![Page 1: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/1.jpg)
AMENDMENT No.1
Name of Work : Tender no. RITES/ CO/B&A/EE/PU/ VRF/E-3/2010 for the work of
“Supply, installation, testing and commissioning of VRF (Variable Refrigerant Flow) Air Conditioning System work under 11th Plan Building Projects for U.G.C, School of Tamil, Humanities & Social Science, Centre for Electronic Media & Mass Communication, Examination Wing, Library and MISAARC Buildings at Pondicherry University, Puducherry.
Tender No.:- Tender no. RITES/ CO/B&A/EE/PU/ VRF/E-3/2010. Table No- 1:- Pertaining to BOQ Part-II of Tender Documents S. No.
Reference/Page No./Clause No.
As per tender Document
Amended and to be read as:-
1 BOQ/ Page No -11 & 12 / Item 1 (a)/ (i) to (xii).
Cooling & Heating Cooling only.
2 BOQ/ Page No -12 / Item 1 (b)/ (vi) & (vii).
Hi Wall Type : 2.5 TR Hi Wall Type : 3.0 TR
Ductable Type : 2.5 TR Ductable Type : 3.0 TR
3 BOQ/ Page No- 13 / Item 1 (c).
Supply, Installation, testing & commissioning of TFA ( Fan Section ) units with high static 30 mm Minium Ceiling mounted Ductable unit capacity with Electrical Isolater switch below
Supply, Installation, testing & commissioning of TFA ( Fan Section ) units with high static 30 mm Minimum Ceiling mounted Ductable unit capacity with Electrical Isolator switch below but without coil.
4 BOQ/ Page No-14 / Item 1 (d)/ Y-Joints/ Unit.
Nos. LOT
5 BOQ/ Page No- 11 & 12 / Item 1 (a).
Outdoor Units Bidder has to quote against the specific BOQ item only. The capacities mentioned are the minimum required capacity. However, the bidder can offer the next higher size unit (if the required capacity unit is not manufactured by them) against that particular item without any extra cost.
6 BOQ/ Page No- 11 & 12 / Item 1 (b).
Indoor Units Bidder has to quote against the specific BOQ item only. The capacities mentioned are the minimum required capacity. However, the bidder can offer the next higher size unit (if the required capacity unit is not manufactured by them) against that particular item without any extra cost.
7 BOQ/ Page No- 14/ Item 1 (e).
Remote Controller For each common hall area, only one group controller shall be required. Bidder has to quote against the specific BOQ item only. However, the exact requirements in this regard shall be finalized at
![Page 2: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/2.jpg)
a later stage during execution of work. 8 BOQ Comprehensive
operation & maintenance of the VRF system.
During 1st year of defect liability period, AC agency is also required to provide the required man power for the operation of the VRF system without any extra cost. Bidders are also required to quote their per year rate separately (as a new BOQ item as per the attached annexure-“A”) towards comprehensive operation & maintenance of the VRF system for the next four years after completion of 1st one year of defect liability/maintenance period. In this regard the AC agency has to provide the bank guarantee of the equivalent per year quoted amount to be kept valid for the 4 years plus three months from the date of completion of 1st year of defect liability period. This BG is required to be submitted by the successful bidder before release of the final bill payments after the successful completion of the work. However a separate supplementary agreement shall be executed (after the successful completion of the work) between the PU and AC agency towards comprehensive operation & maintenance of the VRF system for the next 4 years after completion of 1st one year of defect liability period.
Table No- 2:- Pertaining to General Modifications
S. No.
Reference/Page No./Clause No.
Description Modifications:-
1 Technical Bid Part-I/ Page No 8 & 23 / 6 (a) & 2(a)
Work Experience: The VRF equipment manufacturers mentioned/ specified in the list of approved makes of this Tender shall be considered meeting the eligibility criteria of work experience given in Tender documents. However, any bidder other than approved VRF manufacturers shall have to full fill the stipulated tender criteria of work experience.
2 Technical Bid Part-I/Specs/Page No 69
Outdoor Unit Specification
Nos. of Inverter compressor in each ODU shall be as per manufactures standard meeting the technical requirements.
3 Technical Bid Part-I/ Page No 69
Color of Indoor Units Color of indoor units shall be as per manufacturers standard.
4 Technical Bid Part-I/Approved Makes/ Page No 86
Refrigerant & Drain Pipe Insulation (VRF System) at S. No. – 33.
Deleted
5 General Heat Load Calculation Bidders can give their confirmation on the heat Load calculations considered in the Tender or may submit their own heat Load calculations for achieving the inside design conditions. Heat Load calculations considered in the tender can be obtained from RITES Gurgaon office or same can also be downloaded from RITES website.
![Page 3: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/3.jpg)
BILL OF QUANTITIES
Annexure-“A”
Comprehensive Operation & Maintenance
Note:- The AC agency has to provide the bank guarantee of the equivalent per year quoted amount to be kept valid for the 4 years plus three months from the date of completion of 1st year of defect liability period. This BG is required to be submitted by the successful bidder before release of the final bill payments after the successful completion of the work. However a separate supplementary agreement shall be executed (after the successful completion of the work) between the PU and AC agency towards comprehensive operation & maintenance of the VRF system for the next 4 years after completion of 1st one year of defect liability period.
S. No.
Description Unit Qty. RATE (Rs.) Amount ( Rs.)
In Figure In Words 24 Comprehensive Operation & Maintenance of
VRF System for the next four years after the completion of defect Liabilities period of one year. Note:- The per year rates to be quoted by the bidders as given below
i 1st Year
Per Job 01
ii 2nd Year
Per Job 01
iii 3rd Year
Per Job 01
iv 4th Year
Per Job 01
Total Amount in Rs.
