Page 1: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

REFERENCESConcepts, Design, Realisation, Operation

for Stadia and Arena

Page 2: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

ACTUAL PROJECTSfor Stadia, Arena and Roofs

Page 3: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Arena Abu Dhabi,UAE

Project Period: since Oct 2012

Capacity: 4.000 – 6.000

Construction Costs: 25 Mio. €

Client: REEM

Architect: ARC

Concept: vision4venue

Project description:

The multifunctional indoor arena represents a

new generation of arenas in the UAE. It is

designed to be as flexible and multifunctional as

posible to create the maximum revenue for the

operator. It includes five F&B outlets 10

hospitality boxes, one VVIP box and a event box

aswell as 250 business seats.

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design, conception and construction

process of t he arena as advisor to the architect.

Page 4: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Arena Cologne,Germany

Project Period: since Oct 2012

Capacity: 8.000

Construction Costs: 35 Mio. €

Client: Kölner Sportstätten

Architect: vision4venue

Concept: vision4venue

Project description:

The existing monofunctional velodrome should be

developed into a multifunctional indoor arena for

events, concerts, shows and especially

professional basketball according to BBL

standards. It is designed to be as flexible and

multifunctional as posible to create the maximum

revenue for the operator. It includes five F&B

outlets 20 hospitality boxes, three event boxes

ana a business area to accomodate 400 – 600

business guests.

vision4venue – Part of the Project:

Vision4venue is contracted to work out a

technical, functional, architectonic feasability

study and a operational concept to compare the

two possible options – re-build a new arena or

transform the velodrome .

Page 5: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Stadium Roof FC

Paranaense, Curitiba, Brazil

Project Period: since Nov 2012

Capacity: 42.000

Roof Area: 30.000 sqm

Construction Costs: 10 Mio. €

Client: FC Paranaense

Architect: vision4venue

Project description:

The retractable Stadium Roof was designed to be

the first of this kind in Sout America.

vision4venue – Part of the Project:

The team of vision4venue is responsible for the

design and conception of the retractable roof in

cooperation with a austrian partner

Page 6: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Stadium Roof Duhok,Duhok, Irak

Project Period: since Feb 2013

Capacity: 25.000

Roof Area: 20.000 sqm

Construction Costs: 20 Mio. €

Client: City of Duhok

Architect: vision4venue

Project description:

The Stadium Roof was designed to be an iconic

and modern facade and steel-roof structure

coverd by membrane and polycarbonate. The

modular standalone roof represents the proud

and independence of the kurdish comunity in Irak

while it is iluminated in the traditional colors.

vision4venue – Part of the Project:

The team of vision4venue is responsible for the

design and conception of the roof in cooperation

with an partner from Netherlands. At a later stage

it is planned, that vision4venue will be

responsible with its partner for the turnkey

execution of the project.

Page 7: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Trainingcentre Rostov,Russia

Project Period: Nov 2013

Capacity: modular system

4.000 – 40.000

Construction Costs:

Client: City of Rostov

Architect: vision4venue

vision4venue – Part of the Project:

The team of vision4venue was responsible for the

idea and desing of the project.

Page 8: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Indoor Arena Bucharest,Romania

Project Period: Sep 2013 – Nov 2013

Capacity: 8.400 – 16.500

Construction Costs: 55 Mio. €

Client: City of Bucharest

Architect: vision4venue

Project description:

The multipurpose indoor arena was designed to

achieve international standards for a modern

multifunctional event and sport arena. It includes

various spaces for VIP and business areas

including 24 to 42 VIP boxes, conference areas

and about 570 business seats. The arena is

designed to host concerts, shows, sports and

entertainment events.

vision4venue – Part of the Project:

The team of vision4venue was responsible for the

overall planning of the project as a participant of

a design and built competition.

Page 9: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Indoor Arena Bucharest,Romania

Project Period: Mar 2014 – May 2014

Capacity: 10.300 – 18.700

Construction Costs: 65 Mio. €

Client: City of Bucharest

Architect: vision4venue

Project description:

The multipurpose indoor arena was designed to

achieve international standards for a modern

multifunctional event and sport arena. It includes

various spaces for VIP and business areas

including 28 to 39 VIP boxes and up to 23

skypboxes, conference areas and about 570

business seats. The arena is designed to host

concerts, shows, sports and entertainment

events.

vision4venue – Part of the Project:

The team of vision4venue was responsible for the

overall planning of the project as a participant of

a design and built competition.

