![Page 1: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/1.jpg)
REGIONAL STATE OF OROMIA
OROMIA FOREST & WILDLIFE ENTERPRISE (OFLRP)
Zonal Consultation & Participation TOT Minute Document
H/G/Wollega, Q/Wollega, W/Wollega, E/Wollega, I/A/Bor, Jimma,Guji, Borena, W/Arsi,
Bale, E/Showa, N/Showa, Finfinne Special & W/Showa
![Page 2: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/2.jpg)
![Page 3: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/3.jpg)
The Oromia Forested Land REDD+ Project (OFLRP)
Consultation And Participation stakeholders Training of Trainers(TOT) Minute
Horo Guduru Wollega(Shambo)
The Oromia Forested Landscape Program (OFLP) is prepared as part of the National REDD+ Readiness Process and in line with
the CRGE Vision. The design of OFLP was officially launched in May 2014. OFLP have been implementing a multi-stakeholders
consultation and local level capacity building as part of its design process so as to facilitate a two-way dialogue (top-down and
bottom-up) to enhance program relevance, ensure ownership and accountability, and build and improve relationships between
all stakeholders using the consultation and Participation Plan prepared as guide.
1. Date:8-9/6/2015
2. Venue: Shambo Area, Coops Union Meeting Hall
3. Participants: Representatives from Zonal sector Offices, Woreda sector Line Offices and , Oromia Forest & Wild Branch &
District Office.
4. The Objective
The objective of training of trainers(TOT) is to familiarize key stakeholders with the Oromia Forested Landscape REDD+ program
and further equipping them with the knowledge of CRGE strategy of Ethiopia, REDD+ basics so that they acquire the capacity to
scale up to the wider bottom structure.
5. Agendas Of The TOT
A) The Country's CRGE strategy - by Ato Fikadu Legesse- ORCU
B) Forest & Climate Change , REDD+ basics - by Ato Gedefa Negera- OFWE
C) OFL REDD+ Program - by Ato Taye Dhugasa - ORCU
D) Consultation & Participation - by Ato Taye Dhugasa- ORCU
E) Methods of C & P - by Ato Lema Kitila- OFWE
F) Conflict and Grievances management Mechanisms- by Ato Lema Kitila- OFWE
G) General Discussions -by Participants
H) Action plan preparation for Woreda C & P trainings
6. Out Put of The TOT
2 female and 37 male representatives of key stakeholder organizations have trained on the session.
7. Out Come Of The TOT
![Page 4: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/4.jpg)
The desired Sprits of stake holders good relationship, initiation, Commitment, Accountability , owner ship have been
created and firmly built on the OFLP.
Trainees became capable, identified and documented the relevant OFLP stake holders and issues to be considered
during C & P.
![Page 5: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/5.jpg)
![Page 6: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/6.jpg)
![Page 7: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/7.jpg)
![Page 8: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/8.jpg)
![Page 9: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/9.jpg)
![Page 10: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/10.jpg)
![Page 11: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/11.jpg)
The Oromia Forested Land REDD+ Project (OFLRP)
Consultation And Participation stakeholders Training of Trainers(TOT) Minute
Qelem Wollega Zone(D/Dolo)
The Oromia Forested Landscape Program (OFLP) is prepared as part of the National REDD+ Readiness Process and in line with
the CRGE Vision. The design of OFLP was officially launched in May 2014. OFLP have been implementing a multi-stakeholders
consultation and local level capacity building as part of its design process so as to facilitate a two-way dialogue (top-down and
bottom-up) to enhance program relevance, ensure ownership and accountability, and build and improve relationships between
all stakeholders using the consultation and Participation Plan prepared as guide.
1. Date:11-12/6/2015
2. Venue: Zone Administration Meeting Hall
3. Participants: Representatives from Zonal sector Offices, Woreda sector Line Offices and , Oromia Forest & Wild Branch &
District Office.
