references - stadionwelt...client: fc bayern münchen vision4venue –part of the project: the team...
TRANSCRIPT
![Page 1: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/1.jpg)
REFERENCESConcepts, Design, Realisation, Operation
for Stadia and Arena
![Page 2: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/2.jpg)
ACTUAL PROJECTSfor Stadia, Arena and Roofs
![Page 3: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/3.jpg)
Arena Abu Dhabi,UAE
Project Period: since Oct 2012
Capacity: 4.000 – 6.000
Construction Costs: 25 Mio. €
Client: REEM
Architect: ARC
Concept: vision4venue
Project description:
The multifunctional indoor arena represents a
new generation of arenas in the UAE. It is
designed to be as flexible and multifunctional as
posible to create the maximum revenue for the
operator. It includes five F&B outlets 10
hospitality boxes, one VVIP box and a event box
aswell as 250 business seats.
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design, conception and construction
process of t he arena as advisor to the architect.
![Page 4: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/4.jpg)
Arena Cologne,Germany
Project Period: since Oct 2012
Capacity: 8.000
Construction Costs: 35 Mio. €
Client: Kölner Sportstätten
Architect: vision4venue
Concept: vision4venue
Project description:
The existing monofunctional velodrome should be
developed into a multifunctional indoor arena for
events, concerts, shows and especially
professional basketball according to BBL
standards. It is designed to be as flexible and
multifunctional as posible to create the maximum
revenue for the operator. It includes five F&B
outlets 20 hospitality boxes, three event boxes
ana a business area to accomodate 400 – 600
business guests.
vision4venue – Part of the Project:
Vision4venue is contracted to work out a
technical, functional, architectonic feasability
study and a operational concept to compare the
two possible options – re-build a new arena or
transform the velodrome .
![Page 5: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/5.jpg)
Stadium Roof FC
Paranaense, Curitiba, Brazil
Project Period: since Nov 2012
Capacity: 42.000
Roof Area: 30.000 sqm
Construction Costs: 10 Mio. €
Client: FC Paranaense
Architect: vision4venue
Project description:
The retractable Stadium Roof was designed to be
the first of this kind in Sout America.
vision4venue – Part of the Project:
The team of vision4venue is responsible for the
design and conception of the retractable roof in
cooperation with a austrian partner
![Page 6: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/6.jpg)
Stadium Roof Duhok,Duhok, Irak
Project Period: since Feb 2013
Capacity: 25.000
Roof Area: 20.000 sqm
Construction Costs: 20 Mio. €
Client: City of Duhok
Architect: vision4venue
Project description:
The Stadium Roof was designed to be an iconic
and modern facade and steel-roof structure
coverd by membrane and polycarbonate. The
modular standalone roof represents the proud
and independence of the kurdish comunity in Irak
while it is iluminated in the traditional colors.
vision4venue – Part of the Project:
The team of vision4venue is responsible for the
design and conception of the roof in cooperation
with an partner from Netherlands. At a later stage
it is planned, that vision4venue will be
responsible with its partner for the turnkey
execution of the project.
![Page 7: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/7.jpg)
Trainingcentre Rostov,Russia
Project Period: Nov 2013
Capacity: modular system
4.000 – 40.000
Construction Costs:
Client: City of Rostov
Architect: vision4venue
vision4venue – Part of the Project:
The team of vision4venue was responsible for the
idea and desing of the project.
![Page 8: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/8.jpg)
Indoor Arena Bucharest,Romania
Project Period: Sep 2013 – Nov 2013
Capacity: 8.400 – 16.500
Construction Costs: 55 Mio. €
Client: City of Bucharest
Architect: vision4venue
Project description:
The multipurpose indoor arena was designed to
achieve international standards for a modern
multifunctional event and sport arena. It includes
various spaces for VIP and business areas
including 24 to 42 VIP boxes, conference areas
and about 570 business seats. The arena is
designed to host concerts, shows, sports and
entertainment events.
vision4venue – Part of the Project:
The team of vision4venue was responsible for the
overall planning of the project as a participant of
a design and built competition.
![Page 9: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/9.jpg)
Indoor Arena Bucharest,Romania
Project Period: Mar 2014 – May 2014
Capacity: 10.300 – 18.700
Construction Costs: 65 Mio. €
Client: City of Bucharest
Architect: vision4venue
Project description:
The multipurpose indoor arena was designed to
achieve international standards for a modern
multifunctional event and sport arena. It includes
various spaces for VIP and business areas
including 28 to 39 VIP boxes and up to 23
skypboxes, conference areas and about 570
business seats. The arena is designed to host
concerts, shows, sports and entertainment
events.
vision4venue – Part of the Project:
The team of vision4venue was responsible for the
overall planning of the project as a participant of
a design and built competition.
