    emazel Engineering offshore division was born with the efforts to design

    and develop high-technological equipments for offshore projects.

    Since the beginning, I took in charge of the establishment of the company

    and supervised directly my outstanding team about the engineering design,

    production, assembly, quality control, installation, start up, commissioning and

    after sales. With the contributions from each one in our team, our equipments

    are now working for various offshore projects all around the world.

    The value of Remazel offshore lies in the advanced technology, customized

    design, high efficiency and foremost reliability, creativity, and best quality

    which have been always the key philosophy for our work ethics. Till 2010, we

    have been working exclusively for Saipem, prestigious oil and gas company

    and a subsidiary of ENI group. Our substantial harvest comes from close

    cooperation with the end customer, constant day-by-day feedback from people

    working onboard, and excelsior improvement in the past 34 years. Moreover,

    working as one of the Research & Development Center for the most important

    projects in offshore field gives us the opportunity to develop the most-advanced

    technology in offshore field, participate all operation procedures and integrate

    every detail of our solutions.

    Last but not least, is our 34 years experience,

    which makes our technology mature,

    trustworthy, with best solution at minimum

    cost.

    Hope you will find our company interesting and

    work with us together dedicating on sustainable

    developments of offshore.

    Gianfranco Gamba

    Remazel Engineering CEO

    3

  • 7/28/2019 Rema Offshore Catalogue

    4/44

    REMA DIVISION ACTIVITIESBEYOND ENGINEERING. TURN-KEY PROJECTS.

    4

  • 7/28/2019 Rema Offshore Catalogue

    5/44

    DESIGNMECHANICSPNEUMATICSHYDRAULICSELECTRICS (HW-SW)

    QUALITY CONTROL

    INSTALLATION

    ASSEMBLING AND TESTING

    START UP

    COMMISSIONING

    AFTER SALES

    WELDINGMACHININGHEATING TREATMENTPAINTING

    WORK SHOP

    5

  • 7/28/2019 Rema Offshore Catalogue

    6/44

    JACK UP RIG

    SEMISUBMERSIBLERIG

    Drilling units Oil production & storag

    Installations vessels and auxiliary equipments

    FPSO/FSO

    CRANE VESSEL MULTI PURPOSE

    VESSEL

    FLOATINGPLATFORM

    Floating Vessels

    6

  • 7/28/2019 Rema Offshore Catalogue

    7/44

    REFINERY

    Pipeline construction

    AUXILIARY

    EQUIPMENTS

    J-LAY BARGE

    S-LAY BARGE

    SHUTTLE

    TANKER

    Oil Transport

    7

  • 7/28/2019 Rema Offshore Catalogue

    8/44

    A jack-up rig is the mobileplatform able to stand still on thesea bottom and rest on a number

    of supporting legs.Drilling platforms

    This type of rig is commonly usedin oil and natural gas drilling.

    Operation

    A jack-up is a floating barge fitswith long support legs that can

    be raised or lowered.Upon arrival at the work location,the legs are jacked down onto the

    sea bottom. Then preloadingtakes place, where the weightof the barge and additionalballast water drive the legssecurely into the sea bottom sothey will not penetrate furtherwhile operations are carried out.After preloading, the jackingsystem is used to raise the entirebarge above the sea water to apredetermined height or air

    gap.Modern jacking systems use arack and pinion gear solution

    where the pinion gears are drivenby hydraulic or electric motorsand the rack is affixed to the legs.

    JACK UP RIG

    8

  • 7/28/2019 Rema Offshore Catalogue

    9/44

    Our equipment

    A jacking system normally consists of three racks for each leg and four tosix pinion units for each rack. Remazel specifically design and manufacture

    pinions, shafts and reduction gear box systems for this kind of high load work.

    Jacking System

    HPU is an independent unit which increases the pressure of the hydraulic oil

    to feed the equipment by pumps. Besides pumps, HPU is usually completedwith multiple auxiliary components, such as tanks, filters, valves, sensors andcontrol panels. Remazel design and manufacture HPU up to 1200 kW operating

    both in hazardous and safe area.

    HPU - Hydraulic Power Unit

    9

  • 7/28/2019 Rema Offshore Catalogue

    10/44

    A semi submersible is a speciali-zed marine vessel with good sta-bility and sea-keeping characte-

    ristics.Characteristics

    Offshore drilling in more than120 meters depth requires theoperations to be done from a flo-ating vessel.A semi-submersible obtains itsbuoyancy from the ballasted, wa-tertight pontoons located belowthe ocean surface and sea waves.With its hull structure submer-ged at a deep draft, the semi-submersible is less affected bywave loadings.

    Mobile Offshore Drilling Units(MODU)

    Semi-submersible rigs makestable platforms for drilling in of-fshore oil and gas industry. Theycan be towed into position by atugboat and anchored, or movedand kept in position by their ownazipod propellers with dynamicpositioning.

    SEMISUBMERSIBLE RIG

    10

  • 7/28/2019 Rema Offshore Catalogue

    11/44

    Our equipment

    A mooring winch consists of an electric or hydraulic mono-drum winchpulling the mooring ropes with a constant tension. A mooring system is to fix

    the position of the floating unit by using a set of mooring winches. Remazeldesign and manufacture mooring winches with pulling force up to 200t for

    semisubmersible units as well asupdate mooring winches already installed.

    Mooring Winch

    Active heave compensated winches filter out the effect of wave movement, allowingfor more accurate lifting of loads, especially when approaching the seabed or when it

    is necessary to maintain a stalling condition. Remazel design and manufacture AHCwinches both for drilling rigs and construction vessels.