4. The Objective
The objective of training of trainers(TOT) is to familiarize key stakeholders with the Oromia Forested Landscape REDD+ program
and further equipping them with the knowledge of CRGE strategy of Ethiopia, REDD+ basics so that they acquire the capacity to
scale up to the wider bottom structure.
5. Agendas Of The TOT
A) The Country's CRGE strategy - by Ato Fikadu Legesse- ORCU
B) Forest & Climate Change , REDD+ basics - by Ato Gedefa Negera- OFWE
C) OFL REDD+ Program - by Ato Taye Dhugasa - ORCU
D) Consultation & Participation - by Ato Taye Dhugasa- ORCU
E) Methods of C & P - by Ato Lema Kitila- OFWE
F) Conflict and Grievances management Mechanisms- by Ato Lema Kitila- OFWE
G) General Discussions -by Participants
H) Action plan preparation for Woreda C & P trainings
6. Out Put of The TOT
6 female and 36 male representatives of key stakeholder organizations have trained on the session.
7. Out Come Of The TOT
The desired Sprits of stake holders good relationship, initiation, Commitment, Accountability, owner ship have been
created and firmly built on the OFLP.
Trainees became capable, identified and documented the relevant OFLP stake holders and issues to be considered
during C & P.
![Page 12: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/12.jpg)
![Page 13: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/13.jpg)
![Page 14: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/14.jpg)
![Page 15: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/15.jpg)
The Oromia Forested Land REDD+ Project (OFLRP)
Consultation And Participation stakeholders Training of Trainers(TOT) Minute
West Wollega Zone(Gimbi)
The Oromia Forested Landscape Program (OFLP) is prepared as part of the National REDD+ Readiness Process and in line with
the CRGE Vision. The design of OFLP was officially launched in May 2014. OFLP have been implementing a multi-stakeholders
consultation and local level capacity building as part of its design process so as to facilitate a two-way dialogue (top-down and
bottom-up) to enhance program relevance, ensure ownership and accountability, and build and improve relationships between
all stakeholders using the consultation and Participation Plan prepared as guide.
1. Date:15-16/6/2015
2. Venue: Grand Land Hotel Meeting Hall
3. Participants: Representatives from Zonal sector Offices, Woreda sector Line Offices and , Oromia Forest & Wild Branch &
District Office.
4. The Objective
The objective of training of trainers(TOT) is to familiarize key stakeholders with the Oromia Forested Landscape REDD+ program
and further equipping them with the knowledge of CRGE strategy of Ethiopia, REDD+ basics so that they acquire the capacity to
scale up to the wider bottom structure.
5. Agendas Of The TOT
A) The Country's CRGE strategy - by Ato Fikadu Legesse- ORCU
B) Forest & Climate Change , REDD+ basics - by Ato Gedefa Negera- OFWE
C) OFL REDD+ Program - by Ato Taye Dhugasa - ORCU
D) Consultation & Participation - by Ato Taye Dhugasa- ORCU
E) Methods of C & P - by Ato Lema Kitila- OFWE
F) Conflict and Grievances management Mechanisms- by Ato Lema Kitila- OFWE
G) General Discussions -by Participants
H) Action plan preparation for Woreda C & P trainings
6. Out Put of The TOT
5 female and 70 male representatives of key stakeholder organizations have trained on the session.
7. Out Come Of The TOT
The desired Sprits of stake holders good relationship, initiation, Commitment, Accountability, owner ship have been
created and firmly, built on the OFLP.
Trainees became capable, identified and documented the relevant OFLP stake holders and issues to be considered
during C & P.
