REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATE e 83/11/09 NOTARIZED! NO DOCKET FACIL:50 400 'Shearon Harris Nuclear Power Planti Unit ii Carolina 0500040 50 401 'Shear on Harris Nuclear Power Pl anti Uni t 2i Carolina 0500040 AUTH ~ NAME 'UTHOR AFF ILI ATION MCDUFFIEiM~ A, Carolina Power 8 Light Co ~ RECIP e NAME'ECIPIENT AFF ILIATION DENTONgH ~ Ri Office of Nuclear Reactor Regulationi Director S UBJECT: Forwards response to Radiological Assessment Branch Draft SER questionsiconsisting of JH Sipp resume w/specific ref to health physics supervisory experience in outage situationi during refueling 8 initial fuel load 8 initial criticality, DISTRIBUTION CODE: B001S COPIES RECEIVED'-LTR . ENCL g SIZE: TITLE: Licensing Submittal:,PSAR/FSAR Amdts 8, Related Correspondence NOTES: RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL: ELD/HDS1 IE/DEPER/EPB 36 IE/DEQA/QAB 21 NRRrDE/CEB 11 .NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/ Ds IrAEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23- RGN2 EXTERNAL: ACRS 41 DMS/DSS (AMDTS) LPDR 03 NSIC 05 COPIES LTTR ENCL 0 1 0 1 0 3 3 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 6 6 1 1 1 1 RECIPIENT ID CODE/NAME NRR LB3 BC BUCKLEYgB 01 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/tlTEB 17 NRR/DF/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSP8 NR R I D S I IA S 8 NRR/DSI/CSB 09 NRR/DSI/METB 12 AB 22 LE 04 RM/DDAMI/MI B BNL(AMDTS ONLY) FEMA REP DIV 39 NRC PDR 02'TIS COPIES LTTR ENCL 1 0 1 1 1 1 1 1 0 1 1 2 2 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 , TOTAL NUMBER OF COPIES REQUIRED: LTTR 53 ENCL 46

Upload: others

Post on 17-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

REGULATORY I RMATION DISTRIBUTION SYS (RIDS)

ACCESSION NBR: 8311150298 DOC ~ DATE e 83/11/09 NOTARIZED! NO DOCKETFACIL:50 400 'Shearon Harris Nuclear Power Planti Unit ii Carolina 0500040

50 401 'Shear on Harris Nuclear Power Pl anti Uni t 2i Carolina 0500040AUTH~ NAME 'UTHOR AFF ILIATION

MCDUFFIEiM~ A, Carolina Power 8 Light Co ~

RECIP e NAME'ECIPIENT AFF ILIATIONDENTONgH ~ Ri Office of Nuclear Reactor Regulationi Director

S UBJECT: Forwards response to Radiological Assessment Branch DraftSER questionsiconsisting of JH Sipp resume w/specific ref tohealth physics supervisory experience in outage situationiduring refueling 8 initial fuel load 8 initial criticality,

DISTRIBUTION CODE: B001S COPIES RECEIVED'-LTR . ENCL g SIZE:TITLE: Licensing Submittal:,PSAR/FSAR Amdts 8, Related Correspondence

NOTES:

RECIPIENTID CODE/NAME

NRR/DL/ADLNRR LB3 LA

INTERNAL: ELD/HDS1IE/DEPER/EPB 36IE/DEQA/QAB 21NRRrDE/CEB 11

.NRR/DE/EQB 13NRR/DE/MEB 18NRR/DE/SAB 24NRR/DHFS/HFEB40NRR/DHFS/PSRBNRR/ Ds IrAEB 26NRR/DSI/CPB 10NRR/DSI/ICSB 16NRR/DSI/PSB 19NRR/DSI/RSB 23-RGN2

EXTERNAL: ACRS 41DMS/DSS (AMDTS)LPDR 03NSIC 05

COPIESLTTR ENCL

01 0

1 0

3 31

1 1

2 21 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1

3

6 61 1

1

1

RECIPIENTID CODE/NAME

NRR LB3 BCBUCKLEYgB 01

IE FILEIE/DEPER/IRB 35NRR/DE/AEABNRR/DE/EHEBNRR/DE/GB 28NRR/DE/tlTEB 17NRR/DF/SGEB 25NRR/DHFS/LQB 32NRR/DL/SSP8NR R ID S IIA S 8NRR/DSI/CSB 09NRR/DSI/METB 12