    Active Heave Compensated Winch

    Fairlead consists of a pivoting sheave that redirects the mooring rope fromthe sea to a vertical direction. The fairlead is normally positioned underwater

    or in a splash area. A set of sheaves turn the orientation of the rope comingfrom the fairlead to the winch drum forming the rope reeving. Remazel design,

    manufacture and install a wide range of fairleads and sheaves for differentvessels layout, loads, and rope diameters.

    Fairleader and Reeving System

    HPU is an independent unit which increases the pressure of the hydraulic oilto feed the equipment by pumps. Besides pumps, HPU is usually completed

    with multiple auxiliary components, such as tanks, filters, valves, sensors andcontrol panels. Remazel design and manufacture HPU up to 1200 kW operating

    both in hazardous and safe area.

    HPU - Hydraulic Power Unit

    1

  • 7/28/2019 Rema Offshore Catalogue

    12/44

    An oil platform is a large structurewith facilities to drill wells, to extractand process oil and natural gas, for

    temporarily storage.Depending on the circumstances,the platform may be fixed to thesea bottom, or include an artificialisland, or in the sea motion.

    Semi-submersible platform

    These platforms have hulls (columnsand pontoons) of sufficient buoyancyto cause the structure to float.Semi-submersible platforms canbe moved from place to place; canbe ballasted up or down by alteringthe amount of flooding in buoyancytanks; they are generally anchoredby combinations of chain, wire ropeand polyester rope, or both, duringdrilling or production operations.

    Floating Oil Platform

    12

  • 7/28/2019 Rema Offshore Catalogue

    13/44

    Our equipment

    The product of oil wells is onboard of FPSO or platform by risers, connected to theChristmas tree or directly to the wellhead, which, on the seabed, is the interface

    with the well. The risers, previously installed and connected to the Christmas tree,are usually raised by ropes pulled with dedicated hydraulic winches. Remazel

    design and manufacture riser winches used onboard oil platform and FPSO.

    Riser Winch

    HPU is an independent unit which increases the pressure of the hydraulic oil to feed theequipment by pumps. Besides pumps, HPU is usually completed with multiple auxiliarycomponents, such as tanks, filters, valves, sensors and control panels. Remazel design

    and manufacture HPU up to 1200 kW operating both in hazardous and safe area.

    HPU - Hydraulic Power Unit

    Floating platform are permanently moored on the oil wells.The ends of the mooring lines, consisting of large diameter steel chains anchoredin the seabed, reach the platform columns where are locked in tension by meansof suitable chain stoppers. The tensioning of the chains, is made using hydraulic

    chain windlasses or chain jacks. Remazel has designed and manufactured completemooring systems for floating units, and has refurbished or upgraded existing ones.

    Floating Platform Mooring

    1

  • 7/28/2019 Rema Offshore Catalogue

    14/44

    FPSO - Floating, Production,Storage, and Offloading

    The floating, production, storageand offloading (FPSO) unit is afloating vessel used by offshoreindustry for the processing ofhydrocarbons and for storage ofoil until it can be offloaded ontoa tanker or transported througha pipelineThese units are moored to alocation for extended periods,and do not actually drill for oil orgas.

    Advantages

    FPSOs eliminate the need tolay expensive long-distancepipelines from the oil well to anonshore terminal.They can also be usedeconomically in smaller oilfields; once the field is depleted,the FPSO can be moved to a newlocation.

    Floating Vessels

    14

  • 7/28/2019 Rema Offshore Catalogue

    15/44

    Our equipment

    To off-load the oil through the hose, the tanker must remain permanentlymoored to the FPSO with the fixed distance and loads free on the hose. Thehawser winch keeps the tanker in position during the offloading operation.

    The hawser winch is equipped with a quick release mooring permitting which,in case of emergency, the tanker departs without influence from the FPSO.

    Remazel supply complete tandem mooring system to FPSO.

    Tandem Mooring System

    FPSO are permanently moored on the oil wells using different methods.Spread mooring: the vessel is moored by a set of mooring lines at eachvessel end.

    Turret mooring: the vessel can rotate around a moored turret (internalor external from the hull). The ends of the mooring lines consist of large

    diameter steel chains anchored in the sea bottom, reach the vessel ends or theturret where are locked in tension by means of suitable chain stoppers. The

    tensioning of the chains is made of hydraulic chain windlasses or chain jacks.Remazel design and manufacture complete mooring systems for floating units.

    FPSO Mooring

    The product of oil wells is onboard of FPSO or platform by risers, connectedto the Christmas tree or directly to the wellhead, which, on the seabed, is the

    interface with the well. The risers, previously installed and connected to theChristmas tree, are usually raised by ropes pulled with dedicated hydraulic

    winches. Remazel design and manufacture riser winchesused onboard oil platform and FPSO.

    Riser Winch

    HPU is an independent unit which increases the pressure of the hydraulic oilto feed the equipment by pumps. Besides pumps, HPU is usually completed

    with multiple auxiliary components, such as tanks, filters, valves, sensors and

    control panels. Remazel design and manufacture HPU up to 1200 kW operatingboth in hazardous and safe area.

    HPU - Hydraulic Power Unit

    Off-loading is to off-load the stored oil from FPSO to shuttle tankers. The off-loading system is made of a large diameter hose that, when not in use, can beleft floating on the sea surface or can be rewound with a hose reel on board of

    FPSO. Remazel supply complete off-loading equipments for FPSO.

    Off-loading System

    1

  • 7/28/2019 Rema Offshore Catalogue

    16/44

    There are two main ways thatsubsea pipes are laid: S-layand J-lay. In S-lay pipeline

    installation, pipe is released offfrom the stern of the vessel asthe boat moves forward. The pipecurves downward from the sternthrough the water until it reachesthe touchdown point formingthe shape of an S in the water.Stingers, measuring up to 300feet (91 meters) long, extend fromthe stern to support the pipe as itis moving into the water, as wellas control the curvature of theinstallation.