![Page 16: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/16.jpg)
![Page 17: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/17.jpg)
![Page 18: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/18.jpg)
![Page 19: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/19.jpg)
![Page 20: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/20.jpg)
The Oromia Forested Land REDD+ Project (OFLRP)
Consultation And Participation stakeholders Training of Trainers(TOT) Minute
East Wollega Zone(D/Dolo)
The Oromia Forested Landscape Program (OFLP) is prepared as part of the National REDD+ Readiness Process and in line with
the CRGE Vision. The design of OFLP was officially launched in May 2014. OFLP have been implementing a multi-stakeholders
consultation and local level capacity building as part of its design process so as to facilitate a two-way dialogue (top-down and
bottom-up) to enhance program relevance, ensure ownership and accountability, and build and improve relationships between
all stakeholders using the consultation and Participation Plan prepared as guide.
1. Date:18-19/6/2015
2. Venue: Zone Administration Meeting Hall
3. Participants: Representatives from Zonal sector Offices, Woreda sector Line Offices and , Oromia Forest & Wild Branch &
District Office.
4. The Objective
The objective of training of trainers(TOT) is to familiarize key stakeholders with the Oromia Forested Landscape REDD+ program
and further equipping them with the knowledge of CRGE strategy of Ethiopia, REDD+ basics so that they acquire the capacity to
scale up to the wider bottom structure.
5. Agendas Of The TOT
A) The Country's CRGE strategy - by Ato Fikadu Legesse- ORCU
B) Forest & Climate Change , REDD+ basics - by Ato Gedefa Negera- OFWE
C) OFL REDD+ Program - by Ato Taye Dhugasa - ORCU
D) Consultation & Participation - by Ato Taye Dhugasa- ORCU
E) Methods of C & P - by Ato Lema Kitila- OFWE
F) Conflict and Grievances management Mechanisms- by Ato Lema Kitila- OFWE
G) General Discussions -by Participants
H) Action plan preparation for Woreda C & P trainings
6. Out Put of The TOT
8 female and 68 male representatives of key stakeholder organizations have trained on the session.
7. Out Come Of The TOT
The desired Sprits of stake holders good relationship, initiation, Commitment, Accountability, owner ship have been
created and firmly built on the OFLP.
Trainees became capable, identified and documented the relevant OFLP stake holders and issues to be considered
during C & P.
![Page 21: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/21.jpg)
![Page 22: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/22.jpg)
![Page 23: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/23.jpg)
![Page 24: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/24.jpg)
![Page 25: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/25.jpg)
The Oromia Forested Land REDD+ Project (OFLRP)
Consultation And Participation stakeholders Training of Trainers(TOT) Minute
Bale(Goba)
The Oromia Forested Landscape Program (OFLP) is prepared as part of the National REDD+ Readiness Process and in line with
the CRGE Vision. The design of OFLP was officially launched in May 2014. OFLP have been implementing a multi-stakeholders
consultation and local level capacity building as part of its design process so as to facilitate a two-way dialogue (top-down and
bottom-up) to enhance program relevance, ensure ownership and accountability, and build and improve relationships between
all stakeholders using the consultation and Participation Plan prepared as guide.
1. Date:19-20/08/2015
2. Venue: Meda Wabu University Meeting Hall
3. Participants: Representatives from Zonal sector Offices, Woreda sector Line Offices and , Oromia Forest & Wild Branch &
District Office.
4. The Objective
The objective of training of trainers(TOT) is to familiarize key stakeholders with the Oromia Forested Landscape REDD+ program
and further equipping them with the knowledge of CRGE strategy of Ethiopia, REDD+ basics so that they acquire the capacity to
scale up to the wider bottom structure.
5. Agendas Of The TOT
A) The Country's CRGE strategy - by Ato Fikadu Legesse- ORCU
B) Forest & Climate Change , REDD+ basics - by Ato Gedefa Negera- OFWE
C) OFL REDD+ Program - by Ato Taye Dhugasa - ORCU
D) Consultation & Participation - by Ato Taye Dhugasa- ORCU
E) Methods of C & P - by Ato Dereje Jembere - OFWE
F) Conflict and Grievances management Mechanisms- by Ato Dereje Jembere - OFWE
G) General Discussions -by Participants
H) Action plan preparation for Woreda C & P trainings
6. Out Put of The TOT
12 female and 67 male representatives of key stakeholder organizations have trained on the session.
