References

Flame Towers City/Country : Baku / AZERBAIJAN

Main Conctractor : DIA Holding

Height : Flame Tower 1 ( 33 Floors, 182 mt. / 597 ft )

: Flame Tower 2 ( 30 Floors, 165 mt. / 541 ft )

: Flame Tower 3 ( 28 Floors, 161 mt. / 528 ft )

Start Date : October 2007 / July 2015

Finish Date : June 2013 / —

Description : MEP Shop Drawings, Installation, Test & Commissioning

MECHANICAL SYSTEMS Shop Drawings, Installation, Test & Commissioning • Plumbing

• Low Temperature / Hot Water System • Air Conditioning & Ventilation System • Smoke Exhaust & Pressurizing Control System

• Air Ducts Manufacturing, Installation ELECTRONIC SYSTEMS Shop Drawings, Test & Commissioning • Building Management System ( 18.000 points ) • Modbus/LonWorks/BACnet Integration

Swissôtel Krasnye Holmy Moscow City/Country : Moscow / RUSSIA

Main Conctractor : ENKA Holding

Project Details : 30.000 m² Construction Area

: 5 Stars, 34 Floors, 160 mt.

: 234 Rooms, 28 Suites, 11 Meeting Rooms

Start Date : July 2003

Finish Date : July 2005

Description : Design, Installation, Test & Commissioning

ELECTRONIC SYSTEMS Design, Installation, Test & Commissioning • Weak Current Systems • Professional Audio/Video System

• Prosessional Stage & Lighting System • Cafe/Bar & Restaurants Professional Music Broadcasting • Meeting Room Automation System - Audio/Video/Lighting/Motorized Blinds & Curtains Control

Kristal Tower Istanbul City/Country : Istanbul / TURKIYE

Main Conctractor : SOYAK Holding

Project Details : 96.622 m² Construction Area

: 35 Floors, 170 mt.

Start Date : March 2011

Finish Date : July 2014

Description : Design, Supervising, Test & Commissioning

ELECTRONIC SYSTEMS Design, Supervising, Test & Commissioning • Weak Current Systems • BMS

• Lighting Automation • Access Control & Security System • IP CCTV System

• Software & Hardware Integration

Hyatt Regency Dushanbe City/Country : Dushanbe / TAJIKISTAN

Main Conctractor : ENKA Holding

Project Details : 38.000 m² Construction Area

: 5 Stars, 12 Floors

: 173 Standart, 41 Semi-Luxurious, 6 Deluxe Bedrooms, Presidential Suite

Start Date : June 2006

Finish Date : August 2008

Description : Design, Installation, Test & Commissioning

ELECTRONIC SYSTEMS Design, Installation, Test & Commissioning • Weak Current Systems • Professional Audio/Video System

• Prosessional Stage & Lighting System • Cafe/Bar & Restaurants Proıfessional Music Broadcasting • Ballroom Automation System - Divided/Multifunctional Ballroom - Audio/Video/Lighting/Motorized Blinds & Curtains Control • Meeting Room Automation System - Audio/Video/Lighting/Motorized Blinds & Curtains Control

Azersu Tower Baku City/Country : Baku / AZERBAIJAN

Main Conctractor : HALLA

Project Details : 36.326 m² Construction Area

: 22 Floors, 124 mt.

Start Date : October 2013

Finish Date : ——

Description : Design, Supervising, Test & Commissioning

ELECTRONIC SYSTEMS Design, Procurement, Supervising, Test & Commissioning

• Building Management System - 28 ea. Area Controllers - 298 ea. Input / 200 ea. Output Points Capacity - 242 ea. Field Equipments, Sensors - 978 ea. Valve & Actuators - 16 ea. Room Sensors - DDC Panels

Spine Tower Istanbul City/Country : Istanbul / TURKIYE

Main Conctractor : Tilaga A.Ş.

Project Details : 140.000 m² Construction Area

: 56 Floors( 9 Underground Fl, 47 Normal Fl ) , 191 mt.

