Rehabilitating a 105-inch Interceptor – Innovations and
Lessons Learned
Pipe User Group | Northern California
March 13, 2018
Tim Karlstrand and Gary Warren
![Page 2: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/2.jpg)
2
Agenda
• System Overview
• Project Need
• Video
• Lessons Learned
• Technology Evaluation
• Hydraulic Analysis
• Cost Savings
• Odor Management
• Reducing Community Impacts
• Phase 1 Lessons Learned
![Page 3: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/3.jpg)
East Bay Municipal Utility District Overview
• EBMUD provides wastewater treatment for 680,000 of its 1.3 million water customers (“west of hills”)
• Wastewater is collected in large diameter interceptors from seven satellite communities – Alameda
– Albany
– Berkeley
– Emeryville
– Oakland
– Piedmont
– Stege Sanitary District
![Page 4: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/4.jpg)
Wastewater Flow Range
•Wastewater flow from satellites (MGD = million gallons per day)
– Average annual flow = 50 MGD
– Peak wet weather = 415 MGD (at MWWTP)
– Peak wet weather = 700 MGD (system-wide)
– Primary treatment = 320 MGD (max)
– Secondary treatment = 168 MGD (max)
• Significant peaking factor is a key challenge
![Page 5: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/5.jpg)
Wastewater Interceptor System
• EBMUD
– 29 miles of gravity interceptors
– 8 miles of force mains
– 15 pump stations
– MWWTP, plus 3 WWFs
• Satellites
– ~1,600 miles of regional collection system
– ~1,600 miles of private sewer laterals
![Page 6: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/6.jpg)
6
Background Project Need • Corrosion of the South Interceptor is active and
rehabilitation is necessary
– Due to high levels of hydrogen sulfide
![Page 7: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/7.jpg)
7
Background Capital Improvement Program
![Page 8: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/8.jpg)
CIP Update Four Phases of 3rd Street
• Four phases of work over 8+ years
8
Project Segment Total Project
Cost 3rd St Rehab Phase 1* $9.0M
3rd St Rehab Phase 2 $24.9M
Special Structures Rehab $8.3M
Embarcadero Rehab $12.8M
Total $55.0M *3rd St Rehab Phase 1 construction estimate is $6.8M
![Page 9: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/9.jpg)
9
Video
• California Association of Sanitation Agencies (CASA)
2017 award for Outstanding Capital Project https://casaweb.org/about-us/awards-program/
![Page 10: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/10.jpg)
Phase 1 – 4 Project Scope
10
Phase 1
Phase 2
Phase 4 (Embarcadero)
*Phase 3 not shown (Special Structures)
![Page 11: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/11.jpg)
11
Constraint Analysis
• Flow – Dry weather construction
– No pumped bypass (of interceptor flow)
– Tributary flow management
– Daily sediment deposition
• Capacity – Reliability during construction
• Method cannot significantly restrict capacity during non-work hours
– Rehabilitated pipe • New profile cannot significantly reduce capacity
![Page 12: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/12.jpg)
12
Lessons Learned Damage Repair Project
• 1993 Danby
• Rigid sheets
• Grouted in place
• No repairs needed
![Page 13: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/13.jpg)
13
Lessons Learned Wood St Projects
• 2001 Linabond
• Flexible sheets glued with “structural polymer”
• Many repairs needed due to hydrostatic failures
• 2012-15 Linabond
• Rigid sheets glued with “structural polymer”
![Page 14: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/14.jpg)
Technology Evaluation Overview
14
• 10 methods evaluated, 5 screened as feasible
Alternative Project Installation
Post Construction
Manned Inspection
Repairs To-date
Danby Crown
SD-205A 1993 1997 None
Linabond SD-238 2000 2007
2012*, 2017**
SD-342 2012-15 n/a n/a
Ameron SD-297 1993 2015 None
Hobas Numerous Large
Diameter Numerous Some
Sekisui & Danby Spiral
Waterside Large
Diameter ? ?
* ’12 329 individual repairs, 1567 square feet of repairs. ** ’17 9 repair of repairs
![Page 15: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/15.jpg)
15
96-97” diameter
Rehabilitation Systems Slipliner Detail (complete liner)
![Page 16: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/16.jpg)
16
97-100” diameter
Rehabilitation Systems Spiral Liner (complete liner)
![Page 17: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/17.jpg)
17
Rehabilitation Systems Crown Liner Manufacturer
• Danby specified
• No known equal
• Linabond not be specified
• Higher cost
• Longer schedule
• Quality concerns by Linabond
• Lower life cycle
• Unresolved safety concern
• Ameron Arrow-Lock specified for repairs
![Page 18: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/18.jpg)
18
Rehabilitation System Evaluating Alternatives (Operations)
Alternative Operations Impacts*
Remote Plant
1. Crown Lining Medium Medium
2. Slip Lining Low Low
3. Spiral-wound Liner Medium Medium
![Page 19: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/19.jpg)
19
Rehabilitation System Evaluating Alternatives (Cost)
Item Alternative
Crown Liner Slip Lining Spiral Liner
Number of Potential Bidders
2 5-10 1
Historic Bid Spread*
40-50% 10-25% n/a
Marketplace Volatility
High Low Medium
*Actual bid range $4.9-7.5M, Engr Est $5.9M
![Page 20: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/20.jpg)
20
Platform
Rehabilitation Systems Crown Liner Detail (Ph1 Selected – Danby)
101” diameter
Lower Termination Level
![Page 21: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/21.jpg)
21
Flow Management Strategy
Extended Work Hours to Lower Cost and Community Impacts
Weir Wall
• Schematic of In-System Storage
![Page 22: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/22.jpg)
22
Flow Management and Working Hours Control Gate Location
![Page 23: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/23.jpg)
23
Flow Management and Working Hours Control Gate Layout
• District purchased standard wastewater control gate • District designing the bulkhead wall • Contractor got O&M training • District tested before rehab starts
![Page 24: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/24.jpg)