7. Out Come Of The TOT
The desired Sprits of stake holders good relationship, initiation, Commitment, Accountability, owner ship have been
created and firmly built on the OFLP.
Trainees became capable, identified and documented the relevant OFLP stake holders and issues to be considered
during C & P.
![Page 26: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/26.jpg)
![Page 27: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/27.jpg)
![Page 28: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/28.jpg)
![Page 29: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/29.jpg)
![Page 30: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/30.jpg)
![Page 31: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/31.jpg)
The Oromia Forested Land REDD+ Project (OFLRP)
Consultation And Participation stakeholders Training of Trainers(TOT) Minute
Borena(Yabello)
The Oromia Forested Landscape Program (OFLP) is prepared as part of the National REDD+ Readiness Process and in line with
the CRGE Vision. The design of OFLP was officially launched in May 2014. OFLP have been implementing a multi-stakeholders
consultation and local level capacity building as part of its design process so as to facilitate a two-way dialogue (top-down and
bottom-up) to enhance program relevance, ensure ownership and accountability, and build and improve relationships between
all stakeholders using the consultation and Participation Plan prepared as guide.
1. Date:13-14/08/2015
2. Venue: Catholic Church Meeting Hall
3. Participants: Representatives from Zonal sector Offices, Woreda sector Line Offices and , Oromia Forest & Wild Branch &
District Office.
4. The Objective
The objective of training of trainers(TOT) is to familiarize key stakeholders with the Oromia Forested Landscape REDD+ program
and further equipping them with the knowledge of CRGE strategy of Ethiopia, REDD+ basics so that they acquire the capacity to
scale up to the wider bottom structure.
5. Agendas Of The TOT
A) The Country's CRGE strategy - by Ato Fikadu Legesse- ORCU
B) Forest & Climate Change , REDD+ basics - by Ato Gedefa Negera- OFWE
C) OFL REDD+ Program - by Ato Taye Dhugasa - ORCU
D) Consultation & Participation - by Ato Taye Dhugasa- ORCU
E) Methods of C & P - by Ato Dagne Nugusu - OFWE
F) Conflict and Grievances management Mechanisms- by Ato Dagne Nugusu - OFWE
G) General Discussions -by Participants
H) Action plan preparation for Woreda C & P trainings
6. Out Put of The TOT
7 female and 54 male representatives of key stakeholder organizations have trained on the session.
7. Out Come Of The TOT
The desired Sprits of stake holders good relationship, initiation, Commitment, Accountability, owner ship have been
created and firmly built on the OFLP.
Trainees became capable, dentified and documented the relevant OFLP stake holders and issues to be considered
during C & P.
![Page 32: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/32.jpg)
![Page 33: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/33.jpg)
![Page 34: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/34.jpg)
![Page 35: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/35.jpg)
![Page 36: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/36.jpg)
The Oromia Forested Land REDD+ Project (OFLRP)
Consultation And Participation stakeholders Training of Trainers(TOT) Minute
E/Showa (Bishoftu)
The Oromia Forested Landscape Program (OFLP) is prepared as part of the National REDD+ Readiness Process and in line with
the CRGE Vision. The design of OFLP was officially launched in May 2014. OFLP have been implementing a multi-stakeholders
consultation and local level capacity building as part of its design process so as to facilitate a two-way dialogue (top-down and
bottom-up) to enhance program relevance, ensure ownership and accountability, and build and improve relationships between
all stakeholders using the consultation and Participation Plan prepared as guide.
1. Date:24-25/07/2015
2. Venue: Bishoftu Tenkir Hotel Meeting Hall
3. Participants: Representatives from Zonal sector Offices, Woreda sector Line Offices and , Oromia Forest & Wild Branch &
District Office.
