Rehabilitation of Chester Water
Authority’s Pine Grove Dam
Tainter Gates
Brian P. MacEwen, P.E.
Director of Engineering
Chester Water Authority
April 24, 2013
PA AWWA Annual Conference
![Page 2: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/2.jpg)
![Page 3: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/3.jpg)
![Page 4: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/4.jpg)
Pine Grove Dam
650 ft. long, 65 ft. high at maximum
138 sq. mile watershed
Storage: 2.2 billion gallons
Uncontrolled ogee spillway 71.5 ft. long
Two 44 ft. wide by 30 ft high Tainter Gates
Gate Crest Elevation: 280 ft
Gate Sill Elevation: 250 ft
Low-Head Hydropower Facility (520 kw)
FERC Regulated Dam
![Page 5: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/5.jpg)
![Page 6: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/6.jpg)
![Page 7: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/7.jpg)
Tainter Gate Section
![Page 8: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/8.jpg)
![Page 9: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/9.jpg)
![Page 10: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/10.jpg)
Folsom Dam, California
![Page 11: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/11.jpg)
U.S. Bureau of Reclamation
1955
![Page 12: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/12.jpg)
Imagine you’re the
person who went to
open up a Tainter Gate
on Monday morning,
July 17, 1995 …
![Page 13: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/13.jpg)
• Sustained Release of
25,800 MGD
• Drained 40% of reservoir
until flow stopped
![Page 14: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/14.jpg)
Folsom Dam, California
Forensic Analysis
Diagonal brace joint next to trunnion was the initial
point of failure
Friction in the trunnion was not considered in the
design
![Page 15: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/15.jpg)
![Page 16: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/16.jpg)
![Page 17: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/17.jpg)
Trunnion
![Page 18: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/18.jpg)
FERC Response to Folsom Dam
FERC required ALL dams with tainter gates to
analyze whether friction was accounted for in
the design of the gate structure
Conduct a full gate opening every 5 or 10 years,
depending on category of dam
Conduct a close-up, detailed inspection every 10
years
![Page 19: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/19.jpg)
Project Team & Schedule
Consultant - Gannett Fleming Structural Analysis and Design in response to FERC directive
Preparation of the Bid Document
Services during Construction
Bid Project - March 2005 Crofton Diving Corporation, Newport News, VA
Construction Phase: Field work started Fall 2005
Fabrication of Bulkhead and Abutment Plates – 2006/07
Gate 1 – 2008 and Gate 2 - 2009
Stored Bulkhead in Summer of 2010
![Page 20: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/20.jpg)
Challenges at Pine Grove Dam
No stop-log or bulkhead arrangement in original
construction that would allow for inspection of
the gates in a dewatered condition
Reservoir and water supply intake had to stay in
operation 24/7
Plant personnel had to be very nimble with
flood events while one gate was out of service
No winter work
![Page 21: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/21.jpg)
How?
Customized Floating Bulkhead
6 caissons – 25” thick by 58” high by 44’ wide
Valves for flooding caisson with water and pumping
air for flotation
Abutment Plates – 304 SS
10” wide face for bulkhead seating
59 anchor bolts for each abutment
Installation with cofferdam
![Page 22: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/22.jpg)
![Page 23: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/23.jpg)
![Page 24: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/24.jpg)
![Page 25: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/25.jpg)
Anchor Bolts
Abutment Plates – 59 anchor bolts each side
1.25” and 1.50” diameter bolts with 11” to 16”
embedment
Loaded to 25,600 lbs
Tested 25% of anchor bolts after installation
![Page 26: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/26.jpg)
![Page 27: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/27.jpg)
![Page 28: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/28.jpg)
![Page 29: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/29.jpg)
![Page 30: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/30.jpg)
Barge
![Page 31: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/31.jpg)
![Page 32: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/32.jpg)
![Page 33: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/33.jpg)
![Page 34: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/34.jpg)
![Page 35: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/35.jpg)
![Page 36: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/36.jpg)
![Page 37: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/37.jpg)
Abutment Plates
![Page 38: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/38.jpg)
![Page 39: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/39.jpg)
![Page 40: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/40.jpg)
![Page 41: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/41.jpg)
![Page 42: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/42.jpg)
![Page 43: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/43.jpg)
![Page 44: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/44.jpg)
![Page 45: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/45.jpg)
Bulkhead
• Delivery to Site
• Installation - Rigid
![Page 46: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/46.jpg)
![Page 47: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/47.jpg)
![Page 48: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/48.jpg)
![Page 49: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/49.jpg)
![Page 50: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/50.jpg)
![Page 51: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/51.jpg)
![Page 52: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/52.jpg)
