

Pachchilaipalli 155708 482099 62.22 12.44

(Set 45) 155398 481757

154990 482119

155294 482462

155708 482099

Pachchilaipalli 158304 479736 72.87 14.57

(Set 46) 158058 479896

157765 479976

157846 480081

158090 480482

158593 480005

158304 479736

Pachchilaipalli 155398 481757 80.28 16.06

(Set 47) 155708 482099

156069 481782

155762 481435

155398 481757

Page 55: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

54

Kurunegala District

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Kuliyapitiya West 117353 248649 25.13 5.03

117353 248911

117741 248911

117741 248649

117353 248649

Pannala 112622 234840 5.99 1.20

112696 234653

112559 234659

112491 234834

112622 234840

Ehetuwewa 156446 307976 4.26 0.85

(Set 1) 156446 308092

156595 308092

156595 307976

156446 307976

156446 307847

156446 307963

156595 307963

156595 307847

156446 307847

Mahawa 140164 290155 70.38 14.08

(Set 1) 139707 289911

139375 290394

139783 290611

140164 290155

Udubaddawa 105019 253845 37.31 7.46

(Set 1) 105174 253335

104910 253213

104770 253764

105019 253845

Mahawa 140798 288366 79.85 15.97

(Set 2) 140343 288095

140141 288482

140165 288785

140478 288915

140798 288366

Udubaddawa 104786 253526 26.36 5.27

(Set 2) 104895 253207

104635 253042

104533 253460

104786 253526

Page 56: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

55

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Mahawa 141015 287108 77.04 15.41

(Set 3) 140561 286897

140237 287419

140681 287651

141015 287108

Ganewatta 159259 269926 54.74 10.95

(Set 1) 159708 269917

159720 269378

159340 269380

159342 269559

159328 269651

159262 269735

159259 269926

Ganewatta 159781 269700 64.54 12.91

(Set 2) 160101 269607

160088 269034

159770 269065

159781 269700

Panduwasnuwara 120000 254634 95.50 19.10

(Set 1) 120582 254634

120575 253966

120000 253966

120000 254634

Panduwasnuwara 124805 264807 30.44 6.09

(Set 2) 125082 264503

124869 264313

124564 264654

124805 264807

Panduwasnuwara 124532 264659 47.24 9.45

(Set 3) 124838 264282

124624 264008

124222 264487

124532 264659

Galgamuwa 145074 315747 5.15 1.03

144908 315749

144908 316068

145074 316068

145074 315747

Mawathagama 161381 244106 76.75 15.35

161649 244100

161646 243445

160959 243479

161381 244106

Page 57: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

56

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Bamunukotuwa 146850 257807 16.84 3.37

(Set 1) 147075 257791

147098 257526

146774 257582

146850 257807

Polpithigama 159276 294432 18.04 3.61

159428 294295

159216 294034

159045 294187

159276 294432

Bamunukotuwa 146774 257582 18.47 3.69

(Set 2) 147098 257526

147072 257268

146748 257394

146774 257582

Mahawa 140336 290110 28.31 5.66

(Set 4) 140649 290337

140791 290099

140463 289838

140336 290110

Mahawa 140606 289030 69.34 13.87

(Set 5) 140331 288870

139895 289603

140277 289702

140606 289030

Mahawa 139358 291136 7.75 1.55

(Set 6) 139501 291135

139501 290917

139355 290917

139358 291136

Ehetuwewa 149792 304002 17.20 3.44

(Set 2) 150039 304001

150041 303721

149793 303720

149792 304002

Mahawa 139664 288499 20.66 4.13

(Set 7) 139915 288558

139942 288207

139700 288181

139664 288499

Page 58: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

57

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Mahawa 140251 290050 27.90 5.58

(Set 8) 140342 289872

139799 289622

139719 289780

140251 290050

Mahawa 141195 290344 16.05 3.21

(Set 9) 141425 290340

141425 290065

141187 290065

141195 290344

Polpithigama 158667 301546 20.06 4.01

158910 301557

158902 301203

158665 301224

158667 301546

Mahawa 139645 290896 26.55 5.31

(Set 10) 139754 290646

139386 290497

139283 290750

139645 290896

Mahawa 139275 289371 16.12 3.22

(Set 11) 139517 289447

139585 289190

139328 289137

139275 289371

Ehetuwewa 157298 308523 8.95 1.79

(Set 3) 157087 308530

157090 308695

157316 308688

157298 308523

Mahawa 140341 290710 15.95 3.19

(Set 12) 140298 291052

140450 291109

140545 290773

140341 290710

Ehetuwewa 157296 309007 10.13 2.03

(Set 4) 157298 308789

157115 308784

157111 309012

157296 309007

Page 59: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

58

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Mahawa 140164 290155 60.22 12.04

(Set 13) 139783 290611

140158 290810

140529 290349

140164 290155

Mahawa 140606 289030 67.55 13.51

(Set 14) 140277 289702

140674 289806

140939 289222

140606 289030

Mahawa 140798 288366 61.98 12.40

(Set 15) 140478 288915

140858 289073

141159 288581

140798 288366

Mahawa 141015 287108 75.06 15.01

(Set 16) 140681 287651

141124 287882

141415 287293

141015 287108

Mannar District

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Mannar Town 91334 430878 38.81 7.76

(Set 1) 91278 430494

90861 430574

90907 430918

91334 430878

Mannar Town 90831 429634 46.52 9.30

(Set 2) 90665 429372

90172 429634

90347 429944

90831 429634

Manthai West 123175 413960 24.91 4.98

(Set 1) 123491 413960

123491 413641

123175 413641

123175 413960

Page 60: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

59

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Manthai West 123175 413641 28.95 5.79

(Set 2) 123490 413641

123490 413270

123173 413271

123175 413641

Manthai West 123174 413783 28.27 5.65

(Set 3) 123174 413457

122826 413447

122826 413780

123174 413783

Manthai West 122914 413965 24.10 4.82

(Set 4) 122914 414336

123175 414336

123175 413960

122914 413965

Manthai West 122914 414761 25.37 5.07

(Set 5) 123184 414761

123183 414380

122914 414380

122914 414761

Mannar Town 89334 429779 14.71 2.94

(Set 3) 89262 429577

88991 429693

89059 429874

89334 429779

Mannar Town 90621 431396 35.41 7.08

(Set 4) 90667 431696

91129 431705

91100 431396

90621 431396

Mannar Town 90621 431396 42.02 8.40

(Set 5) 91155 431395

91164 431080

90621 431080

90621 431396

Mannar Town 90667 431696 43.52 8.70

(Set 6) 90668 432002

91250 432009

91251 431711

90667 431696

Page 61: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

60

DS Division East

(m)

North

(m)

Land area

(Acre)

Capacity

(MW)

Mannar Town 88756 429969 24.99 5.00

(Set 7) 89084 429849

88958 429587

88619 429729

88756 429969

Matara District

DS Division East (m) North

(m)

Land area

(Acre)