Page 10: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Stadium Erfurt,Germany

Project Period: Nov 2013 – Jan 2014

Capacity: 18.600 to 19.500

Construction Costs: 35 Mio. €

Client: City of Erfurt

Architect: vision4venue

Project description:

The aim of the design and built competition was

to modernize and to expand the existing

Steigerwaldstadium up to 18.500 spectators.

The two moveable stands behind the goals

enables perfect sightlines for athletics (stands

following the athletic track) and football (stand

following the linear pitch). The new comfortable

main stand offers a generous business and event

area and provides up to 17 variable event boxes.

vision4venue – Part of the Project:

The team of vision4venue was responsible for the

overall planning of the project as a participant of

a design and built competition.

Page 11: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Stadium Erfurt,Germany

Project Period: Nov 2013 – Jan 2014

Capacity: 19.300

Construction Costs:

Client: City of Erfurt

Architect: vision4venue

Project description:

The aim of the design and built competition was

to modernize and to expand the existing

Steigerwaldstadium up to 18.500 spectators.

The athletic track should be preserved. The

curved arrangement of the new stands integrates

the existing weststand perfectly and creates a

uniform appearance of the stadium. Furthermore

the comfortable new grandstand offers a

generous business and event area and provides

up to 17 variable event boxes.

vision4venue – Part of the Project:

The team of vision4venue was responsible for the

overall planning of the project as a participant of

a design and built competition.

Page 12: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Rhein Energie Stadium Cologne, Germany

Project Period: Nov 2013 – Jun 2014

Construction Costs:

Client: Kölnersportstätten

Architect: vision4venue

Project description:

- Austausch der bestehenden Videowände

(LPH 1 – 8)

- 4 neue LED Screens etwa 10,8 m x 6 m

(66,15 m²)

- Sichtanalyse – welche Plätze können nicht

mehr genutzt werden

vision4venue – Part of the Project:

The team of vision4venue was responsible for the

LPH 1 – 8.

Page 13: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

REALISED PROJECTSfor Stadia and Arena

Page 14: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Indoor Arena Nuremberg,Germany

Project Period: May 2000 – Aug 2001

May 2011 – Sep 2011

Capacity: 8.200 – 10.500

Construction Costs: 25 Mio. €

Upgrading 7 Mio. €

Client: City of Nuremberg

Architect: Glöckner Architects

Operation &

Architectonic Concept: vision4venue

Project description:

The Arena Nuremberg was build in 2001 to host

the IIHF World Championships 2001. The arena

concept is developed as a multifunctional arena

for icehockey, ballsports and all kind of concerts,

events and shows. The arena includes a newly

renovated VIP and business area including 24

hospitality boxes, two event boxes and about 400

business seats.

vision4venue – Part of the Project:

The team of vision4venue was involved in the

design and construction process and for the

recent renovation and upgradings. Furthermore

we developed with the operator the extended

operational concept during the design phases

between 2001 - 2012 while employed at the main

contractor.

Page 15: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Rhein Energie Stadium Cologne, Germany

Project Period: Nov 2001– May 2004

Capacity: 51.000

Construction Costs: 120 Mio. €

Client: Kölnersportstätten

Architect: GMP

Extention and

OperationalConcept: vision4venue

Project description:

The stadium Cologne was completed in 2004 to

host five games for the FIFA World Cup 2006 and

the matches of the 1. FC Köln. The stadium is a

classical football stadium with vour close stands

to the footballfield which creats an outstanding

atmosphere. The stadium also is one of the most

efficient stadiums in germany in terms of

marketing, multifunctionality and hosted concerts

and shows from international artists as ACDC,

Bruce Springsteen, Coldplay and many more. It

includes various spaces for VIP and business

areas including 60 hospitality boxes, two event

boxes and about 2000 business seats.

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design and construction process while

empolyed at the main contractor and since 2004

as advisor for operational and stadium extension

concepts.

