Rehabilitation works for IOM- Office Hay Al-andalus BILL OF QUANTITY (BOQ) Department: VHR Location : Hay Al-andalus Date prepared: 31\7\2019 Estimated Project Cost Total Price USD Unit Price USD Qty. Unit Description Item No. 1 L.S Cleaning of the site from waste such as plants, old furniture, Maintenance Residues and any damaged materials or equipment and transfer of waste to public dumps. 1 9 1 L.S Plastic paint ((JUTON) ) for interior walls and ceiling (Two faces paint+ one face paste) . The work includes treatment of cracking and wall deformities. 2 1 L.S Supply and implement of paints for exterior walls of the building & fence. According to the required color, the price includes the treatment of cracks, distortions & moisture in the walls. 3 1 L.S Repair and treatment of cracks & concrete cover for building, the work includes: - Removal of crushed concrete. - Cleaning steel reinforcement and paint it with special material to protect it. - Use of treatment materials such as sika when filling the concrete cover to ensure the cohesion and adhesion between old & new concrete. 4

Upload: others

Post on 24-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rehabilitation works for IOM- Office Hay Al-andalus

Rehabilitation works for IOM- Office

Hay Al-andalus

BILL OF QUANTITY (BOQ)

Department: VHR Location : Hay Al-andalus Date prepared: 31\7\2019

Estimated Project Cost

Total Price USD

Unit Price USD

Qty. Unit Description Item

No.

1 L.S Cleaning of the site from waste such as plants, old furniture, Maintenance Residues and any damaged materials or equipment and transfer of waste to public dumps.

1

9 1 L.S Plastic paint ((JUTON) ) for interior walls and ceiling (Two faces paint+ one face paste) . The work includes treatment of cracking and wall deformities.

2

1 L.S Supply and implement of paints for exterior walls of the building & fence. According to the required color, the price includes the treatment of cracks, distortions & moisture in the walls.

3

1 L.S

Repair and treatment of cracks & concrete cover for building, the work includes: - Removal of crushed concrete. - Cleaning steel reinforcement and paint it with special material to protect it. - Use of treatment materials such as sika when filling the concrete cover to ensure the cohesion and adhesion between old & new concrete.

4

Page 2: Rehabilitation works for IOM- Office Hay Al-andalus

2 Unit Maintenance of emergency exit stairs, the work includes removing the corrosion (cleaning), Anti-rust paint & two layers paint, cut and replace the worn iron.

5

1 L.S

Supply and installation of steel door with 6mm thick for main gate, the work includes removing old gate. Maintenance of gate of cars (main gate), the work as follows: - Supply & installation of steel door with 6mm thick & dimensions of (4.20 * 2.80) m. The work includes Anti-rust paint, two layers paint according to the required color and removal of the old gate. - Supply and installation of an electric device to open and close the gate. The work includes all necessary to finish the work.

6

1 Unit Supply and installation of 6 mm thick steel door with dimensions (2.20 * 1.50) m for the entry of persons, the work includes Anti-rust paint, two layers paint according to required color & removal of the old gate

7

1 Unit Supply and installation of 6 mm thick steel door with dimensions (2.20 * 2.10) m for staff (side door), the work includes Anti-rust paint, two layers paint according to required color & removal of the old gate

8

3 Unit Supply and installation of 4 mm thick steel door with dimensions (2.00 * 1.20) m for Security room, the work includes Anti-rust paint, two layers paint according to required color & removal of the old gate

9

3 Unit Maintenance of steel door (2.15*1.50)m for western, northren & south entrance, the work includes removing the corrosion (cleaning), Anti-rust paint, two layers paint & cut and replace the worn iron.

10

3 Unit Detection and repair of air conditioners. 11

5 Unit Supply and installation of air conditioner 18 BTU (Panasonic), the work includes electrical connections, power switch and all necessary to finish work.

12

55 M2 Supply and installation of aluminum as partitions for the waiting room of the immigrant, the work includes installation of windows and doors.

13

22 M Supply and installation of barrier with 2m high to avoid visibility of adjacent buildings. 14

185 M2 Supply and installation of a metal shade (according to the attached catalog) for developing yard, work includes electrical works accordance to the technical specifications and instructions of the engineer.

15

Page 3: Rehabilitation works for IOM- Office Hay Al-andalus

5 Unit Supply and installation of P.V.C window (woody color) of excellent quality, the work includes the installation of glass thickness of 6 mm, remove the old window, prepare the place to receive the new work & all necessary to finish the work according to the standard specifications.

16

12 Unit Maintenance of windows, the work includes replacement of broken glass, maintenance of (joints, locks ,frames) & all necessary to finish the work according to the standard specifications.

17

2 Unit Supply and installation of aluminum door of excellent quality for western & south entrance, the work includes the installation of glass thickness of 6 mm, remove the old door, prepare the place to receive the new work and all necessary to finish work according to technical specifications.

18

1 Unit Supply and installation of aluminum door (2.15*1.50)m of excellent quality for northern entrance, the work includes the installation of glass thickness of 6 mm, remove the old door, prepare the place to receive the new work and all necessary to finish work according to technical specifications.

