Remanufacturing Research and Development
Submitted by: Komatsu Ltd
Workshop on Remanufacturing Research and Development in APEC Economies
Singapore28 March 2012
3/28/2012
1
1
RemanufacturingRemanufacturing Research and Development
March 28, 2012 K t LtdKomatsu Ltd.
Product Support Div. Reman dept.Takafumi TAKENAKA
2
ContentsContents
1)Construction Equipments2)Reman Operation & Activity3)Remanufacturing Research & Development4)Reman Facility (KRI)4)Reman Facility (KRI)
3/28/2012
2
3
Crawler Dozers Crawler Excavators
Main Products
Model Operating wgt.(ton) Capacity (HP)
D155 - D475 39.5 – 113.2 354 - 890Model Operating wgt.(ton) Capacity (HP)
PC1000 - PC8000 103.0 – 744.0 611 - 3863
Dump TrucksModel Operating wgt.(ton) Capacity (HP)
HD465 – 960E 42.8 – 249.5 739 - 3500
Wheel Loaders Motor GradersModel Operating wgt.(ton) Capacity (HP)
WA500 – WA1200 32.9 – 205.2 353 – 1715Model Operating wgt.(ton) Capacity (HP)
GD825 26.4 280
4Overburden treatment in mining
Electric Dump Truck(wgt. 140.6 ton, 2,000HP) Excavator (wgt. 398.0ton, 1,775HP)
3/28/2012
3
5
Engine Transmission Piston Pump Motor (PPM)
Reman Components
Engine subcomponent:F l I j ti P T b h
Wheel MotorHydraulic Cylinder:SuspensionFuel Injection Pump, Turbocharger Suspension
6Komatsu Reman Operation
Komatsu is helping to create a resource recycling society by promoting the reuse and recycling of used components and by improving the recyclability rate of construction machinery through its Reman Activity.
1. Concept
Komatsu to provide Quality Assurance Responsibility for Reman as a manufacture to maximize Customer Machine Availability and O&O Cost Reduction and create Reliable Relationship with Customer.
2. Basic Policy
1.Quality : Quality & Performance guaranteed to be the same level as for new component
2.Cost : Lower cost for Reman component3.Delivery : Reduced idle time for machines through sufficient Inventory 4.Efficiency : Centralized by Komatsu Reman Facility can avoid
duplicate investment by customer
3/28/2012
4
7Reman Potential
Reman Activity has been growing
Large size machine global population(Population history and estimation) Lots of
PotentialPotentialin future with machine population increase
8
Global Supply NetworkGlobal Supply Network
Komatsu Global Reman Operation Network① Komatsu has Large size Global Reman Operation Facilities in Indonesia & Chile② Komatsu establish Regional Reman Facilities in Emerging area
(Difficult Core Trade ; China, Russia, India & Brazil)
① Komatsu has Large size Global Reman Operation Facilities in Indonesia & Chile② Komatsu establish Regional Reman Facilities in Emerging area
(Difficult Core Trade ; China, Russia, India & Brazil)
Engine
Transmission
Wheel Motor
Hydraulic Cylinder
3/28/2012
5
9
Research Center
Development Center - Dozer- Excavator
D T k
Remanufacturing Research & Development
Components development
Products development - Dump Trucks- ICT, Others
- Engines- Transmissions- Hydraulic Pumps,
Cylinders- Electronic, Others
Material development
Production Engineering development
Co-Working for development
- Metal spraying- Others
Remanufacturing Engineering development
10
Shaft
GearImpeller
Core Situation
The Shaft of Engine Water Pump
WearWater Pump
Corrosion
Spec. of the shaft
Scratches
Metal Spraying
・Material : SUS・Surface hardness : HRC30~35・Surface hardness Oil seal contacted-part: HRC40~50
Remanufactured parts the same quality assurance methodsas Komatsu newly developed parts
3/28/2012
6
11
Test ResultTest Equipment
(1)Durability Test(Breaking Test)
Durability Test for the layer of Metal spraying
島津サーボパルサ
200mm
±17.4kg・m
(2)Torsion Fatigue TestFrequency Number ;10 million times.
Torq
ue
Time
The part of Impeller
Stress GaugesDurability Test : Pass
<without any damage such asabrasion or crack on the layerof Metal spraying>
12Corrosion Evaluation after Operation Test in Actual Vehicle
Appearance after Operation Test in Actual Vehicle
B ond-coat
Top-coat(13C rス テンレス)
表面および内部に腐食は認められない
Inspection of the Seal-Contacted part
(13 Cr stainless)
Top-coat
Bond-coat
シール部
Adherent matters
B ond coat(N i5Al)
基材(SUS431)
Seal contacted part Base layer
No corrosion on the surface and in the inner part of Metal Spraying
Base layer
OK
Corrosion Evaluation Test : Pass
<after Operation Test in Actual Vehicle >
Energy dispersion X-ray Spectroscopic Analysis:EDX
3/28/2012
7
13Examples of Remanufacturing Engine Parts
14
Cylinder Block by Metal Spraying Valve, Crank Shaft by Grinding & Polishing
Cylinder Head by Cutting & Grinding
Examples of Remanufacturing Engine Parts
Fuel Injection Pump
Turbocharger
3/28/2012
8
15
Remanufacturing ProcessClutch Plate by Tempering & Grinding
Tempering Grinding
Finished Good
Examples of Remanufacturing TransmissionParts
Heat Spot
T/M Case by Insert CollarCross Section of T/M Hub by Metal Spraying
Wear ; Mounting Part Wear ; Bearing Part
T/M CaseHub
16Global Reman Factory - Komatsu Reman Indonesia (KRI)
①General view ②Location
③Products□ Reman Engines (Large)
Jakarta, Indonesia
Establishment:Jan., 2007
16.5 K Sq. M.
g ( g )
□ Reman T/C & T/M (Large)
□ Reman Piston & Pump Motor (Large)
3/28/2012
9
17Remanufacturing Process
Inspection Upon Receipt Core Cleaning Dis-Assembly Parts Inspection
Parts Cleaning Salvaging AssemblyParts Cleaning Salvaging Assembly
Performance Test Painting ShipmentFinished Goods
18Quality Assurance same as New Component
④ Measuring Equipments ④ Measuring Equipments ① ISO9001-2000 Certification② STD Procedure (Check Sheet )③ 100% In-House Machining & Salvaging④ Measuring Equipments (Partsevaluation)⑤ Component Traceability Control
① ISO9001① ISO9001 ② Check Sheet ② Check Sheet
⑤ Component Traceability Control⑥ Testing Equipments (Performance)
③ In-house Salvaging: ex Boring machine③ In-house Salvaging: ex Boring machine ⑤ Component Traceability ⑤ Component Traceability
□ IC Tag□ Second Dimension Bar Code
Coordinate Measuring Machine
3/28/2012
10
19
⑥Testing Equipments⑥Testing Equipments
HYDRAULIC TEST BENCHENGINE DYNAMOMETER
Quality Assurance same as New Component
ENGINE DYNAMOMETER CERTIFICATE
20
Issues !!
3/28/2012
11
21