Page 16: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Meydan Racecourse, Dubai, UAE

Project Period: Oct 2008 – Apr 2009

Capacity: 60.000

Construction Costs: 100 Mio. €

Client: Meydan Racecourse

Project description:

The racecourse was designed to achieve

international standards for a modern equestrian

race course including a 5-star hotel. It includes

various spaces for VIP and business areas

including 100 hospitality boxes, VVIP areas and

about 2000 business seats.

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design, conception and construction

process of the precast structure while empolyed

at the main contractor.

Page 17: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Ratiopharmarena Ulm,Germany

Project Period: Jan 2010 – Dec 2012

Capacity: 6.000 – 9.000

Construction Costs: 25 Mio. €

Client: City of Ulm

Architect: ARC

Operation &

Architectonic Concept: vision4venue

Project description:

The multifunctional indoor arena represents a

new generation of arenas in germany. It is

designed to be as flexible and multifunctional as

posible to create the maximum revenue for the

operator. It includes eight F&B outlets 11

hospitality boxes, one VVIP box and a party box

aswell as 450 business seats.

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design, conception and construction

process of the arena.

The operational concept, businessplan the

markting, the catering strategy and the

implementation of the operator and marketing

team was created and implemented by members

of vision4venue while empolyed at the main

contractor.

Page 18: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Nationalstadium Bukarest,Romania

Project Period: May 2007 – Nov 2011

Capacity: 55.000

Construction Costs: 140 Mio. €

Client: City Bukarest

Architect: GMP

Operation Concept: vision4venue

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design process and member of the internal

board for stadium roofs.

Project Period: Dez 2007 – Aug 2009

Capacity: 30.000

Construction Costs: 75 Mio. €

Client: Bayer Leverkusen

Architect: HPP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design process and member of the internal

board for stadium roofs.

Bayarena Leverkusen,Germany

Page 19: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Stadium Wroclaw,Poland

Project Period: Jan 2010 – Sep 2011

Capacity: 43.000

Construction Costs: 160 Mio. €

Client: City Wroclaw

Architect: JSK

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design process and member of the internal

board for stadium roofs while employed at the

main contractor.

Project Period: Jun 2011 –Sep 2011

Capacity: 6.700

Construction Costs: 5 Mio. €

Client: FC Bayern München

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design and conception process while

employed at the main contractor.

Audidome Munich,Germany

Page 20: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Stadium Frankfurt,Germany

Project Period: Mar 2002 – Jun 2005

Capacity: 51.000

Construction Costs: 140 Mio. €

Client: City Frankfurt

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design process and member of the internal

board for stadium roofs while employed at the

main contractor.

Project Period: Mai 2003 –Mar 2005

Capacity: 71.000

Construction Costs: 25 Mio. €

Client: FC Bayern München

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design process and member of the internal

board for stadium roofs while employed at the

main contractor.

Stadiumroof Allianz Arena Munich,Germany

Page 21: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Arena Varazdin,Croatia

Project Period: Jan 2007 – Sep 2008

Capacity: 5.000

Construction Costs: 16 Mio. €

Client: City Varazdin

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design process and for the arena

management while employed at the main

contractor.

Page 22: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

ARCHITECTONIC AND

OPERATIONAL CONCEPTSfor Stadia

Page 23: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Stadium Koblenz,Germany

Project Period: Jun 2009– Sep 2009

Capacity: 25.000

Construction Costs: 30 Mio. €

Client: TuS Koblenz

Architect: vision4venue

Operation Concept: vision4venue

Project description:

The football stadium was designed to increase

the standards for marketing and hospitality for the

football club. Therefor a modern multifunctional

football stadium was designed to achieve the

latest standards according to the national football

association as well to increase the revenue on

non matchdays. It includes up to 40 VIP boxes

and about 1600 sqm business areas with about

about 2000 business seats.

vision4venue – Part of the Project:

The team member of vision4venue was

responsible for the design and conception

process as well as the advisor for operational

aspects including business plans and operation

and management concepts.