19

1 Unit Supply and installation of aluminum door of excellent quality for entrance of balcony in Office No (12), the work includes installation of glass and remove the old door and prepare the place to receive the new work and all necessary to work according to technical specifications and instructions supervisor engineer.

20

3 Unit Maintenance of aluminum doors, the work includes replacement of maintenance of (joints, locks, frames) and all necessary to finish work according to technical specifications.

21

5 Unit Maintenance of wood doors, the work includes carpentry, painting, maintenance of ( joints, locks, frame) and all necessary to finish the work according to technical specifications.

22

7 M2 Supply and installation of gypsum board wall (thickness of 12.50 mm & height of 2.30 m), the work includes installation of PVC door. (office-14)

23

1 L.S Remove wall of gypsum boards. (Office No. 15) 24

47 M2 Treatment of the leakage through the slab of security section by using (???????????). 25

100 M2 Replacement the damaged mosaic tiles for the external courtyard. 26

1 L.S Maintenance of the gardens surrounding the building. 27

Page 4: Rehabilitation works for IOM- Office Hay Al-andalus

Redeveloping W.Cs & Water System

1 L.S

Redeveloping of the bathroom No. (5) on the ground floor, the work includes the following: - - Remove flooring, sewage & water system, demolition of partition wall and clean the place to receive new work. - Implementation of the modification as shown in the drawings. - Implementation of sewage network for new developments, the work including excavation and backfill works. - Supply and installation of water network and connect it to the source. - Implementation of electricity network. - Supply and installation of ceramics for floors and walls. - Supply and installation of sanitary equipment : 3 latrines & 2 wash basin including all accessories. -Supply and installation of 3 shower mixers and 3 bidets spray. - Supply and installation of 3 doors of PVC with all accessories. - Supply and installation of 2 ventilation fan. all necessary to finish the work accordance to the technical specifications and instructions of the supervisor. Note: (All faucets and water mixers must be chrome-plated copper)

28

1 L.S

Maintenance of bathroom No. (11) The work includes: - Detect the water network and change the damaged accessories and valves. - Supply and installation of latrine (Chinese-painted porcelain) according to the required color. - Supply and installation of wash basin excellent sample includes a copper-chrome water mixer and plastic siphon. - Supply and installation of bidet (Chinese-painted porcelain) according to the required color.. The work includes dismantling the old equipment and preparing the place to receive the new work and all that is necessary to finish the work.

29

1 L.S Maintenance of bathroom No. (17) The work includes: - Remove the water network and implement a new network including all necessary accessories and

30

Page 5: Rehabilitation works for IOM- Office Hay Al-andalus

valves. - Supply and installation of latrine (Chinese-painted porcelain) according to the required color. - Supply and installation of wash basin excellent sample includes a copper-chrome water mixer and plastic siphon. - Supply and installation of bidet (Chinese-painted porcelain) according to the required color.. The work includes dismantling the old equipment and preparing the place to receive the new work and all that is necessary to finish the work.

1 L.S

Maintenance of bathroom in the security section The work includes: - Detect the water network and change the damaged accessories and valves. - Supply and installation of latrine (Chinese-painted porcelain) according to the required color. - Supply and installation of wash basin excellent sample includes a copper-chrome water mixer and plastic siphon. - Connect the water & sewage system with building network . - Detection & cleaning of sewage system The work includes dismantling the old equipment and preparing the place to receive the new work and all that is necessary to finish the work.

31

2 Unit Supply and installation of water heater with 80L capacity, the work includes electric work & remove old one & all necessary to finish the work according to the standard.

32

1 L.S

Redeveloping of water system the work includes: - Supply water tank with a capacity of 3000 liters and connect it to the well then be connected to the upper water tanks. - Supply and installation of (2)water tank with a capacity of 1500 liter. - Supply a pump (1.5) hp and connect it with the electric float. - Implementation of (3) iron platforms (1.5 m) height to put the tanks on them. - Connect upper water tank to with building to feed all components of the building. - Removing the old water system.

33

1 L.S Maintenance drain of rainwater and replacement damaged pipe for all site. 34

Page 6: Rehabilitation works for IOM- Office Hay Al-andalus

Electrical Network

1 L.S

Maintenance of electrical network for the site and work includes: - Detection of the existing network and preparation of a plan for the distribution of loads to ensure that there are no electrical problems due to the operation of electrical equipment, such as (air condensers + air conditioners + electric heaters + electric heaters + lighting). - Supply and installation of switches and electrical outlet ( thermal) high quality (original), the work includes the removal of all keys and old outlets. - Detecting the connections of the electricity generator and redistributing it to adequate the electrical loads. - Installation of electrical boxes and extensions necessary to finish the work according to the technical specifications and instructions of the supervisor engineer. The work includes all installations and extensions necessary to finish the work according to the technical specifications and instructions of the supervisor.

35

1 L.S Replacement of lights unit for the building, the work includes electric connection. 36

IT UNIT Unit CCTV System 37

IT UNIT Unit Fire Alarm System 38

IT UNIT Unit Internal communications system 39

Total Price= ........................ USD