: 80 Residances & A Type Offices

Start Date : March 2010

Finish Date : August 2014

Description : Design, Installation, Test & Commissioning

ELECTRONIC SYSTEMS Design, Installation, Test & Commissioning • Building Management System AHU, Fan Coils, VAVs Cooling / Heating Pumps Chillers, Boilers Frequency Inverters • Weak Current Systems • IP CCTV

• Access Control Systems • Fire Detection & Alarm System • General Music & Emergency Announcement System • Lighting Automation ELECTRONIC SYSTEMS Service & Maintenance Agreement for 2016 & 2017

Convention Center Baku City/Country : Baku / AZERBAIJAN

Main Conctractor : İLK Construction

Project Details : 146.000 m² Construction Area

: Auditorium ( 3500 Seats )

: Conference Rooms ( 15 ea / 1250 Seats )

Start Date : March 2013

Finish Date : June 2015

Description : MEP Technical Office Works for Design & Supervising

ELECTRICAL SYSTEMS Technical Office Works

• MV / LV Power Distribution, Cubicles • Transformers, Generators, MDPs, UPSs

• Earthing & Lightning Protection • Lighting • Busbar, Cable Trays, Rise Floors, etc. MECHANICAL SYSTEMS Technical Office Works • Rainwater System • Waste Water & Sanitary System • Plumbing

• Low Temperature / Hot Water System • Air Conditioning & Ventilation System • Natural Gas System

• Building Management System ( Procurement, Supervising, Test & Commissioning ) - 265 ea. Area Controllers - 2450 ea. Input / 2750 ea. Output Points Capacity - 1750 ea. Sensors - DDC Panels • Fire Protection System

• Water Treatment & Softener System • Smoke Exhaust & Pressurizing Control System • Air Duct ( Production, Supervising, Test & Commissioning ) - 40.200 m² Air Duct ( 0,6-0,8-1,0-1,2 mm )

ELECTRONIC SYSTEMS Design, Procurement, Supervising, Test & Commissioning

• Weak Current Systems • Lighting Automation ( DALI ) - 1250 ea. Relay Controller Points - 212 ea. DALI Channels - 168 ea. Input Points - 350 ea. Motion Detectors - 200 ea. Keypads • Fire Detection & Alarm Systems ( 2100 ea. Detection Points ) • IP TV & Digital Signage Systems ( 75 ea. Points )

• IT Indoor & Outdoor WiFi System ( 230 ea. Indoor & 20 ea. Outdoor Units ) • Broadcast TV Distribution System - 84 ea. Boradcast Connection Points - 3 ea. Outdoor OB Van Connection Points - 32.275 mt. Hybrid F/O Fiber Optic FRNC FMW fp/LEMO PEW fs Cable • Multiview Platform System

Azerbaijan Diplomatic Academy ( ADA ) City/Country : Baku / AZERBAIJAN

Main Conctractor : AIKON CPIT

Area : 45.000 m²

Start Date : March 2011

Finish Date : September 2012

Description : MEP Design, Procurement, Installation, Test & Commissioning

ELECTRICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning

• MV ( 6kV / 10kV / 35kV ) Power Distribution, Cubicles • LV ( 300/500 V, 600/1000 V ) Power Distribution

• Transformers, Generators, MDPs, UPSs • Earthing & Lightning Protection • Lighting & Lighting Automation ( KNX, DALI )

• Busbar, Cable Trays, Rise Floors, etc. MECHANICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning • Rainwater System • Waste Water & Sanitary System

• Plumbing • Low Temperature / Hot Water System • Air Conditioning & Ventilation System • Natural Gas System

• Building Management System • Fire Protection System • Water Treatment & Softener System

• Smoke Exhaust & Pressurizing Control System ELECTRONIC SYSTEMS Design, Procurement, Installation, Test & Commissioning

• Weak Current Systems • Lighting Scneraios, Motorized Blind & Curtains Control & Automation • Fire Detection & Alarm Systems

• Public Announcement & Emergency Warning Systems • Access Control System & e-Campus Applications • IP CCTV System

• Analog TV / IP TV Systems

• BMS Automation & Control System

• Videowall Huge Displays • Smartboard İnteractive Boards • Digital Signage / Information Displays

• Information Technologies • IT Active & Passive Equipments, Indoor & Outdoor WiFi System • Professional Audio/Video Systems • Professional Stage & Lighting Systems

Electrical System / Main Distribution & MCC Panels

Mechanical Systems / Main Mechanical Room, Boilers, Pumps, Pump Controllers, etc.