Capacity

(MW)

Matara Four Gravets

(Set 1) 178761 85839 5 1

178566 85823

178561 86057

178723 86057

178761 85839

Matara Four Gravets

(Set 2) 178523 86132 5 1

178495 85888

178322 85899

178349 86132

178523 86132

Matara Four Gravets 178723 86057 5 1

(Set 3) 178561 86057

178566 86241

178707 86257

178723 86057

Matale District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Dambulla (Set 1) 197115 310731 28.10 5.62

197251 310834

197369 310557

197242 310478

197115 310731

Dambulla (Set 2) 196944 311109 36.48 7.29

197115 311206

197225 310908

197081 310806

196944 311109

Page 62: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

61

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Dambulla (Set 3) 197862 311526 21.46 4.29

197904 311350

197716 311312

197674 311494

197862 311526

Dambulla (Set 4) 197252 311219 35.54 7.10

197403 311316

197543 311033

197381 310928

197252 311219

Naula 189054 278958 31.81 6.36

189280 278959

189280 278728

189053 278729

189054 278958

Laggala-Pallegama 204389 262165 69.93 13.98

204521 262504

204796 262393

204638 262006

204389 262165

Dambulla (Set 5) 193731 304790 94.51 18.90

194107 304790

194111 304381

193730 304381

193731 304790

Monaragala District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Moneragala 258946 183631 7.20 1.44

(Set 1) 258946 183807

259112 183807

259112 183631

258946 183631

Siyambalanduwa 294220 194448 24.22 4.84

(Set 1) 294220 194739

294557 194739

294557 194448

294220 194448

Page 63: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

62

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Siyambalanduwa 294473 194455 16.74 3.35

(Set 2) 294473 194716

294733 194716

294733 194455

294473 194455

Siyambalanduwa 279835 173721 417.00 83.4

(Set 3) 281184 173442

281847 172859

280687 171375

278866 171972

279835 173721

Moneragala 259651 183831 3.87 0.77

(Set 2) 259651 183955

259777 183955

259777 183831

259651 183831

Moneragala 266068 182295 2.49 0.50

(Set 3) 266068 182395

266169 182395

266169 182295

266068 182295

Buttala 254768 175030 50.39 10.08

(Set 1) 254601 175352

255066 175704

255237 175421

254768 175030

Siyambalanduwa 279329 189689 37.13 7.43

(Set 4) 279834 189676

279818 189378

279335 189378

279329 189689

Moneragala 268824 180718 18.44 3.69

(Set 4) 269094 180710

269085 180433

268812 180445

268824 180718

Buttala 250809 155719 57.40 11.48

(Set 2) 250303 155705

250303 156172

250809 156172

250809 155719

Page 64: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

63

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Moneragala 268872 181052 19.16 3.83

(Set 5) 269200 180989

269158 180756

268835 180825

268872 181052

Sewanagala 225389 131194 32.94 6.59

(Set 1) 225688 131225

225731 130790

225429 130750

225389 131194

Sewanagala 218777 135025 16.66 3.33

(Set 2) 219014 135027

219012 134737

218779 134740

218777 135025

Buttala 249530 155418 72.55 14.51

(Set 3) 249000 155409

249000 155968

249536 155963

249530 155418

Moneragala 257839 180886 3.19 0.64

(Set 6) 257941 180891

257941 180762

257839 180764

257839 180886

Siyambalanduwa 283382 174285 15.27 3.05

(Set 5) 283790 174262

283731 174098

283363 174137

283382 174285

Siyambalanduwa 283297 174317 21.11 4.22

(Set 6) 283299 174489

283797 174486

283796 174316

283297 174317

Siyambalanduwa 283319 174693 24.04 4.81

(Set 7) 283797 174677

283795 174496

283226 174505

283319 174693

Page 65: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

64

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Wellawaya 247024 149363 48.96 9.79

(Set 1) 247021 149892

247396 149892

247401 149368

247024 149363

Wellawaya 230161 150090 57.84 11.57

(Set 2) 230188 150615

230651 150619

230586 150090

230161 150090

Siyambalanduwa 281895 182704 79.81 15.96

(Set 8) 281556 183295

282011 183519

282304 182980

281895 182704

Buttala 257134 176222 25.05 5.01

(Set 4) 257427 175923

257433 175686

257111 175810

257134 176222

Moneragala 259379 182670 27.81 5.56

(Set 7) 259729 182346

259675 182175

259378 182172

259379 182670

Wellawaya 241126 147514 8.03 1.61

(Set 3) 241313 147432

241325 147285

241074 147379

241126 147514

Buttala 253180 166158 8.89 1.78

(Set 5) 253359 166168

253421 165959

253233 165973

253180 166158

Buttala 256400 175789 61.76 12.35

(Set 6) 256081 175525

255745 176078

256078 176290

256400 175789

Page 66: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

65

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Buttala 256704 175316 57.88 11.58

(Set 7) 256370 175030

256081 175525

256414 175767

256704 175316

Siyambalanduwa 288260 190360 50.40 10.08

(Set 9) 288253 190815

288701 190822

288701 190360

288260 190360

Siyambalanduwa 292150 192595 90.74 18.15

(Set 10) 292146 193004

293056 192985

293057 192586

292150 192595

Siyambalanduwa 282238 189068 33.12 6.62

(Set 11) 282823 189011

282803 188784

282221 188840

282238 189068

Moneragala 259362 182922 27.43 5.49

(Set 8) 259665 182921

259684 182415

259370 182696

259362 182922

Siyambalanduwa 289057 205781 58.40 11.68

(Set 12) 288661 206067

288887 206482

289298 206220

289057 205781

Sewanagala 217202 125541 8.74 1.75

(Set 3) 217460 125543

217460 125404

217204 125404

217202 125541

Sewanagala 217204 125404 8.29 1.66

(Set 4) 217460 125404

217461 125274

217204 125274

217204 125404

Page 67: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

66

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Sewanagala 217204 125274 8.80 1.76

(Set 5) 217461 125274

217461 125135

217204 125134

217204 125274

Moneragala 259691 182663 21.44 4.29

(Set 9) 260065 182664

260055 182578

260063 182528

260079 182478

260103 182431

259693 182433

259691 182663

Moneragala 260103 182431 15.86 3.17

(Set 10) 260101 182260

259745 182258

259717 182433

260103 182431

Moneragala 259346 182169 17.08 3.42

(Set 11) 259774 182175

259774 182002

259384 182003

259346 182169

Sewanagala 226238 129855 5.95 1.19

(Set 6) 226239 129680

226101 129681

226101 129855

226238 129855

Thanamalwila 235022 138695 7.48 1.50

(Set 1) 235215 138694

235214 138535

235026 138536

235022 138695

Thanamalwila 235020 138576 7.55 1.51

(Set 2) 235020 138403

234843 138405

234845 138579

235020 138576

Thanamalwila 234679 138569 7.41 1.48

(Set 3) 234679 138405

234495 138408

234494 138569

234679 138569

Page 68: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

67

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Thanamalwila 234680 138659 6.68 1.34

