remote sensing systems to monitor conversion areas · remote sensing systems to monitor conversion...

10
1 Seite 1 Remote sensing systems to monitor conversion areas Supported by Lao-EU FLEGT VPA TWG Meeting, Crowne Plaza, 02.08.2017 02.08.2017 Contents 1 Monitoring of Conversion Areas 2 Optical Earth Observation 3 Forest Degradation 4 Remote sensing in FLEGT 5 Results Satellites 6 Results UAVs 7 Discussion 02.08.2017 Supported by TWG Meeting 2

Upload: others

Post on 20-Apr-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Remote sensing systems to monitor conversion areas · Remote sensing systems to monitor conversion areas Supported by Lao-EU FLEGT VPA –TWG Meeting, Crowne Plaza, 02.08.2017 02.08.2017

1

Seite 1

Remote sensing systems to monitor conversion areas

Supported by

Lao-EU FLEGT VPA – TWG Meeting, Crowne Plaza, 02.08.2017

02.08.2017

Contents

1 Monitoring of Conversion Areas

2 Optical Earth Observation

3 Forest Degradation

4 Remote sensing in FLEGT

5 Results Satellites

6 Results UAVs

7 Discussion

02.08.2017

Supported by

TWG Meeting 2

Page 2: Remote sensing systems to monitor conversion areas · Remote sensing systems to monitor conversion areas Supported by Lao-EU FLEGT VPA –TWG Meeting, Crowne Plaza, 02.08.2017 02.08.2017

2

Seite 3

Monitoring of conversion areas

02.08.2017

Dennis Roitsch – GIZ Internship Programme – February to July 2017

Task: Compile list of remote sensing systems for near real-time

monitoring of conversion areas in a future TLAS

1. Weak supply-chain control in the past

2. Logging often happened outside concession areas, causing forest

degradation

3. One focal point of the EU Lao-FLEGT negotiations

TWG Meeting

Remote sensing + on-the-ground inspections

Seite 4

Optical earth observation

02.08.2017

Canopy openness is a

good indicator

Minimal seasonal

variation

Topography

complicates remote

sensing

Difficult climate

conditions: - Cloud coverage

- Atmospheric

disturbance

TWG Meeting

Page 3: Remote sensing systems to monitor conversion areas · Remote sensing systems to monitor conversion areas Supported by Lao-EU FLEGT VPA –TWG Meeting, Crowne Plaza, 02.08.2017 02.08.2017

3

Seite 5

Forest degradation – Proxies used by remote sensing

02.08.2017

Openings in canopy coverLog landings Logging trails

TWG Meeting

Seite 6

Remote sensing in the TLAS

02.08.2017

5. Independent Audit

3. Verification of

compliance of

operators

and timber products

1. Legality

Definition

2. Timber

Supply

chain

4. Issuing of

FLEGT

Licenses

TWG Meeting

Page 4: Remote sensing systems to monitor conversion areas · Remote sensing systems to monitor conversion areas Supported by Lao-EU FLEGT VPA –TWG Meeting, Crowne Plaza, 02.08.2017 02.08.2017

4

02.08.2017

Investment Project Timeline for Conversion Timber

Proposal

Survey

Construction phase

• Construction, including logging

• ESMMP Implementation

Operation Phase

Remote sensing

Concession Agreement

TWG Meeting

Seite 8

• Phase II: UAVs for detailed

assessment

One-Phase or Two-Phase Approach

02.08.2017

• Phase I: Wide-ranging detection

with satellite imagery

TWG Meeting

Page 5: Remote sensing systems to monitor conversion areas · Remote sensing systems to monitor conversion areas Supported by Lao-EU FLEGT VPA –TWG Meeting, Crowne Plaza, 02.08.2017 02.08.2017

5

Seite 9

Eligible optical satellite missions

02.08.2017

Planet Sentinel 2

Resolution 5m/3m 10m

Revisit time Daily 5 days

Processing time 1-2 days 1-3 weeks

Data costs 10-21USD/km²

(1 year)

Free

Software MangoMaps:

USD 3,600

OpenForests:

USD 37,500

Unique: USD 63,000

Training USD 4,000 Included

TWG Meeting

Seite 1002.08.2017

• 143 Doves (micro-satellites) in orbit

• Weight 4kg (Sentinel 2: 1,140kg)

• Camera resolution between 3m and

5m per pixel depending on altitude

• Latest launch 14 February 2017

• Completely functional by end of 2017

• Automated time series analysis is

developed

• Requires annual renewal

Planet Labs

TWG Meeting

Page 7: Remote sensing systems to monitor conversion areas · Remote sensing systems to monitor conversion areas Supported by Lao-EU FLEGT VPA –TWG Meeting, Crowne Plaza, 02.08.2017 02.08.2017

