Funding Caspian Energy Infrastructure
A Caspian Energy Grid
Chris Cook
Ashgabat December 2014
![Page 2: Reliable energy ashgabat chris cook](https://reader035.vdocuments.us/reader035/viewer/2022062320/55a103571a28abe6078b4656/html5/thumbnails/2.jpg)
Reliable & Stable Transmission – Problem
'Caspian Energy Grid' = Caspian region energy transportation/ generation & transmission infrastructure
Existing legacy infrastructure fragmented, fragile & grossly inefficient (<20% output efficiency)
Huge carbon fuel waste between producer & consumer
Competition between Caspian regional producers for sales of energy-as-a-commodity
Market volatility & ongoing bank capital shortage means conventional funding almost impossible
![Page 3: Reliable energy ashgabat chris cook](https://reader035.vdocuments.us/reader035/viewer/2022062320/55a103571a28abe6078b4656/html5/thumbnails/3.jpg)
Reliable & Stable Transmission – Solution
Least Carbon Fuel Cost Principle - minimise carbon fuel system input for given electricity, heat or power output
$ 100s billion investment in
- efficiency upgrade of legacy gas transportation & heat/power generation
- existing legacy power grid
- next generation gas to power & efficient grid transmission eg HVDC
Question - how can Caspian Energy Grid upgrade/ development be funded?
![Page 4: Reliable energy ashgabat chris cook](https://reader035.vdocuments.us/reader035/viewer/2022062320/55a103571a28abe6078b4656/html5/thumbnails/4.jpg)
Funding the Grid
Prepay Energy Credit
- energy consumers or investors pay forward at a discount
- pre-dates modern debt/equity finance capital
- re-emerging in use eg $85bn prepay transaction by Sinopec with Rosneft
Energy Loans
- investors lend $, € or other agreed currency
- Energy Loan denominated in energy eg MWhrs or MMbtu
- Project repays loan by purchasing energy credits at the energy market price in $, € or agreed currency
![Page 5: Reliable energy ashgabat chris cook](https://reader035.vdocuments.us/reader035/viewer/2022062320/55a103571a28abe6078b4656/html5/thumbnails/5.jpg)
Funding the Grid
Value Proposition
- consumers buy in advance cheaper & lock in price
- producers obtain interest free credit & lock in price
- investors obtain energy return & sell to consumers
Requirements
- physical energy market & pricing benchmark
- accounting system
- framework of trust - “Clearing Union”
![Page 6: Reliable energy ashgabat chris cook](https://reader035.vdocuments.us/reader035/viewer/2022062320/55a103571a28abe6078b4656/html5/thumbnails/6.jpg)
Caspian Energy Grid Market Platform
Caspian Energy Grid(Custodian)
Caspian Energy Grid(Custodian)
Investors
Caspian EnergyGrid Users
Service Providers
%Prepay
Use Fee
![Page 7: Reliable energy ashgabat chris cook](https://reader035.vdocuments.us/reader035/viewer/2022062320/55a103571a28abe6078b4656/html5/thumbnails/7.jpg)
Energy-as-a-Service – Value Propositions
Producers/Generators & Consumers - share cost of Caspian Energy Grid through agreed use payment
Service Providers - receive agreed entitlement as %age of use fees - balance of use fees available to investors
Investors - buy energy prepay credits at a discount
Consumers – pay for energy delivered using conventional payment or energy prepay credits
![Page 8: Reliable energy ashgabat chris cook](https://reader035.vdocuments.us/reader035/viewer/2022062320/55a103571a28abe6078b4656/html5/thumbnails/8.jpg)
Proof of Concept – KAT Core
KAT = Kazakhstan, Azerbaijan, Turkmenistan
Turkmenistan littoral Gas to Power generation hub
- state of the art Combined Cycle Gas Turbines (CCGT)
- c 60% efficiency
High Voltage Direct Current (HVDC) subsea triangle
- Turkmenistan – Kazakhstan (eg Atirau)
- Turkmenistan – Azerbaijan (eg Baku)
- Azerbaijan - Kazakhstan
![Page 9: Reliable energy ashgabat chris cook](https://reader035.vdocuments.us/reader035/viewer/2022062320/55a103571a28abe6078b4656/html5/thumbnails/9.jpg)
Marchwood (UK) – 58% efficient CCGT
![Page 10: Reliable energy ashgabat chris cook](https://reader035.vdocuments.us/reader035/viewer/2022062320/55a103571a28abe6078b4656/html5/thumbnails/10.jpg)
BritNed and NorNed HVDC Connections
BritNed 260km - 600MW NorNed 580km - 600MW
![Page 11: Reliable energy ashgabat chris cook](https://reader035.vdocuments.us/reader035/viewer/2022062320/55a103571a28abe6078b4656/html5/thumbnails/11.jpg)
Caspian Energy Grid – KAT Core
Turkmen Gas/ Power Hub
![Page 12: Reliable energy ashgabat chris cook](https://reader035.vdocuments.us/reader035/viewer/2022062320/55a103571a28abe6078b4656/html5/thumbnails/12.jpg)
Caspian Energy Grid - Outcomes
Turkmenistan exports power to Caspian littoral statesEnergy savings fund development of Caspian Energy GridTurkmenistan conserves gas which is then available for
generation or exportAzerbaijan & Kazakhstan reduce local carbon fuel requirement
and release fuels for exportCaspian energy market & pricing benchmarkMinimise funding costs: energy loans bear no compound interestIncreased resilience - Grid also capable of carrying regional
renewable energy power & load balancing
![Page 13: Reliable energy ashgabat chris cook](https://reader035.vdocuments.us/reader035/viewer/2022062320/55a103571a28abe6078b4656/html5/thumbnails/13.jpg)
Proposal & Next Steps
Wimpole Consortium – led by major global energy engineer/ manufacturer
Two proposed proofs of concept- KAT Core proposal- re-powering of existing legacy gas transmission infrastructure