Page 1: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU LOGISTICS GUIDELINES FOR PURCHASED PARTS / AUTOMOTIVE

Issue 3

Status 01/2017

The current valid version applies - to be found under http://www.rehau.ch/logrl

www.rehau.com Construction

Automotive

Industry

Page 2: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Table of content 1 General aspects ...................................................................................................................................... 6

1.1 Target and validity of the guidelines .................................................................................................... 6

1.2 Contact ............................................................................................................................................ 6

1.3 General requirements on the supplier ................................................................................................. 6

1.3.1 Reporting requirements............................................................................................................... 6

1.3.2 Organisation .............................................................................................................................. 7

2.1 General requirements ........................................................................................................................ 8

2.2 Definition of permissible materials, packaging height and maximum weight ............................................ 9

2.3 Disposable and reusable packaging .................................................................................................... 9

2.3.1 Preproduction series ................................................................................................................. 10

2.3.2 Series ..................................................................................................................................... 11

2.3.3 Alternative packaging ............................................................................................................... 11

2.3.4 Special load carrier ................................................................................................................... 11

2.4 Protective and transport function ...................................................................................................... 12

2.5 Admissibility - mixed load carrier....................................................................................................... 13

2.6 Overseas packaging ........................................................................................................................ 13

3 Shipping documents and marking ............................................................................................................ 14

3.1 Waybill ........................................................................................................................................... 14

3.2 Delivery note .................................................................................................................................. 14

3.3 Invoice ........................................................................................................................................... 14

3.4 The marking ................................................................................................................................... 15

3.4.1 Examples for attachment of the markings ................................................................................... 15

3.4.2 Marking in Europe and South Africa ........................................................................................... 17

3.4.3 Marking - world ........................................................................................................................ 18

4 Load carrier management ....................................................................................................................... 18

4.1 REHAU specifications ..................................................................................................................... 18

4.2 Container account / inventory record keeping .................................................................................... 19

4.3 Management of the containers in keeping with EOP ........................................................................... 19

5 DFÜ / EDI ............................................................................................................................................. 19

5.1 Communication channels ................................................................................................................. 19

5.2 REHAU EDI parameter .................................................................................................................... 20

Page 3: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

6 Transports ............................................................................................................................................ 20

6.1 General aspects .............................................................................................................................. 20

6.2 Cargo securing ............................................................................................................................... 20

7 Customs clearance ................................................................................................................................ 21

7.1 Processing in case of Incoterm 2010 – FCA ...................................................................................... 21

7.2 Processing in case of Incoterm 2010 – DAP ...................................................................................... 22

8 Bidding phase ....................................................................................................................................... 23

9 Rolling requirement and call-off planning .................................................................................................. 24

9.1 Principle procedures ........................................................................................................................ 24

9.2 Confirmation of the delivery call-off ................................................................................................... 25

9.3 Delivery quantity upon individual requests / delivery cycle ................................................................... 25

9.4 Delivery period ................................................................................................................................ 25

10 VMI / consignment store ....................................................................................................................... 26

10.1 VMI .............................................................................................................................................. 26

10.2 Consignment ................................................................................................................................ 26

11 Emergency concept ............................................................................................................................. 26

12 Financial consequences in case of violations .......................................................................................... 27

13 Validity ................................................................................................................................................ 29

14 Enclosures .......................................................................................................................................... 29

15 Acceptance ......................................................................................................................................... 30

Page 4: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 4

List of abbreviations

BPO Blanket Purchase Order

DFÜ Remote data transmission

EDI Electronic Data Interchange

ETD Spare parts service

EU-Gibo Euro wire mesh box

ISPM 15 International Standards for Phytosanitary Measures, No. 15, in conformity with the recommen-

dations of the International Plant Protection Convention (IPPC)

KLT Small load carrier

LBS Pounds

LKW Heavy goods vehicle

LT Load carrier

MRN Movement Reference Number

NAFTA North American Free Trade Agreement

SLB Shipment identification number

VDA Verband der Automobilindustrie e.V. (German Automotive Industry Association)

VE Packing unit

VMI Vendor managed inventory

Page 5: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 5

Definitions

Offer The offer shall be based on the enquiry sent previously by the purchasing

centre. For suppliers of directed buy parts this shall be equivalent to price

agreement.

Container Standardised, permanent transport container which is easy to load and un-

load, to be closed safety, and which can be moved between means of

transport as loading unit.

Disposable packaging Packaging which is used once only.

Small load carrier (KLT) Small load carriers, which together with loading aids (such as pallets) form a

loading unit, which can be shipped.

= packing unit.

Loading unit A loading unit is a unit which is shipped and stored. A loading unit may con-

sist of a load carrier or a combination of small load carriers and loading aids.

Loading aids Loading aids are used to form loading units, when the load carrier alone can-

not be shipped (such as pallets, end caps, etc.).

Load carrier The load carrier encloses the product, such as pallet, wire mesh box, folding

box, Raubox.

Reusable packaging Packaging that can be uses several times.

Special load carrier Article-specific load carriers, which can be applied for the use of a special

product / material.

Packaging Generic term for all elements of packages.

Page 6: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 6

1 General aspects

1.1 Target and validity of the guidelines

The supplier shall be informed in detail about the logistics requirements of the customer REHAU. The aim is to

organise the smooth process, to strengthen the relationship between the partners and to minimise the costs. The

guideline shall be applicable all over the world for all suppliers and deliveries. Wherever possible, country-specific

requirements have been taken into consideration whilst setting up these guidelines. By sending the offer the sup-

plier commits to complying with the REHAU logistics requirements.

1.2 Contact

In case of general questions on the logistics guidelines, please get in touch with the

purchasing centre in Muri, Switzerland: Mr von Richthofen Telephone: +41 (31) 950 3449 [email protected] or with the Logistics Planning Department in Rehau, Germany: Mr Strasser Telephone: +49 (9283) 77 1686 [email protected] For the respective project-specific logistics planner, please refer to the respective enquiry documents.

1.3 General requirements on the supplier

As a competitive factor, logistics are an important key to economic success. Correspondingly it is self-evident for

REHAU to set up and optimise reliable and efficient logistics processes with the suppliers. REHAU pursues the

goal of the goods being received in the right quantity, at the right costs, in the right type and quality at the right time,

at the right place and recipient. For this reason, it is of importance to REHAU that the logistics of the partners and

their delivery chain are set up according to standardised basic principles. The communication between the supplier

and REHAU forms the basis for a functioning co-operation in this respect.

1.3.1 Reporting requirements

If the supplier wants to carry out changes on the points mentioned hereinafter, this fact has to be indicated to the

contacts mentioned in chapter 1.2 as promptly as possible. In parts this may mean a renewed approval process by

REHAU.

Changes in the defined delivery times, deadlines, periods or -sequences.

Change of the production location or of the shipping plant.

Change of IT system.

Changes of operational logistics structures.

Page 7: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 7

Changes on the product and/or the packaging.

1.3.2 Organisation

The supplier shall have to ensure that

independently and without additional reminders, a detailed time schedule is set up for all milestones for

the implementation of the requested deadline significant for the project handling. The supplier is respon-

sible for updates and the flow of information.

at least one contact is nominated for technical matters and quality questions as well as a competent rep-

resentative who is authorised to take decisions and who is available at any time during the office hours.

Upon request of REHAU a project team with project members is nominated for all relevant fields.

for special actions outside office hours a competent contact is available and that his or her accessibility is

ensured.

between the supplier and the competent REHAU contact regular written reports can be exchanged which

are maintained at least until the series release by REHAU.

all communication with REHAU is carried out in German or English language.

the data exchange between the two parties can be carried out electronically (cf. chapter 5 DFÜ / EDI).

the planned needs of REHAU are met.

Page 8: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 8

2 Packaging

2.1 General requirements

REHAU attaches importance to the fact that the following points are taken into consideration in the selection of a

suitable packaging:

Protection of the parts

Costs for packaging and handling

Avoidance of waste of packaging redundance

Job safety and environmental protection

Suitability for storage

Suitability for loading and transport

High packaging density

The supplier shall have to carry out the development of the packaging independently. The packaging shall have

to be developed in such a way that the articles can be processed in a qualitatively perfect condition throughout

the entire process. In the process, all country-specific regulations in the countries of dispatch, transit and destina-

tion shall have to be observed and the means of transport (heavy goods vehicle, overseas container) used shall

have to be used to optimal capacity. Further, the packaging concept has to be discussed and agreed. The coding

of the transfer of electronic delivery data has to be discussed and agreed as well (Contacts, please see chapter

5.2)

If a product is supplied to various REHAU plants (such as to Germany and the USA), REHAU shall reserve the

right to request from the supplier different packaging for the delivery of the respective plants.

The supplier shall ensure that the costs offered include the presentation of a sample container including parts for

every location mentioned in the enquiry of REHAU for approval of the packaging.

In case of the packaging of purchased parts, REHAU differentiates between concept approval, which may be

based on a presentation as well, and the approval of the packaging which shall be based on a sample packaging

including parts.