(Set 4) 234846 138658

234845 138495

234680 138495

234680 138659

Thanamalwila 234680 138493 5.98 1.20

(Set 5) 234845 138493

234841 138350

234676 138343

234680 138493

Buttala 249750 162059 11.48 2.30

(Set 8) 249750 161868

249504 161871

249506 162060

249750 162059

Thanamalwila 230383 134032 7.46 1.49

(Set 6) 230383 133841

230226 133839

230226 134034

230383 134032

Thanamalwila 216668 153901 10.92 2.18

(Set 7) 216898 153903

216898 153696

216666 153725

216668 153901

Buttala 249506 162060 13.30 2.66

(Set 9) 249504 161871

249211 161881

249213 162058

249506 162060

Sewanagala 225071 127888 5.20 1.04

(Set 7) 225209 127887

225209 127734

225072 127734

225071 127888

Sewanagala 225164 127620 9.63 1.93

(Set 8) 225334 127619

225337 127394

225162 127394

225164 127620

Page 69: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

68

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Moneragala 266855 175612 16.10 3.22

(Set 12) 267126 175761

267127 175552

266854 175344

266855 175612

Siyambalanduwa 281319 173947 57.16 11.43

(Set 13) 281122 174316

281563 174590

281772 174133

281319 173947

Thanamalwila 234504 138345 45.92 9.18

(Set 8) 235224 138345

235224 138091

234504 138083

234504 138345

Sewanagala 225058 127925 15.96 3.19

(Set 9) 225056 127732

224723 127731

224723 127924

225058 127925

Siyambalanduwa 287886 207361 76.92 15.38

(Set 14) 288326 207488

288362 206790

287842 206762

287886 207361

Siyambalanduwa 291916 205982 75.32 15.06

(Set 15) 292086 206586

292697 206500

292226 205897

291916 205982

Siyambalanduwa 290269 205356 46.80 9.36

(Set 16) 289835 205818

289981 206058

290456 205620

290269 205356

Siyambalanduwa 287276 187552 26.18 5.24

(Set 17) 287277 186957

287053 187163

287139 187383

287027 187454

287035 187597

287276 187552

Page 70: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

69

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Siyambalanduwa 287276 187552 26.22 5.24

(Set 18) 287588 187484

287446 187342

287554 187249

287277 186957

287276 187552

Thanamalwila 236408 138772 20.32 4.06

(Set 9) 236639 138854

236710 138520

236478 138443

236408 138772

Sewanagala 224950 128384 19.60 3.92

(Set 10) 225220 128384

225220 128093

224950 128088

224950 128384

Thanamalwila 232816 137175 23.92 4.78

(Set 10) 233069 137171

233066 136788

232816 136788

232816 137175

Thanamalwila 233069 137171 26.17 5.23

(Set 11) 233346 137171

233346 136793

233066 136788

233069 137171

Thanamalwila 235709 138176 18.23 3.65

(Set 12) 235886 138291

236061 138017

235920 137857

235709 138176

Thanamalwila 233462 139830 18.43 3.69

(Set 13) 233225 139823

233225 140137

233469 140137

233462 139830

Buttala 249644 158334 78.70 15.74

(Set 10) 249205 158335

249218 159071

249644 159070

249644 158334

Page 71: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

70

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Buttala 249644 158334 90.77 18.15

(Set 11) 249644 157512

249190 157514

249205 158335

249205 158335

249644 158334

Buttala 250047 158332 72.54 14.51

(Set 12) 249644 158334

249644 159070

250033 159069

250039 159069

250047 158332

Buttala 250047 158332 82.47 16.49

(Set 13) 250055 157511

250018 157511

249644 157512

249644 158334

250047 158332

Buttala 250629 158592 55.67 11.13

(Set 14) 250629 159067

250647 159067

251113 159066

251114 158613

250629 158592

Buttala 250629 159067 70.91 14.18

(Set 15) 250629 158592

250044 158566

250039 159069

250629 159067

Buttala 250629 157509 54.50 10.90

(Set 16) 250629 157952

251114 157971

251115 157507

250629 157509

Buttala 250629 157509 61.38 12.28

(Set 17) 250576 157509

250055 157511

250051 157930

250629 157952

250629 157509

Page 72: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

71

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Buttala 250629 157952 76.86 15.37

(Set 18) 250629 158592

251114 158613

251114 158327

251114 157971

250629 157952

Buttala 250629 157952 91.67 18.33

(Set 19) 250051 157930

250047 158332

250044 158566

250629 158592

250629 157952

Buttala 248626 158693 52.93 10.59

(Set 20) 247992 158713

248042 159036

248662 159054

248626 158693

Buttala 248626 158693 53.39 10.68

(Set 21) 248662 159054

249218 159071

249211 158675

248626 158693

Buttala 248584 158281 63.33 12.67

(Set 22) 248626 158693

249211 158675

249203 158238

248584 158281

Buttala 248626 158693 63.68 12.74

(Set 23) 248584 158281

247933 158327

247992 158713

248626 158693

Buttala 249530 155418 62.38 12.48

(Set 24) 250028 155426

250027 154907

249524 154929

249530 155418

Buttala 250028 155426 65.86 13.17

(Set 25) 249530 155418

249536 155963

250028 155958

250028 155426

Page 73: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

72

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Buttala 249000 155409 61.54 12.31

(Set 26) 249530 155418

249524 154929

248999 154953

249000 155409

Buttala 250809 155719 51.45 10.29

(Set 27) 251304 155733

251304 155304

250809 155307

250809 155719

Buttala 251304 155733 54.56 10.91

(Set 28) 250809 155719

250809 156172

251304 156172

251304 155733

Buttala 250303 155705 50.42 10.08

(Set 29) 250809 155719

250809 155307

250303 155309

250303 155705

Siyambalanduwa 281181 183110 34.28 6.86

(Set 19) 280976 183008

280668 183524

280870 183635

281181 183110

Siyambalanduwa 281557 182477 42.09 8.42

(Set 20) 281369 182350

280976 183008

281181 183110

281557 182477

Siyambalanduwa 281555 183294 64.87 12.97

(Set 21) 281181 183110

280870 183635

281248 183842

281555 183294

Siyambalanduwa 281555 183294 80.75 16.15

(Set 22) 281248 183842

281700 184090

282011 183519

281555 183294

Page 74: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

73

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Siyambalanduwa 281895 182704 72.08 14.42