    S-LAY BARGE

    16

  • 7/28/2019 Rema Offshore Catalogue

    17/44

    Our equipment

    A mooring winch consists of an electric or hydraulic mono-drum winchpulling the mooring ropes with a constant tension. A mooring system is to fix

    the position of the floating unit by using a set of mooring winches. Remazeldesign and manufacture mooring winches with pulling force up to 200t for

    semisubmersible units as well as update mooring winches already installed.

    Mooring Winch

    Fairlead consists of a pivoting sheave that redirects the mooring rope fromthe sea to a vertical direction. The fairlead is normally positioned underwater

    or in a splash area. A set of sheaves turn the orientation of the rope comingfrom the fairlead to the winch drum forming the rope reeving. Remazel design,

    manufacture and install a wide range of fairleads and sheaves for differentvessels layout, loads, and rope diameters.

    Fairleaders and Reeving System

    The pipes are unloaded from the pipe storage vessels and stacked on thestorage areas on both sides of the pipe-lay barge. Pipes are handled andmoved to the working area safely using automatic equipment that offers

    optimal results both for productivity and reliability. Remazel design andmanufacture pipe handling systems according to the vessel layout.

    Pipe Handling

    1

  • 7/28/2019 Rema Offshore Catalogue

    18/44

    The fireline, ie the actual launch line of the pipeline, consists of track chainsand rollers. The track chain are installed in the initial part of the fireline;

    they are used to support the pipe in the route between tensioners and piperollers. Track chains are normally divided in three separate independent units.

    Independent load cells are integrated in each unit to monitor the pipe load.

    Pipe Chain Track

    Our equipment

    To prepare the pipes for welding, the ends of the pipes are beveled to makethem exactly the right shape to be fit together. Remazel supply bevelling

    machines, available for pipe diameter between 6 and 60 inches.

    Bevelling

    To prepare welding process, the pipes must be perfectly aligned. The internalline-up clamp (ILUC) is designed specifically for the line-up and centering

    of the pipeline. Remazel supply ILUC machines available for pipe diameterbetween 6 and 60 inches.

    Pipe Centering and Allignment

    Due to the movements of the ILUC inside the pipeline, an umbilical hose,feeding compressed air and power, must follow the ILUC movements. ILUCwinch un-wind and re-wind around its drum the umbilical serving the ILUC.

    Remazel design, manufacture and upgrade ILUC winches.

    ILUC Winch

    The rollers are installed in the final part of the fireline to the end of thesubmerged stinger; they are used to support and route the pipe in the delicate

    transition between the stinger and the sea. Vertical rollers counteract thelateral forces are installed at the end of the stinger. Remazel design and

    supplied track chain supports for pipe diameter between 6 and 60 inches.

    Pipe Roller Support

    18

  • 7/28/2019 Rema Offshore Catalogue

    19/44

    During pipe-lay operations, if there are bad weather conditions like hurricane,it is necessary for the vessel to quickly abandon the pipe on the seabed with

    help of winches and leave specifically designed to Abandon or Recover thepipeline on the seabed. Remazel design and manufacture numerous A&R

    winches up to 1100 ton capacity and up to 4000 m of rope (diameter 160 mm).

    A & R Winch

    For the completion of pipeline abandonment and recovery, it is necessary torelease and then hang up the end of the pipeline by means of special roperelease equipment. Remazel design and supply reliable underwater rope

    release equipment.

    Underwater Rope Release System

    1

  • 7/28/2019 Rema Offshore Catalogue

    20/44

    There are two main ways thatsubsea pipe is laid: S-lay andJ-lay.

    J-lay method, by inserting thepipeline in an almost verticalposition, puts less stress on thepipeline allowing working indeeper water depth.Unlike the double curvatureobtained in S-lay, the pipe onlycurves once in J-lay installation,taking on the shape of a J underthe water.

    J-LAY BARGE

    20

  • 7/28/2019 Rema Offshore Catalogue

    21/44

    Our equipment

    The pipes are unloaded from the pipe storage vessels and stacked on thestorage areas on both sides of the pipe-lay barge. Pipes are handled andmoved to the working area safely using automatic equipment that offers

    optimal results both for productivity and reliability. Remazel design andmanufacture pipe handling systems according to the vessel layout.

    Pipe Handling

    The TRA Winch has the main function of sustaining the pipeline when thehang off clamp is released and moving the pipeline during pipe-lay. The TRA

    winch is also designed to recover, when necessary, the load of the TRA and thepipes along the tower. Remazel has mature experience in this type of powerful

    winches and can design and supply customized units.

    TRA Winch

    The LDA winch purpose is to drive the J-Lay Tower Loading Arm that loads anewly built pipe string on the firing line into the J-Lay Tower. Remazel design

    and supply LDA winch according to customer specification.

    LDA Winch

    To prepare the pipes for welding, the ends of the pipes are beveled to makethem exactly the right shape to be fit together. Remazel supply bevellingmachines, available for pipe diameter between 6 and 60 inches.

    Bevelling

    To prepare welding process, the pipes must be perfectly aligned. The internalline-up clamp (ILUC) is designed specifically for the line-up and centering

    of the pipeline. Remazel supply ILUC machines available for pipe diameterbetween 6 and 60 inches.

    Pipe Centering and Allignment

    2

  • 7/28/2019 Rema Offshore Catalogue

    22/44

    The Initiation winch is used to pull the A&R wire rope from / to the capstanwinch and from / to the utilization place, for instance, the J-lay tower or sidefairleads. The initiation winch is a single drum winch, with adjustable speed,

    controlled in automatic or manual mode.