The sample packaging shall be presented to REHAU in harmonisation with the logistics planner, and the approval

of the packaging shall be obtained.

If a part shall be used in various REHAU locations, this may mean potentially also a separate sample packaging

for each location. In keeping with the separately harmonised project time schedule, the packaging shall have to

be rendered available to the project in due time.

The packaging approval shall permit the supplier to purchase the packaging for series production.

Without further request, the supplier shall provide evidence for the containers paid by REHAU.

Page 9: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 9

The packaging for REHAU plants shall have to fulfil certain requirements. They shall be defined in greater detail

in the next chapters. The responsibility for the qualitative suitability of the packaging shall continue to be with the

supplier even after their approval by REHAU. The approval for the packaging is specific to the plant and the pro-

ject. In the event of a plant change during the series process, the supplier must again obtain the approval of the

plant that is now responsible. REHAU reserves the right to carry out container changes in coordination with the

supplier or for well-justified reasons.

If the supplier should violate the agreement reached, REHAU reserves the right to charge the supplier with the

expenses resulting thereof. Further points are stipulated in chapter 12 titled “Financial consequences in case of

violations”.

2.2 Definition of permissible materials, packaging height and maximum weight

The document titled “Requirement catalogue - packaging” (Enclosure 1) shall be decisive. In any case, the legal

requirements of the recipient country shall have precedence.

Packaging height / maximum weight:

The maximum permissible overall height of a loading unit shall be 1,000 mm. The said shall have to be strictly

observed, but shall not apply retroactively for awards already completed. Applicable as from enquiry for new pro-

jects!

For REHAU it is important to strictly observe the health and safety regulations. Independent of the type of packaging

(disposable and reusable packaging) the following maximum permissible gross weights shall have to be observed:

- Individual packaging / KLT max. 15 kg (30 lbs)

- Loading unit / pallet max. 1,000 kg

These specifications shall have to be strictly observed. Deviations shall have to be coordinated with the appropri-

ate logistics planner of REHAU, and may be implemented only after the written approval of the said.

2.3 Disposable and reusable packaging

In coordination with REHAU, suitable packaging shall have to be defined for every new product to be supplied. The

use of disposable and reusable packaging shall be based on economic considerations, and shall depend on the

location of the real production plant and the distance between the locations.

Disposable packaging shall have to be recyclable and shall be disposable without any effort because the said shall

not be returned. For construction and dimensions of the KLTs and loading units, please refer to the current “Re-

quirement catalogue - packaging” (Enclosure 1), in which additional permissible standard packaging for REHAU

plants have been listed. It is imperative that the disposable loading units are stackable (minimum 1+1) for transport

and storage. Single stacking must be coordinated with the appropriate logistics planner of REHAU.

Page 10: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 10

Damage of the goods, which is the result of insufficient layout of the packaging, shall be borne by the supplier. The

smooth supply of the REHAU plants shall have top priority, and thus the on-time delivery of the products to REHAU

customers. Further points are stipulated in chapter 12 titled “Financial consequences in case of violations”.

In case of reusable containers, it shall have to be observed that

they can be emptied completely and are easy to clean.

they can be pooled (cf. Enclosure 1 titled “Requirement catalogue - packaging“).

repairs, replacement purchases and thus involved expenses shall be borne by the causer as a matter

of principle. If no assignment to a causer is possible, the costs for repair or thus involved expenses

shall be split 50:50 between REHAU and the supplier.

replacement containers and their inlays, if and when applicable, shall be charged at 100 % of the

replacement value. This arrangement shall apply for reusable packaging which are the property of

REHAU as well as for empties of third parties which cannot be returned by the supplier.

containers, which are not the property of the supplier, may be scrapped only with the written approval

of the appropriate logistics planner of REHAU.

for after-series and ETD needs the supplier shall be obligated to store containers temporarily in suffi-

cient quantity. The quantity shall have to be coordinated with the appropriate logistics planner of RE-

HAU.

Moreover it shall have to be observed that an ESD-compatible load carrier shall have to be used for the delivery of

ESD-endangered component parts.

During the construction of the packaging it shall have to be observed that another secondary packaging of individual

parts is avoided. A direct removal from the packaging shall be possible without any additional unpacking process.

The supplier shall have to ensure that the empties for surface-critical visible parts as well as for electronic compo-

nents are stored under a roof at least, and thus are not subjected to weather conditions. The packaging costs shall

include the costs for cleaning, maintenance and repair. The corresponding charges shall have to be corroborated

separately.

2.3.1 Preproduction series

Up to the use of the serial packaging agreed upon, the supplier solely shall be responsible for rendering available

to REHAU a suitable, safe and correct solution at his costs. All solutions must be approved by REHAU - at minimum

four weeks - prior to their use. In coordination with the appropriate logistics planner, this packaging for preproduction

series shall also serve as emergency concept / alternative packaging for the series. The common objective shall

be to provide the serial packaging for the delivery of the preproduction series already.

Page 11: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 11

2.3.2 Series

As a matter of principle, series packaging (emergency concept and spare parts packaging as well) shall have to be

approved product-specifically by the Logistics Planning Department of REHAU in cooperation with all REHAU

plants involved. The delivery intervals shall be specified at material level by REHAU. The number of packaging

shall be planned in such a way that the planned reaches plus the quantity in transit are made. Further points are

stipulated in chapter 4 titled “Load carrier management”. Tool costs for special containers shall be offered to REHAU

separately.

As from approval, the delivery shall be made in the approved packaging. Deviations shall have to be correspond-

ingly indicated on the delivery note (such as emergency packaging, alternative container). In case of product

changes (type, shape of structural parts) the supplier shall be obligated to check the series containers available

and to adapt or replace them potentially in coordination with the responsible logistics planner.

2.3.3 Alternative packaging

Should series packaging agreed with REHAU be no longer available or only available in insufficient quantities in

the series process, the supplier requires alternative packaging which must be determined in cooperation with the

Logistics Planning Department of REHAU prior to the SOP. Importance is attached to the fact that this bottleneck

situation is an individual case and the use of an alternative packaging is a temporarily limited measure. However,

the supplier may not use any packaging that has not been approved by REHAU in advance. The proposed pack-

aging must always be approved of by the logistics planner of REHAU. It has to be ensured that the alternative

packaging meets the requirements of the products, and the goods are ideally protected in the alternative packaging

as well, so that no damage or encroachment occurs. These preventive measures shall avoid the reduction in quality.

The use of an alternative packaging shall be indicated to the empties manager in the Bought-in Goods Department

at the REHAU recipient plant in due time. If the supplier should violate the agreement reached, REHAU reserves

the right to charge the supplier with the expenses resulting thereof. Further points are stipulated in chapter 12 titled

“Financial consequences in case of violations”.

2.3.4 Special load carrier

Special load carriers may become necessary in case of excessive lengths, ocean transport, special cases (such

as liquids or coils), temperature-sensitive products or in case of hazardous materials in conformity with the latest

valid legal regulations. The use of special load carriers shall have to be coordinated with the appropriate logistics

planner of REHAU. The planning, development and construction of the special load carrier and alternative packag-

ing shall be carried out by the respective supplier. The said shall also bear the costs of planning, development and

construction. Acceptance and approval of the special load carrier shall be effected by REHAU.

Page 12: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 12

2.4 Protective and transport function

Loading units shall have to withstand the loads occurring during the shipment process. The protective function and

thus the perfect transport function as well shall have to be ensured during the entire transport. The weight of load

and the potential superimposed load of the packaging shall have to be identifiable.

The objective of REHAU shall be to always call off full containers. Incomplete layers or pyramid stacks are not

permissible. If fills of complete layers are not possible with the container solution due to the called-off quantity, the

last layer shall have to be filled up with empty containers which shall be correspondingly marked “empty”. Loading

units open to the top shall have to be covered with a pallet cover plate and shall have to be strapped with plastic

tape (at least twice).

Example for unacceptable packaging:

Inadequate packaging

Pyramid

stacking

Edge

Diagonal ar-

rangement

Missing pallet cover plate

Repackaging which is caused by insufficient transport protection or bad packaging material shall be at the ex-

pense of the supplier. Further points are stipulated in chapter 12 titled “Financial consequences in case of viola-

tions”. The same shall apply to incorrect palletizing (overlaying).

Page 13: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 13

2.5 Admissibility - mixed load carrier

The main objective of REHAU is to ensure unmixed delivery on pallets. In duly substantiated exceptional cases,

mixed pallets may be formed as well. The clarification and acceptance of mixed pallets by the REHAU logistic

planning department is mandatory. In this case it has to be ensured that different material numbers have to be

physically separated from each other. If the supplier should violate the agreement reached, REHAU reserves the

right to charge the supplier with the expenses resulting thereof. Further points are stipulated in chapter 12 titled

“Financial consequences in case of violations”.