![Page 10: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/10.jpg)
Stadium Erfurt,Germany
Project Period: Nov 2013 – Jan 2014
Capacity: 18.600 to 19.500
Construction Costs: 35 Mio. €
Client: City of Erfurt
Architect: vision4venue
Project description:
The aim of the design and built competition was
to modernize and to expand the existing
Steigerwaldstadium up to 18.500 spectators.
The two moveable stands behind the goals
enables perfect sightlines for athletics (stands
following the athletic track) and football (stand
following the linear pitch). The new comfortable
main stand offers a generous business and event
area and provides up to 17 variable event boxes.
vision4venue – Part of the Project:
The team of vision4venue was responsible for the
overall planning of the project as a participant of
a design and built competition.
![Page 11: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/11.jpg)
Stadium Erfurt,Germany
Project Period: Nov 2013 – Jan 2014
Capacity: 19.300
Construction Costs:
Client: City of Erfurt
Architect: vision4venue
Project description:
The aim of the design and built competition was
to modernize and to expand the existing
Steigerwaldstadium up to 18.500 spectators.
The athletic track should be preserved. The
curved arrangement of the new stands integrates
the existing weststand perfectly and creates a
uniform appearance of the stadium. Furthermore
the comfortable new grandstand offers a
generous business and event area and provides
up to 17 variable event boxes.
vision4venue – Part of the Project:
The team of vision4venue was responsible for the
overall planning of the project as a participant of
a design and built competition.
![Page 12: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/12.jpg)
Rhein Energie Stadium Cologne, Germany
Project Period: Nov 2013 – Jun 2014
Construction Costs:
Client: Kölnersportstätten
Architect: vision4venue
Project description:
- Austausch der bestehenden Videowände
(LPH 1 – 8)
- 4 neue LED Screens etwa 10,8 m x 6 m
(66,15 m²)
- Sichtanalyse – welche Plätze können nicht
mehr genutzt werden
vision4venue – Part of the Project:
The team of vision4venue was responsible for the
LPH 1 – 8.
![Page 13: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/13.jpg)
REALISED PROJECTSfor Stadia and Arena
![Page 14: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/14.jpg)
Indoor Arena Nuremberg,Germany
Project Period: May 2000 – Aug 2001
May 2011 – Sep 2011
Capacity: 8.200 – 10.500
Construction Costs: 25 Mio. €
Upgrading 7 Mio. €
Client: City of Nuremberg
Architect: Glöckner Architects
Operation &
Architectonic Concept: vision4venue
Project description:
The Arena Nuremberg was build in 2001 to host
the IIHF World Championships 2001. The arena
concept is developed as a multifunctional arena
for icehockey, ballsports and all kind of concerts,
events and shows. The arena includes a newly
renovated VIP and business area including 24
hospitality boxes, two event boxes and about 400
business seats.
vision4venue – Part of the Project:
The team of vision4venue was involved in the
design and construction process and for the
recent renovation and upgradings. Furthermore
we developed with the operator the extended
operational concept during the design phases
between 2001 - 2012 while employed at the main
contractor.
![Page 15: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/15.jpg)
Rhein Energie Stadium Cologne, Germany
Project Period: Nov 2001– May 2004
Capacity: 51.000
Construction Costs: 120 Mio. €
Client: Kölnersportstätten
Architect: GMP
Extention and
OperationalConcept: vision4venue
Project description:
The stadium Cologne was completed in 2004 to
host five games for the FIFA World Cup 2006 and
the matches of the 1. FC Köln. The stadium is a
classical football stadium with vour close stands
to the footballfield which creats an outstanding
atmosphere. The stadium also is one of the most
efficient stadiums in germany in terms of
marketing, multifunctionality and hosted concerts
and shows from international artists as ACDC,
Bruce Springsteen, Coldplay and many more. It
includes various spaces for VIP and business
areas including 60 hospitality boxes, two event
boxes and about 2000 business seats.
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design and construction process while
empolyed at the main contractor and since 2004
as advisor for operational and stadium extension
concepts.