4. The Objective
The objective of training of trainers(TOT) is to familiarize key stakeholders with the Oromia Forested Landscape REDD+ program
and further equipping them with the knowledge of CRGE strategy of Ethiopia, REDD+ basics so that they acquire the capacity to
scale up to the wider bottom structure.
5. Agendas Of The TOT
A) The Country's CRGE strategy - by Ato Fikadu Legesse- ORCU
B) Forest & Climate Change , REDD+ basics - by Ato Gedefa Negera- OFWE
C) OFL REDD+ Program - by Ato Taye Dhugasa - ORCU
D) Consultation & Participation - by Ato Taye Dhugasa- ORCU
E) Methods of C & P - by Ato Taye Dhugasa - ORCU
F) Conflict and Grievances management Mechanisms- by Ato Taye Dhugasa- ORCU
G) General Discussions -by Participants
H) Action plan preparation for Woreda C & P trainings
6. Out Put of The TOT
4 female and 41 male representatives of key stakeholder organizations have trained on the session.
7. Out Come Of The TOT
The desired Sprits of stake holders good relationship, initiation, Commitment, Accountability, owner ship have been
created and firmly built on the OFLP.
Trainees became capable, identified and documented the relevant OFLP stake holders and issues to be considered
during C & P.
![Page 37: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/37.jpg)
![Page 38: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/38.jpg)
![Page 39: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/39.jpg)
![Page 40: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/40.jpg)
The Oromia Forested Land REDD+ Project (OFLRP)
Consultation And Participation stakeholders Training of Trainers(TOT) Minute
Guji (Adolaa)
The Oromia Forested Landscape Program (OFLP) is prepared as part of the National REDD+ Readiness Process and in line with
the CRGE Vision. The design of OFLP was officially launched in May 2014. OFLP have been implementing a multi-stakeholders
consultation and local level capacity building as part of its design process so as to facilitate a two-way dialogue (top-down and
bottom-up) to enhance program relevance, ensure ownership and accountability, and build and improve relationships between
all stakeholders using the consultation and Participation Plan prepared as guide.
1. Date:10-11/08/2015
2. Venue: Woreda Administration Meeting Hall
3. Participants: Representatives from Zonal sector Offices, Woreda sector Line Offices and , Oromia Forest & Wild Branch &
District Office.
4. The Objective
The objective of training of trainers(TOT) is to familiarize key stakeholders with the Oromia Forested Landscape REDD+ program
and further equipping them with the knowledge of CRGE strategy of Ethiopia, REDD+ basics so that they acquire the capacity to
scale up to the wider bottom structure.
5. Agendas Of The TOT
A) The Country's CRGE strategy - by Ato Fikadu Legesse- ORCU
B) Forest & Climate Change , REDD+ basics - by Ato Gedefa Negera- OFWE
C) OFL REDD+ Program - by Ato Taye Dhugasa - ORCU
D) Consultation & Participation - by Ato Taye Dhugasa- ORCU
E) Methods of C & P - by Ato Roba Turche - OFWE
F) Conflict and Grievances management Mechanisms- by Ato Roba Turche - OFWE
G) General Discussions -by Participants
H) Action plan preparation for Woreda C & P trainings
6. Out Put of The TOT
5 female and 53 male representatives of key stakeholder organizations have trained on the session.
7. Out Come Of The TOT
The desired Sprits of stake holders good relationship, initiation, Commitment, Accountability, owner ship have been
created and firmly built on the OFLP.
Trainees became capable, identified and documented the relevant OFLP stake holders and issues to be considered
during C & P.
![Page 41: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/41.jpg)
![Page 42: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/42.jpg)
![Page 43: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/43.jpg)
![Page 44: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/44.jpg)
![Page 45: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/45.jpg)
The Oromia Forested Land REDD+ Project (OFLRP)
Consultation And Participation stakeholders Training of Trainers(TOT) Minute
Jimma (JImma)
The Oromia Forested Landscape Program (OFLP) is prepared as part of the National REDD+ Readiness Process and in line with
the CRGE Vision. The design of OFLP was officially launched in May 2014. OFLP have been implementing a multi-stakeholders
consultation and local level capacity building as part of its design process so as to facilitate a two-way dialogue (top-down and
bottom-up) to enhance program relevance, ensure ownership and accountability, and build and improve relationships between
all stakeholders using the consultation and Participation Plan prepared as guide.