Page 24: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Emirates Rugby Stadium, Dubai, UAE

Project Period: Aug 2007 – Oct 2007

Capacity: 65.000

Construction Costs: 120 Mio. €

Client: Emirates Airlines

Architect: vision4venue

Project description:

The Emirates Rugby Stadium was designed to

hist the anual Dubai Rugby Sevens events. It

includes spaces for VIP and business areas

including 20 hospitality boxes, VVIP areas and

about 200 business seats.

vision4venue – Part of the Project:

The team member of vision4venue was

responsible for the design and conception

process as well as the advisor for operational

aspects including business plans and operation

and management concepts.

Page 25: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Stadium Mainz,Germany

Project Period: Aug 2008 – Jan 2009

Capacity: 36.000

Construction Costs: 50 Mio. €

Client: City of Mainz

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design and estimation process during the

design and build competition while employed at

the main contractor.

Project Period: Sep 2008 –Jan 2009

Capacity: 15.000

Construction Costs: 18 Mio. €

Client: FC Ingolstadt

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design and estimation process during the

design and build competition while employed at

the main contractor.

Stadium Ingolstadt,Germany

Page 26: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Al Wasl Stadium Dubai,UAW

Project Period: Jan 2009 – Aug 2009

Capacity: 25.000

Construction Costs: 70 Mio. €

Client: Al Wasl

Architect: vision4venue

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design and development of a full air-

conditioned and roofed stadium concept while

employed at the main contractor.

Project Period: Mar 2009

Capacity: 70.000

Construction Costs: 75 Mio. €

Client: Kölner Sportstätten

Architect: vision4venue

vision4venue – Part of the Project:

The team member of vision4venue was

responsible for the design and estimation process

for the extention of the stadium from 50.000 to

70.000 while employed at the main contractor.

Rhein Energie Stadium,Cologne, Germany

Page 27: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Stadium St. Pölten,Austria

Project Period: Jun 2009 – Aug 2009

Capacity: 13.000

Construction Costs: 20 Mio. €

Client: City of St. Pölten

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design and estimation process during the

design and build competition while employed at

the main contractor.

Project Period: Mar 2009

Capacity: 15.000

Construction Costs: 15 Mio. €

Client: Kickers Emden

Architect: vision4venue

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design and estimation process during the

design and build competition while employed at

the main contractor.

Stadium Emden,Germany

Page 28: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

New Anfield, LiverpoolUK

Project Period: Jan 2010 – Feb 2011

Capacity: 69.000

Construction Costs: 250 Mio. €

Client: FC Liverpool

Architect: Ian Ritchie London

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Project Period: Jun 2010 – May 2011

Capacity: 60.000

Construction Costs: 150 Mio. €

Client: FC Liverpool

Architect: Ian Ritchie London

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Extension Anfield, LiverpoolUK

Page 29: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Nadional Stadium, BaghdadIrak

Project Period: Jun 2010 – Aug 2011

Capacity: 100.000

Construction Costs: 400 Mio. €

Client: Ministry of Sports

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design and estimation process for the

design and build competition while employed at

the main contractor.

Project Period: Jun 2010 – Dec 2011

Capacity: 20.000

Construction Costs: 25 Mio. €

Client: City Offenbach

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Football Stadium, OffenbachGermany

Page 30: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Outdoor Stadium,

Dubai Sports City, UAE

Project Period: Jun 2010 – Dec 2010

Capacity: 38.000

Construction Costs: 100 Mio. €

Client: DSC

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the re-design and cost saveing process while

employed at the main contractor.

Project Period: Jun 2010 – Nov 2010

Capacity: 35.000

Construction Costs: 110 Mio. €

Client: Ministry of Sports

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Olympic Stadium, BasraIrak

Project Period: Aug 2010 – Feb 2011

Capacity: 30.000

Construction Costs: 100 Mio. €

Client: Ministry of Sports

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Olympic Stadium, NajafIrak

Page 31: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Tottenham Stadium, London, UK

Project Period: Oct 2010 – May 2011

Capacity: 55.000

Construction Costs: 200 Mio. €

Client: FC Tottenham

Architect: Ian Ritchie London

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Project Period: Sep 2010 – Nov 2010

Capacity: 35.000

Construction Costs: 90 Mio. €

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Stadium Straßburg, France

Page 32: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Olympic Stadium, Al Anbar, Irak