![Page 16: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/16.jpg)
Meydan Racecourse, Dubai, UAE
Project Period: Oct 2008 – Apr 2009
Capacity: 60.000
Construction Costs: 100 Mio. €
Client: Meydan Racecourse
Project description:
The racecourse was designed to achieve
international standards for a modern equestrian
race course including a 5-star hotel. It includes
various spaces for VIP and business areas
including 100 hospitality boxes, VVIP areas and
about 2000 business seats.
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design, conception and construction
process of the precast structure while empolyed
at the main contractor.
![Page 17: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/17.jpg)
Ratiopharmarena Ulm,Germany
Project Period: Jan 2010 – Dec 2012
Capacity: 6.000 – 9.000
Construction Costs: 25 Mio. €
Client: City of Ulm
Architect: ARC
Operation &
Architectonic Concept: vision4venue
Project description:
The multifunctional indoor arena represents a
new generation of arenas in germany. It is
designed to be as flexible and multifunctional as
posible to create the maximum revenue for the
operator. It includes eight F&B outlets 11
hospitality boxes, one VVIP box and a party box
aswell as 450 business seats.
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design, conception and construction
process of the arena.
The operational concept, businessplan the
markting, the catering strategy and the
implementation of the operator and marketing
team was created and implemented by members
of vision4venue while empolyed at the main
contractor.
![Page 18: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/18.jpg)
Nationalstadium Bukarest,Romania
Project Period: May 2007 – Nov 2011
Capacity: 55.000
Construction Costs: 140 Mio. €
Client: City Bukarest
Architect: GMP
Operation Concept: vision4venue
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design process and member of the internal
board for stadium roofs.
Project Period: Dez 2007 – Aug 2009
Capacity: 30.000
Construction Costs: 75 Mio. €
Client: Bayer Leverkusen
Architect: HPP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design process and member of the internal
board for stadium roofs.
Bayarena Leverkusen,Germany
![Page 19: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/19.jpg)
Stadium Wroclaw,Poland
Project Period: Jan 2010 – Sep 2011
Capacity: 43.000
Construction Costs: 160 Mio. €
Client: City Wroclaw
Architect: JSK
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design process and member of the internal
board for stadium roofs while employed at the
main contractor.
Project Period: Jun 2011 –Sep 2011
Capacity: 6.700
Construction Costs: 5 Mio. €
Client: FC Bayern München
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design and conception process while
employed at the main contractor.
Audidome Munich,Germany
![Page 20: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/20.jpg)
Stadium Frankfurt,Germany
Project Period: Mar 2002 – Jun 2005
Capacity: 51.000
Construction Costs: 140 Mio. €
Client: City Frankfurt
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design process and member of the internal
board for stadium roofs while employed at the
main contractor.
Project Period: Mai 2003 –Mar 2005
Capacity: 71.000
Construction Costs: 25 Mio. €
Client: FC Bayern München
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design process and member of the internal
board for stadium roofs while employed at the
main contractor.
Stadiumroof Allianz Arena Munich,Germany
![Page 21: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/21.jpg)
Arena Varazdin,Croatia
Project Period: Jan 2007 – Sep 2008
Capacity: 5.000
Construction Costs: 16 Mio. €
Client: City Varazdin
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design process and for the arena
management while employed at the main
contractor.
![Page 22: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/22.jpg)
ARCHITECTONIC AND
OPERATIONAL CONCEPTSfor Stadia
![Page 23: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/23.jpg)
Stadium Koblenz,Germany
Project Period: Jun 2009– Sep 2009
Capacity: 25.000
Construction Costs: 30 Mio. €
Client: TuS Koblenz
Architect: vision4venue
Operation Concept: vision4venue
Project description:
The football stadium was designed to increase
the standards for marketing and hospitality for the
football club. Therefor a modern multifunctional
football stadium was designed to achieve the
latest standards according to the national football
association as well to increase the revenue on
non matchdays. It includes up to 40 VIP boxes
and about 1600 sqm business areas with about
about 2000 business seats.
vision4venue – Part of the Project:
The team member of vision4venue was
responsible for the design and conception
process as well as the advisor for operational
aspects including business plans and operation
and management concepts.
![Page 24: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/24.jpg)
Emirates Rugby Stadium, Dubai, UAE
Project Period: Aug 2007 – Oct 2007
Capacity: 65.000
Construction Costs: 120 Mio. €
Client: Emirates Airlines
Architect: vision4venue
Project description:
The Emirates Rugby Stadium was designed to
hist the anual Dubai Rugby Sevens events. It
includes spaces for VIP and business areas
including 20 hospitality boxes, VVIP areas and
about 200 business seats.
vision4venue – Part of the Project:
The team member of vision4venue was
responsible for the design and conception
process as well as the advisor for operational
aspects including business plans and operation
and management concepts.