Electronic Systems / Main Security Control Room, CCTV, Fire Detection, Access Control, etc.

Electronic Systems / Professional Audio-Video Systems, Videowalls, etc.

Carpet Museum

City/Country : Baku / AZERBAIJAN

Main Conctractor : AIKON CPIT

Area : 27.000 m²

Start Date : January 2010

Finish Date : August 2014

Description : MEP Design, Procurement, Installation, Test & Commissioning

ELECTRICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning

• MV ( 6kV / 10kV / 35kV ) Power Distribution, Cubicles • LV ( 300/500 V, 600/1000 V ) Power Distribution

• Transformers, Generators, MDPs, UPSs • Earthing & Lightning Protection • Lighting & Lighting Automation ( DALI )

• Busbar, Cable Trays, Rise Floors, etc. MECHANICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning • Rainwater System • Waste Water & Sanitary System

• Plumbing • Low Temperature / Hot Water System • Air Conditioning & Ventilation System

• Natural Gas System • Building Management System • Fire Protection System • Water Treatment & Softener System

• Smoke Exhaust & Pressurizing Control System ELECTRONIC SYSTEMS Design, Procurement, Installation, Test & Commissioning

• Weak Current Systems • Lighting Scneraios, Motorized Blind & Curtains Control & Automation • Fire Detection & Alarm Systems

• Public Announcement & Emergency Warning Systems • Access Control System • IP CCTV System

• BMS Automation & Control System

• Videowall Huge Displays • Digital Signage / Information Displays • Information Technologies

• IT Active & Passive Equipments, Indoor & Outdoor WiFi System • Professional Audio/Video Systems • Audio Guide, Intercom Systems • People Counter System

• Metal Detector & X-Ray Scanners

Baku Sport Hall City/Country : Baku / AZERBAIJAN

Main Conctractor : AIKON CPIT

Area : 12.484 m²

Start Date : March 2013

Finish Date : May 2015

Description : MEP Design, Procurement, Installation, Test & Commissioning

ELECTRICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning

• MV ( 6kV / 10kV / 35kV ) Power Distribution, Cubicles • LV ( 300/500 V, 600/1000 V ) Power Distribution

• Transformers, Generators, MDPs, UPSs • Earthing & Lightning Protection • Lighting & Lighting Automation ( KNX, DALI )

• Busbar, Cable Trays, Rise Floors, etc. MECHANICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning • Rainwater System • Waste Water & Sanitary System

• Plumbing • Low Temperature / Hot Water System • Air Conditioning & Ventilation System • Natural Gas System

• Building Management System • Fire Protection System • Water Treatment & Softener System

• Smoke Exhaust & Pressurizing Control System ELECTRONIC SYSTEMS Design, Procurement, Installation, Test & Commissioning

• Weak Current Systems • Lighting Scneraios, Motorized Blind & Curtains Control & Automation • Fire Detection & Alarm Systems

• Public Announcement & Emergency Warning Systems • Access Control System • IP CCTV System

• Analog TV / IP TV Systems

• BMS Automation & Control System

• Videowall Huge Displays • Digital Signage / Information Displays • Information Technologies

• IT Active & Passive Equipments, Indoor & Outdoor WiFi System • Professional Audio/Video Systems

PASHA Bank Head Office City/Country : Baku / AZERBAIJAN

Main Conctractor : AIKON CPIT

Area : 6.200 m²

Start Date : May 2013

Finish Date : May 2014

Description : MEP Design, Procurement, Installation, Test & Commissioning

ELECTRICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning

• LV ( 300/500 V, 600/1000 V ) Power Distribution • Transformers, Generators, MDPs, UPSs