2.6 Overseas packaging

Overseas packaging must be designed to be disposable. Care must be taken to ensure that the disposable pack-

aging is able to withstand the usual rigours of ocean transport. Receptacles and loading units must be stackable to

ensure optimum use of the shipping containers. The footprint measurements of the pallets must be aligned with 40‘

HC-ISO shipping containers. Exceptions require the approval of the responsible logistics planner of REHAU. Fur-

ther, the loading units must have a 4-way tail lift recess. For the overseas packaging, the shipping container meas-

urements (maximum 3 (1+2) stacked loading units), the IPPC standard for wood packaging and all country-specific

regulations must be complied with. The maximum gross weight of individual cartons/ small load carriers must not

exceed 15 kg (30 lbs). Since 01 July 2016 the new SOLAS Regulation for the determination of the gross mass of

shipping containers applies. From this point in time, only shipping containers with a verified gross mass may be

loaded. For this reason, it is essential that the supplier provides REHAU with exact information on the gross weight

of the components and packaging (incl. padding and fastening material). If he fails to do so or if the information

transpires to be incomplete or incorrect, the supplier is liable regardless of his culpability for all direct costs and

also subsequent costs resulting from the supplier’s breach of contract.

Page 14: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 14

3 Shipping documents and marking

3.1 Waybill

The following data have to be rendered on the waybill for REHAU:

Delivery note number and date

DFÜ- Warenbegleitschein/ packaging slip (according to VDA4912) / SLB No., provided if a transmission

in conformity with VDA4913/EDIFACT DESADV has been set up

Shipment quantity

Delivery address (including data of the unloading point)

Data on the loading equipment: Disposable / reusable including its number from the delivery note indi-

cating REHAU V No.

Gross weight

3.2 Delivery note

The following data have to be rendered on the delivery note for REHAU:

Delivery note number and date

DFÜ / SLB No., provided a transmission in conformity with VDA4913 has been set up

REHAU order number / job number

REHAU material number and designation

Revision status / index (cf. VDA label field 14)

Shipment quantity

Delivery conditions

Delivery date, arriving

Delivery address (including data of the unloading point)

Number of the reusable packages with indication of the REHAU V No.

Best-before date

3.3 Invoice

As a matter of principle the following data have to be rendered on the invoices:

REHAU order number / job number

REHAU material number

Quantity

Delivery date

Page 15: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 15

3.4 The marking

The supplier shall have to mark all containers clearly with the markings required for the contractual handling on

long and a short side (adjacent sides).

Right from the first delivery of the preproduction series, the supplier shall be obligated to mark the goods correctly.

The container identifications shall have to be in compliance with the regional industrial standard and shall have to

be coordinated in detail with the respective REHAU customer plant. As a matter of principle, the marking shall have

to be reached by bar-code reader without having to re-shift the loading unit. The container identifications shall have

to be attached well visibly to the containers, shall not exceed packaging, and shall not cover each other. Further-

more they shall have to be protected against soiling, environmental influences and transport stress. Elements of

the loading unit protection (strapping tapes) must not obstruct the legibility of the container identifications. If the

product is subject to a limited preservability, a best-before date shall have to be mentioned on each container.

Products with a best-before date shall have to be indicated clearly in the offer already indicating the best-before

date. In case of missing, illegible or incompletely filled-in markings, REHAU reserves the right to charge the supplier

with the additional expenditure. Further points are stipulated in chapter 12 titled “Financial consequences in case

of violations”.

3.4.1 Examples for attachment of the markings

Wire mesh box

The marking shall be attached on the right-hand top broadside of the wire mesh box or in a pocket at the front side.

Small load carriers

The marking of small load carriers shall have to be added to the pockets intended for the purpose and shall have

to be fitted by means of completely removable adhesive spots or shall be applied by adhesive labels in the first

place, which can be removed without a trace. If no pockets are available, the adhesive labels, which can be re-

moved without a trace, shall have to be attached to the intended document surface. If no document surface has

been defined, an arrangement shall have to be made with the appropriate logistics planner. The small load carriers

shall have to be arranged on a pallet in such a way that all labels of the small load carriers sitting on the pallet can

Front

side

Broadside

Top right

Page 16: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 16

be read. The marking of the entire pallet shall be fitted to the same point as on a small load carrier in case of a wire

mesh box or on the cover.

Examples for correct attachment

In case of containers in the NAFTA size, the label may be attached only on the intended field (Kennedy label).

Boxes

The marking of the individual boxes shall be attached horizontally on the front side. The boxes shall have to be

arranged on a pallet in such a way that all labels of the boxes sitting on the pallet can be read. The marking of the

entire pallet shall be fitted to the same point as on a box in case of wire mesh boxes or on the cover.

Page 17: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 17

Container identification labels

The container identification labels of REHAU must not be removed. The supplier shall have to remove obsolete

dispatch pendants or other irritating labels prior to the next delivery. In the course of the development it is imperative

that the supplier agrees the content, attachment and any other details concerning the container identification label

with the project-specific contact from the Logistics Planning Department. The container identification label requires

the approval of the contact at the Logistics Planning Department.

Container identification label example:

3.4.2 Marking in Europe and South Africa

As a matter of principle, standardised and bar-code readable labels in conformity with guideline VDA 4902, Version

4, shall have to be used for marking right down to the smallest packaging unit. Basically, the packages shall have

to be labelled on the level of the master as well as on the level of the single. Moreover, REHAU may request an

additional marking of the package upon agreement with the supplier.

If the supplier has consignments to a REHAU plant in France, the GALIA goods labels may be used. For deliveries

to the REHAU locations in South Africa, the marking on the VDA label “Packaging Material No. Customer” (Field

11.2) has to be filled in.

Other deviations shall have to be coordinated with the respectively responsible logistics planner.

The REHAU template for the VDA goods label (bar-code readable) - “Master label” (loading unit) as well as “Single

label” (packing unit, KLT / box) is rendered in Enclosure 2 titled “Example: VDA goods label”.

The supplier shall be responsible for the fact that all parts including prototypes and preproduction deliveries are

marked according to instructions.

Page 18: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 18

3.4.3 Marking - world

America

In the American plants and the countries belonging to NAFTA, the packaging units shall be labelled with normed,

standardised and bar code capable labels according to Guideline VDA 4902 Version 4. In exceptional cases the

specifications of the AIAG also apply, these must however be agreed with the logistics planner of REHAU in ad-

vance. All REHAU plants worldwide have adopted the VDA 4902 Version 4 as standard.

The labelling requirement applies to even the smallest packaging unit.

Further details/specifications for our plants in America are defined in attachment 5.

4 Load carrier management

4.1 REHAU specifications

In general, the cost calculation for the reusable container concept shall be based on an empties / full goods ex-

change ratio of 1:1 whereby the supplier shall have to ensure the initial top-up at REHAU.

All containers for a smooth process (such as batch sizes, safety stock, transport circulation of full goods and emp-

ties, etc.) shall have to be included in the calculation by the supplier. REHAU has a fixed stock of corresponding

containers of eight days. The delivery shall take place min. once a week. If a complete loading unit covers more

than needs of three months, a reasonable delivery batch shall have to be defined with the contact of the Logistics

Planning Department of REHAU. Additional demands for containers used for deliveries between supplier and his

suppliers and refiners shall not be paid for by REHAU. If an exception is required for the container reaches, this

shall be specified by the purchasing body in cooperation with the central contact of the Logistics Planning Depart-

ment.

Furthermore, the supplier shall have to keep to the specified exchange / quality criteria for the containers of REHAU.

As matter of principle, it applies that the containers must not be deformed, damaged, soiled or be stuck all over

with old labels (except the container identification label). If one or several deviations exist, the additional costs for

repackaging the goods, additional personnel expenses and disposal of the old container shall be charged to the

supplier. Further points are stipulated in chapter 12 titled “Financial consequences in case of violations”.

The description of the REHAU exchange criteria for reusable packaging is rendered in Enclosure 3 titled “Exchange

criteria - reusable packaging”.

Page 19: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 19

4.2 Container account / inventory record keeping

When using reusable packaging, a container account shall have to be kept by the supplier. If and when required,

these data shall have to be rendered available to the REHAU employee competent for the empties management -

cf. Enclosure 4 titled “Additional contacts”. In addition, the supplier shall have to supply a stock declaration every

month at a key date agreed upon. Handwritten elaborations shall not be accepted. The account management shall

have to be carried out in electronic form. If the supplier wishes to use a certain programme for the stock declaration,

he shall have to check the compatibility with REHAU programmes. It is only by rendering available usable data that

the quality of the process can be ensured.

Moreover REHAU shall demand an inventory once a year. This action is necessary to ensure a controlled process.

The aim is to process and balance timely any differences in stock occurring. For REHAU the security of supply is

of primary importance. REHAU Logistik Automotive in Muri near Berne is available as another arbitration board. In

case of need, it decides on the further solution process.