    Initation Winch

    During pipe-lay operations, if there are bad weather conditions like hurricane,it is necessary for the vessel to quickly abandon the pipe on the seabed with

    help of winches and leave specifically designed to Abandon or Recover thepipeline on the seabed. Remazel design and manufacture numerous A&R

    winches up to 1100 ton capacity and up to 4000 m of rope (diameter 160 mm).

    A & R Winch

    To deviate the A&R wire rope from the deck to the pipeline direction, it isnecessary to use high load vertical sheaves. These sheaves must be designed

    according to the J-lay tower and deck layout. Remazel design and manufacturemovable sheaves systems up to 2000 ton operations.

    Movable Sheave

    NO DISCLOSUREAGREEMENT

    To abandon the pipeline is necessary to move the weight of the pipeline fromthe J-lay tower clamp to the rope of the A&R winch. The load transfer requiresa tool specifically designed taking into account the geometry of the system and

    applied loads. Remazel design and manufacture A&R tools up to 1000 ton.

    A & R Tool

    For the completion of pipeline abandonment and recovery, it is necessary torelease and then hang up the end of the pipeline by means of special roperelease equipment. Remazel design and supply reliable underwater rope

    release equipment.

    Underwater Rope Release System

    The LDA hold back winch is used to pull the LDA off the tower and to providea resistance to the main. LDA winch when the LDA approaches the JLT at high

    operating angles.

    Hold Back Winch

    22

  • 7/28/2019 Rema Offshore Catalogue

    23/44

    Once the pipeline string has been entirely launched, it must be pulled onshore with an onshore anchored linearwinch. The pipeline string is laid in a trench, which will be backfilled up to the initial seabed level.

    SHORE APPROACH

    Our equipment

    The linear winch (Tirfor), with self-gripping jaws, moves wire through thewinch. It is used mainly for laying of pipelines via the beach pull method forpipe diameters ranging from 6 inch to 60 inch. Remazel has designed linear

    winches up to 500 ton pull capacity.

    Linear Winch

    Normally the winch pull capacity reaches 250- 500 ton. In case of higher loadit is possible to use a specific sheave arrangement permitting to double the

    pulling force and reduce the speed.

    Horizontal Subsea Sheave

    2

  • 7/28/2019 Rema Offshore Catalogue

    24/44

    A crane vessel, crane ship orfloating crane is a ship witha crane specialized in lifting

    heavy loads. The largest cranevessels are used for offshoreconstruction. The largest cranevessels are often catamaran orsemi-submersible types as theyhave increased stability.

    CV - Crane Vessel

    24

  • 7/28/2019 Rema Offshore Catalogue

    25/44

    Our equipment

    The umbilical winch allows unwinding and rewinding an umbilical hose, forexample a flexible pipe within which pass pipes and cables. The machineis equipped with a rotary joint for the passage of fluids and possibly a slip

    ring assembles for electrical connections. Remazel design and manufactureumbilical winches for a large range of diameters and length.

    Umbilical Winch

    Tuggers are electric or hydraulic drum winches including deck handlingwinches for tug boats, pipeline handling winches for mining operations or evendragging items along tracks such as conveyor feed boxes. In particular, on high

    load crane vessels, tugger winches are used to pull and guide laterally theloads lifted by the crane. Remazel design, manufacture and upgrade several

    type of tugger winches with a wide range of pulling capacity.

    Tugger Winch

    2

  • 7/28/2019 Rema Offshore Catalogue

    26/44

    Multi Purpose Vessel is a bargetargeted for different offshore works.This type of vessels is normally

    used to perform subsea works,

    for example, preparing the anchorsystem for platform and FPSO. Theequipment installed on a MPV cover

    a wide range of machinery.

    MPV - Multi Purpose Vessel

    The traction winch, as defined in marine deep water applications, is theprimary component of a system designed to provide a significant tractive orload-bearing effort to subsea cable. As operating depths and related cable

    lengths are increasing, traction winch systems are particularly attractive asthese operating parameters complicate. Remazel design and manufacture awide range of double capstan traction winches up to 750 ton.

    Traction Winch

    The deviation of the ropes coming from the winch is achieved by the installationof sheaves, vertical, horizontal or oblique, while the final address to the sea

    is often performed by fairleads with horizontal axis. The sheaves, whosepitch diameter must accommodate the type of working rope, can be equipped

    with instruments to measure the load and speed. The fairlead provides theorientation of the end of the ropes to the sea. Remazel design and manufacture

    sheaves and fairleaders ranging from 50 to 1000 ton.

    Sheave and Fairleader

    Active heave compensated winches filter out the effect of wave movement,allowing for more accurate lifting of loads, especially when approaching the

    seabed or when it is necessary to maintain a stalling condition. Remazel designand manufacture AHC winches both for drilling rigs and construction vessels.

    Active Heave Compensated Winch

    A windlass restrains and manipulates the chain and rope, allowing the chain tobe raised and lowered. The chain handling wheel is variously referred to as the

    gypsy (in the UK) or wildcat (in North America). One or more free wheels are oftenused in combination with the windlasses to redirect the chain. Remazel design and

    manufacture both horizontal and vertical axis windlasses and free wheels.

    Windlass and Free Wheel

    Our equipment

    26

  • 7/28/2019 Rema Offshore Catalogue

    27/44

    Auxiliary winches can be used forvarious purposes to pull a load. Inparticular in offshore field it haslarge range of application. Exampleof the usage are the spooling winch

    providing the back tension duringthe winding of a wire rope on a drum,or the hold back winches preventingthe fall of a load.