• Earthing & Lightning Protection • Cable Trays, Rise Floors, etc. MECHANICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning • Rainwater System

• Waste Water & Sanitary System • Plumbing • Low Temperature / Hot Water System

• Air Conditioning & Ventilation System • Natural Gas System • Building Management System • Fire Protection System

• Water Treatment & Softener System • Smoke Exhaust & Pressurizing Control System ELECTRONIC SYSTEMS Design, Procurement, Installation, Test & Commissioning

• Weak Current Systems • Lighting Scneraios, Motorized Blind & Curtains Control & Automation

• Fire Detection & Warning Systems • Public Announcement & Emergency Warning Systems • Access Control System

• IP CCTV System • BMS Automation & Control System • IT Active & Passive Equipments, Indoor & Outdoor WiFi System

• Professional Audio/Video Systems

PASHA Bank Head Office

Diaqnostic Center City/Country : Baku / AZERBAIJAN

Main Conctractor : AIKON CPIT

Area : 7.200 m²

Start Date : January 2013

Finish Date : December 2013

Description : MEP Design, Procurement, Installation, Test & Commissioning

ELECTRICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning

• LV ( 300/500 V, 600/1000 V ) Power Distribution • Transformers, Generators, MDPs, UPSs

• Earthing & Lightning Protection • Busbar, Cable Trays, Rise Floors, etc. MECHANICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning • Rainwater System

• Waste Water & Sanitary System • Plumbing • Low Temperature / Hot Water System

• Air Conditioning & Ventilation System • Natural Gas System • Building Management System • Fire Protection System

• Water Treatment & Softener System • Smoke Exhaust & Pressurizing Control System ELECTRONIC SYSTEMS Design, Procurement, Installation, Test & Commissioning

• Weak Current Systems • Lighting Scneraios, Motorized Blind & Curtains Control & Automation

• Fire Detection & Warning Systems • Public Announcement & Emergency Warning Systems • Access Control System

• IP CCTV System • BMS Automation & Control System • IT Active & Passive Equipments, Indoor & Outdoor WiFi System

• Professional Audio/Video Systems

Diaqnostic Center

Quba Memorial Complex City/Country : Quba / AZERBAIJAN

Main Conctractor : AIKON CPIT

Area : 12.000 m²

Start Date : September 2013

Finish Date : May 2014

Description : MEP Design, Procurement, Installation, Test & Commissioning

ELECTRICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning

• LV ( 300/500 V, 600/1000 V ) Power Distribution • Transformers, Generators, MDPs, UPSs

• Earthing & Lightning Protection • Busbar, Cable Trays, Rise Floors, etc. MECHANICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning • Rainwater System

• Waste Water & Sanitary System • Plumbing • Air Conditioning & Ventilation System

• Building Management System • Fire Protection System • Water Treatment & Softener System ELECTRONIC SYSTEMS Design, Procurement, Installation, Test & Commissioning

• Weak Current Systems • Lighting Scneraios, Motorized Blind & Curtains Control & Automation

• Fire Detection & Warning Systems • Public Announcement & Emergency Warning Systems • Access Control System

• IP CCTV System • BMS Automation & Control System • IT Active & Passive Equipments, Indoor & Outdoor WiFi System

• Professional Audio/Video Systems

Sadko City/Country : Baku / AZERBAIJAN

Main Conctractor : AIKON CPIT

Area : 26.833 m²

Start Date : September 2014

Finish Date : on going

Description : MEP Design, Procurement, Installation, Test & Commissioning

ELECTRICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning

• MV ( 6kV / 10kV / 35kV ) Power Distribution, Cubicles • LV ( 300/500 V, 600/1000 V ) Power Distribution

• Transformers, Generators, MDPs, UPSs • Earthing & Lightning Protection • Lighting & Lighting Automation ( KNX, DALI )

• Facade Lighting • Busbar, Cable Trays, Rise Floors, etc. MECHANICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning • Rainwater System