![Page 53: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/53.jpg)
![Page 54: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/54.jpg)
![Page 55: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/55.jpg)
![Page 56: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/56.jpg)
![Page 57: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/57.jpg)
![Page 58: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/58.jpg)
![Page 59: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/59.jpg)
![Page 60: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/60.jpg)
![Page 61: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/61.jpg)
![Page 62: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/62.jpg)
![Page 63: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/63.jpg)
Repairs
![Page 64: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/64.jpg)
![Page 65: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/65.jpg)
![Page 66: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/66.jpg)
![Page 67: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/67.jpg)
![Page 68: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/68.jpg)
![Page 69: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/69.jpg)
![Page 70: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/70.jpg)
![Page 71: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/71.jpg)
![Page 72: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/72.jpg)
![Page 73: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/73.jpg)
![Page 74: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/74.jpg)
![Page 75: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/75.jpg)
![Page 76: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/76.jpg)
![Page 77: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/77.jpg)
![Page 78: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/78.jpg)
![Page 79: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/79.jpg)
![Page 80: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/80.jpg)
![Page 81: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/81.jpg)
![Page 82: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/82.jpg)
![Page 83: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/83.jpg)
![Page 84: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/84.jpg)
![Page 85: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/85.jpg)
![Page 86: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/86.jpg)
![Page 87: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/87.jpg)
![Page 88: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/88.jpg)
![Page 89: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/89.jpg)
![Page 90: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/90.jpg)
![Page 91: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/91.jpg)
![Page 92: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/92.jpg)
![Page 93: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/93.jpg)
![Page 94: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/94.jpg)
![Page 95: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/95.jpg)
![Page 96: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/96.jpg)
![Page 97: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/97.jpg)
![Page 98: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/98.jpg)
![Page 99: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/99.jpg)
![Page 100: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/100.jpg)
![Page 101: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/101.jpg)
![Page 102: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/102.jpg)
![Page 103: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/103.jpg)
Full Height Lift
![Page 104: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/104.jpg)
![Page 105: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/105.jpg)
![Page 106: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/106.jpg)
![Page 107: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/107.jpg)
![Page 108: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/108.jpg)
![Page 109: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/109.jpg)
![Page 110: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/110.jpg)
![Page 111: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/111.jpg)
![Page 112: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/112.jpg)
![Page 113: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/113.jpg)
![Page 114: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/114.jpg)
Bulkhead Removal
Process
• Roll-up Garage Door
![Page 115: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/115.jpg)
![Page 116: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/116.jpg)
![Page 117: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/117.jpg)
![Page 118: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/118.jpg)
![Page 119: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/119.jpg)
![Page 120: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/120.jpg)
![Page 121: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/121.jpg)
![Page 122: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/122.jpg)
![Page 123: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/123.jpg)
![Page 124: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/124.jpg)
![Page 125: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/125.jpg)
Caisson Storage
• Location: Fishing HQ
• Power washed & touch-up paint
• Treated seals to prevent dry-rot
• Purge chambers with nitrogen
![Page 126: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/126.jpg)
![Page 127: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/127.jpg)
![Page 128: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/128.jpg)
Final Project Costs
Engineering - $ 150,000
Construction - $1,728,000
Thanks to:
Treatment Plant Staff
Gannett Fleming – Richard Horvath, P.E.
Crofton Diving Corporation
Jay Crofton & Kurt Feairheller
![Page 129: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering](https://reader036.vdocuments.us/reader036/viewer/2022062909/5b5ae0de7f8b9aa30c8cfeb8/html5/thumbnails/129.jpg)
QUESTIONS?