(Set 23) 281557 182477

281181 183110

281556 183295

281895 182704

Buttala 256400 175789 46.54 9.31

(Set 30) 256078 176290

256323 176446

256683 176025

256400 175789

Buttala 256704 175316 43.89 8.78

(Set 31) 256414 175767

256659 175944

256995 175565

256704 175316

Siyambalanduwa 289074 206826 29.61 5.92

(Set 24) 288754 207057

288962 207272

289263 207171

289074 206826

Siyambalanduwa 289074 206826 44.31 8.86

(Set 25) 288887 206482

288491 206735

288518 206812

288754 207057

289074 206826

Siyambalanduwa 289473 206538 45.37 9.07

(Set 26) 289298 206220

288887 206482

289074 206826

289473 206538

Siyambalanduwa 289473 206538 48.85 9.77

(Set 27) 289074 206826

289263 207171

289574 207066

289557 206692

289473 206538

Siyambalanduwa 288661 206067 27.56 5.51

(Set 28) 288510 205790

288240 206010

288340 206298

288661 206067

Page 75: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

74

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Siyambalanduwa 288661 206067 49.03 9.81

(Set 29) 288340 206298

288491 206735

288887 206482

288661 206067

Siyambalanduwa 289057 205781 39.60 7.92

(Set 30) 288891 205478

288510 205790

288661 206067

289057 205781

Moneragala 259300 182379 37.90 7.58

(Set 13) 258890 182208

258798 182549

259229 182704

259255 182586

259300 182379

Moneragala 258702 182907 39.84 7.97

(Set 14) 258281 182770

258266 182825

258186 183129

258537 183233

258608 183254

258702 182907

Moneragala 259153 183054 42.12 8.42

(Set 15) 258702 182907

258608 183254

259079 183394

259142 183107

259153 183054

Moneragala 258798 182549 41.33 8.27

(Set 16) 258378 182398

258353 182495

258281 182770

258702 182907

258798 182549

Moneragala 259229 182704 41.80 8.36

(Set 17) 258798 182549

258702 182907

259153 183054

259205 182815

259229 182704

Page 76: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

75

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Moneragala 258473 182035 37.17 7.43

(Set 18) 258890 182208

258980 181876

258952 181866

258556 181719

258486 181986

258473 182035

Moneragala 258890 182208 40.16 8.03

(Set 19) 258473 182035

258413 182266

258378 182398

258798 182549

258890 182208

Moneragala 258890 182208 37.50 7.50

(Set 20) 259300 182379

259310 182332

259377 182025

258980 181876

258890 182208

Sewanagala 225389 131194 26.12 5.22

(Set 11) 225146 131169

225118 131622

225351 131624

225389 131194

Sewanagala 225146 131169 27.94 5.59

(Set 12) 225389 131194

225429 130750

225173 130716

225146 131169

Sewanagala 225688 131225 30.71 6.14

(Set 13) 225389 131194

225351 131624

225648 131627

225688 131225

Wellawaya 247024 149363 46.87 9.37

(Set 4) 246666 149358

246666 149892

247021 149892

247024 149363

Wellawaya 230161 150090 36.39 7.28

(Set 5) 229957 150090

229831 150612

230188 150615

230161 150090

Page 77: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

76

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Siyambalanduwa 290269 205356 46.68 9.34

(Set 31) 290099 205116

289664 205535

289835 205818

290269 205356

Siyambalanduwa 288260 190360 40.50 8.10

(Set 32) 287894 190359

287894 190809

288253 190815

288260 190360

Mulathivu District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Pudukudiyirippu (Set 1) 159618 451486 80.12 16.02

160046 451600

160062 451388

159566 451115

159618 451486

Tunukkai (Set 1) 153637 454861 2974.76 594.95

157643 454978

157636 453715

153642 453688

153637 454861

Tunukkai (Set 2) 157783 454992 192.59 38.51

158408 455003

158408 454500

157783 454484

157783 454992

Pudukudiyirippu (Set 2) 160808 453130 228.56 45.71

161386 453143

161368 452489

160806 452470

160808 453130

Maritimepattu (Set 1) 197017 458018 55.27 11.05

197309 457856

197160 457612

196877 457816

197017 458018

Page 78: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

77

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Maritimepattu (Set 2) 197577 458369 60.07 12.01

197722 458259

197515 457820

197327 457943

197577 458369

Maritimepattu (Set 3) 197018 457209 49.89 9.97

197236 457200

197219 456924

196861 456918

197018 457209

Maritimepattu (Set 4) 197384 457820 62.21 12.44

197676 457685

197562 457519

197143 457445

197384 457820

Maritimepattu (Set 5) 214711 429790 76.08 15.21

214948 429944

215121 429544

214862 429387

214711 429790

Nuwara-Eliya District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Ambagamuwa (Set 1) 185397 186594 1719.12 343.82

186838 186645

186822 184597

185405 184700

185397 186594

Ambagamuwa (Set 2) 183811 186135 1070.55 214.11

185172 186137

185169 184849

183811 184841

183811 186135

Hanguranketha (Set 1) 203715 221142 5 1

203715 221298

203921 221298

203921 221142

203715 221142

Page 79: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

78

Polonnaruwa District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Dimbulagala 231212 289508 4.36 0.87

(Set 1) 231201 289489

231261 289512

231307 289484

231332 289403

231126 289479

231115 289571

231112 289601

231128 289620

231183 289570

231185 289522

231212 289508

Welikanda 250797 308204 57.92 11.58

(Set 1) 251342 307510

251072 307457

251040 307292

250627 308088

250797 308204

Dimbulagala 243051 294093 19.45 3.89

(Set 2) 243224 294111

243305 293661

243137 293638

243051 294093

Welikanda 250797 308204 81.16 16.23

(Set 2) 251231 307500

250909 307530

250723 307217

250534 308050

250643 308245

250797 308204

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Hanguranketha (Set 2) 203930 221132 5 1

203930 221308

204175 221308

204175 221132

203930 221132

Page 80: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

79

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Welikanda 259422 306363 53.86 10.77

(Set 3) 259926 306379

259978 305962

259394 305978

259422 306363

Dimbulagala 238422 281126 69.30 13.86

(Set 3) 237955 280972

237821 281589

238209 281710

238422 281126

Welikanda 255638 305872 53.52 10.70

(Set 4) 256130 305928

256162 305539

255567 305459

255638 305872

Welikanda 245062 302353 58.24 11.65

(Set 5) 245631 302486

245657 302102

245062 301934

245062 302353

Welikanda 257144 306199 59.32 11.86

(Set 6) 257629 306374

257716 305977

257224 305691

257144 306199

Dimbulagala 237339 292733 68.15 13.63

(Set 4) 237638 292995

238003 292289

237746 292092

237339 292733

Welikanda 250116 314234 22.16 4.43

(Set 7) 250173 314435

250581 314300

250525 314099

250116 314234

Welikanda 253043 306920 32.71 6.54

(Set 8) 253476 306865

253467 306564

253025 306619

253043 306920

Page 81: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

80

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Welikanda 250442 309524 67.99 13.60