4.3 Management of the containers in keeping with EOP

If the purchase contract, a project or special scopes of delivery should expire, the supplier shall be obligated to

register in writing the containers which are not his property. REHAU shall be permitted to take over free of charge

all containers allocated to this scope of delivery, this project or this purchase contract. For scrapping the containers

the supplier shall require a written approval of the appropriate logistics planner of REHAU. Losses of containers

shall be replaced at 100 percent of the replacement value. REHAU shall charge this amount to the supplier. This

arrangement shall apply for reusable packaging which are not the property of the supplier as well as for empties of

third parties which cannot be returned by the supplier.

5 DFÜ / EDI

5.1 Communication channels

The coordination between REHAU plant locations, REHAU GmbH Muri (CH), IT/IS and our suppliers shall be

performed centrally by REHAU GmbH Muri (CH). Contact:

Mr Berger, Tel.: +41 (31) 950 34 07; E-mail: [email protected].

The technical (IT/IS) responsibility and performance of corresponding work shall be the task of the IT/IS Centre of

REHAU in Germany. Contact:

Mr Stefan Ertl, Tel.: +49 (9283) 77 2096, E-mail: [email protected], or [email protected].

The received and sended EDI-/EDIFACT-data will be operated by the EDI-converter of REHAU Germany.

Page 20: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 20

5.2 REHAU EDI parameter

Information required for the set-up will be hand over to the supplier separately or can be requested from Mr Stefan

Ertl, [email protected] or [email protected]. The technical structure and content of the

electronic delivery note must match standard specification, which were agreed. A seperate technical agreement of

the structure and the content between the EDI-interfaces is mandatory.

6 Transports

6.1 General aspects

The transports including transfer of costs and risk shall be carried out exclusively on the basis of the provisions in

keeping with Incoterms 2010. The prices in the offer shall be based mandatorily on the Incoterms respectively

mentioned in the enquiry.

REHAU shall reserve the right to change the delivery agreements in keeping with the Incoterms in the

course of the project.

Basically REHAU shall reserve the right to collect the products by its own forwarding agent. In this case

the supplier shall receive a corresponding “routing order” indicating the transport time to be taken into

consideration.

Special trips caused by demonstrable fault of the supplier (e.g. delayed delivery, return shipments due to early or

excessive delivery) shall be the responsibility of the supplier. All additional costs for special trips / express shipping

resulting thereof shall have to be borne by the supplier.

Suppliers awarded for DAP have to discuss and agree to the delivery concept with REHAU in advance. The time

slot schedule of some REHAU plants has to be booked and observed.

6.2 Cargo securing

In order to protect the staff against work-related accidents and the material against damage, it is important to

observe the correct load safety. Materials must not protrude over the side of the load carrier. The load centre of the

load carriers shall have to be observed and shall have to be marked, if and when necessary.

Moreover, the stacking capability of the load carrier during transport shall have to be observed with respect to load

safety. Damaged load carriers must not be used and shall have to be removed from the process. The materials

must not move inside the packaging and on the load carrier. It has to be ensured that the materials and the pack-

aging are linked non-slip with the load carrier in every direction. Applicable legal and official requirements for secu-

rity of the load must be observed.

Page 21: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 21

7 Customs clearance

7.1 Processing in case of Incoterm 2010 – FCA

Responsibilities matrix:

REHAU GMBH, Switzerland, Logistics

Muri

Supplier

Forwarding

agent

Order x

Reminder of order confirmation x

Order confirmation x

Shipment notification x

Delivery note x

Invoice x

Export declaration / MRN x

Preference text x

EUR 1 x

Shipment / air freight data x

The order shall be sent to the supplier stating the required delivery time.

The order confirmation shall have to be received within 2 working days. The order confirmation must state the

collection time.

The shipment notification (sea and air freights 3 days before the collection time, inland transport 1 day) shall

have to indicate the complete data (dimension, weight and number of pallets) to the respective material manager

of REHAU GmbH, Switzerland. Upon collection, the shipping documents including export documents shall have to

be issued already. Required documents for the export:

Registration with forwarding agent: Number of pallets or packages, their dimensions, net and gross

weight, stacking capacity, collection point, collection time, collection reference as well as contact per-

son on the side of the supplier

Delivery note including preference text

Original invoice, no proforma invoice

Export declaration + MRN (Movement Reference Number)

EUR 1

For wooden packaging, the treatment in keeping with ISPM 15 is imperative provided the destination country is

mentioned in the recommendation of the International Plant Protection Convention (IPPC).

Page 22: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 22

The delivery note shall have to be issued with the preference text as the duty will be paid with the commercial

invoice of REHAU and the delivery note of the supplier. For this reason the delivery note shall have to disclose

bindingly the following information in addition:

Order number and plant order number or internal PO number

Customs tariff number

Note: The invoice recipient is always REHAU GmbH, Switzerland.

The invoice shall have to contain the following additional information:

Delivery note number and date

Order number / job number and plant order number / internal PO number

Customs tariff number

Price

Delivery conditions

Delivery address

Note: The invoice recipient is always REHAU GmbH, Switzerland.

An original invoice to be sent by surface mail to REHAU GmbH, Switzerland, is not required, if the invoice has been

sent previously by shipment notification.

The export declaration + MRN shall be issued by the supplier every time when the goods exceed a goods value

of EUR 1,000. If this should not be possible by the supplier, the competent purchasing group shall have to be

informed immediately. The aim in this case is the fee-based handover to an external service provider.

7.2 Processing in case of Incoterm 2010 – DAP

Responsibilities matrix:

REHAU GMBH, Switzer-land, Logistics Muri

Supplier

Order x

Reminder of order confirmation x

Order confirmation x

Shipment notification x

Delivery note x

Invoice x

Export declaration / MRN x

MRN x

Preference text x

EUR 1 x

Freight rates x

Shipment / air freight data x

Page 23: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 23

The order shall be sent to the supplier stating the required delivery time.

The order confirmation shall have to be received within 2 working days. Along with the order confirmation, it is

imperative that the dispatch date and the arrival date is confirmed in case of DAP supplies.

The shipment notification shall be analogue to “Processing in case of Incoterm 2010 – FCA”.

For wooden packaging, the treatment in keeping with ISPM 15 is imperative provided the destination country is

mentioned in the recommendation of the International Plant Protection Convention (IPPC).

The delivery note shall be analogue to “Processing in case of Incoterm 2010 – FCA”.

The invoice shall be analogue to “Processing in case of Incoterm 2010 – FCA”.

The export declaration + MRN shall be analogue to “Processing in case of Incoterm 2010 – FCA”.

The indication of the freight rates, shipping and air freight rates is mandatory for the issue of the commercial

invoice by REHAU GmbH, Switzerland. The said shall be sent together with the shipping message. The shipping

rates are divided up as follows:

(A) FCA – FOB (B) FOB – CPT (C) CPT – DAP

8 Bidding phase

The offer shall include the delivery in keeping with Incoterms 2010. Component part prices, packaging costs and

logistics costs shall be rendered separately in the offer. REHAU expects as an offer the solicitation documents

completely filled in by the supplier. In this respect special emphasis shall be given to the logistics process. For

directed buy parts this shall be ensured by the supplier by filling in and returning REHAU BPO (blanket purchase

order).

Upon request, REHAU shall be provided with cost details for purchased parts as well as for tools / investments.

Upon request of REHAU, the price contracts shall have to be provided for directed buy parts mandatory by OEMs.

By submitting the offer, the supplier confirms that the component parts originate from the EU, otherwise the origin

of the goods has to be declared clearly. In case of an order, the supplier shall provide the proof in the form of a

supplier’s declaration, origin declaration on the delivery note and/or customs-confirmed EUR 1.

By submitting the offer, the supplier shall declare that

there is a fundamental willingness to set up a consignment store and/or VMI. The further coordination on

the realisation shall take place between REHAU and the supplier in case of an order.

Page 24: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 24

he has received access to the functional specifications and requirements mentioned in the enquiry and

that he shall observe them.

9 Rolling requirement and call-off planning

9.1 Principle procedures

REHAU shall render available to the supplier a permanently updated rolling requirement and call-off plan for the

products agreed upon.

In this respect the required quantity shall be calculated by a machine process and shall be issued on the REHAU

delivery schedule or shall be transferred by EDI data set (Delfor/VDA4905). The said shall be transferred automat-

ically – the interval of delivery scheduling is coordinated bilaterally between REHAU and the supplier. As the re-

quired quantities are calculated on the basis of the goods received, it is important to prevent shortages and/or

excessive deliveries that the supplier carries out a plausibility check, and in case of potential differences he shall

immediately inform the Central Purchasing Department in Muri.

The delivery schedule lists the required quantities in short-term, medium-term and long-term periods for a maximum

of 9 months.

The short-term period (about 1 to 2 weeks1) includes the current delivery call-off(s). The delivery call-offs shall be

assigned to precise calendar days. These delivery dates shall be binding and shall have to be observed without

fail. They shall be considered deadlines for receipt and always without grace period. The delivery of the required

quantities shall have to be in conformity with the latest delivery schedule. Additional and/or separate orders shall

not be placed.