24
South Interceptor Diurnal Water Level
Platform Level Possible Work Hours
• Flow modeling in work area
PS-H Off PS-H On
Flow Management and Working Hours Remote Operations Impacts
![Page 25: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/25.jpg)
25
South Interceptor Projected Flow at IPS
Flow Management and Working Hours Plant Operations Impacts
Total Projected Flow at IPS
Projected Storage at Plant ~7 MG
Assumed Plant Base Flow Rate
![Page 26: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/26.jpg)
26
Scenario Available
Work Hours Productivity Work Hours
Wood St 4 2
3rd St 10 8
Productivity Improvement -- 300%
Potential Cost Savings -- $0.5-1 million
Potential Schedule Savings -- 1-2 months
• Extended work hours due to control gate
• Cost of control gate assembly ~$100K
Flow Management and Working Hours Comparison to Wood St Work Hours
![Page 27: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/27.jpg)
Safety and Odor Odor Treatment System – Study Overview
• Feed hypo from SAC Dechlor at 1 to 4 gpm
• Goal is to reduce sulfide loading and release during construction
• Collect liquid and gas sulfide data
27
![Page 28: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/28.jpg)
•Grab samples taken at S54 and S60
• Conclusions
– Clear reduction in liquid sulfides with 3 GPM hypo feed
28
Avg. Sulfide (mg/L)
Baseline Week 1
Baseline Week 2
1GPM Hypo
3 GPM Hypo
S54 2.3 1.8 1.3 0.2
S60 2.5 2.2 1.9 0.4
Safety and Odor Odor Treatment System – Initial Liquid Results
![Page 29: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/29.jpg)
29
Safety and Odor Odor Treatment System – Baseline Gas Results
![Page 30: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/30.jpg)
Average Value During Work Times
Reduction from Baseline
4AM-4PM ppm Baseline 16.9 0% 1 GPM 13.5 20% 3 GPM 7.1 58%
30
• Average during 3 GPM hypo feed -> 58% reduction in H2S
Safety and Odor Odor Treatment System – Initial Gas Results
![Page 31: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/31.jpg)
• Contractor operates hypo feed system
• Cost Savings: Dosing 3 gpm is $108K versus $325K for odor scrubber
• Contractor provides redundant odor control system in work area
31
Safety and Odor Odor Treatment System – Contractor Scope
![Page 32: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/32.jpg)
Challenges/Risks Community/Business
Risk Initial Risk Level
Mitigations Residual Risk Level
Residential neighborhood construction impacts
(working hours and traffic on narrow streets)
High
• Shift work hours to daytime with control gate
• Add temporary manhole outside residential area (inside Post Office)
• Limit work hours for staging and access in residential area
• Design traffic controls to minimize traffic impacts
Low
Public upset about construction impacts (noise, light, and odor) Medium
• Clearly define contractor requirements for controlling construction impacts to threshold values
• Measure and enforce requirements
Low
Public upset about displaced street parking and towing
Medium
• Provide resident notice about no parking via mailers and changeable message signs
• Secure an alternative parking area for residents, if needed
Low
Impact to Post Office operations caused by traffic disruption High
• Add new manhole outside roadway
• Limit work hours for manholes in the path of travel for freight trucks
• Work closely with Post Office
Low
32
![Page 33: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/33.jpg)
Challenges/Risks Safety/Regulatory/Permitting
Risk Initial Risk Level
Mitigations Residual Risk Level
Manned entry into active sewer under confined space conditions with hazardous sewer gases High
• Design an odor treatment system that reduces hazardous sewer gas levels below OSHA limit
• Clearly define safety requirements
• Monitor compliance with safe work practices
Low
Sanitary sewer overflow in tributary system (Oakland) caused by contractor’s operations Medium
• Clearly define requirements to maintain free flowing condition in Oakland system
• Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system
Low
Not receiving obstruction and excavation from City of Oakland on schedule
Medium • Obtain pre-approval of traffic control
plans
• Work closely with City of Oakland Medium
Criminal activity jeopardizes safety of District staff High
• Clearly define site security requirements in special provisions Medium
Worker exposure to toxic rehabilitation materials in a confined space condition High
• Only specify materials that are proven safe in a confined space condition
• Specify requirements for ventilation system
Low
33
![Page 34: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/34.jpg)
Challenges/Risks Technical/Quality
34
Risk Initial Risk Level
Mitigations Residual Risk Level
Design does not provide flow management strategy that provides enough working hours for proper application
High
• Utilize flow equalization available at Plant and South Interceptor to extend working hours
• Utilize temporary bulkhead wall and control gate to extend working hours
Low
Design does not incorporate lessons learned from previous Wood St. Rehab projects High
• Utilize project team from Wood St. Rehab projects for design submittal review
• Incorporate details from Wood St. Rehab project RFIs and COs into bidding documents
Low
Design does not anticipate challenges associated with managing tributary flows Medium
• Collect best available data on tributary flows (size, peak flow rate, etc)
• Clearly define contractor’s responsibility to convey tributary flows in special provisions
Low
Rehabilitation materials are applied under unsuitable conditions High
• Only specify rehabilitation materials that are proven under active flow condition
• Require manufacturer representative assistance during application
• Apply rigorous quality assurance test procedures
Medium
![Page 35: Rehabilitating a 105-inch Interceptor – Innovations and ... · Oakland system • Clearly define penalties in special provisions for sanitary sewer overflow in Oakland system](https://reader034.vdocuments.us/reader034/viewer/2022042918/5f5d53ccbd3d58438a050976/html5/thumbnails/35.jpg)
35
Questions