AB 22LE 04

RM/DDAMI/MIB

BNL(AMDTS ONLY)FEMA REP DIV 39NRC PDR

02'TIS

COPIESLTTR ENCL

1 0

1

1 1

1 1

1 01 1

2 21 1

1 1

1 1

1 0

1 1

1 1

1 1

1 1

1 1

1 0

1 1

1

1 1

1 1

, TOTAL NUMBER OF COPIES REQUIRED: LTTR 53 ENCL 46

Page 2: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

»Il

NN

") Nv e 4 ~ c

4

«4

,ece f

I )he

'le«4»A

f'c

Ie ) l «af 1"~ I J»fthfl» 11 'Ic)f IN)f>

'1 r«

I t'fr "1 rfiI'

)LV»

14 ~ e ~'eNg )N.'N

«I')ceilI

II 4) frv 0 "'4

cc'«lc ffl11 "1

»lf»« "l Vf

Clf f») liT,

V1r> t

»

ri

lh, »»»

~'» I

[, 4 NI »A

Nj

I II».

,r'

ylf f

«0 )".C)r

C

V«I«w J

1'I l( h»4)

lf f

1») rh'4 '»f) '»

»

fll f e«gr ~

f

f f«,l f I>'4

ef f.f) C

fir I $

f,r sh„

r~

hih

f )c.'Cgf V 1 e) «1)e

f 4lf 4

hi) I s «1 e" ' 1

r«~4 C ')»i'

') fel'(AC fr ill"N)>'I

'1h ee "I» I )

Villill fN

')fh'Ii

s3

N ) < 7 N: eiv g . 3 <-'I 'I > v Nv If»vfe) l,h el%»,«,,V Cs ig»*r' ~ (I II/ flh hlir" I I) fe'„el )') f I ", C Il lh N

~ ««

," 1'-

e«J

iI I 'f,Ni )

iN

NI'NI,) I

fff",41, N >i I«

Jf e ~ l

>>I < JifN )WINT

>» 4»ff'h«g"'il'Ne><, Ni"

felgtN„rl "

Ir«ees«X )" NX'Ilif

f«, IC e

1 h»l««»N N4

XI

c' I I

c'i(

Jf c ~ iiihh'I N j

Ng 1 X: ">l„r

4lt« g

(f'N,fhee „if

c <'»

')«

4 / I

: I«,'N VI N f fc 1

N «« ~ li I 'i » 1 «l es NL rl I 'N

'

Page 3: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

Carolina Power 8 Light Company

NOV 09 1983SERIAL: LAP-83-522

Mr. Harold R. Denton, DirectorOffice of Nuclear Reactor RegulationUnited States Nuclear Regulatory CommissionWashington, DC 20555

SHEARON HARRIS NUCLEAR POWER PLANTUNIT NOS. 1 AND 2

DOCKET NOS 50-400 AND 50-401DRAFT SAFETY EVALUATION REPORT RESPONSES

RADIOLOGICAL ASSESSMENT BRANCH

Dear Mr. Denton:

By letter dated October 28, 1983, Carolina Power & Light Company (CP&L)transmitted its commitment to the recommendations of Regulatory Guide 1.8"Personnel Selection and Training" for the Shearon Harris Nuclear Power Plant(SHNPP) position equivalent to the radiation protection manager. In thatsubmittal, CP&L stated that the SHNPP Manager — Environmental and RadiationControl would satisfy the recommendations for the radiation protectionmanager. This submittal stated that the resume for the Manager—Environmental and Radiation Control would be provided at a future date. Theresume is the attachment to this letter.

In discussions with NRC reviewer, S. Block, he stated that the NRC was

particularly interested in a radiation protection manager'rs experience withhealth physics activities during refueling. The attached resume makesspecific reference to health physics supervisory experience in outagesituations, during refueling operations and during initial fuel load and

initial criticality at the Vermont Yankee Plant.

The attached resume also details formal training of the individualselected as the Manager — Environmental and Radiation Control. This trainingwill be supplemented by training for SHNPP specific equipment and procedures.

8311150298 831109 i

PDR ADOCK 05000400E PDR

goo/

411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602

Page 4: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

C

<<~~I„ f)

lit

1

Page 5: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

Harold R. Denton

Based on our evaluation, the individual selected for the ManagerEnvironmental & Radiation Control is qualified by management experience andpractical application experience to manage the SHNPP health physics program.