![Page 25: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/25.jpg)
Stadium Mainz,Germany
Project Period: Aug 2008 – Jan 2009
Capacity: 36.000
Construction Costs: 50 Mio. €
Client: City of Mainz
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design and estimation process during the
design and build competition while employed at
the main contractor.
Project Period: Sep 2008 –Jan 2009
Capacity: 15.000
Construction Costs: 18 Mio. €
Client: FC Ingolstadt
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design and estimation process during the
design and build competition while employed at
the main contractor.
Stadium Ingolstadt,Germany
![Page 26: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/26.jpg)
Al Wasl Stadium Dubai,UAW
Project Period: Jan 2009 – Aug 2009
Capacity: 25.000
Construction Costs: 70 Mio. €
Client: Al Wasl
Architect: vision4venue
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design and development of a full air-
conditioned and roofed stadium concept while
employed at the main contractor.
Project Period: Mar 2009
Capacity: 70.000
Construction Costs: 75 Mio. €
Client: Kölner Sportstätten
Architect: vision4venue
vision4venue – Part of the Project:
The team member of vision4venue was
responsible for the design and estimation process
for the extention of the stadium from 50.000 to
70.000 while employed at the main contractor.
Rhein Energie Stadium,Cologne, Germany
![Page 27: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/27.jpg)
Stadium St. Pölten,Austria
Project Period: Jun 2009 – Aug 2009
Capacity: 13.000
Construction Costs: 20 Mio. €
Client: City of St. Pölten
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design and estimation process during the
design and build competition while employed at
the main contractor.
Project Period: Mar 2009
Capacity: 15.000
Construction Costs: 15 Mio. €
Client: Kickers Emden
Architect: vision4venue
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design and estimation process during the
design and build competition while employed at
the main contractor.
Stadium Emden,Germany
![Page 28: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/28.jpg)
New Anfield, LiverpoolUK
Project Period: Jan 2010 – Feb 2011
Capacity: 69.000
Construction Costs: 250 Mio. €
Client: FC Liverpool
Architect: Ian Ritchie London
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
Project Period: Jun 2010 – May 2011
Capacity: 60.000
Construction Costs: 150 Mio. €
Client: FC Liverpool
Architect: Ian Ritchie London
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
Extension Anfield, LiverpoolUK
![Page 29: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/29.jpg)
Nadional Stadium, BaghdadIrak
Project Period: Jun 2010 – Aug 2011
Capacity: 100.000
Construction Costs: 400 Mio. €
Client: Ministry of Sports
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design and estimation process for the
design and build competition while employed at
the main contractor.
Project Period: Jun 2010 – Dec 2011
Capacity: 20.000
Construction Costs: 25 Mio. €
Client: City Offenbach
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
Football Stadium, OffenbachGermany
![Page 30: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/30.jpg)
Outdoor Stadium,
Dubai Sports City, UAE
Project Period: Jun 2010 – Dec 2010
Capacity: 38.000
Construction Costs: 100 Mio. €
Client: DSC
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the re-design and cost saveing process while
employed at the main contractor.
