KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 20301
SUMMARY OF Roadway Excavation
SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS
1 544,946.82 509,416.74 35,530.08
2 462,228.83 449,060.52 13,168.31
3 Bridge 128+129.575 15,326.22 10,060.00 5,266.22
4 Bridge 172+600 30,229.50 4,494.33 25,735.17
5 Bridge 191+021 14,700.00 14,700.00
QUANTITY = 1,067,431.37 973,031.59 94,399.78 Cu.m
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Khatib & Alami
SUMMARY OF CUTTING -I RIGHT Side
SUMMARY OF CUTTING -I Left Side
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 20601
SUMMARY OF Embankment
SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS
1#REF! #REF! #REF!
2 76,111.34 #REF! #REF!
3Bridge 128+129.575 #REF! #REF! #REF!
6Bridge 141+000 #REF! #REF!
4Bridge 172+600 #REF! #REF! #REF!
5Bridge 191+021 #REF! #REF!
QUANTITY = #REF! #REF! #REF! Cu.m
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Khatib & Alami (SAB)
SUMMARY OF FILLING-I RIGHT Side
SUMMARY OF FILLING-I Left Side
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 20601
SUMMARY OF Sub Grade
SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS
1 124,887.07 111,435.89 13,451.17
###
2 114,134.72 101,566.72 12,568.00
###
3 142,623.09 136,604.89 6,018.20
###
4 130,711.65 125,049.17 5,662.48
###
5 89,723.70 61,549.22 28,174.48
###
6 74,490.71 58,382.71 16,108.01
###
7Bridge 128+129.575 22,655.02 16,662.43 5,992.59
###
8Bridge 172+600 38,882.34 7,000.00 31,882.34
###
9Bridge 191+021 31,279.39 31,279.39
###
Agg. Base Course
QUANTITY = 769,387.69 618,251.03 151,136.66 Cu.mB.B.CB.W.C
###
###
###
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
SUMMARY OF Sub Grade-I Right Side
SUMMARY OF Sub Grade-II Right Side
SUMMARY OF Sub Grade-I ( LEFT Side)
SUMMARY OF Sub Grade-11 ( LEFT Side)
SUMMARY OF Sub Grade-SIDE SLOPE ( LEFT Side)
SUMMARY OF Sub Grade-SIDE SLOPE ( RIGHT Side)
B.W.C
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 3030101
SUMMARY OF AGGREGATE BASE COURSE GRADING
SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS
1 80,239.57 63,613.51 16,626.06
###
2 68,945.80 62,138.62 6,807.18
###
3 82,522.05 79,012.16 3,509.89
###
4 80,557.67 77,178.29 3,379.38
###
5Bridge 128+129.575 21,027.35 9,783.63 11,243.72
###
6Bridge 172+600 39,829.15 39,829.15
###
7Bridge 191+021 46,715.79 46,715.79
###
QUANTITY = 419,837.38 291,726.21 128,111.17 Cu.m
###
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
SUMMARY OF AGGREGATE BASE COURSE GRADING - I Right Side
SUMMARY OF AGGREGATE BASE COURSE GRADING - II Right Side
SUMMARY OF AGGREGATE BASE COURSE GRADING - I ( LEFT Side)
SUMMARY OF AGGREGATE BASE COURSE GRADING - II ( LEFT Side)
###
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 4020102
SUMMARY OF Bituminous Prime Coat - Grade MC-I
SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS
1 465,703.90 417,280.00 48,423.90
###
2SUMMARY OF MC - 01 ( LEFT Side) 551,300.43 521,062.24 30,238.19
###
3Bridge 128+129.575 71,777.96 15,758.03 56,019.93
###
4Bridge 172+600 119,105.66 119,105.66
###
5Bridge 191+021 147,367.49 147,367.49
###
QUANTITY = 1,355,255.44 954,100.27 401,155.17 Sq.m
###
###
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: khatib & Alami (SAB)