Yours very truly,

Q ~7n~M. A. McDuffie

Senior Vice PresidentNuclear Generation

JHE/cfr (8420COM)En closure

cco Mr. B. C. Buckley (NRC)Mr. Sy Block (NRC-METB)Mr. G. F. Maxwell (NRO-SHNPP)Mr. J. P. O'Reilly (NRC-RII)Mr. Travis Payne (KUDZU)Mr. Daniel F. Read (CHANGE/ELP)Mr. R. P. Gruber (NCUC)Chapel Hill Public Library

Mr. Wells EddlemanDr. Phyllis LotchinMr. John D. RunkleDr. Richard D. WilsonMr. G. O. Bright (ASLB)Dr. J. H. Carpenter (ASLB)Mr. J. L. Kelley (ASLB)Wake County Public Library

Page 6: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

4

~2 ~

,(

I'

f.

N

I' I

~ r4

1 0 Ih

Jl k

t

t

ll F

~ 0

Page 7: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

RESTE OPJOSEPH Ho SIPP

EXPERIENCE:

November 1983 to present

Carolina Power and Light CompanyShearon Harris Nuclear Power PlantP. 0. Box 165New Hill, North Carolina 27562

Position Held: Mana er Environmental and Radiation Control

May 1981 to November 1983

General Public Utilities Company100 Interpace ParkwayParsippany, New Jersey 07054

Position Held: Mana er of Chemical E ineerin

Res onsibilities:

Review of the chemical processes in the facility to insure theiroptimization. This involves the review of plant chemistry, and.operational data and comparing it to the system chemistryspecifications and other design criteria.

Preparation of Chemistry Reports summarizing systems chemicalhistory.

Chemical Engineering coordinates the activities between outsideorganizations and the plant where appropriate.

Conducting of investigations and making engineering recommendationsand providing implementation with management approval.

Review of chemical processes against state-of-the art and makingrecommendations for their upgrade.

Provide all the Chemical Engineering for the water treatment systems.

Write all Chemistry Specifications for the plants.

Upgrade Specifications based on state-of-the art data.

Implement the necessary programs to insure the power plant canoperate at the required specifications.

Provide all the Chemical Engineering for the water treatment systems.

Page 8: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

Provide all the Chemical Engineering for the waste water treatmentsystems.

Provide input to all plant procedures affected by Chemi.stry/ChemicalEngineering.

Manage a staff of eight professionals, and a secretary

Act as the Prospect Manager on unique 0 and M items at the plant.

Prepare and provide the technical portion of licensing responses toregulatory body findings.

Provide safety review of important-to-safety systems.

April 1979 to May 1981

Public Service Company of New HampshireSeabrook StationP.O. Box 300Seabrook, New Hampshire 03874

Position Held: Chemist De artment Su ervisor

Res onsibilities:

Directed a Chemistry staff of twenty-six people (had responsibilityfor setting up staff and preparing department budget).

Developnent, implementation and maintenance of the station'sanalytical and radiochemical monitoring program to insure compliancewith state, federal, and vendor requirements for start up andoperation of two 1200 MWE Nuclear Units.

'I

Review of all chemical systems for system optimization andrecommended the necessary system

changes'reparation

of all required reports, evaluation of personnel, andpreparation of the department's budget.

Member of emergency team.

March 1973 to April 1979

Vermont Yankee Nuclear Power CorporationP 0. Box 157Vernon, Vermont 05354

Position Held: Plant Chemist

Page 9: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50
Page 10: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

Res onsibilities:

The position included the responsibility for serving on an alternatebasis as onshift health physics supervisor during refueling and majormaintenance outages and during normal operations. During the sub)ecttime interval, the plant underwent an average of one refueling andtwo maintenance outages per year. The onshift health physicssupervisor's responsibilities include the preparation and signoff forradiation work permits; and directing technicians in theimplementation of work permits conduct of radiation surveys andimplementation of health physics procedures,

Directed a staff of four people as a Plant Chemist and directed astaff of thirteen people when acting as Chemistry and Health PhysicsSupervisor.

Assisted the Chemistry and Health Physics Supervisor in thedevelopment, implementation and maintenance of the departmentprograms.

Participated in the review of department personnel, procedures, andgenerated necessary reports to satisfy regulatory requirements

Administratively controlled all plant chemical processes.,

Acted for the Chemistry and Health Physics Supervisor in his absence.

Directed the chemical operation in the plant to optimize theirperformance (Radwaste, condensate filter, demineralizers, charcoalfilters, "etc.).Reviewed all potential release points and ensured they were properlymonitored.

Maintained the Chemical and Radio chemical laboratories, Chemical andRadio chemical on line monitoring -equipment (calibration and datareduction) .

Member of emergency team and fire brigade.

February 1970 to March 1973

Vermont Yankee Nuclear Power Corporation '

0. Box 157Vernon, Vermont 05354

Position Held: Chemist and Health Ph sics Assistant

Chemistr Res onsibilities:

Assisted and directed the Chemistry and Health Physics Technicians inroutine analysis and surveillance in the chemistry laboratory.