In the medium-term period, the required quantities shall be assigned to calendar weeks and to months in case of

long-term periods. The required quantities rendered for the medium-term and long-term periods shall be considered

target figures.

Due to influences, for which REHAU is not responsible, variations of the required quantities may occur. In order to

ensure constant readiness for delivery, REHAU and the supplier may agree on minimum inventory levels in indi-

vidual cases to be stocked by the supplier.

REHAU shall grant the supplier a production / material approval in conformity with a separate agreement. In case

of a complete cancellation of the required quantity, REHAU takes over the obligation to accept the materials ordered

and/or the preliminary materials required with the reservation of contract and specification conformity. In this case

1The short-term period is also dependent on the frozen zone. The frozen zone is predetermined by REHAU (bilaterally by

supplier, article and site) and must be reflected in the corresponding supplier system.

Page 25: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 25

the delivery shall have to be agreed upon with the competent dispatcher. The acceptance shall take place at the

latest 12 months after the cancellation.

The “production / material approval” period shall start with the date of the delivery schedule, and if no new delivery

schedule is available shall apply progressively for the period stated. The obligation to accept shall refer to the

highest required quantity during this period.

9.2 Confirmation of the delivery call-off

A confirmation of the delivery call-off shall not be required because REHAU shall take it for granted that the re-

quested quantities and the delivery date shall be observed. In exceptional cases change requests shall have to be

disclosed in writing to the competent dispatcher immediately, at the latest, however, within 48 hours, or within 24

hours in case of daily deliveries.

9.3 Delivery quantity upon individual requests / delivery cycle

The quantity to be delivered each time shall be indicated on the REHAU delivery schedule. As a matter of principle,

the delivery quantities shall correspond to the multiple of the packaging unit agreed upon.

REHAU shall not be obligated to accept any short deliveries or overdeliveries. In this case the short deliveries or

overdeliveries shall have to be agreed upon with the competent dispatcher. In case of overdeliveries and/or ad-

vance deliveries not agreed upon REHAU shall reserve the right to return the goods freight collect. The delivery

cycle shall be rendered in the delivery schedule.

9.4 Delivery period

In case of cross-border deliveries within Europe the delivery call-offs shall be passed on 10 working days, outside

of europe max. 42 working days, previous at the longest; in case of deliveries within a country at the longest 5

working days ahead of the delivery date. The delivery period for each product and receiving location shall have to

be coordinated between the supplier and REHAU.

REHAU shall try to make sure that no changes of the arrangement occur during this delivery period. Nonetheless

the supplier shall try to do everything to deliver as fast as possible in emergency cases.

Page 26: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 26

10 VMI / consignment store

The consignment store / VMI shall have to be coordinated with REHAU and shall have to be ordered separately.

10.1 VMI

VMI is a consumption-based procedure, in which the supplier is responsible for scheduling and delivery control.

Based on delivery of the products in due time, the supplier ensures at all times that the minimum and maximum

stock agreed upon is not fallen short of or exceeded. In this respect it shall be considered safe that REHAU shall

inform the supplier at least once a week about the current inventory. In addition, along with the stock declaration

the supplier shall receive a rolling consumption preview of the presumable required quantity for the following days,

weeks and months. As a matter of principle, the VMI process shall take place with the consignment.

10.2 Consignment

In the consignment handling process, the products delivered by the supplier shall remain the property of the supplier

until removed by REHAU - from the consignment store named by REHAU. With the removal of the product from

the consignment stores, the said shall be considered sold.

Logistic and commercial details shall be defined in the REHAU consignment store contract. The REHAU process

shall provide consignment in combination with VMI and delivery schedule. In coordination with the supplier REHAU

reserves the right to combine other planning procedures with consignment.

11 Emergency concept

With the award of the contract, the supplier shall have to present REHAU with an emergency concept. This emer-

gency concept can then be harmonised with REHAU. On the side of the supplier, a competent contact shall have

to be nominated in addition, who is available at any time.

The aim shall be to define common measures which may serve as an emergency concept in case of disruptions

which could have an influence on the supply of REHAU. For example, disruptions may occur through the following

examples:

Defective machines or plants

Tool breakage

Capacity problems

Quality problems

Damage or delays during transport

Page 27: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 27

Disturbances in the supply chain of the supplier

EDP problems

Employees fall ill

Means of transport drop out

Other events (strikes, accidents, etc.)

Immediately when a disturbance occurs which has an influence on the supply of REHAU, the supplier shall be

obligated to report this fact to the appropriate planner at REHAU.

The supplier shall have to include the following data in his or her message:

Data on the currently known maximum supply disruption (quantities)

Cause of disturbance and estimation of its duration

Presentation of the measures taken / planned to remove the disturbance

Quantity and times of the emergency deliveries

If the procedure to remove the disturbance is insufficient as seen by REHAU, REHAU shall be permitted to suggest

measures to remove the disturbances under consideration of the interests of the supplier. The supplier shall be

obligated to implement these measures, provided these measures and their implementation are reasonable.

12 Financial consequences in case of violations

If a supplier violates against the provisions of this directive, REHAU shall charge its expenses for the correction as

follows.

The expenses mentioned shall cover the costs occurring to REHAU (staff, surface, operating materials, general

expenses), which are necessary to correct the corresponding faults before they can lead to further disturbances.

The outlay unit (AE) shall serve as a basis for the calculation of expense. REHAU organises its production locations

as follows:

Country 1: Germany, Austria, USA, France, Spain, South Africa: EUR 50 per AE.

Country 2: Mexico, Czech Republic, Slovakia, Hungary: EUR 35 per AE.

All countries not listed here shall fall into the group “Country 2”.

(A) Basic outlay

A value of 2.0 AE shall be charged for the basic outlay for each complaint. The following services shall be included:

Page 28: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 28

Administration of the complaint with the REHAU purchasing network

Complaint information to supplier

Performance of the tasks to process the complaints within the REHAU production plant (fault analysis,

blocking and separating of parts, and return / rework, if and when required)

Monitoring, internal control of the corrective measures of the supplier, completion of the complaint, issue

of debit note, dispatch and booking, archiving of complaint

(B) Additional outlay

Following up of the allocation of the outlay units, which shall be used to charge the individual error patterns in

addition to the basic outlay for the complaints. The data shall always refer to the number of positions per delivery

concerned.

Consignment fault: 1.0 AE

The following faults shall be taken into consideration here for example:

Inadequate delivery documents (not in conformity with our specifications from this document)

Faulty or absent DFÜ, if agreed upon

Division of the quantity delivered to several consignments

Underdelivery or overdelivery without previous approval by REHAU

Missing time slot booking

Faulty packaging: 1.0 AE

The following faults shall be taken into consideration here for example:

Delivery in wrong packaging

Delivery in incomplete packaging, without caps, for example

Marking / labelling: 1.0 AE

The following faults shall be taken into consideration here for example:

Insufficient marking

No label

Wrong data on the label

Several labels

No label in conformity with our specifications from this document

Page 29: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 29

Sorting and/or repacking process:

Sorting out or repacking of parts at a REHAU production location by the supplier: 0.5 AE per hour

Sorting out or repacking of parts at a REHAU production location by REHAU: 1.0 AE per hour

On the basis of the REHAU complaints report, the debit note shall be issued to the supplier.

13 Validity

In individual cases, a situational adaptation of the logistics guidelines shall be possible. On account of the high

demands of the REHAU customers especially, this may become necessary. In this case a cooperation with the

supplier shall be coordinated. A refusal of an adaptation shall not be permitted without an understandable reason.

If a provision of this logistics agreement should be or become invalid, this fact shall not affect the validity of the

other provisions. By means of adaptation the ineffective stipulations shall be replaced by another reasonable stip-

ulation which comes economically closest to what the contractual parties would have wanted if they had known

about the ineffectiveness of the stipulation.

14 Enclosures

1. Requirement catalogue - packaging

2. Example: VDA goods label

3. Exchange criteria - reusable packaging

4. Additional contacts

5. Specification of America

Page 30: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU Logistics Guidelines for purchased parts / Automotive

Status 01 2017 Page 30

15 Acceptance

The observation of the logistics guidelines and their enclosures is confirmed herewith.