1. Date:16-17/07/2015
2. Venue: SYF Hotel Meeting Hall
3. Participants: Representatives from Zonal sector Offices, Woreda sector Line Offices and , Oromia Forest & Wild Branch &
District Office.
4. The Objective
The objective of training of trainers(TOT) is to familiarize key stakeholders with the Oromia Forested Landscape REDD+ program
and further equipping them with the knowledge of CRGE strategy of Ethiopia, REDD+ basics so that they acquire the capacity to
scale up to the wider bottom structure.
5. Agendas Of The TOT
A) The Country's CRGE strategy - by Ato Fikadu Legesse- ORCU
B) Forest & Climate Change , REDD+ basics - by Ato Gedefa Negera- OFWE
C) OFL REDD+ Program - by Ato Taye Dhugasa - ORCU
D) Consultation & Participation - by Ato Taye Dhugasa- ORCU
E) Methods of C & P - by Ato Taye Dhugasa - ORCU
F) Conflict and Grievances management Mechanisms- by Ato Taye Dhugasa - ORCU
G) General Discussions -by Participants
H) Action plan preparation for Woreda C & P trainings
6. Out Put of The TOT
8 female and 65 male representatives of key stakeholder organizations have trained on the session.
7. Out Come Of The TOT
The desired Sprits of stake holders good relationship, initiation, Commitment, Accountability, owner ship have been
created and firmly built on the OFLP.
Trainees became capable, identified and documented the relevant OFLP stake holders and issues to be considered
during C & P.
![Page 46: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/46.jpg)
![Page 47: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/47.jpg)
![Page 48: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/48.jpg)
![Page 49: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/49.jpg)
The Oromia Forested Land REDD+ Project (OFLRP)
Consultation And Participation stakeholders Training of Trainers(TOT) Minute
I/A/Bor(Mettu)
The Oromia Forested Landscape Program (OFLP) is prepared as part of the National REDD+ Readiness Process and in line with
the CRGE Vision. The design of OFLP was officially launched in May 2014. OFLP have been implementing a multi-stakeholders
consultation and local level capacity building as part of its design process so as to facilitate a two-way dialogue (top-down and
bottom-up) to enhance program relevance, ensure ownership and accountability, and build and improve relationships between
all stakeholders using the consultation and Participation Plan prepared as guide.
1. Date: 13-14/07/2015
2. Venue: Zone Administration Meeting Hall
3. Participants: Representatives from Zonal sector Offices, Woreda sector Line Offices and , Oromia Forest & Wild Branch &
District Office.
4. The Objective
The objective of training of trainers(TOT) is to familiarize key stakeholders with the Oromia Forested Landscape REDD+ program
and further equipping them with the knowledge of CRGE strategy of Ethiopia, REDD+ basics so that they acquire the capacity to
scale up to the wider bottom structure.
5. Agendas Of The TOT
A) The Country's CRGE strategy - by Ato Fikadu Legesse- ORCU
B) Forest & Climate Change , REDD+ basics - by Ato Gedefa Negera- OFWE
C) OFL REDD+ Program - by Ato Taye Dhugasa - ORCU
D) Consultation & Participation - by Ato Taye Dhugasa- ORCU
E) Methods of C & P - by Ato Taye Dhugasa - ORCU
F) Conflict and Grievances management Mechanisms- by Ato Taye Dhugasa - ORCU
G) General Discussions -by Participants
H) Action plan preparation for Woreda C & P trainings
6. Out Put of The TOT
7 female and 86 male representatives of key stakeholder organizations have trained on the session.