![Page 4: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/4.jpg)
BASIS OF DESIGN
A. Outside Design Conditions DBT °C WBT °C
Summer / Monsoon / Winter 44.4/35/7.2 23.9/28.3/5 B. Inside Design Conditions DBT °C RH Summer / Monsoon 24.00± 1 Around 55% C. Exposed roof: All exposed roof / terraces shall be insulated with 50 mm thick expanded polystyrene or
equivalent material by client through their own agencies to get an overall heat transmission factor of 0.12 BTU/HR/SFT/°F.
D. POWER SUPPLY: Stabilised three phase four wire AC supply i.e. 415 Volts ± 10 % & 50 Hz ± 5 %
with double earthing shall be made available near each outdoor unit & Single-phase power supply with earthing near each indoor units.
![Page 5: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/5.jpg)
E. Parameters For Air-conditioning - VRF System
Building - UGC Academic Staff Building
Sl Floor & Area
Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load Pancy Load or
CFM/ Air Below Above CFM Summer Monsoon Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Ground Floor
Machine - 1
1 Seminar Hall 120 120 20 105 5 10 1050 Gr. R-Sun 4745 16.69 14.482 x 8.0 TR Duct Type Unit
2 Classroom 72 72 20 60 NIL 10 600 Gr. R-Sun 2439 9.03 7.61 2 x 4.0 TR Duct Type Unit
3 Classroom 48 48 20 40 NIL 10 400 Gr. R-Sun 1631 6.03 5.05 3 x 2.0 TR Hi - Wall Unit
4 Classroom 48 48 20 40 NIL 10 400 Gr. R-Sun 1631 6.03 5.05 3 x 2.0 TR Hi - Wall Unit
Total 288 37.78 32.19 1 x 34 HP Out Door Unit
Ground Floor
Machine - 2
5 Office 25 25 20 4 NIL 10 40 Gr. R-Sun 866 1.91 1.45 2 x 1.6 TR Hi - Wall Unit
6 Director 32 32 20 4 NIL 10 40 Gr. R-Sun 888 1.95 1.49 2 x 1.6 TR Hi - Wall Unit
![Page 6: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/6.jpg)
Sl Floor & Area
Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load Pancy Load or
CFM/ Air Below Above CFM Summer Monsoon Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
7 Faculty - 2 No. 24 48 20 6 NIL 10 60 Gr. R-Sun 494 2.74 1.88 2 x 2.0 TR Hi - Wall Unit Each Each Each
8 Library 38 38 20 18 NIL 10 180 Gr. R-Sun 1007 3.22 2.63 2 x 2.0 TR Hi - Wall Unit
9 Computer Lab 48 48 20 32 5 10 320 Gr. R-Sun 2271 6.62 5.92 1 x 8.0 TR Duct Type Unit
10 Dinning Hall 70 70 20 50 5 10 500 Gr. NAC 2239 7.91 6.62 2 x 4.0 TR Duct Type Unit
1 x 3200 CFM TFA Unit 1 x 500 CFM TFA Unit - Ding
Total 261 24.35 19.99 1 x 28 HP Out Door Unit
Gross Total 549 62.13 52.18
![Page 7: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/7.jpg)
Building - School of Tamil
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsson Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Ground Floor
Machine - 1
1 HOD Room 43 43 20 4 NIL 10 40 Gr. NAC 976 2.11 1.01 2 x 1.6 TR Hi Wall Unit
2 Prof Room - 4 No. 20 80 20 3 NIL 10 30 Gr. NAC 448 4.24 2.56 4 x 1.6 TR Hi Wall Unit Each Each
3 Seminar Room 120 120 20 120 5 10 1200 Gr. R-Sun 4969 18.24 16.13 2 x 8.0 TR Duct Type Unit
4 Dean Room 43 43 20 4 NIL 10 40 Gr. NAC 1136 2.41 1.19 2 x 1.6 TR Hi Wall Unit
5 Library 70 70 20 24 NIL 10 240 Gr. NAC 1851 5.24 3.49 1 x 8.0 TR Duct Type
1 x 1600 CFM TFA Unit
Total 356 32.24 24.38 1 x 34 HP out Door Unit
![Page 8: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/8.jpg)
Sl Floor & Area
Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load Pancy Load or
CFM/ Air Below Above CFM Summer Monsoon Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
