Rehabilitation of Aspen Street NW 16th Street NW to Georgia Avenue NW
Public MeetingJuly 9, 2020Presenters:
Samer Alhawamdeh, DDOTRandall Clarke, DMPED
![Page 2: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/2.jpg)
Agenda
• Project Introduction
• Project Location
• Timeline
• Project Improvements
![Page 3: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/3.jpg)
Project Overview
Aspen Street NW (from 16th Street to Georgia Avenue) is a multi-modal transportation corridor located in the Brightwood community adjacent to the Walter Reed Campus (south side). The District Department of Transportation (DDOT) is working to:
Ø Improve safety/mobility for motorists, bicyclists, and pedestriansØCoordinate with Walter Reed RedevelopmentØPreserve and enhance the historical significance of Aspen
Street NW
![Page 4: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/4.jpg)
Project Location
16th
Stre
et N
W
Geo
rgia
Ave
nue
NW
![Page 5: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/5.jpg)
Project Schedule
• Project Kick-off January 2019
• Public Meeting May 2019
• 30% Preliminary Design Complete Summer 2019
• 65% Intermediate Design Spring 2020
• ANC 4A Meeting July 2020
• 100% Final Design Winter 2020
• Start of Construction Summer 2021(anticipated)
![Page 6: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/6.jpg)
Shed Updates
• Two sheds (Buildings 31 and 84) are within new Aspen Street right-of-way.
• DMPED is leading application to Mayors agent thorough Historic Preservation Review Board (HPRB) to remove sheds.
• Mayor’s Agent for Historic Preservation has approved the removal of the sheds
![Page 7: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/7.jpg)
Key Design Elements
• Pedestrian/Bicycle Trail• Safety Improvement• Traffic Calming Measures• Street Lighting Upgrades• Improved Traffic Signal Operation • ADA Compliances• Roadway Reconstruction• Sidewalk Reconstruction• Drainage Improvements• Landscaping Improvement • More Trees / Preserve Existing Trees• Low Impact Development (LID)
![Page 8: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/8.jpg)
Proposed Typical Cross-Section
![Page 9: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/9.jpg)
Pedestrian/Bicycle Trail
• Similar Multi-use Trails in the City
Pennsylvania Avenue SE
Eastern Avenue
South Dakota Avenue NE
![Page 10: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/10.jpg)
Pedestrian/Bicycle Trail• Trail etiquette and space for all users
Metropolitan Branch Trail
![Page 11: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/11.jpg)
Trail Education
• Safe Routes to School• Adult Learn to Ride• Confident City Cycling• ABCs of Family Cycling• Since 2015 all DC 2nd Graders learn
how to ride (purchased over 900 bikes)
• WABA Bicycle Ambassadors and Trail Rangers
• Educated over 2300 Children & Adults in 2019
![Page 12: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/12.jpg)
Proposed Improvements (16th St to W. of 14th St)
![Page 13: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/13.jpg)
Proposed Improvements (West of 14th St to 14th Pl)
![Page 14: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/14.jpg)
Proposed Improvements (14th Pl to W. of 13th St)
![Page 15: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/15.jpg)
Proposed Improvements (W. of 13th St to 13th Pl)
![Page 16: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/16.jpg)
Proposed Improvements (13th Pl to Georgia Ave)
![Page 17: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/17.jpg)
Project Contacts
DDOT, Project Manager DMPED, Director Walter ReedSamer Alhawamdeh Local Redevelopment Authority202-369-4637 Randall [email protected] 202-727-1692
Contact our outreach coordinator for any questions:Public Outreach Coordinator Stacee [email protected]
DDOT Project Website:https://ddot.dc.gov/page/rehabilitation-aspen-street-nw
![Page 18: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/18.jpg)
Questions?
![Page 19: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/19.jpg)
![Page 20: Rehabilitation of Aspen Street NW...Randall Clarke, DMPED. Agenda •Project Introduction •Project Location •Timeline •Project Improvements. ProjectOverview Aspen Street NW (from](https://reader035.vdocuments.us/reader035/viewer/2022071215/6045cca70f420316287f623d/html5/thumbnails/20.jpg)
Proposed Improvements
• Drainage and Stormwater management improvements
• Landscaping and street trees to enhance neighborhood
• Green Infrastructure:– Parking lane porous asphalt– Bio-retention planters