(Set 9) 250714 309544

250859 309014

250343 309008

250118 309233

250442 309524

Thamankaduwa 218367 297009 54.06 10.81

(Set 1) 218157 297124

218678 297577

218821 297323

218367 297009

Thamankaduwa 218868 297281 78.80 15.76

(Set 2) 219381 297018

219503 296286

218990 296651

218969 296889

218937 297027

218778 297138

218868 297281

Welikanda 250517 313092 63.31 12.66

(Set 10) 250727 313656

251095 313656

251092 313127

250517 313092

Welikanda 251777 314715 87.45 17.49

(Set 11) 252271 314735

252213 314390

251766 314393

251777 314715

Welikanda 251708 314756 57.46 11.49

(Set 12) 251907 315244

252297 315252

252304 314788

251708 314756

Dimbulagala 240654 281397 61.34 12.27

(Set 5) 240194 281393

240184 281933

240647 281933

240654 281397

Medirigiriya 221126 327311 5.13 1.03

221251 327307

221251 327144

221126 327142

221126 327311

Page 82: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

81

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Welikanda 253828 304033 11.10 2.22

(Set 13) 253900 304048

253952 304059

254040 304038

254135 303983

254196 303924

254132 303810

254033 303900

253989 303940

253944 303964

253852 303940

253824 303924

253790 304015

253828 304033

Medirigiriya 220569 327395 15.74 3.15

220801 327402

220807 327124

220569 327130

220569 327395

Welikanda 251590 303003 12.15 2.43

(Set 14) 251821 303003

251823 302793

251586 302793

251590 303003

Welikanda 250525 314099 24.17 4.83

(Set 15) 250467 313887

250044 314018

250116 314234

250525 314099

Welikanda 259393 309647 43.60 8.72

(Set 16) 259815 309868

259934 309474

259505 309296

259468 309500

259393 309647

Welikanda 259823 309789 32.14 6.43

(Set 17) 260251 309966

260468 309615

260116 309579

259995 309708

259823 309789

Page 83: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

82

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Thamankaduwa 219445 297003 90.48 18.10

(Set 3) 219826 297122

220207 296482

219636 296291

219445 297003

Welikanda 249982 313058 34.15 6.83

(Set 18) 249989 312633

249665 312634

249662 313068

249982 313058

Welikanda 250555 313867 11.26 2.25

(Set 19) 250618 314021

250908 314000

250874 313860

250555 313867

Welikanda 250555 313867 24.59 4.92

(Set 20) 251061 313857

251059 313676

250477 313683

250555 313867

Welikanda 249849 313824 37.07 7.41

(Set 21) 249849 313507

249381 313522

249382 313846

249849 313824

Welikanda 249742 313511 27.21 5.44

(Set 22) 249746 313209

249379 313220

249381 313522

249742 313511

Dimbulagala 239541 281906 12.33 2.47

(Set 6) 239750 281917

239757 281687

239546 281662

239541 281906

Dimbulagala 239546 281662 11.80 2.36

(Set 7) 239757 281687

239757 281469

239546 281427

239546 281662

Page 84: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

83

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Welikanda 249915 308607 26.42 5.28

(Set 23) 250194 308664

250291 308318

250042 308213

249915 308607

Dimbulagala 230894 290516 6.49 1.30

(Set 8) 230750 290621

230850 290740

230908 290678

230970 290603

230986 290577

230982 290574

230894 290516

Dimbulagala 230750 290622 7.47 1.49

(Set 9) 230596 290737

230677 290859

230850 290740

230750 290622

Dimbulagala 238209 281710 60.37 12.07

(Set 10) 237821 281589

237677 282255

237975 282349

238209 281710

Dimbulagala 238209 281710 66.05 13.21

(Set 11) 237975 282349

238337 282462

238598 281831

238209 281710

Dimbulagala 238422 281126 63.92 12.78

(Set 12) 238209 281710

238598 281831

238832 281262

238422 281126

Dimbulagala 239255 281402 46.65 9.33

(Set 13) 239021 281963

239337 282061

239536 281494

239255 281402

Dimbulagala 239255 281402 66.98 13.40

(Set 14) 238832 281262

238598 281831

239021 281963

239255 281402

Page 85: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

84

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Dimbulagala 239021 281963 59.07 11.81

(Set 15) 238758 282594

239112 282705

239337 282061

239021 281963

Dimbulagala 239021 281963 74.43 14.89

(Set 16) 238598 281831

238337 282462

238758 282594

239021 281963

Thamankaduwa 218367 297009 54.04 10.81

(Set 4) 218344 297000

218630 296762

218260 296407

218048 296698

218157 297124

218367 297009

Welikanda 250517 313092 51.57 10.31

(Set 24) 250084 313066

250423 313656

250727 313656

250517 313092

Welikanda 251708 314756 51.19 10.24

(Set 25) 251223 314729

251543 315237

251907 315244

251708 314756

Puttalam District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Puttalam 99564 307814 24.55 4.91

(Set 1) 99564 307564

99166 307575

99169 307826

99564 307814

Vanathavilluwa 98660 322758 3.13 0.63

(Set 1) 98751 322758

98751 322614

98660 322625

98660 322758

Page 86: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

85

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Puttalam 100155 312606 21.50 4.30

(Set 2) 100506 312415

100526 312261

100216 312216

100155 312606

Arachchikattuwa 96310 280332 9.34 1.87

(Set 1) 96548 280332

96556 280173

96318 280173

96310 280332

Vanathavilluwa 101401 340698 28.28 5.66

(Set 2) 101534 340810

102202 340619

102058 340473

101401 340698

Mahakumbukkadawala 103662 301351 34.11 6.82

(Set 1) 104080 301235

103858 300963

103574 301191

103662 301351

Puttalam 100196 311689 7.13 1.43

(Set 3) 100332 311716

100341 311501

100203 311486

100196 311689

Anamaduwa 111555 289933 20.19 4.04

111733 290113

111911 289868

111724 289656

111555 289933

Vanathavilluwa 98500 322237 14.24 2.85

(Set 3) 98807 322171

98784 321978

98471 322073

98500 322237

Puttalam 100470 311488 8.57 1.71

(Set 4) 100620 311510

100636 311277

100489 311259

100470 311488

Page 87: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

86

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Vanathavilluwa 98993 339781 6.58 1.32

(Set 4) 98993 339698

98678 339695

98678 339782

98993 339781

Mahakumbukkadawala 104432 296156 61.09 12.22

(Set 2) 104837 295886

104543 295457

104154 295727

104432 296156

Mundalama 96948 293790 52.40 10.48

(Set 1) 97389 293799

97406 293328

96956 293310

96948 293790

Mundalama 95047 300631 16.36 3.27

(Set 2) 94996 300298

94853 300300

94880 300451

94789 300457

94816 300657

95047 300631

Mundalama 96527 291585 10.79 2.16

(Set 3) 96918 291585

96918 291472

96524 291474

96527 291585

Mundalama 96525 291702 11.13 2.23

(Set 4) 96916 291698

96918 291585

96527 291585

96525 291702

Mundalama 96526 291795 9.05 1.81

(Set 5) 96917 291791

96916 291698

96525 291702

96526 291795

Mundalama 96525 291980 8.90 1.78

(Set 6) 96917 291980

96917 291889

96526 291886

96525 291980

Page 88: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

87

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Mundalama 96526 291886 9.13 1.83