    Auxiliary Winch

    The DMA winch works for deployment and recovery of dead man anchors andrelated testings. Once the wire, initially stored on the DMA Winch Drum, is

    fully paid out, it may be required to add an extra wire section. In this case aparticular drum design is required. In order to speed up the DMA deployment

    operations, the DMA Winch is capable to pay out at fast speed when the wireis not loaded. Remazel design and manufacture this particular units for ultradeep water operations.

    Dead Man Anchor Winch

    To perform underwater work, it is often necessary to equip the vessels withspecial equipments. For example, in case of major upheavals, whose weightexceeds the maximum pulling capacity of the winch installed on the vessel,

    a reeving system can be equipped with an integrated swiveling load hook.Remazel design and manufacture the subsea hooks up to 800 tons.

    Sub-sea Hooks and Tools

    The spooling of a wire rope on a drum needs constant tensions to apply to therope a suitable tension to avoid the premature wear of the rope. The spoolingwinches are machines designed to maintain the back tension during the rope

    spooling. Remazel design and manufacture spooling winches covering a largerange of reel dimensions.

    Spooling Winch

    Our equipment

    2

  • 7/28/2019 Rema Offshore Catalogue

    28/44

    Spooling winchMax reel weight: 120 tonMax reel diameter: 4100mmMax reel length: 3500mmMax pull: 34ton @ 16 m/min (1st layer)Max speed: 38 m/min @ 17 ton (last layer)

    Equipment supplied by Remazel Engineering:

    Scarabeo 63rd generation semi submersible drilling rigBuilt by Rauma Repola Shipyard in Pori, FinlandMain deck length: 66.10 mMain deck breadth: 49.90 mDrilling draft: 20.90 mMoonpool dimensions: 23.55 x 6.40 m

    Displacement: 31,506 t

    Scarabeo 75th generation semi submersible drilling rigMain deck length: 122.70 mMain deck breadth: 64.60 mMain deck depth: 4.50 mMoonpool dimensions: 24.60 x 6.30 mLightship weight: 19,325 tWater depth: up to 4,920 ftDrilling depth: up to 7,600 mVariable deck load: 3,500 t

    Spooling winch upgrade

    Max reel weight: 120 tonMax reel diameter: 4100mmMax reel length: 3500mmMax pull: 34 ton @ 17 m/min (1st layer)Max speed: 41 m/min @ 14.4 ton (last layer)

    Mooring winch upgradeWindlass for chain diam: 76mmRope diameter: 90mmRope lenght: 3000mMax pull: 200 ton @ 10m/minMax speed: 40m/min @ 44 ton

    Equipment supplied by Remazel Engineering:

    28

  • 7/28/2019 Rema Offshore Catalogue

    29/44

    HPU 1200 kWtotal power: 1200kW

    Oil tank capacity: 10000 ltHydraulic Rig Line ( N.6 hydraulic piston pumps ) @ 210 bar

    Active Heave Compensator Line ( N.2 hydraulic piston pumps ) @ 20/300 barBooster line ( N1 gears hydraulic pump ) @ 40 bar

    Heave Compensated WinchesMax pull: 8ton @ 16 m/min

    Max speed: 25 m/min @ 5 tonActive / passive compensation system @ max pull: Hs = 5 m, T = 11s

    Explosion proof Atex zone 2

    Hydraulic cylinders for Catwalk drill floorBore: 100mm; Rod: 70mm; stroke: 600mm

    nominal pressure: 250barExplosion proof Atex zone 2

    Equipment supplied by Remazel Engineering:

    Scarabeo 8Ultra Deepwater 6th Generation Semi-submersible Drilling Rig

    Length: 118.56 mBreadth: 15.73 m

    Depth: 10.15 mCorner radius: 1.90 m

    Pontoon spacing: 59.28 m

    Water depth:up to 3,280 ft (moored),

    up to 10,000 ft (dynamic positioned mode)Drilling depth: up to 10,660 m

    Variable deck load: 6,600 t

    350T hydraulic piston for skidding system

    Pinions, shafts and reduction gear box systems

    Equipment supplied by Remazel Engineering:

    Perro Negro 4/5Self Elevating Drilling Platform

    Hull length: 74 mHull width: 61.15 mHull depth: 7.92 m

    Aft leg centers: 43.3 mCentre line aft legs to forward leg: 39.3 m

    Maximum water depth: 300 ftDrilling depth: 6,100 m

    Variable load: 2,365 t

    2

  • 7/28/2019 Rema Offshore Catalogue

    30/44

    Equipment supplied by Remazel Engineering:

    FPSOCidade de Vitria

    Built in 1976 in shipyard IHI in Kure, Japan and converted in 2005-2006in Dubai Dry Docks, U.A.E

    Overall length: 337 m

    Extreme breadth: 54.5 mMoulded depth: 27 m

    Loaded draught: 21 mDeadweight: 273,775 mt

    Max. Oil prod.: 100,700 bopdWater production: 50,350 bwpd

    Desulfated water injection: 138,500 bwpdMax. Gas prod.: 118 mmscfd

    Max. Gas flare: 150 mmscfd peak emergency, 87 mmscfd max.continuous

    Gas compression: 122 mmscfd

    Permanent mooring system, includes 16 fairleads, 16 chain

    stoppers, 2 vertical axis windlasses, 2 HPU and auxiliary equipmentsChain diameter: 120mmChain grade: RQ4 studless

    Chain RBL: 1383 ton

    WindlassesMax pull: 300ton @ 2.2 m/min

    Max speed: 3.0 m/min @ 250tonStatic brake: 375 ton

    Main winch for riser pull-inMax pull: 350ton @ 3.0 m/min (last layer)

