reliability-based assessment of system effect for timber...

29
COST Action E24, 6th working group meeting, Florence, 27-28 May, 2004 1 1 Reliability-based assessment of system effect for timber floors Alaa Mohamed French Institute for Advanced Mechanics, LaMI - IFMA & UBP, France

Upload: others

Post on 26-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 200411

Reliability-based assessment of system effect for timber floors

Alaa Mohamed

French Institute for Advanced Mechanics, LaMI - IFMA & UBP, France

Page 2: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 200422

Coupled joist behavior due to sheathing stiffness

Floor slab configuration

Joists

Sheathing (polywood/RC)

Page 3: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 200433

Redistribution of loading between joists

System behavior under loading

Additional safety margin due to load reduction

Page 4: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 200444

Outline of the presentation

• Reliability analysis

• Mechanical model for timber floors

• Reliability assessment of the system effect

• parametric analysis of the floor

• Conclusion

Page 5: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 200455

Reliability analysis

Page 6: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 200466

SollicitationRésistance "R"

"S"f (s),f (r)R S

s, rx

Action Strength

mS mRsk rk

S*=r*

Fundamental case of safety

Page 7: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 200477

Structural reliability formulation

fX1,X2(x1,x2)

X2

X1

{ } in XXXX =,,, 21 K• Random variables:• Limit state function:• Failure probability:

)( ixG[ ] 1( ) 0

P ( ) 0 ( ,..., ) ( )i

ii X nG x

G X f x x dx β≤

≤ = =Φ −∫

2X

1X

Safetydomain

Failuredomain

G( X )= 0

Page 8: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 200488

2X

1X

Safetydom ain

F ailuredom ain

G ( X )= 0

2U

1U H(U) = 0

βP*

0

Reliability index methods (FORM/SORM)

• Reliability index• Importance factors• Design point

FORM/SORM

Transformation into the standard space

Approximations

Page 9: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 200499

Mechanical model

and

reliability computation

Page 10: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20041010

Finite element model

• Shell

• Beam

• Links

Page 11: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20041111

Deformed shape

Page 12: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20041212

Coupled Reliability and Mechanical model

Page 13: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20041313

Reliability computation tool

Reliability combination

under PHIMECA©

Mechanical model

FEA analysis(ABAQUS, ANSYS, …)

Interface files

Reliability results :Probability, sensitivities, influence, …

Page 14: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20041414

Reliability assessment

Page 15: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20041515

System modification factor

Single beam

Beam span

Ben

ding

mom

ent

Beam in system

8

2LPM uu = βsamethefor

LLK

B

Ss

2

=

Single beam

Beam spanR

elia

bilit

y in

dex

Beam in system

Page 16: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20041616

2

=

B

SsK

ββ

Single beam

Beam span

Rel

iabi

lity

inde

x

Beam in system

Other definition of the System modification factor

2

=

fS

fBs P

PKor

Page 17: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20041717

Random variables in the floor design

Variable Description Distribution Mean COVfm Timber strength Lognormal 36 MPa 25%G Dead load Lognormal 1 kN/m2 10%Q Live load Gumbel 2 kN/m2 30%

b = 0.06m

h = 0.18 m

Lx*Ly = 4 x 4 m

Number of beams = 9 (i.e. spacing a = 0.5 m)

Timber class: C24

Page 18: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20041818

Reliability sensitivities

G = 0.8 fm - σ(G,Q,b,h,…)

Page 19: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20041919

Effect of sheathing thickness and Length

L

eSlab

Page 20: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20042020

eSlab

RC sheathing

L

5 cm7.5 cm

10 cm

12.5 cm

15 cm

Page 21: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20042121

Effect of MOE variability

E1 / E0E0E1E0

Page 22: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20042222

Parametric studies

Variable Description Distribution Mean COVfm Timber strength Lognormal 36 MPa 25%G Dead load Lognormal 1 kN/m2 10%Q Live load Gumbel 2 kN/m2 30%

b = 0.06m

h = 0.18 m

Lx*Ly = 4 x 4 m

Number of beams = 9 (i.e. spacing a = 0.5 m)

Timber class: C24

Page 23: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20042323

Mean strength - Mean Live load

Mean(fm)

COV(Q)

Page 24: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20042424

COV and mean of stength

COV(fm)

mean(fm)

Page 25: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20042525

Mean and COV of Live load

COV(Q)

Mean(Q)

Page 26: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20042626

Mean stength - COV of Live load

COV(Q)

Mean(fm)

Page 27: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20042727

COV of stength - mean of Live load

COV(fm)

Mean(Q)

Page 28: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20042828

COV of stength - COV of Live load

COV(fm)

COV(Q)

Page 29: Reliability-based assessment of system effect for timber ...km.fgg.uni-lj.si/coste24/data/florencedocuments/mohamed1.pdf1 COST Action E24, 6th working group meeting, Florence, 27-28

COST Action E24, 6th working group meeting, Florence, 27-28 May, 20042929

Conclusion

Large effect of system when RC slabs are involved.

Significant effects of uncertainties on moment redistribution.

Further works:Post-failure system combination

Fastners (nonlinear) rigidity

Correlation of Ei’s