7. Out Come Of The TOT
The desired Sprits of stake holders good relationship, initiation, Commitment, Accountability, owner ship have been
created and firmly built on the OFLP.
Trainees became capable, identified and documented the relevant OFLP stake holders and issues to be considered
during C & P.
![Page 50: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/50.jpg)
![Page 51: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/51.jpg)
![Page 52: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/52.jpg)
![Page 53: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/53.jpg)
![Page 54: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/54.jpg)
![Page 55: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/55.jpg)
The Oromia Forested Land REDD+ Project (OFLRP)
Consultation And Participation stakeholders Training of Trainers(TOT) Minute
W/Arsi (Shashemene)
The Oromia Forested Landscape Program (OFLP) is prepared as part of the National REDD+ Readiness Process and in line with
the CRGE Vision. The design of OFLP was officially launched in May 2014. OFLP have been implementing a multi-stakeholders
consultation and local level capacity building as part of its design process so as to facilitate a two-way dialogue (top-down and
bottom-up) to enhance program relevance, ensure ownership and accountability, and build and improve relationships between
all stakeholders using the consultation and Participation Plan prepared as guide.
1. Date:17-18/08/2015
2. Venue: Rift Valley Hotel Meeting Hall
3. Participants: Representatives from Zonal sector Offices, Woreda sector Line Offices and , Oromia Forest & Wild Branch &
District Office.
4. The Objective
The objective of training of trainers(TOT) is to familiarize key stakeholders with the Oromia Forested Landscape REDD+ program
and further equipping them with the knowledge of CRGE strategy of Ethiopia, REDD+ basics so that they acquire the capacity to
scale up to the wider bottom structure.
5. Agendas Of The TOT
A) The Country's CRGE strategy - by Ato Fikadu Legesse- ORCU
B) Forest & Climate Change , REDD+ basics - by Ato Gedefa Negera- OFWE
C) OFL REDD+ Program - by Ato Taye Dhugasa - ORCU
D) Consultation & Participation - by Ato Taye Dhugasa- ORCU
E) Methods of C & P - by Ato Kedir Nino - OFWE
F) Conflict and Grievances management Mechanisms- by Ato Kedir Nino - OFWE
G) General Discussions -by Participants
H) Action plan preparation for Woreda C & P trainings
6. Out Put of The TOT
5 female and 38 male representatives of key stakeholder organizations have trained on the session.
7. Out Come Of The TOT
The desired Sprits of stake holders good relationship, initiation, Commitment, Accountability, owner ship have been
created and built on the OFLP.
Trainees became capable, identified and documented the relevant OFLP stake holders and issues to be considered
during C & P.
![Page 56: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/56.jpg)
![Page 57: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/57.jpg)
![Page 58: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/58.jpg)
![Page 59: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/59.jpg)
The Oromia Forested Land REDD+ Project (OFLRP)
Consultation And Participation stakeholders Training of Trainers(TOT) Minute
N/Showa(Sululta)
The Oromia Forested Landscape Program (OFLP) is prepared as part of the National REDD+ Readiness Process and in line with
the CRGE Vision. The design of OFLP was officially launched in May 2014. OFLP have been implementing a multi-stakeholders
consultation and local level capacity building as part of its design process so as to facilitate a two-way dialogue (top-down and
bottom-up) to enhance program relevance, ensure ownership and accountability, and build and improve relationships between
all stakeholders using the consultation and Participation Plan prepared as guide.
1. Date:22-23/09/2015
2. Venue: Sululta Town Adminstration Meeting Hall
3. Participants: Representatives from Zonal sector Offices, Woreda sector Line Offices and , Oromia Forest & Wild Branch &
District Office.
4. The Objective
The objective of training of trainers(TOT) is to familiarize key stakeholders with the Oromia Forested Landscape REDD+ program
and further equipping them with the knowledge of CRGE strategy of Ethiopia, REDD+ basics so that they acquire the capacity to
scale up to the wider bottom structure.
5. Agendas Of The TOT
A) The Country's CRGE strategy - by Ato Fikadu Legesse- ORCU
B) Forest & Climate Change , REDD+ basics - by Ato Fikadu Legesse - ORCU
C) OFL REDD+ Program - by Ato Taye Dhugasa - ORCU
D) Consultation & Participation - by Ato Taye Dhugasa- ORCU
E) Methods of C & P - by Ato Taye Dhugasa - ORCU
F) Conflict and Grievances management Mechanisms- by Ato Taye Dhugasa - ORCU
G) Action plan preparation for Woreda C & P trainings
6. Out Put of The TOT
8 female and 80 male representatives of key stakeholder organizations from N/Showa & Finfinne special zone have trained on
the session.
7. Out Come Of The TOT
The desired Sprits of stake holders good relationship, initiation, Commitment, Accountability, owner ship have been
created and firmly built on the OFLP.
Trainees became capable, identified and documented the relevant OFLP stake holders and issues to be considered
during C & P.
![Page 60: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/60.jpg)
![Page 61: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/61.jpg)
![Page 62: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/62.jpg)
![Page 63: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/63.jpg)
![Page 64: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/64.jpg)
![Page 65: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/65.jpg)
The Oromia Forested Land REDD+ Project (OFLRP)
Consultation And Participation stakeholders Training of Trainers(TOT) Minute
W/Showa(Ambo)
The Oromia Forested Landscape Program (OFLP) is prepared as part of the National REDD+ Readiness Process and in line with
the CRGE Vision. The design of OFLP was officially launched in May 2014. OFLP have been implementing a multi-stakeholders
consultation and local level capacity building as part of its design process so as to facilitate a two-way dialogue (top-down and
bottom-up) to enhance program relevance, ensure ownership and accountability, and build and improve relationships between
all stakeholders using the consultation and Participation Plan prepared as guide.
1. Date:25-26/09/2015
2. Venue: Ambo Martha Hotel Meeting Hall
3. Participants: Representatives from Zonal sector Offices, Woreda sector Line Offices and , Oromia Forest & Wild Branch &
District Office.
4. The Objective
The objective of training of trainers(TOT) is to familiarize key stakeholders with the Oromia Forested Landscape REDD+ program
and further equipping them with the knowledge of CRGE strategy of Ethiopia, REDD+ basics so that they acquire the capacity to
scale up to the wider bottom structure.
5. Agendas Of The TOT
A) The Country's CRGE strategy - by Ato Fikadu Legesse- ORCU
B) Forest & Climate Change , REDD+ basics - by Ato Fikadu Legesse - ORCU
C) OFL REDD+ Program - by Ato Taye Dhugasa - ORCU
D) Consultation & Participation - by Ato Taye Dhugasa- ORCU
E) Methods of C & P - by Ato Taye Dhugasa - ORCU
F) Conflict and Grievances management Mechanisms- by Ato Taye Dhugasa - ORCU
G) Action plan preparation for Woreda C & P trainings
6. Out Put of The TOT
7 female and 73 male representatives of key stakeholder organizations have trained on the session.
7. Out Come Of The TOT
The desired Sprits of stake holders good relationship, initiation, Commitment, Accountability, owner ship have been
created and firmly built on the OFLP.
Trainees became capable, identified and documented the relevant OFLP stake holders and issues to be considered
during C & P.
![Page 66: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/66.jpg)
![Page 67: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/67.jpg)
![Page 68: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/68.jpg)
![Page 69: REGIONAL STATE OF OROMIA - ethiopiareddplus.gov.et · The Oromia Forested Land REDD+ Project (OFLRP) Consultation And Participation stakeholders Training of Trainers(TOT) Minute Horo](https://reader030.vdocuments.us/reader030/viewer/2022033119/5e05ea85c997ad7d3b691cef/html5/thumbnails/69.jpg)