• Waste Water & Sanitary System • Plumbing • Low Temperature / Hot Water System • Air Conditioning & Ventilation System

• Natural Gas System • Building Management System • Fire Protection System

• Water Treatment & Softener System • Smoke Exhaust & Pressurizing Control System ELECTRONIC SYSTEMS Design, Procurement, Installation, Test & Commissioning

• Weak Current Systems • Lighting Scneraios, Motorized Blind & Curtains Control & Automation

• Fire Detection & Alarm System • Public Announcement & Emergency Warning Systems • Access Control System

• IP CCTV System

• BMS Automation & Control System

• Analog TV / IP TV Systems • IP PABX & Telephones • Digital Signage / Information Displays

• Information Technologies • IT Active & Passive Equipments, Indoor & Outdoor WiFi System • Professional Audio/Video Systems

BMX Park City/Country : Baku / AZERBAIJAN

Main Conctractor : AIKON CPIT

Area : 40.000 m²

Start Date : January 2015

Finish Date : May 2015

Description : MEP Design, Procurement, Installation, Test & Commissioning

ELECTRICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning

• LV ( 300/500 V, 600/1000 V ) Power Distribution • Transformers, Generators, MDPs, UPSs

• Earthing & Lightning Protection • Lighting & Lighting Automation ( KNX, DALI ) MECHANICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning • Rainwater System

• Waste Water & Sanitary System • Plumbing • Air Conditioning & Ventilation System

• Building Management System ELECTRONIC SYSTEMS Design, Procurement, Installation, Test & Commissioning

• Weak Current Systems • Lighting Scneraios, Control & Automation • Fire Detection & Warning Systems • Public Announcement & Emergency Warning Systems

• IP CCTV System

Swimming Complex City/Country : Baku / AZERBAIJAN

Main Conctractor : Euro Design

Area : 45.000 m²

Start Date : February 2015

Finish Date : May 2015

Description : Access Control System, Loyalty Card Applications

ELECTRONIC SYSTEMS Design, Procurement, Installation, Test & Commissioning

• Weak Current Systems • Access Control System • Loyalty Card Applications

AAC Factory City/Country : Baku / AZERBAIJAN

Main Conctractor : AIKON CPIT

Area : 14.000 m²

Start Date : June 2010

Finish Date : January 2011

Description : Electrical Systems Procurement, Installation,

Test & Commissioning

ELECTRICAL SYSTEMS Procurement, Installation, Test & Commissioning

• LV ( 300/500 V, 600/1000 V ) Power Distribution • Transformers, Generators, MDPs, UPSs

• Earthing & Lightning Protection • Substructure, Cabling, Termination • Test & Commissioning

AAC Factory

Chenot Palace Health Wellness Hotel - Gabala

City/Country : Baku / AZERBAIJAN

Main Conctractor : Ilk Construction

Project Detail : 32.000 m² (Closed Area)

: Five Star Luxury hotel , 88 guest rooms, 3 spacious villas with private spas.

Start Date : March 2015

Finish Date : November 2016

Description : MEP Technical Office Works for Design & Supervising

ELECTRICAL SYSTEMS Technical Office Works

• MV / LV Power Distribution, Cubicles

• Transformers, Generators, MDPs, UPSs

• Earthing & Lightning Protection

• Lighting

• Busbar, Cable Trays, Rise Floors, etc.

MECHANICAL SYSTEMS Technical Office Works

• Rainwater System

• Waste Water & Sanitary System

• Plumbing

• Low Temperature / Hot Water System

• Air Conditioning & Ventilation System

• Fire Protection System

• Water Treatment & Softener System

• Smoke Exhaust & Pressurizing Control System

• Air Duct ( Production, Supervising, Test & Commissioning )

ELECTRONIC SYSTEMS Design, Procurement, Supervising, Installation,

Test & Commissioning .