(Set 7) 96917 291889

96917 291791

96526 291795

96526 291886

Puttalam 102901 310069 7.40 1.48

(Set 5) 103060 310069

103060 309880

102901 309880

102901 310069

Mahakumbukkadawala 107669 287062 5.93 1.19

(Set 3) 107811 287062

107811 286893

107669 286893

107669 287062

Mahakumbukkadawala 105096 294891 5.57 1.11

(Set 4) 105217 294891

105217 294706

105096 294706

105096 294891

Vanathavilluwa 99761 320430 5.70 1.14

(Set 5) 99876 320438

99873 320227

99761 320234

99761 320430

Vanathavilluwa 103575 333052 5.84 1.17

(Set 6) 103718 333055

103718 332888

103575 332888

103575 333052

Arachchikattuwa 92434 277545 34.30 6.86

(Set 2) 92687 277554

92698 276995

92450 276997

92434 277545

Arachchikattuwa 92543 276996 57.98 11.60

(Set 3) 93125 276992

93215 276610

92575 276610

92543 276996

Page 89: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

88

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Mahakumbukkadawala 101529 296064 24.39 4.88

(Set 5) 101730 295921

101523 295598

101304 295739

101529 296064

Mahakumbukkadawala 101747 295139 14.51 2.90

(Set 6) 101893 295444

102039 295336

101887 295038

101747 295139

Mahakumbukkadawala 101972 295205 11.58 2.32

(Set 7) 102192 295042

102133 294900

101887 295038

101972 295205

Mahakumbukkadawala 101227 295789 17.41 3.48

(Set 8) 101407 295672

101280 295408

101059 295519

101227 295789

Puttalam 103311 309549 18.28 3.66

(Set 6) 103387 309335

103092 309103

103034 309291

103311 309549

Mahawewa 99924 249514 38.12 7.62

(Set 1) 101009 249521

101009 249382

99924 249369

99924 249514

Mahawewa 99924 249369 44.60 8.92

(Set 2) 101009 249382

101015 249210

99917 249210

99924 249369

Mahawewa 99917 249210 36.69 7.34

(Set 3) 101015 249210

101015 249091

99924 249058

99917 249210

Page 90: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

89

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Mahawewa 99911 249693 48.04 9.61

(Set 4) 101002 249699

101009 249521

99924 249514

99911 249693

Mahawewa 99924 249058 56.33 11.27

(Set 5) 101015 249091

101015 248886

99917 248846

99924 249058

Kalpitiya 82036 324196 5.43 1.09

(Set 1) 82214 324196

82210 324073

82032 324073

82036 324196

Kalpitiya 82040 324315 5.25 1.05

(Set 2) 82218 324315

82214 324196

82036 324196

82040 324315

Mundalama 97247 296998 72.51 14.50

(Set 8) 97600 297460

97979 297198

97668 296677

97247 296998

Puttalam 98762 306654 65.08 13.02

(Set 7) 98405 306657

98400 307102

98775 307092

98762 306654

Puttalam 99564 307564 32.29 6.46

(Set 8) 99576 307169

99226 307197

99228 307564

99564 307564

Mahakumbukkadawala 109757 291777 5.85 1.17

(Set 9) 109866 291777

109863 291552

109757 291560

109757 291777

Page 91: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

90

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Mahakumbukkadawala 109523 291617 5.05 1.01

(Set 10) 109639 291617

109639 291445

109520 291441

109523 291617

Mahakumbukkadawala 109173 285808 28.32 5.66

(Set 11) 109587 285786

109586 285586

109336 285459

109177 285565

109173 285808

Vanathavilluwa 99062 339776 8.59 1.72

(Set 7) 99496 339777

99496 339696

99062 339697

99062 339776

Mundalama 92117 281472 7.80 1.56

(Set 9) 92277 281472

92277 281275

92117 281275

92117 281472

Arachchikattuwa 92575 276610 39.88 7.98

(Set 4) 93011 276610

93018 276234

92627 276207

92575 276610

Vanathavilluwa 99410 337726 17.26 3.45

(Set 8) 99408 337969

99702 337845

99699 337610

99410 337726

Vanathavilluwa 99410 337726 12.37 2.47

(Set 9) 99699 337610

99656 337432

99412 337546

99410 337726

Vanathavilluwa 99412 337546 13.28 2.66

(Set 10) 99656 337432

99633 337166

99413 337365

99412 337546

Page 92: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

91

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Vanathavilluwa 99275 338098 10.49 2.10

(Set 11) 99405 338067

99410 337726

99277 337793

99275 338098

Vanathavilluwa 99277 337793 10.49 2.10

(Set 12) 99410 337726

99413 337365

99275 337529

99277 337793

Mundalama 92918 283060 68.68 13.74

(Set 10) 92819 283795

93269 283804

93271 283170

92918 283060

Mundalama 94087 297816 21.17 4.23

(Set 11) 94313 297761

94262 297396

94039 297439

94087 297816

Mundalama 93758 298086 38.65 7.73

(Set 12) 94020 297995

93924 297475

93617 297592

93758 298086

Vanathavilluwa 102140 333465 27.66 5.53

(Set 13) 102385 333459

102379 333008

102136 333002

102140 333465

Mundalama 93351 283795 68.18 13.64

(Set 13) 93851 283740

93839 283270

93349 283148

93351 283795

Page 93: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

92

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Mahakumbukkadawala 98213 288511 17.38 3.48

(Set 12) 98212 288343

98163 288322

98119 288320

98025 288296

97960 288271

97914 288209

97896 288181

97895 288517

98213 288511

Puttalam 101687 317128 65.71 13.14

(Set 9) 101687 316661

101131 316661

101121 317142

101687 317128

Mahakumbukkadawala 109451 292858 29.18 5.84

(Set 13) 109890 292858

109890 292590

109449 292589

109451 292858

Mahakumbukkadawala 109097 292269 40.24 8.05

(Set 14) 109102 291745

108791 291743

108785 292265

109097 292269

Mundalama 88463 302368 51.45 10.29

(Set 14) 89124 302368

89009 302023

88463 302023

88463 302368

Mundalama 88463 302023 46.54 9.31

(Set 15) 89009 302023

88889 301634

88463 301637

88463 302023

Puttalam 101130 308956 10.17 2.03

(Set 10) 101315 308956

101315 308734

101130 308734

101130 308956

Page 94: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

93

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Mahakumbukkadawala 108591 292582 39.07 7.81