Place, date Signature

Stamp

Page 31: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Table of enclosures

1. Requirement catalogue

packaging Europe + SA

Status January 2017

2. Example: VDA goods label

Status August 2016

3. Exchange criteria - reusable packaging

Status June 2014

4. Additional contacts

Status August 2016

5. Specification of America

Status January 2017

Page 32: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Enclosure 1 Requirement catalogue

packaging Europe + SA

Status January 2017

Consisting of:

Page Content

01 Permissible packaging materials

02 -03 Packaging concepts

Page 33: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 1 Requirement catalogue packaging Europe + SA, Status 01/2017

Mr Straßer, phone: +49 9283 77 1686, e-mail: [email protected] Page 1 /4

Approved packaging materials:

Packaging materials

Material Accepted materials Invalid materials

Composites not accepted

Plastics in general PE, PP acc. DIN 6120, PE foam

Selected packaging

Packaging

Foil

Bags

Protection and insulation caps

Pipes

Trays

PE (DIN 6120, adhesive strips and stick-ers of the same material)

PE, PP, PS

PE, PP, PS, PET, ABS

Percentage of other markings max. 3% of foil surface markings

adhesive strips and stickers not of the same material

Cardboard and paper Marked with the RESY symbol Insoluble in water: such as wax paper, par-rafin paper, oil paper

Strapping PP strapping, steel strapping PA and polyester strapping

Anti corrosion papers Recyclable material, with RESY symbol

Wood acc. IPPC standard Chipboard, waterproofed, coated or painted wood

Padding material Corrugated board, paper Vegetable fiber chips, EPS-chips

Page 34: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 1 Requirement catalogue packaging Europe + SA, Status 01/2017

Mr Straßer, phone: +49 9283 77 1686, e-mail: [email protected] Page 2 /4

Group Part-Name (Examples)

Surface Loading Unit (Dimensions in mm) Comment

Concept Length Width Height

Chrom Parts „simple geometry“

Chrome Trim Left/Right/Center Chrome wing Chrome tip FHL

Class-A Chromed or painted

EPP-Trays

Max. 1200

Max. 800

Max. 1000

Min part density = 10 Handling from short side. One row per tray. Outside dimensions based on EU-pallets => Alteration have to be agreed with LOG AU upfront

Parts with surface and "complex geometry"

Skid Plate

Chrome frame

A-Wing

Radiator Grille

Class-A Chromed/ Painted

Per Agreement/Approval with LOG AU See comment „pool-ability“

Wiring Harness

Non visible Cardboardbox Handheld Tote 6280/6428

600 400 280 Wiring Harness individually

Energby Absorber

EU Pallet Cage 1240 835 970 See comment „pool-ability“

Collapsable skeleton container (bulk bin)

Max. 2200

Max. 1200

970 Length x per Part-Requirements

Big parts Parts with length between 21” < x < 29”

grained Cardboardbox/Handheld Tote

800 600 210 Incl. Trays – returnable/expandable after agreement with logistics, wrapping in non-woven fabric/foil/... is not accapted painted Handheld Tote / EPP-Tray 800 600 210

Parts with length

x > 29”

Grained corrugated carton/ bulk bin bag-racks

1200 Max. 2200

835 Max. 1200

970 Max. 1000

See comment „pool-ability“

painted Special load carrier / EPP Max 2400

Max 1400

Max 1000

If part geometry requires a height > 1,000 mm (exp. grill), agreement with responsible logistic planner is mandory in advance of quotation.

Small parts Cover Lamella Tow Lug/SRA Cover Visual protection left/right Cover left/right Grid left/right License Plate Adapter Etc.

Class-A grained

Cardboardbox Handheld Tote 6280/6428

600

400

280

Lamella etc.

Class-A Inhouse-Painting

Cardboard-Box Handheld

Tote 6280/6428

600 400 280 With Tray-Inlays – disposable/returnable in coordination with LOG AU No wrapping with foil etc.

Page 35: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 1 Requirement catalogue packaging Europe + SA, Status 01/2017

Mr Straßer, phone: +49 9283 77 1686, e-mail: [email protected] Page 3 /4

Exhaust Pipe Mounting Bracket Rear Center Inlay BSM Bracket

Non visible Cardboard-Box Handheld Tote 6280/6428

600 400 280 Check necessary of set packaging

Very Small parts

PTS/PLA-Adapter FGS-Adapter Flap Ritsch-Ratsch Plate/ Camera-Bracket Adapter Wheelhouse

Non visible Cardboard-Box Handheld Tote 4280/4328

400 300 280

Fastening Elements

(expanding)rivets Screws Clips Plug-in/clip nut Brackets (EasyBoss)nuts Reinforcing hole Mounting bracket MMS (sealing)disc "plate with pins"

Non visible Cardboard-Box Handheld Tote 3174/3418

400 300 150 Provided in production in BOSCH grab containers => pourability!

Page 36: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 1 Requirement catalogue packaging Europe + SA, Status 01/2017

Mr Straßer, phone: +49 9283 77 1686, e-mail: [email protected] Page 4 /4

Project-specific deviations from the catalog above are possible af-ter consultation, checking and approval with the responsible lo-

gistics planer

Specifications for Cardboard-Packaging FEFCO - Typ 0201 - Qualität 2.50BC

max. Dimensions per Shipping Unit 1200x800x1000 mm

Pool ability Pallet Cages must be pool- and exchangeable and follow

UIC 435-3.

EU-Pallets need must be fabricated according EN13698-1.

The choice of packaging dimension has to match the standard dimensions of REHAU [mm]

Group: Length Width Height

Cardboardbox

Handheld Tote 400 300 280

600 400 280

800 600 280

Bag Rack 1200 800 1000

1600 1200 1000

2200 1200 1000

Uniqe designed Rack 1200 800 1000

1600 1200 1000

2200 1200 1000

2400 1400 1000

Returnable pallets according to the valid DIN EN 13698

and bulk-bins according to the valid UIC 435 have to be

used, if the connection to the EU-pool system is possible.

Every returnable pack shipped to REHAU has to be

equipped with Kennedy Placards where shipping labels are

placed on.

Pallets to be used in case of:

Expendable Loading Units = One Way Wooden Pallet

Returnable Loading Units = Plastic Pallet + matching

Lid

Returnables are not to be shipped on wooden pallets! If possible, no parts individually wrapped to avoid un-

necessary handling (foil, microfoam, polybags, etc.)

Page 37: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Page 5 /3

Enclosure 2 Example: VDA goods label

Status August 2016

Consisting of:

Page Content

01 Master label (loading unit)

02 Single label (packing unit)

Page 38: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 2 Page 1 / 2

State 08/2016

Example for a VDA-transport label (barcode-capable)

„Master label“ (loading unit)

Nr. Description Content 1 consignee plant + location

2 unloading point-storage location-usage identifier

unloading point (if predefined)

3 Packing slip no Number assigned by the supplier to the packing slip

4 vendor address vendor address in shortened form

5 weight net weight of the package without carrier in kg

6 weight gross weight of the package with carrier in kg

7 number of packages number of packages for the entire delivery

8 customer part number Left aligned REHAU identification number incl. bar code Right aligned 6-digit raw material number as text

Note: With regard to the contents the REHAU raw material num-ber will be transmitted with the call-off orders according to VDA 4905 with the record type 515 in field 09 „Complementary ident. no.“. This complementary ident. no. is expected to appear on the VDA label according to VDA4902 standard in field 8, in addition to the REHAU ident. no., right-justified as “ident. no. customer short form”. The two numbers shall not overlap.

9 packing density actual pack density of the identification number (on master label of the whole package; on single label of the small hand held totes)

10 description of shipment or service description of goods

11.1 11.2

supplier part number customer packaging number (op-tional)

supplier part number for the bin

12 vendor number allocated Identification number to the supplier by REHAU

13 date delivery date of goods

14 engineering revision status delivered revision status

15 package number allocated identification number to the package by the supplier

16 batch number allocated number to a batch by the manufacturer

1

2

3

4

5 6 7

8

9

1

11.

11 1

1 1

11.

Page 39: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 2 Page 2 / 2

State 08/2016

Example for a VDA-transport label (barcode-capable)

„Single label“ (packaging unit (Handheald tote/cardboard/EPP-Tray))

Nr. Description Content 1 consignee plant + location

2 unloading point-storage location-usage identifier

unloading point (if predefined)

3 Packing slip no Number assigned by the supplier to the packing slip

4 Customer part number Left aligned REHAU identification number incl. bar code Right aligned 6-digit raw material number as text Note: With regard to the contents the REHAU raw material number will be transmitted with the call-off orders according to VDA 4905 with the record type 515 in field 09 „Comple-mentary ident. no.“. This complementary ident. no. is expected to appear on the VDA label according to VDA4902 standard in field 8, in addi-tion to the REHAU ident. no., right-justified as “ident. no. customer short form”. The two numbers shall not overlap.

5 packing density actual packing density of the identification number (on mas-ter label of the whole package; on single label of the small load carriers)

6 description of shipment or service description of goods

7 supplier part number supplier part number for the bin

8 vendor number allocated Identification number to the supplier by REHAU

9 date delivery date of goods

10 engineering revision status delivered revision status

11 package number allocated identification number to the package by the sup-plier

12 batch number allocated number to a batch by the manufacturer

All goods, including prototypes and pre series delivieres, have to be labeled in accordance to

above instructions by the supplier.

It is imperative that deviations from VDA 4902 Version 4 (e.g. bar codes) are agreed in ad-

vance with the Logistics Planning Department of REHAU.