Project Period: Jun 2010 – Nov 2010
Capacity: 35.000
Construction Costs: 110 Mio. €
Client: Ministry of Sports
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
Olympic Stadium, BasraIrak
Project Period: Aug 2010 – Feb 2011
Capacity: 30.000
Construction Costs: 100 Mio. €
Client: Ministry of Sports
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
Olympic Stadium, NajafIrak
![Page 31: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/31.jpg)
Tottenham Stadium, London, UK
Project Period: Oct 2010 – May 2011
Capacity: 55.000
Construction Costs: 200 Mio. €
Client: FC Tottenham
Architect: Ian Ritchie London
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
Project Period: Sep 2010 – Nov 2010
Capacity: 35.000
Construction Costs: 90 Mio. €
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
Stadium Straßburg, France
![Page 32: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/32.jpg)
Olympic Stadium, Al Anbar, Irak
Project Period: May 2011 – Aug 2011
Capacity: 30.000
Construction Costs: 110 Mio. €
Client: Ministry of Sports
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
Project Period: Aug 2011 – Oct 2011
Capacity: 35.000
Construction Costs: 120 Mio. €
Client: Ministry of Sports
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
Olympic Stadium, Al Sadre, Irak
![Page 33: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/33.jpg)
Olympic Stadium, Baghdad, Irak
Project Period: May 2011 – Nov 2011
Capacity: 60.000
Construction Costs: 250 Mio. €
Client: Ministry of Sports
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
Project Period: Aug 2011 – Nov 2011
Capacity: 35.000
Construction Costs: 35 Mio. €
Client: City of Lodz
Architect: Populous
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
Football Stadium Lodz, Poland
![Page 34: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/34.jpg)
ARCHITECTONIC AND
OPERATIONAL CONCEPTSfor Arena
![Page 35: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/35.jpg)
Dubai Sports City Arena, Dubai, UAE
Project Period: Oct 2006 – Apr 2011
Capacity: 15.000
Construction Costs: 100 Mio. €
Client: DSC
Architect: GMP / vision4venue
Concept: vision4venue
Project description:
The multipuroise indoor arena was designed and
redesigned during the project period to achieve
international standards for a modern
multifunctional event and sport arena. It includes
various spaces for VIP and Business areas
including 100 hospitality boxes, VVIP areas and
about 2000 business seats and a retractable roof
to achieve the requirements to host international
open air tennis championships.
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the design, re-design, conception process as
well as the advisor for operational aspects
including business plans and operation and
management concepts.
![Page 36: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/36.jpg)
Dubai Sports City Arena, Dubai, UAE
Project Period: Apr 2008 – Sep 2009
Capacity: 19.000
Construction Costs: 160 Mio. €
Client: DSC
Architect: vision4venue
Operation Concept: vision4venue
Project description:
The multipuroise indoor arena was designed to
achieve international standards for a modern
multifunctional event and sport arena. It includes
various spaces for VIP and business areas
including 100 hospitality boxes, VVIP areas and
about 2000 business seats to host concerts,
shows, sports and entertainment events.
vision4venue – Part of the Project:
The team member of vision4venue was
responsible for the design and conception
process as well as the advisor for operational
aspects including business plans and operation
and management concepts.
![Page 37: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/37.jpg)
Indoor Arena Bukarest,Romania
Project Period: Sep 2010 – Oct 2011
Capacity: 18.000
Construction Costs: 140 Mio. €
Client: City of Bukarest
Architect: vision4venue
Operation Concept: vision4venue
Project description:
The multipuroise indoor arena was designed to
achieve international standards for a modern
multifunctional event and sport arena. It includes
various spaces for VIP and business areas
including 100 hospitality boxes, conference areas
and about 2000 business seats. The arena is
designed to host concerts, shows, sports and
entertainment events.
vision4venue – Part of the Project:
The team member of vision4venue was
responsible for the design and conception
process as well as the advisor for operational
aspects including business plans and operation
and management concepts.
![Page 38: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/38.jpg)
Ballsports Arena Nuremberg,Germany
Project Period: Mar 2009 – Aug 2009
Capacity: 4.000
Construction Costs: 15 Mio. €
Client: City of Nuremberg
Architect: vision4venue
Operation Concept: vision4venue
Project description:
The ballsports arena was designed to host
professional basketball and handball sports as
well as multifunctional event and concert arena
for medium audiences. It includes a VIP and
business areas with 10 hospitality boxes, and
about 200 business seats.
vision4venue – Part of the Project:
The team member of vision4venue was
responsible for the design and conception
process as well as the advisor for operational
aspects including business plans and operation
and management concepts.
![Page 39: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/39.jpg)
Rhein-Main Arena Frankfurt, Germany
Project Period: Mar 2009 – Apr 2009
Capacity: 14.000
Construction Costs: 100 Mio. €
Client: City of Frankfurt
Architect: vision4venue
Operational Concept: vision4venue & AEG
vision4venue – Part of the Project:
The team member of vision4venue was
responsible in the concept development during
the design process and the operational concept
together with AEG while employed at the main
contractor.
Project Period: May 2009
Capacity: 8.000
Construction Costs: 35 Mio. €
Architect: vision4venue
Operational Concept: vision4venue
vision4venue – Part of the Project:
The team member of vision4venue was
responsible in the concept development during
the design process and the operational concept
together with while employed at the main
contractor.