(Set 15) 109085 292580

109097 292269

108587 292262

108591 292582

Kalpitiya 85381 318007 28.80 5.76

(Set 3) 85689 318007

85689 317627

85389 317621

85381 318007

Kalpitiya 87442 335524 20.17 4.03

(Set 4) 87842 335703

87747 335373

87430 335373

87442 335524

Vanathavilluwa 99293 325713 18.81 3.76

(Set 14) 99397 325891

99737 325764

99696 325581

99293 325713

Vanathavilluwa 99451 325870 11.17 2.23

(Set 15) 99608 326066

99719 326037

99706 325789

99451 325870

Kalpitiya 86163 316799 7.39 1.48

(Set 5) 86355 316800

86176 316487

86163 316799

Kalpitiya 86163 316799 8.72 1.74

(Set 6) 86171 316609

85983 316606

85983 316799

86163 316799

Puttalam 105057 310650 10.43 2.09

(Set 11) 104833 310529

104756 310682

104984 310794

105057 310650

Puttalam 104692 310780 7.53 1.51

(Set 12) 104948 310900

104984 310794

104756 310682

104692 310780

Page 95: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

94

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Puttalam 101121 317142 63.29 12.66

(Set 13) 100511 317157

100512 317520

101110 317626

101121 317142

Puttalam 101687 317128 69.36 13.87

(Set 14) 101121 317142

101110 317626

101687 317627

101687 317128

Puttalam 101121 317142 74.21 14.84

(Set 15) 101131 316661

100511 316661

100511 317157

101121 317142

Mundalama 97600 297460 63.48 12.70

(Set 16) 97247 296998

96919 297248

97198 297737

97600 297460

Mundalama 92918 283060 67.21 13.44

(Set 17) 92571 282952

92488 283789

92819 283795

92918 283060

Arachchikattuwa 93646 268547 56.77 11.35

(Set 5) 93648 269053

94093 269050

94110 268543

93646 268547

Arachchikattuwa 93648 269053 69.84 13.97

(Set 6) 93646 268547

93087 268552

93087 269057

93648 269053

Arachchikattuwa 93644 268029 59.45 11.89

(Set 7) 93646 268547

94110 268543

94126 268045

93644 268029

Page 96: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

95

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Arachchikattuwa 93646 268547 72.90 14.58

(Set 8) 93644 268029

93087 268011

93087 268552

93646 268547

Mundalama 97389 293799 48.53 9.71

(Set 18) 96948 293790

96940 294237

97374 294249

97389 293799

Ratnapura District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Imbulpe 200518 165037 25.39 5.08

(Set 1) 200518 165320

200881 165320

200881 165037

200518 165037

Imbulpe 200552 164561 34.28 6.86

(Set 2) 200552 164901

200960 164901

200960 164561

200552 164561

Embilipitiya 200900 136149 7.47 1.49

(Set 1) 200900 136307

201090 136307

201090 136149

200900 136149

Embilipitiya 209495 120161 17.01 3.40

(Set 2) 209347 119811

209170 119844

209302 120190

209495 120161

209322 120202

209174 119852

208997 119885

209129 120231

209322 120202

Page 97: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

96

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Embilipitiya 211444 120623 8.64 1.73

(Set 3) 211270 120578

211195 120767

211404 120782

211444 120623

Embilipitiya 207479 119383 75.12 15.02

(Set 4) 207042 120050

207396 120233

207804 119579

207479 119383

Embilipitiya 212494 118849 8.70 1.74

(Set 5) 212659 118850

212657 118632

212498 118633

212494 118849

Embilipitiya 206808 119298 13.73 2.75

(Set 6) 206984 119291

206977 118974

206805 118974

206808 119298

Embilipitiya 211330 120359 11.55 2.31

(Set 7) 211543 120358

211553 120136

211348 120133

211330 120359

Embilipitiya 208982 121725 25.93 5.19

(Set 8) 209379 121727

209313 121465

209109 121303

208982 121725

Embilipitiya 208980 121733 37.08 7.42

(Set 9) 208916 122043

209482 122091

209363 121763

208980 121733

Embilipitiya 202794 122069 24.33 4.87

(Set 10) 203124 121992

203082 121712

202743 121780

202794 122069

Page 98: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

97

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Embilipitiya 208286 120600 21.83 4.37

(Set 11) 208507 120829

208527 120757

208692 120753

208709 120441

208286 120600

Embilipitiya 208727 121318 17.32 3.46

(Set 12) 208837 121159

208567 120943

208457 121144

208727 121318

Embilipitiya 208260 120977 10.43 2.09

(Set 13) 208393 121092

208527 120900

208394 120776

208260 120977

Embilipitiya 200764 140955 11.60 2.32

(Set 14) 200960 140953

200961 140713

200766 140713

200764 140955

Embilipitiya 210652 120215 9.41 1.88

(Set 15) 210486 120218

210483 120444

210652 120443

210652 120215

Embilipitiya 200487 140399 59.13 11.83

(Set 16) 201175 140404

201172 140052

200494 140050

200487 140399

Embilipitiya 200487 140399 51.69 10.34

(Set 17) 200486 140707

201175 140704

201175 140404

200487 140399

Embilipitiya 207635 120491 19.76 3.95

(Set 18) 207783 120214

207580 120078

207412 120337

207635 120491

Page 99: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

98

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Embilipitiya 209297 120641 35.76 7.15

(Set 19) 209482 120641

209509 120173

209090 120144

209297 120641

Trincomalee District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Kinniya 242527 360571 38.63 7.73

(Set 1) 242966 360466

242892 360127

242410 360286

242527 360571

Kinniya 245288 356477 54.04 10.81

(Set 2) 245768 356477

245796 356065

245217 356065

245288 356477

Seruvila 261572 344847 75.41 15.08

261012 344392

260727 344677

261277 345168

261572 344847

Muttur 262405 359313 69.84 13.97

(Set 1) 263055 359197

263008 358858

262206 358900

262405 359313

Muttur 249399 357965 47.90 9.58

(Set 2) 249616 358404

249948 358365

249904 357908

249399 357965

Kuchaveli 244750 388186 13.09 2.62

(Set 1) 244915 388244

244961 387956

244749 387923

244750 388186

Page 100: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

99

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Town & Gravets 243189 379533 21.62 4.32

(Set 1) 243453 379542

243294 379157

243077 379225

243189 379533

Town & Gravets 245097 380121 17.20 3.44

(Set 2) 245328 380309

245459 380137

245210 379919

245097 380121

Town & Gravets 245607 380518 29.52 5.90

(Set 3) 246075 380917

246197 380769

245716 380359

245607 380518

Town & Gravets 245328 380309 17.33 3.47

(Set 4) 245607 380518

245716 380359

245459 380137

245328 380309

Town & Gravets 243577 379276 6.76 1.35

(Set 5) 243714 379278

243714 379077

243577 379079

243577 379276

Kuchaveli 240169 393371 21.26 4.25

(Set 2) 240258 393088

239988 392954

239915 393248

240169 393371

Eachchilampattai 261012 344392 63.51 12.70

261572 344847

261806 344591

261278 344127

261012 344392

Muttur 249616 358404 43.51 8.70

(Set 3) 249399 357965

249008 358010

249250 358448

249616 358404

Page 101: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

100

Vavuniya District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Vavuniya 167950 403570 2.66 0.53