1 2 3

4

5

6

7

8

9 1

11

Page 40: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Enclosure 3 Exchange criteria - reusable packaging

Status June 2014

Consisting of:

Page Content

01 Containers

02 Pallets

03 Wire mesh boxes

Page 41: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 3 Page 1 / 3

State 06/2014

Exchange Criteria for Returnables:

1.0 Handheld-Totes

REHAU-Tote-Exchange Criteria

This tote conforms with the REHAU Exchange Crite-

ria for Handheld Totes

REHAU-Tote-Quality Criteria

This tote conforms with the REHAU

Quality Criteria for Handheld Totes

These totes do not conform with the REHAU Ex-

change Criteria for Handheld Totes

Tote is damages. Work safety cannot be guaranteed

anymore. The Tote cannot be exchanged.

These totes do not conform with the

REHAU Quality Criteria for Handheld

Totes

Tote is labeled with old stickers.Tote is

labeled with old stickers. These stickers

have to be removed by the supplier be-

fore filling.

Tote is badly deformed. The original footprint cannot

be recovered. This tote cannot be exchanged.

Tote is dirty. It’s the suppliers responsi-

bility to only fill clean2Totes.

2 Clean = No dirt comes off when the tote is rubbed down with a cloth. The tote is therefore clean off

Oil, Dust, Chips or similar.

Page 42: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 3 Page 2 / 3

State 06/2014

2.0 Pallets

To exchange EPAL certified EUR-pallets, the following exchange criteria must be observed.

Non-Exchangeable EUR-pallets3:

A single upper or lower edge board is dam-aged so that more than one nail or screw shank is revealed.

The marking EUR on the right, as well as the logo of a rail-company is missing on the left side.

A board is missing.

A block is missing or split to the point where more than one nail shank is visible. Skewed blocks may not protrude more than 10 mm.

A board is broken transversely or diagonally.

More than two upper or lower edge boards are dam-aged so that more than one nail or screw shank is visible.

Other characteristics (Poor condition overall):

The loading capacity can no longer be guaranteed (wood worm-eaten or rotten).

Contamination is such that products may be soiled.

Large splinters are coming away from a number of blocks.

There is evidence that inadmissible construction elements have been used, e.g. boards

and blocks that are too weak.

3 Source: www.epal-pallets.de/de/produkte/tauschkriterien.php

Page 43: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 3 Page 3 / 3

State 06/2014

3.0 Boxes

The valid EPAL exchange criteria apply. Non-exchangeable boxes are4:

The stacking frame or the corner uprights are de-formed.

The hinged front panels can no longer be opened or closed.

The floor frame or feet are so bent that the box pallet no longer stands firmly on four feet or can no longer be stacked safely.

The lattice is so torn that the wire ends pro-trude inside or outside (one wire per wall is al-lowed to be missing).

One board is missing or broken.

The essential identification markings (EUR in oval, railway symbol) are missing or illegible.

Due to rust or dirt, the general condition is so bad that freight can be contaminated.

4 Source: www.epal-pallets.de/de/produkte/gb_tauschkriterien.php

Page 44: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Enclosure 4 Additional contacts

Status August 2016

Consisting of:

Page Content

01 Additional contacts

Page 45: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Additional Contacts

REHAU - Automotive locations, Germany:

Location Contact – Management -

Deliveries Empties management - Purchase

Goods receiving times Information on loading / unloading

Brake Mr. Benedikt Rolfes Mr. Steffen Ruessbuelt/ Mr. Bastian Grube Monday to Friday

06:00 - 22:00 h

Break: 10:00-10:30 h; 19:00-19:30 h

Loading from the side is pos-sible only

Tel. +49 4401/ 7091-500 Tel. +4944017091-326

[email protected]

[email protected] [email protected]

Feuchtwangen Mr. Andreas Wessely Mrs. Lohre Langohr Monday to Thursday 07:30 – 16:15 h

Friday: 07:30 - 15:00 h

Loading from the side is pos-

sible only, with forklift truck

possible; loading from the

left; vehicles with tarpaulin. Tel. +49 9852 905 389 Tel. +49 9852 905 535

[email protected] [email protected]

Feuchtwangen Mr. Emmad Hammati Mr. Emmad Hammati Monday to Thursday 07:30 - 16:15 h

Friday: 07:30 - 15:00 h

Rear loading with ramp is possible only; no loading from the side.

LDL Tel. +49 9852 905 5914 Tel. +49 9852 905 5914

Fa. Geiss [email protected]

[email protected]

MLC Ingolstadt

Mr. Waldemar Feil Mr. Florian Bergmüller Monday to Friday

Rear loading and loading from the side possible; load-ing with ramp not possible.

Tel. +4984198122220 Tel. +49 841 98122 225 08:00:00 - 16:00 h

[email protected] [email protected]

Schwarzen-

bach

Mrs. Doris Reuter Mr. Roland Knauer Monday to Thursday Unloading with ramp only is

possible; no loading from the

side. Tel. +49 9289 9643 107 Tel. +49 9289 9643 255 07:30 – 16:30 h

[email protected] [email protected] Friday: 07:30 - 15:00 h

MLC

Mosel

Mr. Sven König Mr. Sven König / Mrs. Anja Pohl Monday to Thursday

07:30 – 16:00 h

Friday: 07:30 - 14:00 h

Loading from the side is pos-

sible only; no ramp or similar

available. Tel. +4937544029220 Tel. +4937544029-220 / -230

[email protected] [email protected]; [email protected]

Viechtach

Mr. Adolf Ernst Mrs. Silke Goller, Mr. Thomas Maierhofer Monday to Thursday

07:00 – 12:00 h und

13:00 – 16:00 h

Friday: 07:30 - 13:00 h

Loading from the side is pos-sible only; no ramp or similar available.

Tel. +4999429426620 Tel. +49994294266 -25 / -22

[email protected]

[email protected] [email protected]

Page 46: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU - Automotive locations, Europe:

Location Contact – Management -

Deliveries Empties management - Purchase

Goods receiving times Information on loading / unloading

MLC

Bratislava (SK)

Mr. Marcel Stefan Mr. Michal Sloboda Monday to Saturday

06:00 - 06:00 h

Unloading on Saturdays / Sun-

day is possible upon consulta-

tion!

Unloading from the left and

rear loading is possible. Tel. +421 (2) 68209111 Tel : +421 917 751 045

[email protected] [email protected]

Mr. Peter Csiszar Mr. Peter Csiszar Sunday to Saturday

22:00 - 18:00 h Unloading on other time is pos-

sible upon consultation!

EKAER Anmeldung: (E-Mail an gesamten Verteiler)

Timea.KOePCSENYIOVA@

rehau.com [email protected] Las-

[email protected] [email protected]

[email protected] [email protected] Pe-

[email protected]

loading from the side possi-ble; loading with ramp not possible.

Györ (HU) Tel. +3696996135 Tel. +36 96 996135

[email protected] [email protected]

MLC

Graz (AT)

Mr. Josef Koch Mr. Josef Koch Monday to Friday Rear loading and loading from the side possible.

Tel. +43 (316) 403049110 Tel. +43 (316) 403049110 06:00:00 - 22:00 h

[email protected] [email protected]

Jevičko (CZ)

Mr. Jan Stula Mr. Jan Stula Monday to Friday

Rear loading and loading from the side with forklift truck, no ramp available.

Tel. +420 (465) 357322 Tel. +420 (465) 357322 06:00:00 - 18:00 h

[email protected] [email protected]

Moravská

Trebová

(CZ)

Mr. Josef Plch Mrs. Lenka Pokorna / Mr. Jaromir Spacek Monday to Friday

06:00:00 - 20:00 h

Rear loading and loading from the side with forklift truck, no ramp available.

Tel. +420 (461) 355320 Tel. +420 461 355 272 / -379

[email protected]

[email protected] [email protected]

POIX DE PI-

CARDIE (FR)

Mr. Nicolas Vercruysse Mr. Fabrice Renoux Monday to Thursday Rear loading and loading from the side with forklift truck, no ramp available. Tel. +33322903877 Tel. +33322903872

08:00 – 12:00 h and 13:00 – 16:00 h

[email protected]

[email protected]

Friday: 08:00 - 13:00 h and 13:00 – 15:00 h

Tortosa

(ES)

Mr. Manel Lamas Mr. Jose Ramon Ferrer Monday to Thursday

Rear loading and loading from the side possible.

Tel +34 977 454 191 Tel +34 977 454 187 08:00 – 13:00 h and

14:30 – 17:30 h

[email protected] [email protected] Friday: 08:00 - 13:00 h

Page 47: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

REHAU - Automotive locations, South Africa:

Location Contact – Management -

Deliveries Empties management - Purchase

Goods receiving times Information on loading / unloading

Port Elizabeth Mr Wayne Venter Mr Lourens Campher Monday to Thursday

07:30 - 16:15 h

Friday: 07:30 - 15:00 h

Loading from the side for JIS and ETD ranges; rear loading is possible; ramp loading is possible only for export con-tainers. Tel. +27 41 9787026 Tel. +2741978-7079

[email protected] [email protected]

Fort Jackson Mr Peter Dyer Mrs. Delene Ntelezi Monday to Thursday 07:30 - 16:15 h

Friday: 07:30 - 15:00 h

Loading from the side is pos-sible only; for export con-tainers rear loading is possi-ble only.