    Max speed: 175ton @ 8.0 m/min (last layer)Rope diameter: 92mm

    Rope length: 500m

    Fairleads for chainMax chain pull: 1383 tonMax wrap angle: 60 deg

    Max pivot angle: +/- 90 deg

    Turn down sheaves with chain stoppersMax chain pull on chain stopper: 1383 ton

    Max chain pull on sheave: 350 tonChain stopper: flap type

    Instrumented with redundant load cell

    Auxiliary winchMax pull: 50ton @ 4.0 m/min (last layer)

    Max speed: 8.0 m/min @ 25 ton (last layer)Rope diameter: 44mm

    Rope length: 500m

    Riser pull in sheaves (fixed and travelling)Rope diameter: 92mm

    Pitch diameter: 1656mmMax wrap angle: 90deg

    Max pulling force: 350ton

    HPUDesign pressure: 315 bar

    Max flow: 490 l/minn 5 electric motors with piston pump x 99kW

    Oil tank capacity: 6000 lt

    30

  • 7/28/2019 Rema Offshore Catalogue

    31/44

    Permanent Mooring System, includes 12 fairleads, 12 submerged chainstoppers, one mooring and riser pull-in winch, 1 HPU and auxiliary equipments

    Chain diameter: 107mmChain grade: RQ4 studless

    Chain RBL: 1133 ton

    n 12 Underwater fairleads with chain stopper:Max force on chain stopper: 1133 ton

    Max wrap angle: 60degMax pivot angle: +/-70 deg

    Instrumented with redundant load cells

    n 1 Hydraulic Mooring and riser pull-in winchMax pull: 210 ton @ 3 m/min

    Max speed: 12 m/min @ 50 tonRope diameter: 80mm

    Rope length: 850m

    Routing and riser pull in sheaves (fixed and travelling)Rope diameter: 80mm

    Pitch diameter: 1440mmMax wrap angle: 90deg

    Max pulling force: 210ton

    n 1 HPUHydraulic pumps with electric motors: 4x99kW + 2x13kW + 2x8.6kW

    Nominal pressure: 315 barOil tank capacity: 4000lt

    n 4 Hydraulic auxiliary winchesMax pull: 21 ton @ 10 m/min (1st layer)

    Max speed: 15 m/min @ 15 tonRope diameter: 25mm

    Rope length: 300m

    Offloading System, including quick release and floating hosesHose diameter: 20

    Tandem mooring System

    Hawser reel max pull: 15 tonQuick release hook: SWL 250 ton

    Equipment supplied by Remazel Engineering:

    FPSO GimboaBuilt in 1976 in shipyard IHI in Kure, Japan and converted in 2005-

    2006 in Dubai Dry Docks, U.A.EOverall length: 337 m

    Extreme breadth: 54.5 mMoulded depth: 27 m

    Loaded draught: 21 m

    Deadweight: 273,777 mtMax. Oil prod.: 60,000 bopdWater production: 60,000 bwpd

    Desulfated water injection: 60,000 bwpdMax. gas prod.: 36.8 mm scfd

    Max. gas flare: 1.49 mm scmd max. continuous, 3.14 mm scmdpeak emergency

    Gas compression: 20 mm scfd

    3

  • 7/28/2019 Rema Offshore Catalogue

    32/44

    32

  • 7/28/2019 Rema Offshore Catalogue

    33/44

    Submerged and internal pipe rollers1 horizontal rollers and 3 track supports for internal ramp + 4 horizontal

    and 3 vertical submerged rollers for external ramp; including rollerhydraulic + elastomeric damping system

    Max. Vertical load: 100 tonMax side load: up to 35 ton on side rollers

    Pipe diameter: up to 60 inchesMax pipe speed: 40 m/min

    Max vertical offset (automatic): 1500mm for track supports, 500mm(included hydraulic + elastomeric damping) for horizontal rollers

    Fairleads and sheaves for mooring system

    12 Fairleads + 12 180wrap sheaves + 12 90wrap sheaves

    Max. line pull: 200 ton @ 25 m/minMax. line speed: 100 m/min @ 50 ton

    Max. line pull (brake condition): 350 tonWire rope diameter: 76 mm

    Sheaves pitch diameter: 1540mmn 12 fairleaders: max wrap angle 100deg, max pivot angle: +/- 90degn 12 turn down sheaves: max wrap angle 180deg, instrumented with

    redundant load celln 12 routing sheaves: max wrap angle 90deg, instrumented with

    redundant encoder deviceRemoval of old equipment and installation + commissioning of the new

    one within 3 weeks

    Double joint system: 22 ton pipe liftsHandling system for pipes up to 22 ton and diameter 60 inches, precisely

    handled to the working area.

    A & R winch upgrade from 180 ton to 330 ton and upgrade of the reelwinch including a new level winder and retractable sheave

    Max pull: 380ton @ 23 m/minMax speed: 45m/min @ 195 ton

    Rope diameter: 4Reel capacity: 2000m

    Retractable sheave pitch diameter: 2580mmRetractable sheave max wrap angle: 85deg

    Spooling Winch

    Capacity: 17 tons at 40 m/min; 34 tons at 16 m/min

    Calibration system for stinger rollersCalibration on site up to 50ton for stinger rollers (both vertical andhorizontal) and track supports; up to 100ton for turn down sheaves

    Equipment supplied by Remazel Engineering:

    Castoro SeiSemi-submersible Pipelay Vessel

    Length overall: 152 mBreadth overall: 70.5 m

    Depth to main deck: 29.8 mOperational draft (min. - max.): 10 - 14.4 m

    Deck load capacity: up to 3,600 t

    3

  • 7/28/2019 Rema Offshore Catalogue

    34/44

    34

  • 7/28/2019 Rema Offshore Catalogue

    35/44

    350 ton A & R winch and traction winchsystem with retractable sheave

    Max pull: 350 ton @ 30 m/minMax speed: 40 m/min. @ 150 ton

    Rope diameter: 105 mmRope length: 2000 m

    Vertical retractable sheave: with max wrapangle: 135 deg

    Sheave pitch diameter: 2625mm

    Equipment supplied by Remazel Engineering:

    Castoro OttoSelf propelled Derrick / Lay Ship

    Length (o.a.): 191.4 mBreadth: 35 m moulded

    Depth to main deck: 15 mDraft: max. 10 m, min. 6.7 m

    Laying facilities:

    5 welding stations (for double jointedpipes) with Passo system.