First Floor
Machine - 2
6 Prof Room - 7 No. 20 140 20 3 NIL 10 30 Gr. R-
Sum 515 8.26 4.13 7 x 1.6 TR Hi Wall Unit Each Each
7 Reader Room - 2 No. 16 32 20 3 NIL 10 30 Gr.
R-Sum 368 1.82 116 2 x 1.3 TR Hi Wall Unit
Each Each 1 x 500 CFM TFA Unit
Total 172 10.08 5.29 1 x 14 HP out Door Unit
Gross Total 528 42.32 29.67
![Page 9: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/9.jpg)
Building - Electronic Media & Communication
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load pancy Loador
CFM/ Air Below Above CFM Summer Monsson Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Ground Floor
Machine - 1
1 Reader Room - 2 No. 24 50 20 3 NIL 10 30 Gr. NAC 854 3.24 1.8 2 x 2.0 TR Hi Wall Unit
Each Each 2 Prof Room - 2 No. 17 34 20 3 NIL 10 30 Gr. NAC 727 2.84 1.6 2 x 1.6 TR Hi Wall Unit
Each Each 3 Board Room 68 68 20 20 NIL 10 200 Gr. NAC 1895 4.64 3.24 1 x 6.5 TR Duct Type Unit
4 Director Room 44 44 20 4 NIL 10 40 Gr. NAC 1257 2.36 1.24 2 x 1.6 TR Hi Wall Unit
5 Reception Room 41 41 20 8 NIL 10 80 Gr. NAC 1139 2.48 1.56 2 x 1.6 TR Hi Wall Unit
6 Multi Media Lab 83 83 20 60 3 10 600 Gr. R-Sun 4210 11.51 9.79 2 x 6.5 TR Duct Type Unit
1 x 1000 CFM TFA Unit
Total 320 27.07 19.23 1 x 30 HP Out Door Unit
![Page 10: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/10.jpg)
Ground Floor
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsson Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Machine - 2
7 Hub Room / Server Room 41 41 20 4 4 10 40 Gr. NAC 1833 3.3 2.41 2 x 2.0 TR Hi Wall Unit
8 Audio Recording Room 43 43 20 12 4 10 120 Gr. NAC 1963 4.13 3.21 1 x 6.5 TR Duct Type
9 Video Recording Room 43 43 20 12 4 10 120 Gr. NAC 1852 4.13 3.21 1 x 6.5 TR Duct Type
10 Production Staff Room 33 33 20 10 NIL 10 100 Gr. NAC 1139 2.63 1.67 1 x 2.0 TR Hi Wall Unit
11 Video Production Home 182 182 20 20 8 10 200 Gr. R-Sun 6155 11.59 8.64 2 x 8.0 TR Duct Type
1 x 2000 CFM TFA Unit First Floor
13 Hub Room / Server Room 41 41 20 4 4 10 40 AC R-Sun 1833 3.3 2.41 2 x 2.0 TR Hi Wall Unit
14 Library 89 89 20 30 NIL 10 300 AC R-Sun 2648 6.64 4.87 1 x 8.0 TR Duct Type Unit
1 x 1000 CFM TFA Unit
Total 472 35.72 26.42 1 x 40 HP Out Door Unit
![Page 11: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/11.jpg)
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsson Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Ground Floor
Machine - 3
12 Auditorium 178 178 20 150 10 10 1500 Gr. R-Sun 9133 26.51 22.34 4 x 8.0 TR Duct Type Unit
Total 178 26.51 22.34 1 x 30 HP Out Door Unit
Gross Total 970 89.3 67.99
![Page 12: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/12.jpg)
Building - Humanities and Social Science
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsson Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Block - 5 ( Anthropology & Seminar Hall )
First Floor
1 Seminar Hall 185 185 20 185 10 10 1850 NAC R-Sun 10089 32.08 26.81 4 x 8.0 TR Duct Type
1 x 2000 CFM TFA
185 32.08 26.81 1 x 30 HP Out Door
Unit
Central Block
Ground Floor - LS
Machine - 1
1 Library Hall ( LS ) 132 132 20 80 NIL 10 800 Gr. NAC 4907 14.2 11.03 2 x 8.0 TR Duct Type Unit
2 Dean Room - ( LS ) 30 30 20 8 NIL 10 80 Gr. NAC 1084 2.39 1.51 2 x 1.6 TR Hi Wall Unit
3 Conference Hall - ( LS) 23 23 20 12 NIL 10 120 Gr. NAC 968 1.4 0.815 2 x 1.6 TR Hi Wall Unit
1 x 1000 CFM TFA
![Page 13: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/13.jpg)
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsson Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Second Floor - LS
4 Seminar Hall (LS) 132 132 20 112 NIL 10 1120 Gr. NAC 5500 17.64 14.32 2 x 8.0 TR Duct Type Unit
1 x 1000 CFM TFA
317 35.63 27.675 1 x 36 HP Out Door
Unit
First Floor - LS
Machine - 1
4 Seminar Hall (LS) 132 132 20 112 NIL 10 1120 Gr. NAC 5500 17.64 14.32 2 x 8.0 TR Duct Type Unit
5 Computer Room (LS) 92 92 20 65 8 10 650 Gr. NAC 5001 13.19 10.94 2 x 8.0 TR Duct Type Unit
6 Server Room (LS) 32 32 20 5 5 10 50 Gr. NAC 1283 1.24 1.03 2 x 2.0 TR Hi Wall Unit
1 x 2000 CFM TFA
256 32.07 26.29 1 x 36 HP Out Door
Unit
![Page 14: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/14.jpg)
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsson Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Ground Floor - RS
Machine - 1