7

Seite 13

DeltaNBR

02.08.2017

Fig.: Comparison: Landsat 8,

DeltaNBR & RapidEye*

* From left to right: 12 January

2014, 21 April 2015, DeltaNBR,

30 March 2015.

• Sentinel 2 and RapidEye (5m

resolution) compare well in detectable

detail

Challenges:

• Method requires bare soil Limited

time frame for detection

• Cloud-free images required

• No final accuracy assessment yet

• DeltaNBR also detects windbreaks,

dead bamboo, fire damage & vines

TWG Meeting

Seite 14

Phase II - UAVs

02.08.2017

SPEL-3

eBee

Skywalker Frame

TWG Meeting

Page 8: Remote sensing systems to monitor conversion areas · Remote sensing systems to monitor conversion areas Supported by Lao-EU FLEGT VPA –TWG Meeting, Crowne Plaza, 02.08.2017 02.08.2017

8

Seite 15

Phase II - UAVs

02.08.2017

Spel-3 eBee Skywalker

Frame

Price USD 152,000 USD 14,070 USD 7,975

Payload 2.5kg 5 different

sensors by

SenseFly

1kg

Type of UAV Fixed-wing Fixed-wing Fixed-wing

Flight time 120 minutes 50 minutes 100 minutes

Mapped area n/a 12 km² 5 km²

TWG Meeting

02.08.2017

2017 2017Aug Sep Oct Nov

Fill in form from National Geographic Department 8/2/2017

National Geographic Department submits to Ministry of Home Affairs8/3/2017

Permission from Ministry of Home Affairs & National Geographic Department8/10/2017

Applicant submits to Ministry of National Defense8/11/2017

Permission from Ministry of National Defense11/13/2017

Applicant submits permission from Ministry of Home Affairs, Ministry of National Defence and National Geographic Department form to the Ministry of Aviation

11/14/2017

- Official way takes 2-3 months

- FIPD requires about 4 weeks

- Space Eye Lao takes 10 days

TWG Meeting

Approval process for UVA flights

Page 9: Remote sensing systems to monitor conversion areas · Remote sensing systems to monitor conversion areas Supported by Lao-EU FLEGT VPA –TWG Meeting, Crowne Plaza, 02.08.2017 02.08.2017

9

Seite 17

Discussion

02.08.2017

Technology:

• Phase I:

• Sentinel 2 data as long-term solution at the lowest cost for the

next 7 years

• Planet Labs is the easiest to handle & cloud based

• Phase II:

• With introduction of Sentinel and given the legal requirements,

there is no need for UAV utilisation

Organization:

• Define roles and procedures for verification in the TLAS

TWG Meeting

Seite 18

Discussion

02.08.2017

Responsible SCC Verification Advantage Disadvantage

MAF/DOF

(FIPD)

• Technical capacity • Inventory and

Planning, not

law enforcement

Logging

Management

Committee

• Responsible based

on 0112

• No capacity

MAF/DOFI

• Law enforcement

agency

• So far no remote

sensing capacity

MoNRE/

DESIA

• To be used for other

monitoring

purposes?

?

Project

Developer

• Obligation to pay

(ESMMP

implementation and

monitoring

?

Page 10: Remote sensing systems to monitor conversion areas · Remote sensing systems to monitor conversion areas Supported by Lao-EU FLEGT VPA –TWG Meeting, Crowne Plaza, 02.08.2017 02.08.2017

10

Seite 19

Open questions

02.08.2017

• Further discussion of responsibilities needed.

• How to institutionalise remote sensing within the TLAS?

• What remote sensing system is most suitable?

• Where and when can remote sensing be piloted?

• How to secure the necessary funding?

Seite 2002.08.2017

Responsible

Heiko Woerner

Author(s)

Dennis Roitsch

Photo credits

© GIZ/Planet/ESA/USGS/NASA/SUFORD-SU

Layout

GIZ

In cooperation with

Supported by

As a federal enterprise, GIZ supports the German Government in achieving its objectives in the field of international cooperation for sustainable development.

Published byDeutsche Gesellschaft fürInternationale Zusammenarbeit (GIZ) GmbH

Registered offices, Bonn and Eschborn, Germany

Support to the Lao EU-FLEGT process (ProFLEGT)

Department of Forest Inspection

That Dam Campus, Chanthabuly District

Vientiane Capital, Lao PDR

P.O. Box 12 95T +856 21 255 264F +856 21 255 263E [email protected] www.giz.de

TWG Meeting