• Weak Current Systems

• Passive Network System

• Active Network System

• Wi-fi System

• IP TV System

• Emergency call system

• IP Phone System • Professional Audio/Video System

• Meeting Room Automation System

Divan Suites Batumi

City/Country : Batumi / GEORGIA

Main Conctractor : Maqro Construction

Project Details : 7.000 m² Construction Area 5Stars, 6 Floors

39 Standart, 8 Superior, 5 Deluxe Rooms, 3 Junior Suites, 6

Corner Suites, 2 Business Suites, 2 Penthouse

Start Date : November 2013

Finish Date : May 2014

Description : Design, Installation, Test & Commissioning

ELECTRICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning

• LV ( 300/500 V, 600/1000 V ) Power Distribution

• Transformers, Generators, MDPs, UPSs

• Earthing & Lightning Protection

• Lighting & Lighting Automation ( KNX, DALI )

• Exterior Lighting

• Busbar, Cable Trays, Rise Floors, etc.

ELECTRONIC SYSTEMS Design, Procurement, Installation, Test & Commissioning

• Weak Current Systems

• Fire Detection & Alarm Systems

• Public Announcement & Emergency Warning Systems

• Access Control System

• IP CCTV System

• IP TV Systems

• nformation Technologies

• IT Active & Passive Equipments, Indoor & Outdoor WiFi System

• Professional Audio/Video Systems

Divan Suites Batumi

Mercure Old Town Tbilisi City/Country : Tbilisi / GEORGIA

Main Conctractor : Maqro Construction

Project Details : 8.000 m² Construction Area

4 Stars, 8 Floors 102 Rooms

Start Date : April 2014

Finish Date : June 2015

Description : Design, Installation, Test & Commissioning

ELECTRICAL SYSTEMS Design, Procurement, Installation, Test & Commissioning

• LV ( 300/500 V, 600/1000 V ) Power Distribution

• Transformers, Generators, MDPs, UPSs

• Earthing & Lightning Protection

• Lighting & Lighting Automation ( KNX, DALI )

• Exterior Lighting

• Busbar, Cable Trays, Rise Floors, etc.

ELECTRONIC SYSTEMS Design, Procurement, Installation, Test & Commissioning

• Weak Current Systems

• Fire Detection & Alarm Systems

• Public Announcement & Emergency Warning Systems

• Access Control System

• IP CCTV System

• IP TV System

• Information Technologies

• T Active & Passive Equipments, Indoor & Outdoor WiFi System

• Professional Audio/Video Systems

MTN HOSPITAL - BAKU

BAKU ASKERİ HASTANESİ (HARBI HOSPITAL)

City/Country : Baku / AZERBAIJAN

Project Detail : 400 bed capacity Hospital

Description : BMS & Security Management System

City/Country : Baku / AZERBAIJAN

Project Detail : 300 bed capacity Hospital

Description : BMS & Security Management System

Workinn Hotel - ISTANBUL

City/Country : Istanbul / TURKIYE

Main Conctractor : Persfektif Yapi

Project Detail : 27.500 m²

: 166 guest rooms, Meeting and conference

Lounges, business center, restaurant,

Cafe-bar, pool and fitness center

Start Date : 2011

Finish Date : 2013

Description : Integration Software & Integrated Building

Systems

Integration Software:

• Building Automation Software

• Security Management and CCTV System

• BMS System and Metasys Integration

Integrated Building Systems:

• Fire Alarm / PA & VA System

• Time and participation management

• Building Maintenance System

• Intelligent Lighting Automation

• Redundant generator system

İTÜ UYBHM Data Center - ISTANBUL

Garanti Bankasi Genel Müdürlük Binası - ISTANBUL

City/Country : Istanbul / TURKIYE

Description : Integration Software & Integrated Building Systems

• Building Automation Software

• Security Management and CCTV System

• BMS System and Metasys Integration

• Fire Alarm / PA & VA System

• Time and participation management

• Building Maintenance System

• Intelligent Lighting Automation

• Redundant generator system

City/Country : Istanbul / TURKIYE

Project Detail : Total number of dots: 16,000 I / O

Description : Building Automation System

• HVAC system control

• Lighting control

• Fire detection

• Seismic Control Systems