Tel. +27437084-401 Tel. +27437084444

[email protected] [email protected]

REHAU - Automotive locations, North Amerika:

Location Contact – Management -

Deliveries Empties management - Purchase

Goods receiving times Information on loading / unloading

Cullman

Mr Oliver Whitis Mrs. Spring Lasseter, Mr.Justin Hodges

Monday to Friday

08:00 – 16:00 h

Rear loading at dock is possi-

ble only; no loading from the

side.

Roll-up doors are not ac-cepted High cube trailer cannot be unloaded. Product must not be loaded over 104“

Tel. +125673730263125 Tel. +125673730263-254 /-273

[email protected]

[email protected]

[email protected]

Page 48: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Enclosure 5 Specification of America

Status January 2017

Consisting of:

Page Content

01 Approved packaging materials

02 - 04 Packaging concepts

05 Labeling of returnable packaging

Page 49: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 5 Specification of America, 01/2017

Mr Volkmann, phone: +001 256-737-3026, Ext. 3042, e-mail: [email protected] Page 1 /6

Approved packaging materials:

Packaging materials

Material Accepted materials Invalid materials

Composites not accepted

Plastics in general PE, PP acc. DIN 6120, PE foam

Selected packaging

Packaging

Foil

Bags

Protection and insulation caps

Pipes

Trays

PE (DIN 6120, adhesive strips and stick-ers of the same material)

PE, PP, PS

PE, PP, PS, PET, ABS

Percentage of other markings max. 3% of foil surface markings

adhesive strips and stickers not of the same material

Cardboard and paper Marked with the RESY symbol Insoluble in water: such as wax paper, par-rafin paper, oil paper

Strapping PP strapping, steel strapping PA and polyester strapping

Anti corrosion papers Recyclable material, with RESY symbol

Wood acc. IPPC standard Chipboard, waterproofed, coated or painted wood

Padding material Corrugated board, paper Vegetable fiber chips, EPS-chips

Page 50: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 5 Specification of America, 01/2017

Mr Volkmann, phone: +001 256-737-3026, Ext. 3042, e-mail: [email protected] Page 2 /6

Group

Part-Name (Examples) Surface Loading Unit (Dimensions in inch) Comment

Concept Length Width Height

Chrom

Parts

„simple

geometry“

Chrome Trim

Left/Right/Center

Chrome wing

Chrome tip FHL

Class-A

Chromed or

painted

EPP-Trays Max 48 Max 45

Max 52

(7“ for the

tray)

Min part density = 10

Handling from short side. One row per tray.

Outside dimensions based on common

48"x45" pallets

max. allowed tray-size 45"x24"

=> Alteration have to be agreed with LOG AU upfront

Parts with

"Class-A"-

surface and

"complex

geometry"

Skid Plate

Chrome frame

A-Wing

Radiator Grille

Class-A

Chromed

Painted

Per Agreement/Approval with LOG AU

Bag-Rack x 48 52

Handling from Short Side.

Length x per Part-Requirements and Agreement with PE

Logistics

Wiring

Harness

Non visible Cardboardbox

Handheld Tote 24 15 7

Wiring Harness individually

Heigth of 9" or 14" per approved by LOG AU

Boxes must fit the common pallets 48“x45“x52“

Energby

Absorber

Non visible

Bulk Bin

Bulk Bin

48

Max 78

45

max. 48

34

34

Length depends on dimensions of part

Big Parts

Parts with length between

21” < x < 29”

grained Cardboardbox

Handheld Tote 32 15 10

Boxes must fit the common pallets 48“x45“x52“

painted Handheld Tote

EPP-Tray 32 15 10

With dunnage in the Trays/Totes Expandable/ returnable after agreement with PE LOG No parts individually wrapped (foil, microfoam, polybags, etc.)

Parts with length

x > 29”

grained Cardboardbox/

Bulk Bin

48

48

15

45

10

34

painted

Unique

designed rack 96 48 52

Dimensions has to match US-standard-trailer dimensions

Small Parts Cover

Lamella

Tow Lug/SRA Cover

Class-A

Grained

Cardboardbox

Handheld Tote 24 15 7

Heigth of 9" or 14" per approved by LOG AU

Boxes must fit the common pallets 48“x45“x52“

(max. Height 52“)

Page 51: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 5 Specification of America, 01/2017

Mr Volkmann, phone: +001 256-737-3026, Ext. 3042, e-mail: [email protected] Page 3 /6

Visual protection left/right

Cover left/right

Grid left/right

License Plate Adapter

Etc.

Small Parts Lamella

Etc. Class-A

Inhouse-

Painting

Handheld Tote

Cardboard-

Box

24 15 7

With Tray-Inlays – disposable/returnable in coordination with

LOG AU

No wrapping with foil etc.

Heigth of 9" or 14" per approval by PE LOG

Exhaust Pipe Mounting

Bracket

Rear Center Inlay

BSM Bracket

Non visible

Handheld Tote

Cardboard-

Box

24 15 7

Approval necessary for set packaging

Heigth of 9" or 14" per approved by LOG AU

Very Small

Parts

PTS/PLA-Adapter

FGS-Adapter

Flap Ritsch-Ratsch

Plate/

Camera-Bracket

Adapter Wheelhouse

Non visible

Handheld Tote

Cardboard-

Box

12 15 7

Fastening

Elements

(expanding)rivets

Screws

Clips

Plug-in/clip nut

Brackets

(EasyBoss)nuts

Reinforcing hole

Mounting bracket MMS

(sealing)disc

"plate with pins"

Non visible

Handheld Tote

Cardboard-

Box

12 15 7

Provided in production in BOSCH grab containers

=> pourability!

Page 52: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 5 Specification of America, 01/2017

Mr Volkmann, phone: +001 256-737-3026, Ext. 3042, e-mail: [email protected] Page 4 /6

Bei Auswahl der Behältergrößen muss der Standard von REHAU eingehalten werden: (Dimensions in inch)

Concept Length Width Height

Handheld Tote

Cardboard-Box 12

24

24

48

48

15

15

22

15

22

7

7

7

7

7

Bag Racks/

Uniqe designed

Rack

48

57

63

70

78

90

96

45

48

48

48

48

48

48

52

52

52

52

52

52

52

Bulk Bins 32

32

48

30

30

45

25

34

25

Project-specific deviations from the catalog above are possible af-ter consultation, checking and approval with the responsible lo-

gistics planer

Pallet Cages must be pool- and exchangeable and fol-low UIC 435-3.

EU-Pallets need must be fabricated according EN13698-1.

If possible, no parts individually wrapped to avoid unneces-

sary handling (foil, microfoam, polybags, etc.)

Pallets to be used in case of:

Expendable Loading Units = One Way Wooden Pallet Returnable Loading Units = Plastic Pallet + matching Lid Returnables are not to be shipped on wooden pallets!

Every returnable pack shipped to REHAU has to be equipped with Kennedy Placards where shipping labels are placed on.

Page 53: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 5 Specification of America, 01/2017

Mr Volkmann, phone: +001 256-737-3026, Ext. 3042, e-mail: [email protected] Page 5 /6

48

48

57

57

63

63

70

70

78

78

45

45

48

48

48

48

48

48

48

48

34

50

25

34

25

34

25

34

25

34

Page 54: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Attachment 5 Specification of America, 01/2017

Mr Volkmann, phone: +001 256-737-3026, Ext. 3042, e-mail: [email protected] Page 6 /6

Labeling of returnable packaging (parts used at REHAU)

In Case of returnable Packaging every tote/bin/rack has to be labeled the following:

Totes (w/o Dunnage) 2 Stickers per tote. One on each long side with a 4-digit V-Number or 6 digit V-Number. Number is unique per tote/supplier. If no num-ber is set up yet this will be done with packaging approval by PE LOG.

Totes (w/ Dunnage) 2 Stickers per tote. One on each long side with a 4-digit V-Number or 6 digit V-Number. Number is unique per part/project. Number will be set up with packaging approval by PE LOG.

Bins (w/o Dunnage) 4 Stickers per Bin. One on each side with a 4-digit V-Number or 6 digit V-Number. Number is unique per tote/supplier. If no number is set up yet this will be done with packaging approval by PE LOG. If Bin is collapsible the number must be visible with collapsed bin. Placement on base

Bins (w/ Dunnage) 5 Stickers per Bin. One on each side with a 4-digit V-Number or 6 digit V-Number. Number is unique per part/project. Number will be set up with packaging approval by PE LOG.

Racks 6-Digit V-Number has to be stenciled on the frame. Visible from all sides (ex. all 4 Corner-Posts). Placement per agreement with PE LOG. Number is unique per part/project. Number will be set up with packaging approval by PE LOG.

Page 55: REHAU LOGISTICS GUIDELINES€¦ · REHAU Logistics Guidelines for purchased parts / Automotive Status 01 2017 Page 6 1 General aspects 1.1 Target and validity of the guidelines The

Table of enclosures

END