SUMMARY OF Bituminous Prime Coat - Grade MC-I Right Side
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 4050176
SUMMARY OF Bituminous Base Course ,Grade
SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS
1 46,133.39 41,076.00 5,057.39 ###
2 45,406.88 40,424.00 4,982.88 ###
3 SUMMARY OF BBC - 01 ( LEFT Side) 54,382.51 51,165.00 3,217.51 ###
4 SUMMARY OF BBC - 02 ( LEFT Side) 53,518.75 50,343.67 3,175.08 ###
5 Bridge 128+129.575 13,045.36 1,955.88 11,089.48 ###
6 Bridge 172+600 26,489.19 26,489.19 ###
7 Bridge 191+021 26,016.82 26,016.82 ###
QUANTITY = 264,992.89 184,964.55 80,028.34 Cu.m
###
###
CONTRACTOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Khatib & Alami (SAB)
SUMMARY OF Bituminous Base Course ,Grade -l Right Side
SUMMARY OF Bituminous Base Course ,Grade -ll Right Side
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 4050376
SUMMARY OF Bitumin Wearing Course
SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS
1 22,526.10 20,081.60 2,444.50 ###
2 SUMMARY OF BWC ( LEFT Side) 26,522.57 24,741.23 1,781.34 ###
3 Bridge 128+129.575 2,638.09 2,638.09 ###
4 Bridge 172+600 7,820.22 7,820.22 ###
5 Bridge 191+021 6,237.09 6,237.09 ###
Quantities 65,744.07 44,822.83 20,921.24 Cu.m
######
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Khatib & Alami (SAB)
SUMMARY OF Bitumin Wearing Course, Grade Right Side
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 9030301
SUMMARY OF Retroreflectorized Thermoplastic White Traffic Lines
SL NO LOCATION TOTAL QTY REMARKS
1 SUMMARY OF Retroreflectorized Thermoplastic White Traffic Lines Right Side 3,645.00
2 SUMMARY OF White Line ( LEFT Side) 4,331.25
3 Bridge 128+129.575 12,884.25
4 Bridge 172+600 15,957.00
5 Bridge 191+021 20,263.00
DONE QUANTITY OF White Line = 57,080.501 Sq.m
CONTRACTOR
PROJECT MANAGER
CONSULTANT
RESIDENT ENGINEER
QUANTITY SURVEYOR QUANTITY SURVEYOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 9030302
SUMMARY OF Retroreflectorized Thermoplastic Yellow Traffic Lines
SL NO LOCATION TOTAL QTY REMARKS
1 SUMMARY OF Retroreflectorized Thermoplastic Yellow Traffic Lines Right side 14,580.00
2 SUMMARY OF Yellow Line ( LEFT Side) 17,325.00
3 Bridge 128+129.575 5,982.46
4 Bridge 172+600 16,999.00
5 Bridge 191+021 4,124.82
DONE QUANTITY OF Yellow Line = 59,011.28 Sq.m
CONTRACTOR
PROJECT MANAGER
CONSULTANT
RESIDENT ENGINEER
QUANTITY SURVEYOR QUANTITY SURVEYOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 9030701
SUMMARY OF SUMMARY OF Cat Eyes
SL NO LOCATION TOTAL QTY REMARKS
1 SUMMARY OF Cat Eyes (Right Side) 8121
2 SUMMARY OF Cat Eyes ( LEFT Side) 9,646
3 Bridge 128+129.575 1,708
4 Bridge 172+600 2,916
5 Bridge 191+021 2,732
6 Err:509 377
DONE QUANTITY OF Cat Eyes = 25,500 No.
CONTRACTOR
PROJECT MANAGER
CONSULTANT
RESIDENT ENGINEER
QUANTITY SURVEYOR QUANTITY SURVEYOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
Summary of Section-1 Quantities
SL NO Description QTY Unit Ammount
1 Cutting #NAME? 5.00 #NAME?
2 Embankment #NAME? 7.00 #NAME?
3 SubGrade Err:509 12.00 Err:509
4 A.B.C #NAME? 43.00 #NAME?
5 Mc-1 Err:509 1.00 Err:509
6 B.B.C #NAME? 214.00 #NAME?
7 B.W.C #NAME? 429.00 #NAME?
8 White line - 20.00 -
9 Yellow line Err:509 20.00 Err:509
10 Cat Eyes 376.92 22.00 8,292.24
Total Ammount #NAME?