references

7
REFERENCE 1. Abdel-Aziz, A.M., “Computerized Risk Analysis Model in Cost Estimating in Construction Proects!, Master "#esis, $agazig %ni&ersity, 'aculty o( Enginee 1))*. *. Akinci, +., and 'isc#er, M., “'actor A((ecting Contractors Risk o( Cost &erburden!, ournal o( Management in Engineering, /ol.10, o.1, anuary 1) 3. Al-+a#ar, .'., and Crandall, 4.C., “5ystemic Risk Management Approac# (or Construction Proects!, ournal o( Construction Engineering and Management, 116, o.3, 5eptember 1))7. 0. Al-8#a(ly, M.A., “9elay in t#e Public %tility Proects in 5audi Arabia!, Mast "#esis, 4ing 'a#d %ni&ersity o( Petroleum : Minerals, 9#a#ran, 1));. ;. Al-<azmi, M.<., “Causes o( 9elay in =arge +uilding Construction Proects!, Master "#esis, 4ing 'a#d %ni&ersity o( Petroleum : Minerals, 9#a#ran, 1)2>. 6. Al- u?aira#, @., “'actors A((ecting Construction Cost in 5audi Arabia!, Mast "#esis, 4ing 'a#d %ni&ersity o( Petroleum : Minerals, 9#a#ran, 1))>. >. Amer a#id, “Analysis and E&aluation o( 9elays in Construction Proect in Eg Master "#esis, $agazig %ni&ersity, 'aculty o( Engineering, 1))0. 2. Askar, M.M., and 8ab-Alla#, A.A., “Problems 'acing Parties Bn&ol&ed in +uild, perate, and "ransport Proects in Egypt!, ournal o( Management in Engineer /ol.12, o.0, ctober *77*. ). +aker, 5., and 5mit#, 5., “Risk Response "ec#ni ues Employed Currently (or M Proects!, Construction Management : Economics, /ol.1>, PP *7;-*13, 1))). 17. +arrie, 9., and Paulson, +., “Pro(essional Construction Management!, Mcgra? <ilal, Bnc. e? @ork, 1))*.

Upload: gaber-yousef

Post on 07-Oct-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

REFERENCE

1. Abdel-Aziz, A.M., Computerized Risk Analysis Model in Cost Estimating in Construction Projects, Master Thesis, Zagazig University, Faculty of Engineering, 1992.

2. Akinci, B., and Fischer, M., Factor Affecting Contractors Risk of Cost Overburden, Journal of Management in Engineering, Vol.14, No.1, January 1998.

3. Al-Bahar, J.F., and Crandall, K.C., Systemic Risk Management Approach for Construction Projects, Journal of Construction Engineering and Management, Vol. 116, No.3, September 1990.

4. Al-Ghafly, M.A., Delay in the Public Utility Projects in Saudi Arabia, Master Thesis, King Fahd University of Petroleum & Minerals, Dhahran, 1995.

5. Al-Hazmi, M.H., Causes of Delay in Large Building Construction Projects, Master Thesis, King Fahd University of Petroleum & Minerals, Dhahran, 1987.

6. Al-Juwairah, Y., Factors Affecting Construction Cost in Saudi Arabia, Master Thesis, King Fahd University of Petroleum & Minerals, Dhahran, 1997.

7. Amer Wahid, Analysis and Evaluation of Delays in Construction Project in Egypt, Master Thesis, Zagazig University, Faculty of Engineering, 1994.

8. Askar, M.M., and Gab-Allah, A.A., Problems Facing Parties Involved in Build, Operate, and Transport Projects in Egypt, Journal of Management in Engineering, Vol.18, No.4, October 2002.

9. Baker, S., and Smith, S., Risk Response Techniques Employed Currently for Major Projects, Construction Management & Economics, Vol.17, PP 205-213, 1999.

10. Barrie, D., and Paulson, B., Professional Construction Management, Mcgraw Hilal, Inc. New York, 1992.

11. Callahan, M.T., Quacken Bush, D.G., and Roings, J.E., Construction Project Scheduling, Megraw Hilal, Inc. New York, 1992.

12. Carter, R.L., and Doherty, N.A., Handbook of Risk Management, Kluwer- Harrap Hand Books, London, 1974.

13. Casey, J.J., Identification and Nature of Risks in Construction Projects; A Contractors Perspective, Proceedings Construction Risk Liability Conf., Vol.I, ASCE, New York, N.Y, PP 17-23, 1979.

14. Clark, P., and Chapman, C.B., The Development of Computer Software for Risk Analysis: A Decision Support System Development Case Study, European Journal of Operational Research 29, 1987.

15. Clough, R.H., Construction Project Management, John Willy & Sonc Inc., New York, 1972.

16. Cowie, G., Enough Scope Yields Better Estimates, Journal of Constructon Engineering and Managment, Vol.113, No.2, 1987.

17. El-Diraby, T.M., Construction Risk Assessment Using Fuzzy Set Theory- An Introductory Computer Model for Expert System, Master Thesis, Zagazig University, Faculty of Engineering, 1989.

18. Erikson, C.A., Oconnor, M.J., and Rood, O.E., Preliminary Investigations of Risk Sharing in Construction Contracts, Interim Report, P-88, U.S. Army Construction Engineering Research Laboratory, Champaign ILL, April 1978.

19. Erikson, C.A., and Oconnor, M.J., Construction Contract Risk Assignment, Technical Report, P-101, U.S. Army Construction Engineering Research Laboratory, Champaign ILL, June 1979.

20. Fabrycky, W.J., and Thuesen, G.J., Economic Decision Analysis, Prentice Hall Inc., Englewood Cliffs, U.S.A., 1980.

21. Fang, D., and Li, M., Risks in Chinese Construction Market Contractors Perspective, Journal of Construction Engineering and Management, Vol.130, No.6, December 2004.