Page 11: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

Prov1ded chemistry coverage in the preoperational and operationalstartup of the plant.

Performed the preoperational testing of radwaste and set up the watertreatment plant. Performed the or1ginal set up and calibration ofthe process monitoring system.

Health Ph sics Res onsibilities:Directed the Health Physics Technicians in operational radiologicalactivities during maintenance and refueling outages.

This position included the responsibility for acting as .the onshifthealth physics supervisor during ma)or maintenance outages. Theseoutages included several shutdowns in the startup program to correctproblems and to perform reconstitution of burnt fuel assemblies.This function, carried out on a twelve hours onshift twelve hoursoffshift basis included direction of all onshift radiation protectionactivities. The initial criticality on the Vermont Yankee plant wasMarch 24, 1972. The onshift health physics supervisor'.sresponsibilities included the preparation and signoff for radiat1onwork permits; and directing technic1ans in the implementation of workpermits, conduct of radiation. surveys and implementation of healthphysics procedures.

Assisted in the continuous monitoring of all radiological activitieswithin the plant and 1ts systems, including .the surroundingenvironment, to ensure maximum safety'at all times

Wrote Radiation Work permits, performed radiation surveys andperformed calibration of Health Physics survey instruments.,

Used the following 'sources for calibration of survey instruments onon«line process instruments:

50 Ci Cs calibrator24 uci Co60

60, Ci IrPu sources.

Also used liquid sources for calibration of ChemistryInstrumentation.

June 1969 to Pebruary 1970

Mine Safety Appliance Research CorporationEvans City, Pennsylvania 16033

Position Held: Research Chemist Technician

Page 12: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

Res onsibilities:

Developed new charcoals.

Performed testing of charcoal to evaluate its ability to filter smallquantities of organic contaminants from air.

Page 13: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

~ ~

EDUCATION:

B. S. Chemistry, 1969Geneva CollegeBeaver Falls, .Pennsylvania

M B.A., 1978Western New England CollegeSpringfield, Massachusetts

Training at Millstone I BWR

Millstone, Connecticut- 3/70 — 5/70

Radionuclide Analysis by Gamma'Spectroscopy at NortheasternRadiological Health Laboratory

In-Place Filter TestingDepartment of Environmental Health SciencesHarvard School of Public Health

State Fire Service Training Program,of Vermont

Applied MetallurgyTaylor and Fem Company

'artford,Connecticut

Westinghouse PWR Chemistry CoursePittsburgh, Pennsylvania

6/70, 1 week

6/23/75 — 6/27/75

dl

-6/70 (40 hours),

4

1/77 —5/77

9/4/7 9 — 11/23/7 9

Seabrook Station,Balance of Plant Training

Westinghouse PWR Information Course

Management and Supervision Courses

Radiochemistry

1979 (60 hours)

1979. (60 hours)

1979 (145 hours)

SpringSemester'980

atNortheastern

Fluid Power Controls

Kepnex Tregoe Decision Analysis

Multimedia First Aid, CPR

The Management and Disposalof Hazardous and Chemical Waste

Fall Semester1980 at Universityof Lowell

4

2/25/80 » 2/29/80

1980

10/29/80 — 10/30/80

Leadership Ef fectiveness Training 1982 (24 hours)

Page 14: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

Management Developnent ProgramPhase I, II, III

C

GPUN Management Trainingby Sterling Institute

12/31/834+8 CEU's

3/9/83 (40 hours)

Page 15: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

4

PAPERS WRITTEN:

Presented at Edison Electric Institute Chemistry Meetings.

l. A New Precoat Material for the Power Industry — 1976.*

2. Product Evaluation of Graver Ecodex and Ecocate at Vermont Yankee—1977.

Presented at the Cooling Tower Institute Annual Meeting.

l. Improve Condenser Cleanliness by Using Dispersant to SupplementChlorination at a Nuclear Power Plant 1978.

Presented at the Western Engineering Conference in the Pall of 1980.

1. Prepared discussion on Three Years Operating with Precoat MaterialsContaining Pibre and Powdered Ion Exhcange Resins.

(8 420COM)

Page 16: REGULATORY I Harris Planti Unit ii Carolina Harris Pl Uni ... · REGULATORY I RMATION DISTRIBUTION SYS (RIDS) ACCESSION NBR: 8311150298 DOC ~ DATEe 83/11/09 NOTARIZED! NO DOCKET FACIL:50

l

'