(Set 1) 167904 403493

167802 403550

167859 403632

167950 403570

Vavuniya South 173634 398151 6.35 1.27

(Set 1) 173628 398084

173628 398152

173634 398151

173634 398151

173644 398266

173874 398253

173859 398145

173634 398151

Vavuniya South 173647 398266 6.57 1.31

(Set 2) 173641 398196

173641 398266

173647 398266

173647 398266

173658 398385

173887 398372

173873 398260

173647 398266

Vengalacheddiculam 143454 395034 7.93 1.59

(Set 1) 143240 394994

143192 395141

143430 395161

143454 395034

Vavuniya South 173844 399261 56.80 11.36

(Set 3) 174130 399155

173940 398386

173685 398427

173844 399261

Vengalacheddiculam 152034 383258 61.26 12.25

(Set 2) 152376 383230

152376 382557

152004 382542

152034 383258

Page 102: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

101

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Vavuniya 171216 385712 61.85 12.37

(Set 2) 171540 385285

171231 384930

170899 385345

171216 385712

Vavuniya 170940 386047 59.19 11.84

(Set 3) 171230 385793

170849 385305

170555 385547

170940 386047

Vavuniya South 174398 392255 6.88 1.38

(Set 4) 174480 392373

174629 392236

174552 392126

174398 392255

Vavuniya South 174436 392538 35.97 7.19

(Set 5) 174670 392756

175004 392462

174782 392229

174436 392538

Vavuniya 175526 398730 22.27 4.45

(Set 4) 175748 398666

175595 398266

175405 398362

175526 398730

Vavuniya South 176015 398755 22.48 4.50

(Set 6) 176225 398755

176225 398324

176015 398324

176015 398755

Vavuniya 149528 394805 46.85 9.37

(Set 5) 149933 394805

149937 394337

149532 394337

149528 394805

Vengalacheddiculam 138962 392514 13.06 2.61

(Set 3) 139108 392512

139106 392148

138962 392150

138962 392514

Page 103: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

102

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Vengalacheddiculam 138838 392380 7.52 1.50

(Set 4) 138962 392381

138960 392133

138838 392133

138838 392380

Vengalacheddiculam 139110 392510 11.61 2.32

(Set 5) 139265 392510

139264 392203

139110 392211

139110 392510

Vengalacheddiculam 139266 392510 10.39 2.08

(Set 6) 139386 392508

139389 392162

139266 392165

139266 392510

Vengalacheddiculam 139386 392494 13.16 2.63

(Set 7) 139493 392494

139497 392007

139386 392007

139386 392494

Vavuniya 174429 397945 16.20 3.24

(Set 6) 174200 397896

174152 398180

174380 398217

174429 397945

Page 104: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

103

Table 06: Identified Locations for Floating Solar Power Development

Reservior East (m) North (m) Capacity

(MW)

Samanala Wewa 200287 164497 10

201070 164561

201070 165175

200287 165196

Victoria 200721 227037 10

201334 227048

201346 227497

200697 227532

Rathkinda 232002 256282 10

232529 256290

232529 256732

232017 256732

Ulhitiya 232131 248254 10

233322 248287

233355 249378

232065 249345

Iginiyamitiya 130682 303158 10

131657 303125

131674 303919

130715 303902

Randenigala 212201 220016 10

213087 220032

213103 220771

212250 220754

Udawalawa 206710 137847 10

207907 137847

207883 138757

206686 138805

Lunugamwehera 247224 132283 10

248189 132301

248189 133211

247205 133193

Senanayaka Samudraya 278143 221294 10

279739 221294

279710 222600

278172 222571

Maduru Oya 247229 267749 100

248606 267774

248656 268825

247254 268876

Page 105: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

104

Table 07: Identified Lands for Onshore Wind Power Development

Jaffna District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Maruthnkerny 155567 493994 1020.38 10

(Set 1) 159479 490772

158946 490204

154914 493448

155567 493994

Maruthnkerny 148886 501509 1297.15 10

(Set 2) 152125 497607

151332 497009

148054 500807

148886 501509

Maruthnkerny 151332 497009 1117.01 10

(Set 3) 152112 497633

155572 493978

154935 493483

151332 497009

Chavakachcheri (Set 1) 131675 489391 3522 10

132138 489986

135644 487969

134982 486481

Chavakachcheri (Set 2) 127309 491739 1092 10

127806 492797

131741 490482

131344 489722

Kilinochchi District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Poonakary (Set 1) 130969 456040 808.44 10

130144 455215

128081 456770

129065 457753

130969 456040

Poonakary (Set 2) 120583 487267 14993 240

121697 488659

135478 480864

136871 474251

Page 106: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

105

Mannar District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Nanaddan 107556 411100 1422.69 60

109141 411185

109085 403371

107443 405155

Musalai (Set 1) 111091 377596 4801.12 100

108995 377596

110475 388849

111831 388849

111091 377596

Musalai (Set 2) 107689 397512 2300 50

108959 398200

112451 392882

111287 391903

Mannar Town 81170 431777 11928 100

85377 431181

93870 427609

98831 424077

99585 422966

98394 421101

92242 425625

84543 429078

81606 429276

Monaragala District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Wellawaya 240207 156232 1148.32 20

239326 155527

236887 158445

237868 159300

240207 156232

Mulattivu District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Maritimepattu 216316 424261 2000 50

217470 424629

221347 419021

220354 418589

Page 107: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

106

Puttalam District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Mundalama (Set 1) 89845 292501 2388.31 50

89028 292190

86890 301715

88134 301520

89845 292501

Mundalama (Set 2) 91108 292022 2545 50

92536 292154

93063 285633

91548 285567

Trincomolee District

DS Division East (m) North (m) Land area

(Acre)

Capacity

(MW)

Kuchaveli (Set 1) 223674 415778 851.60 10

223079 415302

220737 418159

221372 419033

223674 415778

Kuchaveli (Set 2) 224744 412131 490 10

225529 412404

226907 409664

226508 409503

Table 08: Identified Locations for Offshore Wind Power Development

Jaffna District

DS Division East (m) North (m) Area (Acre) Capacity

(MW)

Poonakary 121661 484592 1235.53 5

122656 485281

124073 483673

123154 482945

Page 108: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

107

Table 09: Identified Lands for Biomass Power Development

Ampara District

DS Division East (m) North

(m)

Applicable

radius (km)

Capacity

(MW)

Dehiattakandiya 228703 260765 7.5 3

Monaragala District

DS Division East (m) North

(m)

Applicable

radius (km)

Capacity

(MW)

Monaragala 257821 180577 25 10

Table 10: Identified Lands for Waste to Energy Project Development

Gampaha District

DS Division East (m) North (m) Capacity

(MW)

Wattala 100577 201448 10

Colombo District

DS Division East (m) North (m) Capacity

(MW)

Kesbewa 104006 179456 10

Page 109: Renewable Energy Development Plan Phase I 2019 -2025powermin.gov.lk/english/wp-content/uploads/2019/08/... · 4.0 Prospective Power Plant Capacity Additions using Renewable Energy

108