22. Farid, F., Required Return on Investment in Construction, Journal of Construction Engineering and Management, Vol.115, March 1989.

23. Felllows, R.F., The Management of Risk, Technical Information Service, The Chartered Institute of Building, No.111, 1989.

24. Flanagan, R., and Norman, G., Risk Management and Construction, Blackwell, Oxford, 1993.

25. Franke, A., Risk Analysis in Project Management, Project Management, Vol.5, No.1, February 1987.

26. Grogan, T., Special Report Forecast95, Engrg. News. Rec., 1995.

27. Guide to the Project Management Body of Knowledge PMBOK @ Guide, Project Management Institute, Four Campus Boulevand, Newtown Square PA 19073-3299 U.S.A., 2000.

28. Han, S.H., and Diekmann, J., Approaches for Making Risk-Based Go/ No-Go Decision for International Projects, Journal of Construction Engineering and Management, Vol.127, No.4, July 2001.

29. Hastak, M., and Shaked, A., Model for International Construction Risk Assessment, Journal of Management in Engineering, Vol.16, No.1, January 2000.

30. He Zhi, Risk Management for Overseas Construction Projects, International Journal of Project Management, Vol.13, No.4, PP 231-237, 1995.

31. Hillebrandt, P.M., Economic Theory and the Construction Industry, Macmillan Press., 1974.

32. Kangari, R., and Boyer, L.T., Project Selection Under Risk, Journal of Construction Division, ASCE, Vol.107, No.4, 1981.

33. Kangari, R., Risk Management Perceptions and Trends of U.S. Construction, Journal of Construction Engineering and Management, Vol.121, December 1995.

34. Kartam, N.A., Risk and its Management in the Kuwaiti Construction Industry: A Contractors Perspective. International Journal of Project Management, Vol.19, PP 325-335, 2001.

35. Kendall, M., and Gibbons, J.D., Rank Correlation Methods, Fifth Edition, Oxford University Press, 1990.

36. Levitt, L.E., Allocating Risk and Incentive in Construction, Journal of the Construction Division, ASCE, Vol.106, September 1980.

37. Li Bing, and Tiong, R., Risk Management in International Construction Joint Ventures, Journal of Construction Engineering and Management, Vol.125, No.4, July 1999.

38. Lifson, M.W., and Shaifer, E.F., Decision and Risk Analysis for Construction Management, John Wiley & Sons. 1982.

39. LY Shen, Project Risk Management in Hong Kong, International Journal of Project Management, Vol.15, No2, PP 101-105, 1997.

40. Mansfield, N.R., and Doran, Causes of Delay and Cost Overrun in Nigerian Construction Projects, International Journal of Project Management, Vol.12, No.4, PP 254-260, 1994.

41. Morgan, P.R., and Fundi, G., Construction Costs in Tanzania: Risk Identification, Reduction, and Allocation, International Journal for Development Technology, Vol.4, 1986.

42. Nakado, R., Construction Time-Influencing Factors: the Contractors Perspective, Construction Management and Economic, Vol.13, PP 81-89, 1995.

43. OBrien J.J., Construction Delay Responsibilities Risk, and Litigation, Cahness Book International Inc., Boston, 1976.

44. Okpala, D.C., and Aniekwn, A.N., Causes of High Costs of Construction in Nigeria, Journal of Construction Engineering and Managment, Vol.114, No.2, 1988.

45. Oyamada, H., and Yokoyama, K., A Study of Cost Estimating Relationship Between Plant Cost and Economic Trend Factors, Assn.of Cost Engrs, Trans., M.2.1 M.2.5, 1986.

46. Perry, J.G., and Hayes, R.W., Risk and its Management in Construction Projects, Proceedings of the Institution of Civil Engineers, Part 1, Vol.78, June 1985.

47. Savant,M., and Levy, H., Capital Investment and Financing Decisions , Prentice Hall, Inc.U.K, 1986.

48. Shaifer, S.L., Risk Analysis for Capital Projects Risk Elements, Transactions of the American Association of Cost Engineers, 1973.

49. Shash, A., and Abdul-Hadi, N.H., The Effect of Contractor Size on Mark-up Size Decision in Saudi Arabia , Construction Management and Economics, Vol.11., PP 421- 429, 1993.

50. Shen, L.Y., and George, W.C., Risk Assessment for Construction Joint Ventures in China, Journal of Construction Engineering and Management, Vol.127, No.1, January 2001.

51. Sincich, T., and Mcclave, J., Statistics, Eight Edition, Prentice Hall, Upper Saddle River, New Jersey, 2000.

52. Smith, G.R., and Bohn, C.M., Small to Medium Contractors Contingency and Assumption of Risk, Journal of Construction Engineering and Management, Vol.125, No.2, March 1999.

53. Snedecor, G., & Cochran, W., Statistical Methods, the Iowa State University Press, 1980.

54. Stevens, J.D., and Al-Dulaijan, S.U., Contractors Financing Public Works in Saudi Arabia, Journal of Construction Engineering and Management, Vol.115, No.1, 1989.

55. Strassman, W.P., and Wells, J., The Global Construction Industry: Strategies for Entry, Growth, and Surriral, Umwain, Hyman, London, 1988.

56. Thompson, P., and Perry, J., Engineering Construction Risks: A Guide to Project Risk Analysis and Risk Management, Thomas Telford, London, 1992.

57. Ubaid, and Ahmed, G., Factors Affecting Contractor Performance, Master Thesis, King Fahd University of Petroleum & Minerals, Dhahran, 1991.