reliance mart at jamnagar, india
DESCRIPTION
Making of Reliance Mart at JamnagarTRANSCRIPT
Features & Photographs showing
Construction of
RELIANCE MART - JAMNAGAR
PREPARED BY
Niraj B AnadkatGeneral Manager – Projects
Reliance Engineering Associates (P) Ltd.
FEATURES OF HYPERMARKET
• Land - 14 Acres
• Built Up area for Phase 1 Building - 94,000 Sq Ft
• Built Up area for Phase 2 Building - 66,000 Sq Ft
• Total Built Up Area - 160,000 Sq Ft
• External Landscaping area – 450,000 Sq Ft
• Hard Landscaping - 210,000 Sq Ft
• Soft Landscaping - 240,000 Sq Ft
Access to Hypermarket
Total No of Entrance Gates - 9 Nos General Entry to Common People – 4 Nos Special Entrance for Township Residents – 3 Nos Utility Gates – 2 Nos
Parking Facility -
Car - 450 Nos Motor Cycle - 70 Nos Bicycle - 13 Nos Bus - 6 Nos
Shopping Trolleys - 2000 Nos
Trolley Parks – 10 Nos
Seating arrangements – 75 Benches to accommodate 300 persons
Construction Features
• Construction Started on - Oct’ 2006
• Completion of Project - Nov’ 2007
• Cement Consumed - 3500 MT
• Reinforcement Steel Consumed – 500 MT
• Structural Steel Consumed - 1600 MT
• Electrical Cable used 70 Kms
• Cable Tray fixed 8 Kms
• No of Lighting Fixtures 2200 Nos
• Illumination Level in Mall -
Maximum Level - 800 Lux
Average Level - 500 Lux
HOW WE BUILD THIS ?
CONSTRUCTION PICTURES
Land opposite Refinery Main Gate identified
BHOOMI - POOJAN
This way it was started in Oct 2006
Pre Engineered Building was Imported from Dubai and Installed at Site
Construction Progress Review by Chairman and other Directors
ACCIDENT WE FACED DURING CONSTRUCTION
( Fortunately No Injury )
TAKING SHAPE
AS BUILD….
PHOTOGRAPHS FOLLOWS…
VIEW FROM CAR ENTRANCE
PARKING AREA
SIDE VIEW OF BUILDING
VIEW FROM PEDESTRIAN ENTRANCE SIDE
BIRD’S EYE
FRONT VIEW FROM HELICOPTER
TROLLEY PARK
CANOPY 10m X 10m
Utilities at Hypermarket
• Power - Rated Capacity 3.2 MVA
• Power Load at Present 1.5 MVA
• HVAC System -
• Chillers Installed 3 Nos of 150 TR capacity each
• Total AHU installed – 7 nos of 15000 CFM each
• Water Treatment Plant - 20 m3 / hr
• Fire Water Operating Pressure 7 kg / cm2
• Water Storage Capacity 500 KL
• Pneumatic System installed
to keep water supply lines at 4 Kg/cm2 pressure at anytime.
Security & Loss Prevention System Introduced
• Every Entry & Exit are sealed & attended by Guards
• Frisking of staff – 100 %
• Material Monitoring - Receipts and dispatches are controlled
• General patrolling on periphery.
• Traffic Management
• Vigilance in Civil Dress
( A ) Physical Security :
• Access Control –
•Doors are with Magnetic Locks
• Restricted Entry
• Video Monitoring by 91 Cameras including PTZ Cameras
• Intruder Alarm System –
•Panic Buttons at Vital Locations
• PIR ( Passive Infra Red ) on all Entry & Exit
• Fire Alarms –
• Smoke Detectors – 351 nos
• Fire Hydrants – 14 nos
• Fire Extinguishers – 34 nos
• Manual Call Points – 12 nos
• Public Announcement System
( B ) Security Automation :
• Anti Shop Lifting Devices –
• Keeper Boxes with Sensor
• Spider Wraps with Sensor
• Apparel Tags ( Hard Tags )
• Soft Tags ( For shoes, leather items etc )
• IR (Infra Red) Alarm Pods for Mobile and other electronic goods
•EAS ( Electronic Article Surveillance ) Antenna.
( C ) Shrink Management :
( D ) Fraud Management :
• Monitoring POS transactions
• Internal Theft prevention
• Prevention of Sweet Shopping
President and Other Higher Officials on Inauguration Day
MAN AT SITE
Now Concentrating on next Project –
Family Entertainment Center at Jamnagar
Let’s not limit our challenges
Instead,