Project Period: May 2011 – Aug 2011

Capacity: 30.000

Construction Costs: 110 Mio. €

Client: Ministry of Sports

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Project Period: Aug 2011 – Oct 2011

Capacity: 35.000

Construction Costs: 120 Mio. €

Client: Ministry of Sports

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Olympic Stadium, Al Sadre, Irak

Page 33: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Olympic Stadium, Baghdad, Irak

Project Period: May 2011 – Nov 2011

Capacity: 60.000

Construction Costs: 250 Mio. €

Client: Ministry of Sports

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Project Period: Aug 2011 – Nov 2011

Capacity: 35.000

Construction Costs: 35 Mio. €

Client: City of Lodz

Architect: Populous

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Football Stadium Lodz, Poland

Page 34: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

ARCHITECTONIC AND

OPERATIONAL CONCEPTSfor Arena

Page 35: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Dubai Sports City Arena, Dubai, UAE

Project Period: Oct 2006 – Apr 2011

Capacity: 15.000

Construction Costs: 100 Mio. €

Client: DSC

Architect: GMP / vision4venue

Concept: vision4venue

Project description:

The multipuroise indoor arena was designed and

redesigned during the project period to achieve

international standards for a modern

multifunctional event and sport arena. It includes

various spaces for VIP and Business areas

including 100 hospitality boxes, VVIP areas and

about 2000 business seats and a retractable roof

to achieve the requirements to host international

open air tennis championships.

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the design, re-design, conception process as

well as the advisor for operational aspects

including business plans and operation and

management concepts.

Page 36: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Dubai Sports City Arena, Dubai, UAE

Project Period: Apr 2008 – Sep 2009

Capacity: 19.000

Construction Costs: 160 Mio. €

Client: DSC

Architect: vision4venue

Operation Concept: vision4venue

Project description:

The multipuroise indoor arena was designed to

achieve international standards for a modern

multifunctional event and sport arena. It includes

various spaces for VIP and business areas

including 100 hospitality boxes, VVIP areas and

about 2000 business seats to host concerts,

shows, sports and entertainment events.

vision4venue – Part of the Project:

The team member of vision4venue was

responsible for the design and conception

process as well as the advisor for operational

aspects including business plans and operation

and management concepts.

Page 37: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Indoor Arena Bukarest,Romania

Project Period: Sep 2010 – Oct 2011

Capacity: 18.000

Construction Costs: 140 Mio. €

Client: City of Bukarest

Architect: vision4venue

Operation Concept: vision4venue

Project description:

The multipuroise indoor arena was designed to

achieve international standards for a modern

multifunctional event and sport arena. It includes

various spaces for VIP and business areas

including 100 hospitality boxes, conference areas

and about 2000 business seats. The arena is

designed to host concerts, shows, sports and

entertainment events.

vision4venue – Part of the Project:

The team member of vision4venue was

responsible for the design and conception

process as well as the advisor for operational

aspects including business plans and operation

and management concepts.

Page 38: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Ballsports Arena Nuremberg,Germany

Project Period: Mar 2009 – Aug 2009

Capacity: 4.000

Construction Costs: 15 Mio. €

Client: City of Nuremberg

Architect: vision4venue

Operation Concept: vision4venue

Project description:

The ballsports arena was designed to host

professional basketball and handball sports as

well as multifunctional event and concert arena

for medium audiences. It includes a VIP and

business areas with 10 hospitality boxes, and

about 200 business seats.

vision4venue – Part of the Project:

The team member of vision4venue was

responsible for the design and conception

process as well as the advisor for operational

aspects including business plans and operation

and management concepts.

Page 39: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Rhein-Main Arena Frankfurt, Germany

Project Period: Mar 2009 – Apr 2009

Capacity: 14.000

Construction Costs: 100 Mio. €

Client: City of Frankfurt

Architect: vision4venue

Operational Concept: vision4venue & AEG

vision4venue – Part of the Project:

The team member of vision4venue was

responsible in the concept development during

the design process and the operational concept

together with AEG while employed at the main

contractor.

Project Period: May 2009

Capacity: 8.000

Construction Costs: 35 Mio. €

Architect: vision4venue

Operational Concept: vision4venue

vision4venue – Part of the Project:

The team member of vision4venue was

responsible in the concept development during

the design process and the operational concept

together with while employed at the main

contractor.