    Mooring systemDescription: 11 electric mooring winches

    Max. pull: 130 ton @ 26 m/min (first layer)Max speed: 122 m/min @ 25 ton (last layer)

    Wire rope diameter: 60mmDrum capacity: 2000m

    Automatic Level Winder + Service and emergency failsafe disk brakesMin. braking load at intermediate layer 200 ton

    Stinger connection system

    Redesign and construction of a new stinger connection systemincluding the stinger heads and vessel hinges. The system includes

    fast link and un-link device.Max loads on hinges: Rx=1500ton, Ry=250ton, Rz=750ton

    Rollers for stingerPipes diameters: 152mm to 1600mm

    Max pipe speed: 30 m/min

    n5 horizontal rollers:max pipe vertical load: 60 ton

    max vertical offset (manual): 2000mm

    n 2 side rollersmax pipe side load: 20 ton

    Pipe track support rollers

    Equipment supplied by Remazel Engineering:

    Castoro IIDerrick / Lay Barge

    Length: 135 m (442.80 ft)Beam: 32.40 m (105.09 ft)

    Depth: 9 m (29.52 ft)Draft: max. 5.50 m (18.04 ft), min. 3.30 m (10.82 ft)

    Mooring system: 12 anchors: 15 t each. - Cable diameter: 60 mmPipelaying: 5 welding stations with PASSO system; 1 inspection

    and control station; 2 field stations (repair, field joint coating).

    3

  • 7/28/2019 Rema Offshore Catalogue

    36/44

    36

  • 7/28/2019 Rema Offshore Catalogue

    37/44

    n 12 mooring winchesMax pull: 200 ton @ 30 m/min (1st layer)

    Max speed: 150 m/min @ 40 ton (last layer)Rope diameter: 3

    Rope length: 2800m

    390 ton A&R winch and traction winch systemMax. Pull: 390 ton @ 15 m/min

    Max speed: 30 m/min @ 195 tonRope diameter: 105 mm

    Rope length: 1600 m

    Sheaves for A&R wire rope deviation

    n 1 sheave max wrap angle 105 deg, instrumented withredundant load cells; pitch diameter: 2140mm

    n 1 sheave max wrap angle 90 deg; pitch diameter: 2140mmn 1 sheave max wrap angle 10 deg, integrated into deck

    structure; pitch diameter: 1530mm

    Equipment supplied by Remazel Engineering:

    Semac 1Semi-submersible Pipelay Barge

    Length overall (excl. truss): 148.5 mLength overall (incl. truss): 188.5 m

    Breadth overall: 54.9 mDepth to main deck: 27.8 m

    Maximum deck load: 5,700 t

    Operational draft: 9 - 16.8 mTransit draft: 7 m

    3

  • 7/28/2019 Rema Offshore Catalogue

    38/44

    400 ton FairleadMax pull: 400tonRope dia.: 4Sheave pitch dia.:2673mmMax wrap angle: 90 degMax pivot angle: +/-90 deg (self aligning)

    Welding stationSpooling winch travelling skidMax reel weight: 350ton

    Min reel diameter: 2500mmMax reel diameter: 9500mmMax reel width: 5500mmTravelling skid max stroke = 5500mm

    20 ton and 2 ton fast winches reconditioning20 ton winchMax pull: 20ton @ 85 m/min (1st layer)Max speed: 180 m/min @ 12ton (last layer)Rope diameter: 28mmRope length: 3000mA-Frame included

    2 ton winchMax pull: 3ton @ 85 m/min (1st layer)Max speed: 205 m/min @ 1ton (last layer)

    Rope diameter: 10mmRope length: 3000mA-Frame included

    Underwater block 625 tonRope diam: 112mm, double fall single sheaveSheave pitch diameter: 2016mmMax water depth: 1500mmSingle prong hook with swivel

    Equipment supplied by Remazel Engineering:

    Saipem FDSMulti-purpose monohull dynamically positioned crane and pipelay (J-lay) vesselLength overall: 163.46 mBreadth: 30 mOperational draft (min. - max.): 7.40 - 8 mDisplacement: 26,608 t at operational draftPayload: 4,300 t at 7.40 draftPipelay equipment: 5 working stations + one in option.Rigid pipe: 4 pipes string J-lay tower system