1 Library Hall ( RS ) 132 132 20 80 NIL 10 800 Gr. NAC 4907 14.2 11.03 2 x 8.0 TR Duct Type Unit
2 Dean Room - ( RS ) 30 30 20 8 NIL 10 80 Gr. NAC 1084 2.39 1.51 2 x 1.6 TR Hi Wall Unit
3 Conference Hall - ( RS) 23 23 20 12 NIL 10 120 Gr. NAC 968 1.4 0.815 2 x 1.6 TR Hi Wall Unit
1 x 1000 CFM TFA Second Floor - RS
4 Seminar Hall (RS) 132 132 20 112 NIL 10 1120 Gr. NAC 5500 17.64 14.32 2 x 8.0 TR Duct Type Unit
1 x 1000 CFM TFA
317 35.63 27.675 1 x 36 HP Out Door
Unit
Cafeteria
First Floor
1 Cafeteria 224 224 20 120 NIL 10 1200 NAC NAC 9600 24.6 23.2 6 x 4.75 TR Duct Type 1 x 1200 CFM TFA Unit
224 24.6 23.2 1 x 28 HP Out Door
![Page 15: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/15.jpg)
Unit F Parameters For Air-conditioning - Split Unit System
Building - UGC Academic Staff Building
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsson Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Ground Floor
1 Guest Room 1 To 4 - 4 No. 14 56 15 2 NIL 10 20 Gr. NAC 597 5.24 2.44 4 x 1.6 TR Hi - Wall Unit
Each Each
2 Guest Room 5 To 8 - 4 No. 14 56 15 2 NIL 10 20 Gr. NAC 570 4.32 2.44 4 x 1.6 TR Hi - Wall Unit
Each Each
3 Guest Room 9 To 11 - 3 No. 14 42 15 2 NIL 10 20 Gr. NAC 556 3.18 1.71
3 x 1.6 TR Hi - Wall Unit
Each Each
4 Guest Room 12 To 14 - 3 No. 14 42 15 2 NIL 10 20 Gr. NAC 572 3.27 1.86
3 x 1.6 TR Hi - Wall Unit
Each Each First Floor
14 Guest Room 1 To 4 - 4 No. 14 56 15 2 NIL 10 20 Gr. R-Sun 597 5.24 2.44 4 x 1.6 TR Hi - Wall Unit
Each Each
15 Guest Room 5 To 8 - 4 No. 14 56 15 2 NIL 10 20 Gr. R-Sun 570 4.32 2.44 4 x 1.6 TR Hi - Wall Unit
Each Each
16 Guest Room 9 To 11 - 4 No. 14 56 15 2 NIL 10 20 Gr. R-Sun 556 4.24 2.28
4 x 1.6 TR Hi - Wall Unit
Each Each 17 Guest Room 12 To 14 - 4 14 56 15 2 NIL 10 20 Gr. R-Sun 572 4.36 2.48 4 x 1.6 TR Hi - Wall
![Page 16: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/16.jpg)
No. Unit Each Each
420 34.17 18.09
Building - Humanities and Social Science
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UN
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsson Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Block - 1 ( History )
Ground Floor
1 Prof Room - 2 No. 20 40 20 3 NIL 10 30 Gr. NAC 531 2.2 1.22 2 x 1.5 TR Hi Wall UnEach Each
2 Reader - 2 No. 14 28 20 3 NIL 10 30 Gr. NAC 376 1.7 1.02 2 x 1.5 TR Hi Wall UnEach Each
3 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
First Floor
1 Conservation & Museum 75 75 20 25 NIL 10 250 Gr. NAC 1944 4.95 3.46 4 x 2.0 TR Hi Wall Un
6 Reader - 2 No. 14 28 20 3 NIL 10 30 Gr. NAC 376 1.7 1.02 2 x 1.5 TR Hi Wall UnEach Each
7 Arch Lab 23 23 20 8 NIL 10 80 AC R-
Sum 700 1.76 1.3 1 x 1.5 TR Hi Wall Un
8 Archival Room 31 31 20 10 NIL 10 100 AC R-
Sum 975 2.36 1.62 2 x 1.5 TR Hi Wall Un
259 16.72 10.65
![Page 17: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/17.jpg)
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsoon Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Block - 2 ( Sociology )
Ground Floor
1 Prof Room - 2 No. 20 40 20 3 NIL 10 30 Gr. NAC 531 2.2 1.22 2 x 1.5 TR Hi Wall UnEach Each
2 Reader - 2 No. 14 28 20 3 NIL 10 30 Gr. NAC 376 1.7 1.02 2 x 1.5 TR Hi Wall UnEach Each
3 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
First Floor
5 Prof Room - 2 No. 20 40 20 3 NIL 10 30 Gr. NAC 531 2.2 1.22 2 x 1.5 TR Hi Wall UnEach Each
6 Reader - 2 No. 14 28 20 3 NIL 10 30 Gr. NAC 376 1.7 1.02 2 x 1.5 TR Hi Wall UnEach Each
7 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
204 11.9 6.5
![Page 18: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/18.jpg)
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UN
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsson Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Block - 3 ( Social Inclusion & Exclusion Studies)
Ground Floor
1 Prof Room - 1 No. 20 20 20 3 NIL 10 30 Gr. NAC 531 1.1 0.62 1 x 1.5 TR Hi Wall Un
2 Reader - 1 No. 14 14 20 3 NIL 10 30 Gr. NAC 376 0.85 0.51 1 x 1.5 TR Hi Wall Un
3 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
68 4 2.14
Block - 4 ( Politics & International Studies
Ground Floor
1 Prof Room - 2 No. 20 40 20 3 NIL 10 30 Gr. NAC 531 2.2 1.22 2 x 1.5 TR Hi Wall UnEach Each
2 Reader - 2 No. 14 28 20 3 NIL 10 30 Gr. NAC 376 1.7 1.02 2 x 1.5 TR Hi Wall UnEach Each
3 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