Indoor Arena , Germany

Page 40: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Sportshall Coburg, Germany

Project Period: May 2009

Capacity: 3.000

Construction Costs: 15 Mio. €

Client: City of Coburg

Architect: vision4venue

Operational Concept: vision4venue

vision4venue – Part of the Project:

The team member of vision4venue was

responsible in the concept development during

the design process and the operational concept

together while employed at the main contractor.

Project Period: Sep 2009 – Mar 2010

Capacity: 4.200

Construction Costs: 15 Mio. €

Architect: vision4venue

Operational Concept: vision4venue

vision4venue – Part of the Project:

The team member of vision4venue was

responsible in the concept development during

the design process and the operational concept

together with while employed at the main

contractor.

Handball Arena Nuremberg , Germany

Page 41: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Weser-Ems Arena,

Oldenburg, Germany

Project Period: Nov 2010 – Jul 2011

Capacity: 6.500

Construction Costs: 45 Mio. €

Client: City of Oldenburg

Architect: GMP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Project Period: Jun 2011 – Nov 2011

Capacity: 3.000

Construction Costs: 15 Mio. €

Client: City of Lodz

Architect: Populous

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Ballsports Arena Lodz, Poland

Page 42: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Handball Arena,

Gummersbach, Germany

Project Period: Sep 2011 – Jun 2012

Capacity: 4.000

Construction Costs: 15 Mio. €

Client: City of Gummersbach

Architect: ARC

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the architects for the

design and build competition while employed at

the main contractor.

Page 43: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

ARCHITECTONIC AND

STRUCTURAL CONCEPTSfor Stadium Roofs

Page 44: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Stadium Roof Juventus Turin, Italy

Project Period: Feb 2009 – May 2009

Capacity: 40.000

Roof Area: 32.000 sqm

Construction Costs: 40 Mio. €

Client: FC Juventus Turin

Concept: vision4venue

Project description:

The cable suspended steel roof is supportet by

two huge steel pylons outside the stadium.

vision4venue – Part of the Project:

The team member of vision4venue was

responsible for the conception and simulation of

the erection concept and the method statment for

this complexe roof structure while employed at

the main contractor.

Page 45: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Stadium Roof Corinthians, Sao Paulo, Brazil

Project Period: Feb 2011 – Sep 2011

Capacity: 65.000

Roof Area: 36.000 sqm

Construction Costs: 45 Mio. €

Client: Corinthians Sao Paulo

Architect: vision4venue

Project description:

The innovative Cable Roof was designed as cost

saveing alternative for the main contractor.

vision4venue – Part of the Project:

The team member of vision4venue was

responsible for the design and conception while

employed at the main contractor.

Page 46: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Stadium Roof Morumbi, Sao Paulo, Brazil

Project Period: Nov 2011 – Jun 2012

Capacity: 70.000

Roof Area: 32.000 sqm

Construction Costs: 50 Mio. €

Client: FC Sao Paulo

Architect: vision4venue

Project description:

The innovative Cable Roof was designed as cost

saveing alternative for the main contractor.

vision4venue – Part of the Project:

The team member of vision4venue was

responsible for the design and conception while

employed at the main contractor.

Page 47: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Stadium Roof Beira Rio,

Porto Alegre, Brazil

Project Period: Jan 2011 – Jul 2011

Capacity: 60.000

Roof Area: 45.000 sqm

Construction Costs: 40 Mio. €

Client: Inter Porto Alegre

Architect: vision4venue & SBP

vision4venue – Part of the Project:

The team member of vision4venue was involved

in the concept development during the design

process as advisor for the structural designers

while employed at the main contractor.

Page 48: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal

Project Period: Jun 2011 – Nov 2011

Capacity: 55.000

Roof Area: 40.000 sqm

Construction Costs: 45 Mio. €

Client: Gremio Porto Alegre

Architect: vision4venue

vision4venue – Part of the Project:

The team member of vision4venue was

responsible in the design development and the

design while employed at the main contractor.

Stadium Roof Gremio Arena,

Porto Alegre, Brazil

Page 49: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal