Page 1: Remedial Programme For Pll Lot

1

Warsaw, 20 August 2008

Remedial programme for PLL LOT

Page 2: Remedial Programme For Pll Lot

2

Table of contents

1. LOT situation

2. LOT ambitions

3. Remedial programme

4. Financial plans and objectives

Page 3: Remedial Programme For Pll Lot

3

Market situation deepens the crisis of LOT

Source:International Air Transport Association

Cycles in aviation sector Operating margin, 1978-2008 (%)

Increasing fuel prices*

1986 200819970

50

100

150

200

250

300

350

400Crude oil price Amsterdam spot(USc/gallon)

Change since early 2007+107%

Compared to minimum price

+1089%

• Economic trend in the entire branch is downward

• Forecast adjustment for this year published in June 2008 by IATA showed break on the market

• Fuel prices doubled over the last 12 months, which makes large airlines reduce their offer and smaller ones go bankrupt

1978 200819981988

3 421 3 421 3 421 1 2

Cycle I Cycle II Cycle III

-4-3-2-101234567

Page 4: Remedial Programme For Pll Lot

4

Difficult external situation

Current situation of Company - reasons

• Advantage not taken of increase in transport and traffic at Polish regional airports

• Development directions inadequate to market reality (e.g. in Asia)

• No strong and efficient commercial and sales function

• Increase in permanent costs (10% over 2 years) and no control of costs after completion of historic cost reduction programmes

• Unprofitable network of connections

• Low labour efficiency and overemployment

• Unstable situation as regards the fleet

• Failed attempts to create a strong regional hub in Warsaw

• Neglected relations with Star Alliance partners

• Lack of managerial continuity (5 different presidents over 5 years)

• Unspecified responsibilities and settlement rules

Difficult internal

situation –

LOT unable to compete on open market Strategy

Market

Costs

Management

•Beginning of economic slack on the market

•Rocketing fuel prices

•Increase in other operational costs

Market

Page 5: Remedial Programme For Pll Lot

5

Current situation of the Company - PLL LOT 6-month performance 6 and 2008 forecast

* Forecast by LOT ControllingSource: LOT Controlling

1.436 1.326

YTD revenue

6M 07

-130

2.752

2.983 2.866

Revenue (12-month forecast)

-216

73

-216

-275

Performance in the first 6 months Annual performance

-1

6M 08A

6M 07 6M 08A

2007 2008 P*

EBIT YTD EBIT (12-month forecast)

2007 2008 P*

In PLN million

Page 6: Remedial Programme For Pll Lot

6

LOT must implement a remedial programme at once

External challenges Internal challenges

• Surging fuel prices force the aviation industry to limit their offer and significantly revise their growth plans: many connections are becoming unprofitable

• The aviation industry is going into economic recession, which translates into lower prices and fewer passengers for most airlines

• Competitors are becoming increasingly active

• LOT’s current operating results are negative and likely to get even worse

• A vast majority of LOT connections are unprofitable – planned expansion was not adjusted to market needs and connections profitability economics

• Additional negative factors – resulting from unprofitable previous actions and outdated structure

Remedial programme

• Quick actions towards marketization of the Company– adjusting to the competitive market

• List of actions for revenues and costs to significantly increase profitability in 2009; suppressing the downward trend

Source: Team analysis

Page 7: Remedial Programme For Pll Lot

7

Table of contents

1. LOT situation

2. LOT ambitions

3. Remedial programme

4. Financial plans and objectives

Page 8: Remedial Programme For Pll Lot

8

LOT ambitions

• LOT as preferable partner in a large alliance

• Closer cooperation with PPL in order to increase the role of the port in Warsaw

• Profitable business model for long haul connections

• Regaining control over Polish market through stronger commercial mergers

• Short-term – profitability by 2010

• Mid-term – improved financial performance to have ROIC over WACC (by 2013)

• LOT as first-choice carrier for customers flying to/from Poland

• Optimisation of product towards customer needs and profitability

• Visibly strengthening position in the business sector at each contact point

• Visible improvement of customer service

• Entering the stock market with improved financial performance

Mark

eti

zati

on

of

PLL L

OT

Ach

ievin

g p

rofi

tab

ilit

y in

2010

Strategic

IPO

Financial

Customers

Page 9: Remedial Programme For Pll Lot

9

Financial objectives for Subsidiary Companies

* except Petrolot and Casinos Poland** compared to the 2008 budget*** net financial result based on the 2009 budgets

Source: team analysis

• Centrawings

• LGS

• EuroLOT

• LOT Catering

CEES

• GTL LOT

• LOT Auto Services

WRO LOT

COMPANY* OBJECTIVE

• Profitability by 2009

• Additional PLN 20 million in operating result** in 2009and additional improvement of operating result** by 10 million PLN in 2010

• Reducing administrative costs by PLN 3 million (e.g. through centralizing administrative functions)

Financial result ensuring return of LOT capital employed exceeding cost of capital

Page 10: Remedial Programme For Pll Lot

10

Table of contents

1. LOT situation

2. LOT ambitions

3. Remedial programme

4. Financial plans and objectives

Page 11: Remedial Programme For Pll Lot

11

Strategy – six leverages of the remedial programme

Remedial programme leverages

Optimising network and fleet

Cost efficiency/CAPEX

Stimulating revenues

Cooperation strategy within alliance

Source:team analysis

Customer

Reforming the capital group

Page 12: Remedial Programme For Pll Lot

12

Leverage 1 - customer

• Segmentation of customers and identifying customer needs

• Improved quality of services

• Better service availability, efficient channels

• New products, promotions

• Better ground personnel

Customer

• Shorter check-in• Improved customer service• Shorter waiting time after

landing

• Improving punctuality• Reducing the number of

cancelled flights• High quality of on-board

staff

Cooperation with PPL,Changes in LGS

Company economises,customer profits!

Through:

• Better functioning www, focusing on internet channel

• Services available on mobile phones

Loyalty of key customers, new customers; new,

convenient access channels

• Network – new destinations replacing unprofitable ones

• Promotions – weekend offers, regular events

Flights more profitable,destinations reflecting

customer needs,developing relations with

customers

• Improved service availability for individual customers

• Focus on business customers and direct cooperation with corporate customers

Personalised product for key customers

Better control over ground customer service; better

quality in areas most influencing customer

satisfaction

Objective:LOT as first-choice carrier for Polish

customers

Page 13: Remedial Programme For Pll Lot

13

Leverage 2 - network

• Optimising network profitability• Adjusting network to realistic demand forecasts• Flexible network (changing on monthly or weekly

seasonal basis)

• More efficient fleet allocation • Revising plans of developing the current fleet and

adjusting it to market situation

• Developing strategy for code share

Source:team analysis

Optimising network and fleet

Page 14: Remedial Programme For Pll Lot

14

Leverage 3 - revenues

Source:team analysis

Stimulating revenues

• Activating sales• Comprehensive application of electronic distribution and

service channels• Mobile access to services (mobile phones)

• Improved revenue management

• Sales stimulating programmes• Dedicated programmes for German and transatlantic

markets

Page 15: Remedial Programme For Pll Lot

15

Leverage 4 - costs

Source:team analysis

• Freezing recruitment and salaries, negotiations with trade unions• Reducing costs and employment in administration

• Implementing lean principles in organisation (e.g. technology, handling, customer service)

• Higher productivity of flying and onboard personnel• Optimising fuel costs• Reviewing and optimising main investments

Cost efficiency/CAPEX

Page 16: Remedial Programme For Pll Lot

16

Leverage 5 – the group

Source:team analysis

• Changing the administration model in the group, more efficient administration

• New action model in Centralwingsand EuroLOT

• Reforming technology, LGS, LOT Catering

Reforming the capital group

Page 17: Remedial Programme For Pll Lot

17

Leverage 6 - alliance

Source:team analysis

• Developing LOT strategy of cooperation with Lufthansa/ Austrian Airlines/Swiss with view to maximum profitability

• Preparing and holding negotiations in August/September

• Improving cooperation with PPL, especially at the Warsaw airport

Cooperation strategy for alliance

Page 18: Remedial Programme For Pll Lot

18

Actions – how do we work

• Detailed schedule• Gradual implementation of tasks until 2010• Implementation of first programme elements in III and IV quarter

of 2008

• Determining top-down objectives• Working teams dedicated for specific tasks• Up-to-date reporting• Revision of progress• Project management office• Gradual implementation of respective elements of the programme• Modifying plans according to feedback information• Up-to-date reporting to RN and MS• Separate team to work on improving the results of CLW, LGS, LOT Catering

• Bottom-up initiatives prepared by responsible representatives of respective teams – cascade programme for getting staff involved in shift work

Page 19: Remedial Programme For Pll Lot

19

Actions already taken

Optimising the network

• Improving the internet channel – promotion www.lot.pl• Weekend promotions available at www.lot.pl

effect: rise in online sales by 10%• More functional website• Since September: regular promotions only at www.lot.pl• Since September: mobile services – mobile-lot.com

• Giving up unprofitable connections• New destinations• Reducing the frequency of selected connections

Negotiations within alliance • Launch of negotiations – President of PLL LOT visits Lufthansa

Sales,New access channels

By the end of 2008 we expect to reduce loss in all areas of our activity by PLN 20 million

Page 20: Remedial Programme For Pll Lot

20

Table of contents

1. LOT situation

2. LOT ambitions

3. Remedial programme

4. Financial plans and objectives

Page 21: Remedial Programme For Pll Lot

21

The remedial programme to reduce loss generated in 2009

Network optimisation

Revenue maximisation

Cost reduction

Overall potential of remedial actions

EBIT in 2009 before the cost of financial leasing of fleet

Revenue maximisation

Reform costs

- 60335

-440

Base 2009 scenario

130

Network optimisation

100150

Cost reduction

-120

EBIT after remedial actions

Total

560*160 150 250

in PLN million

Reform costs

-70

* Excluding one-time reform costs

Page 22: Remedial Programme For Pll Lot

22

Achieving full effects of the programme necessary for LOT to become profitable by 2010

Network optimisation

Revenue maximisation

Cost reduction

Overall potential of remedial actions

EBIT in 2009 before the cost of financial leasing of fleet5

435

-545

Base 2010 scenario

160

Network optimisation

150

Revenue maximisation

250

Cost reduction Reform costs EBIT after remedial actions

- 10

Total

560*160 150 250

In PLN million

Major risks:– Developing long haul connections– Developing the situation on the German market (including cooperation

with Lufthansa)– Possible implementation of full remedy potential

Reform costs

-70

* Excluding one-time reform costs

Page 23: Remedial Programme For Pll Lot

23

To achieve the 2010 goal it is necessary to implement the objectives of network optimisation and improved efficiency

No. of passengers (million)

* Additional effect expected in 4th quarter of 2008 in connection with network optimisation and sales activationSource: team analysis

Base scenario

Scenario after network optimisation

Scenario after all initiatives

4.200

08

4.4004.270

2007

4.100

09 2010

3.900

08

4.0304.270

2007

4.100

09 2010

3.990

08*

4.2004.270

2007

4.100

09 2010

Page 24: Remedial Programme For Pll Lot

24

Thank you for your attention