Indoor Arena , Germany
![Page 40: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/40.jpg)
Sportshall Coburg, Germany
Project Period: May 2009
Capacity: 3.000
Construction Costs: 15 Mio. €
Client: City of Coburg
Architect: vision4venue
Operational Concept: vision4venue
vision4venue – Part of the Project:
The team member of vision4venue was
responsible in the concept development during
the design process and the operational concept
together while employed at the main contractor.
Project Period: Sep 2009 – Mar 2010
Capacity: 4.200
Construction Costs: 15 Mio. €
Architect: vision4venue
Operational Concept: vision4venue
vision4venue – Part of the Project:
The team member of vision4venue was
responsible in the concept development during
the design process and the operational concept
together with while employed at the main
contractor.
Handball Arena Nuremberg , Germany
![Page 41: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/41.jpg)
Weser-Ems Arena,
Oldenburg, Germany
Project Period: Nov 2010 – Jul 2011
Capacity: 6.500
Construction Costs: 45 Mio. €
Client: City of Oldenburg
Architect: GMP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
Project Period: Jun 2011 – Nov 2011
Capacity: 3.000
Construction Costs: 15 Mio. €
Client: City of Lodz
Architect: Populous
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
Ballsports Arena Lodz, Poland
![Page 42: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/42.jpg)
Handball Arena,
Gummersbach, Germany
Project Period: Sep 2011 – Jun 2012
Capacity: 4.000
Construction Costs: 15 Mio. €
Client: City of Gummersbach
Architect: ARC
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the architects for the
design and build competition while employed at
the main contractor.
![Page 43: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/43.jpg)
ARCHITECTONIC AND
STRUCTURAL CONCEPTSfor Stadium Roofs
![Page 44: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/44.jpg)
Stadium Roof Juventus Turin, Italy
Project Period: Feb 2009 – May 2009
Capacity: 40.000
Roof Area: 32.000 sqm
Construction Costs: 40 Mio. €
Client: FC Juventus Turin
Concept: vision4venue
Project description:
The cable suspended steel roof is supportet by
two huge steel pylons outside the stadium.
vision4venue – Part of the Project:
The team member of vision4venue was
responsible for the conception and simulation of
the erection concept and the method statment for
this complexe roof structure while employed at
the main contractor.
![Page 45: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/45.jpg)
Stadium Roof Corinthians, Sao Paulo, Brazil
Project Period: Feb 2011 – Sep 2011
Capacity: 65.000
Roof Area: 36.000 sqm
Construction Costs: 45 Mio. €
Client: Corinthians Sao Paulo
Architect: vision4venue
Project description:
The innovative Cable Roof was designed as cost
saveing alternative for the main contractor.
vision4venue – Part of the Project:
The team member of vision4venue was
responsible for the design and conception while
employed at the main contractor.
![Page 46: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/46.jpg)
Stadium Roof Morumbi, Sao Paulo, Brazil
Project Period: Nov 2011 – Jun 2012
Capacity: 70.000
Roof Area: 32.000 sqm
Construction Costs: 50 Mio. €
Client: FC Sao Paulo
Architect: vision4venue
Project description:
The innovative Cable Roof was designed as cost
saveing alternative for the main contractor.
vision4venue – Part of the Project:
The team member of vision4venue was
responsible for the design and conception while
employed at the main contractor.
![Page 47: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/47.jpg)
Stadium Roof Beira Rio,
Porto Alegre, Brazil
Project Period: Jan 2011 – Jul 2011
Capacity: 60.000
Roof Area: 45.000 sqm
Construction Costs: 40 Mio. €
Client: Inter Porto Alegre
Architect: vision4venue & SBP
vision4venue – Part of the Project:
The team member of vision4venue was involved
in the concept development during the design
process as advisor for the structural designers
while employed at the main contractor.
![Page 48: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/48.jpg)
Project Period: Jun 2011 – Nov 2011
Capacity: 55.000
Roof Area: 40.000 sqm
Construction Costs: 45 Mio. €
Client: Gremio Porto Alegre
Architect: vision4venue
vision4venue – Part of the Project:
The team member of vision4venue was
responsible in the design development and the
design while employed at the main contractor.
Stadium Roof Gremio Arena,
Porto Alegre, Brazil
![Page 49: REFERENCES - Stadionwelt...Client: FC Bayern München vision4venue –Part of the Project: The team member of vision4venue was involved in the design process and member of the internal](https://reader033.vdocuments.us/reader033/viewer/2022050220/5f65b18074376d3dcf2abc30/html5/thumbnails/49.jpg)