![Page 19: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/19.jpg)
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsoon Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
First Floor
4 Reader - 2 No. 14 14 20 3 NIL 10 30 Gr. NAC 376 1.74 1.1 2 x 1.5 TR Hi Wall Un
5 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
150 9.74 5.36
Block - 5 ( Anthropology & Seminar Hall )
Ground Floor
1 Visual Anthro 50 50 20 15 2 10 150 Gr. NAC 1788 4.08 3.02 4 x 1.5 TR Hi Wall Un
2 Museum 41 41 20 15 NIL 10 150 AC R-
Sum 1317 3.31 2.46 2 x 1.5 TR Hi Wall Un
3 Prof Room - 1 No. 20 20 20 3 NIL 10 30 Gr. NAC 531 1.1 0.62 1 x 1.5 TR Hi Wall Un
4 Reader - 2 No. 14 28 20 3 NIL 10 30 Gr. NAC 376 1.7 1.02 2 x 1.5 TR Hi Wall UnEach Each
5 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
173 12.24 8.13
![Page 20: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/20.jpg)
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UN
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsson Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Block - 6 ( English )
Ground Floor
1 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
2 Prof Room - 3 No. 20 60 20 3 NIL 10 30 Gr. NAC 531 3.3 1.86 3 x 1.5 TR Hi Wall UnEach Each
3 Reader - 6 No. 14 84 20 3 NIL 10 30 Gr. NAC 376 5.1 3.06 6 x 1.5 TR Hi Wall UnEach Each
First Floor
4 ELT Lab 50 50 20 15 NIL 10 150 NAC R-Sun 2066 4.53 3.14 4 x 1.5 TR Hi Wall Un
5 Language Lab 50 50 20 15 NIL 10 150 NAC R-Sun 2066 4.53 3.14 4 x 1.5 TR Hi Wall Un
278 19.51 12.21 Block - 7 ( French)
Ground Floor
1 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
2 Prof Room - 1 No. 20 40 20 3 NIL 10 30 Gr. NAC 531 1.1 0.62 1 x 1.5 TR Hi Wall UnEach Each
3 Reader - 2 No. 14 28 20 3 NIL 10 30 Gr. NAC 376 1.7 1.02 2 x 1.5 TR Hi Wall Un
![Page 21: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/21.jpg)
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsoon Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Each Each
102 4.85 2.65
Block - 8 ( Applied Psychology)
Ground Floor
1 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
2 Prof Room - 1 No. 20 40 20 3 NIL 10 30 Gr. NAC 531 1.1 0.62 1 x 1.5 TR Hi Wall UnEach Each
3 Reader - 2 No. 14 28 20 3 NIL 10 30 Gr. NAC 376 1.7 1.02 2 x 1.5 TR Hi Wall UnEach Each
First Floor
4 Consulting Hall with 73 73 20 25 NIL 10 250 NAC R-Sun 2671 6.29 4.23 4 x 2.0 TR Hi Wall UnObservation Room
5 Lab With Object Space 73 73 20 25 NIL 10 250 NAC R-Sun 2671 6.29 4.23 4 x 2.0 TR Hi Wall Un
6 Lab With Object Space 73 73 20 25 NIL 10 250 NAC R-Sun 2671 6.29 4.23 4 x 2.0 TR Hi Wall Un
321 23.72 15.34
![Page 22: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/22.jpg)
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UN
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsson Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Block - 9 ( Asian Christian Studies)
Ground Floor
1 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
2 Prof Room - 1 No. 20 20 20 3 NIL 10 30 Gr. NAC 531 1.1 0.62 1 x 1.5 TR Hi Wall UnEach Each
3 Reader - 2 No. 14 28 20 3 NIL 10 30 Gr. NAC 376 1.7 1.02 2 x 1.5 TR Hi Wall UnEach Each
First Floor
4 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
5 Prof Room - 2 No. 20 40 20 3 NIL 10 30 Gr. NAC 531 1.1 0.62 2 x 1.5 TR Hi Wall UnEach Each
6 Reader - 2 No. 14 28 20 3 NIL 10 30 Gr. NAC 376 1.7 1.02 2 x 1.5 TR Hi Wall UnEach Each
7 Computer Lab 31 31 20 18 NIL 10 180 Gr. R-Sun 1240 3.39 1.02 2 x 2.0 TR Hi Wall Un
8 Library 38 38 20 18 NIL 10 180 Gr. R-Sun 1206 3.36 2.74 2 x 2.0 TR Hi - Wall
253 16.45 9.06
![Page 23: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/23.jpg)
Sl Floor & Area Name Area Total Light Occu- Eqpt. ACPH Fresh Floor Floor Dehum. TR TR IN / OUT Door UNIT
No. SMT Area Load pancy Load or
CFM/ Air Below Above CFM Summer Monsoon Selection SMT W/SMT KW PER CFM Summer (Total) (Total)
Block - 10 ( Sanskrit)
Ground Floor
1 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
2 Prof Room - 1 No. 20 20 20 3 NIL 10 30 Gr. NAC 531 1.1 0.62 1 x 1.5 TR Hi Wall UnEach Each
3 Reader - 2 No. 14 28 20 3 NIL 10 30 Gr. NAC 376 1.7 1.02 2 x 1.5 TR Hi Wall UnEach Each
First Floor
4 HOD 34 34 20 4 NIL 10 40 Gr. NAC 1067 2.05 1.01 2 x 1.5 TR Hi Wall Un
5 Prof Room - 1 No. 20 20 20 3 NIL 10 30 Gr. NAC 531 1.1 0.62 1 x 1.5 TR Hi Wall UnEach Each
6 Reader - 2 No. 14 28 20 3 NIL 10 30 Gr. NAC 376 1.7 1.02 2 x 1.5 TR Hi Wall UnEach Each
164 9.7 5.3
Gr. Total Huminaties 1972 128.83 77.34
![Page 24: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/24.jpg)
F. Refrigeration Load The total refrigeration load based on the parameters given below. Building Name Area Summer Monsoon SMT TR TR
Gr. Total Humanities 3308 390.72 283.92
UGC 804 88.66 65.32
Total Tamil 508 42.32 29.67
Total Elect Media 970 89.3 67.99
Gross Total ( Project ) 5585 611.05 446.9
![Page 25: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/25.jpg)
BASIS OF DESIGN FOR AIR CONDITIONING WORKS
EXAMINATION WING :
SYSTEM‐1(44HP)
No DESCRIPTION AREA HEIGH
T Occupancy
Indoor Unit
QTY TOTAL
Type of IDU Floor
SFT (FT) Nos TR Nos. TR
1 DDE Office 428 14.0 9.0 2.0 2.0 4.0 Concealed Ground
2 A.R Cabin 212 14.0 1.0 2.0 1.0 2.0 Concealed Ground
3 D.R. Secretary 50 14.0 1.0 1.0 1.0 1.0 Concealed Ground
4 D.R.Cabin‐2 102 14.0 3.0 1.0 1.0 1.0 Concealed Ground
5 Computer Section 317 14.0 9.0 2.5 1.0 2.5 Concealed Ground
6 Valuation Hall 3709 14.0 154.0 4.0 6.0 24.0 Ductable Ground
7 Finance Selection 228 14.0 5.0 2.0 1.0 2.0 Concealed Ground
8 A.R. Cabin 141 14.0 1.0 1.5 1.0 1.5 Concealed Ground
9 Cafteria 141 14.0 5.0 1.5 1.0 1.5 Concealed Ground
TOTAL 15.0 39.5
![Page 26: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/26.jpg)
SYSTEM‐2 (36 HP)
No DESCRIPTION AREA HEIGH
TOccupancy
Indoor Unit QTY
TOTAL Type of IDU Floor
SFT (FT) Nos TR Nos. TR
10 COMPUTER HALL 717 14.0 20.0 2.5 3.0 7.5 Concealed Ground
11 FUT SEC OFF 553 14.0 9.0 2.0 2.0 4.0 Concealed Ground
12 UG/PG Engg & Tech 432 14.0 9.0 2.0 2.0 4.0 Concealed Ground
13 Medical / Para Med/ Law 432 14.0 9.0 2.0 2.0 4.0 Concealed Ground
14 UG/PG Arts & Science
432 14.0 9.0 2.0 2.0 4.0 Concealed Ground
15 Inquiry/ Certi room
553 14.0 9.0 2.0 2.0 4.0 Concealed Ground
16 Waiting Hall 686 14.0 24.0 2.5 2.0 5.0 Concealed Ground
17 Reception 186 14.0 3.0 2.0 1.0 2.0 Concealed Ground
TOTAL 16.0 34.5
![Page 27: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/27.jpg)
SYSTEM‐3 (20 HP)
No DESCRIPTION AREA HEIGH
T Occupancy
Indoor Unit
QTY TOTAL
Type of IDU Floor
SFT (FT) Nos TR Nos. TR
18 A.R ‐3 cabin 130 14.0 1.0 1.0 1.0 1.0 Concealed Ground
19 A.R ‐4 cabin 130 14.0 1.0 1.0 1.0 1.0 Concealed Ground
20 A.R ‐2 cabin 130 14.0 1.0 1.0 1.0 1.0 Concealed Ground
21 A.R ‐1 cabin 130 14.0 1.0 1.0 1.0 1.0 Concealed Ground
22 D.R. Secretary 55 14.0 1.0 1.0 1.0 1.0 Concealed Ground
23 D.R.Cabin‐1 102 14.0 3.0 1.0 1.0 1.0 Concealed Ground
24 Research section 318 14.0 3.0 2.5 1.0 2.5 Concealed Ground
25 Lobby 561 14.0 8.0 2.5 2.0 5.0 Concealed Ground
26 Security & Data room
230 14.0 2.0 2.0 1.0 2.0 Concealed Ground
27 Staff Dinning 526 14.0 24.0 2.0 2.0 4.0 Concealed Ground
TOTAL 12.0 19.5
SYSTEM‐ 4 (50 HP)
No DESCRIPTION AREA HEIGH
T Occupancy
Indoor Unit
QTY TOTAL
Type of IDU Floor
SFT (FT) Nos TR Nos. TR
1 Valuation Hall 5301 14.0 215.0 5.0 10.0 50.0 Ductable First
TOTAL 10.0 50.0
![Page 28: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/28.jpg)
SYSTEM‐ 5 (44 HP)
No DESCRIPTION AREA HEIGH
T Occupancy
Indoor Unit
QTY TOTAL
Type of IDU Floor
SFT (FT) Nos TR Nos. TR
2 Mini Valuation hall
867 14.0 35.0 4.0 3.0 12.0 Ductable First
3 Confidential room
432 14.0 7.0 2.5 2.0 5.0 Concealed First
4 C.E.Room 432 14.0 10.0 2.5 2.0 5.0 Concealed First
5 C.E. Sec. cabin 288 14.0 6.0 3.0 1.0 3.0 Ductable First
6 Conference hall 686 14.0 21.0 3.0 3.0 9.0 Ductable First
7 Board meeting room
720 14.0 24.0 3.0 3.0 9.0 Ductable First
8 D.R.Cabin‐3 97 14.0 3.0 1.0 1.0 1.0 Concealed First
9 D.R. Secretary 56 14.0 1.0 1.0 1.0 1.0 Concealed First
TOTAL 16.0 45.0
![Page 29: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/29.jpg)
SYSTEM‐ 6
No DESCRIPTION AREA HEIGH
T Occupancy
Indoor Unit
QTY TOTAL
Type of IDU Floor
SFT (FT) Nos TR Nos. TR
10 Pre Valuation 330 14.0 10.0 3.0 1.0 3.0 Ductable First
11 Pre Valuation 289 14.0 10.0 3.0 1.0 3.0 Ductable First
12 Pre Valuation 289 14.0 10.0 3.0 1.0 3.0 Ductable First
13 Pre Val(M.ED & Law)
710 14.0 10.0 3.0 3.0 9.0 Ductable First
14 Pre Val(Eng) 710 14.0 10.0 3.0 3.0 9.0 Ductable First
TOTAL 9.0 27.0
OUTSIDE DESIGN CONDITIONS : 39.44 DEG C DRY BULB / 27.77 DEC C WET BULB.
INSIDE DESIGN CONDITIONS : 24 +/- 1.1 DEG C DRY BULB AND 55 +/- 5 % RELATIVE HUMIDITY.
![Page 30: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/30.jpg)
BASIS OF DESIGN FOR AIR CONDITIONING WORKS
LIBRARY WING:
SYSTEM‐1 (32 HP)
No DESCRIPTION AREA HEIGHT
Occupancy
Indoor Unit
QTY TOTAL
Type of IDU Floor
SFT (FT) Nos TR Nos. TR
1 Reading Hall 3543 12.0 30.0 5.0 6.0 30.0 Ductable Ground
2 Section In‐charge 180 12.0 2.0 1.5 1.0 1.5 Concealed Ground
3 Visually Challenged 1763 12.0 20.0 4.0 3.0 12.0 Ductable Ground
TOTAL 10.0 43.5
SYSTEM‐2 (32 HP)
No DESCRIPTION AREA
HEIGHT
Occupancy
Indoor Unit QTY
TOTAL Type of IDU Floor
SFT (FT) Nos TR Nos. TR
4 Children Section 1146 12.0 20.0 4.0 2.0 8.0 Ductable Ground
5 Children Section 1432 12.0 20.0 4.0 3.0 12.0 Ductable Ground
TOTAL 5.0 20.0
![Page 31: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/31.jpg)
SYSTEM‐3 (32 HP)
No DESCRIPTION AREA
HEIGHT
Occupancy
Indoor Unit QTY
TOTAL Type of IDU Floor
SFT (FT) Nos TR Nos. TR
6 Auditorium 2345 19.0 200.0 5.0 4.0 20.0 Ductable Ground
7 Lobby & Cafteria 919 12.0 20.0 4.0 2.0 8.0 Ductable Ground
TOTAL 6.0 28.0
SYSTEM‐4 (32 HP)
No DESCRIPTION AREA
HEIGHT
Occupancy
Indoor Unit QTY
TOTAL Type of IDU Floor
SFT (FT) Nos TR Nos. TR
3 Readers Room 2495 12.0 30.0 4.0 5.0 20.0 Ductable First
4 Room‐1 133 12.0 2.0 1.0 1.0 1.0 Concealed First
5 Room‐2 133 12.0 2.0 1.0 1.0 1.0 Concealed First
6 Room‐3 133 12.0 2.0 1.0 1.0 1.0 Concealed First
TOTAL 8.0 23.0
![Page 32: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/32.jpg)
SYSTEM‐5 (16 HP)
No DESCRIPTION AREA
HEIGHT
Occupancy
Indoor Unit QTY
TOTAL Type of IDU Floor
SFT (FT) Nos TR Nos. TR
1 Computer Section 1545 12.0 20.0 4.0 4.0 16.0 Ductable First
TOTAL 4.0 16.0
SYSTEM‐6 (16 HP)
No DESCRIPTION AREA
HEIGHT
Occupancy
Indoor Unit QTY
TOTAL Type of IDU Floor
SFT (FT) Nos TR Nos. TR
2 Research Scholars 1587 12.0 10.0 4.0 4.0 16.0 Ductable First
TOTAL 4.0 16.0
![Page 33: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/33.jpg)
SYSTEM‐7 (26 HP)
No DESCRIPTION AREA
HEIGHT
Occupancy
Indoor Unit QTY
TOTAL Type of IDU Floor
SFT (FT) Nos TR Nos. TR
6 Class Room‐2 1020 12.0 25.0 5.0 2.0 10.0 Ductable Second
7 Class Room‐3 1039 12.0 25.0 5.0 2.0 10.0 Ductable Second
8 Faculty Room‐1 111 12.0 2.0 1.0 1.0 1.0 Concealed Second
9 Faculty Room‐2 111 12.0 2.0 1.0 1.0 1.0 Concealed Second
10 Faculty Room‐3 111 12.0 2.0 1.0 1.0 1.0 Concealed Second
11 Faculty Room‐4 111 12.0 2.0 1.0 1.0 1.0 Concealed Second
12 Faculty Room‐5 111 12.0 2.0 1.0 1.0 1.0 Concealed Second
13 Faculty Room‐6 111 12.0 2.0 1.0 1.0 1.0 Concealed Second
TOTAL 10.0 26.0
![Page 34: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/34.jpg)
SYSTEM‐8 (44 HP)
No DESCRIPTION AREA
HEIGHT
Occupancy
Indoor Unit QTY
TOTAL Type of IDU Floor
SFT (FT) Nos TR Nos. TR
1 Rest Room 308 12.0 2.0 2.5 1.0 2.5 Concealed Second
2 H.O.D Room
252 12.0 2.0 2.5 1.0 2.5 Concealed Second
3 Office Room 762 12.0 10.0 4.0 2.0 8.0 Ductable Second
4 Lecturer Hall 1530 12.0 25.0 4.0 4.0 16.0 Ductable Second
5 Class Room‐1 1127 12.0 25.0 5.0 2.0 10.0 Ductable Second
14 Meeting 238 12.0 5.0 2.5 1.0 2.5 Concealed Second
TOTAL 11.0 41.5
OUTSIDE DESIGN CONDITIONS : 39.44 DEG C DRY BULB / 27.77 DEC C WET BULB.
INSIDE DESIGN CONDITIONS : 24 +/- 1.1 DEG C DRY BULB AND 55 +/- 5 % RELATIVE HUMIDITY.
![Page 35: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/35.jpg)
BASIS OF DESIGN FOR AIR CONDITIONING WORKS
MISAARC WING :
SYSTEM‐1( 20 HP)
No DESCRIPTION AREA HEIGHTOccupancy
Indoor Unit
QTY TOTAL Type of IDU Floor
SFT (FT) Nos TR Nos. TR
2 Rest Room 96 14.0 3.0 1.0 1.0 1.0 Concealed Ground
3 Office Room 222 14.0 4.0 2.0 1.0 2.0 Concealed Ground
4 Waiting Room 133 14.0 13.0 1.0 1.0 1.0 Concealed Ground
5 Faculty 201 14.0 6.0 2.0 1.0 2.0 Concealed Ground
6 Class Room‐1 426 14.0 30.0 2.0 2.0 4.0 Concealed Ground
7 Class Room‐2 604 14.0 40.0 4.0 2.0 8.0 Ductable Ground
8 Directors Room 320 8.0 8.0 2.5 1.0 2.5 Concealed Ground
TOTAL 8.0 18.5
![Page 36: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/36.jpg)
SYSTEM‐2(36 HP)
No DESCRIPTION AREA HEIGH
T Occupancy
Indoor Unit
QTY TOTAL Type of IDU Floor
SFT (FT) Nos TR Nos. TR
1 Waiting Lobby & Rece
2388 14.0 31.0 5.0 3.0 15.0 Ductable Ground
9 Ladies Room 112 14.0 9.0 1.0 1.0 1.0 Concealed Ground
10 Class Room 315 14.0 20.0 2.5 1.0 2.5 Concealed Ground
11 Class Room 315 14.0 20.0 2.5 1.0 2.5 Concealed Ground
12 Computer Hall 604 14.0 28.0 3.0 3.0 9.0 Ductable Ground
13 Faculty‐1 160 14.0 6.0 1.5 1.0 1.5 Concealed Ground
14 Faculty‐2 160 14.0 6.0 1.5 1.0 1.5 Concealed Ground
15 Faculty‐3 160 14.0 6.0 1.5 1.0 1.5 Concealed Ground
TOTAL 12.0 35.5
![Page 37: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/37.jpg)
SYSTEM‐3( 20 HP)
No DESCRIPTION AREA HEIGHTOccupancy
Indoor Unit
QTY TOTAL Type of IDU Floor
SFT (FT) Nos TR Nos. TR
2 Meeting Room‐2 361 14.0 12.0 3.0 1.0 3.0 Ductable First
3 VIP Guest Room 207 14.0 3.0 2.5 1.0 2.5 Concealed First
4 Faculty 207 14.0 6.0 2.5 1.0 2.5 Concealed First
5 Faculty 207 14.0 6.0 2.5 1.0 2.5 Concealed First
6 Meeting Room 320 14.0 14.0 3.0 1.0 3.0 Ductable First
7 Faculty 154 14.0 6.0 2.0 1.0 2.0 Concealed First
4 Visiting professor's room
199 14.0 6.0 2.0 1.0 2.0 Concealed Second
5 Society Office 95 14.0 6.0 1.0 1.0 1.0 Concealed Second
6 Visiting professor's room
199 14.0 6.0 2.0 1.0 2.0 Concealed Second
TOTAL 9.0 20.5
![Page 38: Refrigerant Flow) Air Conditioning System work under 11th ... · a later stage during execution of work. 8 BOQ Comprehensive operation & maintenance of the VRF system. During 1st](https://reader031.vdocuments.us/reader031/viewer/2022022015/5b517e1a7f8b9a35278c0678/html5/thumbnails/38.jpg)
SYSTEM‐4( 50 HP)
No DESCRIPTION AREA HEIGHTOccupancy
Indoor Unit
QTY TOTAL Type of IDU Floor
SFT (FT) Nos TR Nos. TR
1 Auditorium 1922 28.0 104.0 6.0 4.0 24.0 Ductable First
8 Faculty‐1 207 14.0 6.0 2.5 1.0 2.5 Concealed First
9 Faculty‐2 207 14.0 6.0 2.5 1.0 2.5 Concealed First
10 Faculty‐3 207 14.0 6.0 2.5 1.0 2.5 Concealed First
11 Librarian 97 14.0 6.0 1.0 1.0 1.0 Concealed First
12 Library,Reading & Stack
659 14.0 28.0 3.0 2.0 6.0 Ductable First
1 Library,Reading & Stack
659 14.0 38.0 3.0 2.0 6.0 Ductable Second
2 Residential Scholars 403 14.0 8.0 2.5 1.0 2.5 Concealed Second
TOTAL 13.0 47.0
OUTSIDE DESIGN CONDITIONS : 39.44 DEG C DRY BULB / 27.77 DEC C WET BULB.
INSIDE DESIGN CONDITIONS : 24 +/- 1.1 DEG C DRY BULB AND 55 +/- 5 % RELATIVE HUMIDITY.