    38

  • 7/28/2019 Rema Offshore Catalogue

    39/44

    750 ton A&R winch and traction winch systemMax. load during payout: 1000 ton

    Max. Speed: 40 m/minRope diameter: 160 mm

    Rope length: 4000 m

    500 ton A&R winch and traction systemMax. load during payout: 600 ton

    Max. Speed: 40 m/minFirst rope diameter: 160 mm length 4000 m

    Second rope diameter: 85 mm length 4000 m

    TRA WinchMax. Design pipe load: 2000 tonWire rope diameter: 60mm

    Drums capacity: 600 mMax. pay-in & out speed: 180 m/min

    LDA WinchMax. Load: 35 ton

    Wire rope diameter: 48 mmDrums capacity: 350 m

    Max. pay-in & out speed: 123 m/min

    Hold back WinchMax. Load: 35 ton

    Max. Line tension during braking: 40 tonWire rope diameter: 48 mm

    Drums capacity: 115 mMax. Pay-in & out speed: 64 m/min

    Initiation Winch

    Max. Load: 38 tonWire rope diameter: 48 mm

    Drums capacity: 300 mMax Pay-in & out speed: 50 m/min

    600 ton FairleadMax. Pulling force: 500 ton

    Speed at max pulling force: 45 m/minMax. Speed: 54 m/min

    Max. rendering load: 600 ton

    Fixed and retractable sheavesMax. Pulling force: 1000 ton

    1000 ton Fairlead

    Max. Pulling force: 750 tonSpeed at max pulling force: 40 m/min

    Max. Speed: 50 m/minMax. rendering load: 1000 ton

    A & R hook 1000 tonMax abandoned pipe load: 1000ton

    n 2 ROV operated quick release systemsMax water depth: 3000m

    2000 ton Stern sheaves system

    n 1 travelling sheave for rope dia. 160mm; pitch diameter: 2880mmn 3 travelling sheaves for rope dia. 125mm; pitch diameter: 2880mm

    Max total load on system: 2000 ton

    Full assembly travelling stroke: 3920mm

    Saipem FDS 2Field Development Ship

    Length o.a.: 183 mLength b.p.: 171 m

    Breadth moulded: 32.2 mDepth moulded: 14.5 m

    Draught design: 9.5 mSailing speed: 13 knots

    Equipment supplied by Remazel Engineering:

    3

  • 7/28/2019 Rema Offshore Catalogue

    40/44

    40

  • 7/28/2019 Rema Offshore Catalogue

    41/44

    750 ton A & R winch (double capstan winch + storagewinch with level winder)

    Max. Pull: 750 ton @ 40 m/minMax speed: 50 m/min @ 600 tonMax rope acceleration: 0.4 m/s2

    Rope diameter: 152 mmRope length: 3850 m

    750 ton retractable sheave for A & R winch

    Max. Pull: 750 ton @ 40 m/min

    Rope diameter: 152 mm and 120mm (removable grooves)Sheave pitch diameter: 3360mm

    Max wrap angle: 35 deg

    Dead man anchor winchMaximum pulling load @ intermediate layer: 200 ton @ 10 m/min

    Max speed: 40 m/minMain wire rope diameter 90mm-length 2000m (extendible to 4000m)

    Messenger wire rope diameter 50mm-length 1300m

    TRA Winch for J-lay tower (Engineering, future construction)Max. Design pipe load: 2000 ton - accidental condition 2500 ton

    nr. of falls: 16Wire rope diameter: 72 mm

    Drums capacity: 2x450mMax rope pulling load: 200 ton @ 64 m/min

    Max rope speed: 180 m/min @ 60 ton

    TRAC reeving sheaves J-lay tower (Engineering, future construction)Max rope pull: 200ton@ 64 m/min

    Wire rope diameter: 72 mmPitch diameter: 1728mmMax wrap angle: 180deg

    Equipment supplied by Remazel Engineering:

    CastoronePipelaying Vessel (under construction)

    Length (o.a.): 330 m excluding rampMoulded breadth: 39 m

    Operational draft (min. - max.): 7 - 10.6 mTransit draft: 8 m approx.

    Transit speed: 14 knots

    Bollard pull (with main propellers): 180 tPipelaying capacity: triple joint 12 m or double joint 18 m;

    pipe size up to 48 (60 including coating)

    4

  • 7/28/2019 Rema Offshore Catalogue

    42/44

    350 ton A&R WinchMax pull: 350ton @ 30 m/min

    Max speed: 40 m/min @ 150tonRope diameter: 105 mm

    Rope length: 3300 m

    350 ton FairleadMax. Pulling force: 350 ton

    Max wrap angle: 105degMax pivot angle: +/- 90deg (self aligning)

    350 ton horizontal sheave

    Max. Pulling force: 350 tonMax wrap angle: 90deg

    Instrumented with redundant load cells

    20 ton vertical chain windlass (electrical driven)Adjustable chain wheel for chain diameter from 125mm to 170mm

    Max. Pull: 20 ton @ 10 m/minMax. Speed: 15 m/min @ 13 ton

    Mooring chain free wheels

    One vertical and one horizontal stand alone free wheel for 125 mm to170mm mooring chain

    Underwater block 700 ton

    Rope diam: 105mm, double fallTwin sheaves, rope inter-axis 6000mm

    Max water depth: 1500mmSingle prog hook with swivel

    Equipment supplied by Remazel Engineering:

    Saipem 3000Self propelled DP crane vessel

    Length overall: 162 mBreadth: 38 m

    Depth to main deck: 9 mOperational draft (min. - max.): 5.5 - 6.3 m

    Gross tonnage: 20,632 t

    Displacement: 31,400 t at operative draft 6.3 m

    42

  • 7/28/2019 Rema Offshore Catalogue

    43/44

    Design of 550 ton A&R winch

    Hydraulic flex-pipe winchMax. Pull: 40 ton @ 7.5 m/min

    Max. Pull:20 ton @ 15 m/minMax hose diameter:2x228mm

    Capacity with max pipe diameter: 2x 360m

    Light umbilical winchTwin hose diameter: 2x1

    Storage capacity: 600m

    Max pull: 1ton @ 36 m/minMax hose pressure: 350 bar

    Deck utility winch

    2 hydraulic holes winders

    150 ton reel winder

    Equipment supplied by Remazel Engineering:

    Saipem 7000Semi-submersible crane and pipelaying (J-lay) DP vessel

    Length: 198 mBreadth: 87 m

    Depth to main deck: 45 mTransit draft: 10.5 m

    Operational draft: 27.5 mJ-lay system: Pipe diameter range from 4 to 32

    4