reference monitoring @ q-cells intersolar 2011. content 2 1. network of references under monitoring...
TRANSCRIPT
Reference Monitoring @ Q-CellsIntersolar 2011
CONTENT
2
1. NETWORK OF REFERENCES UNDER MONITORING
2. EXAMPLES OF PERFORMANCE DATA
3. LIVE LOG-IN TO WEB PORTAL
Network of References under Monitoring (1)
3
Why reference monitoring?
In reality, STC conditions almost never occur… Crucial is the performance under real conditions, in different applications and segements!
Monitoring and development of Q-Cells products under real conditions (ex. Anti PID-Technology)
Network of References under Monitoring (2)
4
Why reference monitoring?
Benefits for you:
Improved performance calculations due to energy yield simulation under real life conditions
Optimisation of system design and installation based on real performance data
Broad reference data base for installation benchmarking
Worldwide Reference Network under Monitoring
5
Currently about 68 reference sites under monitoring Covering nearly all climate conditions, applications, and segments
We need you to further build up the worldwide network!
CONTENT
6
1. NETWORK OF REFERENCES UNDER MONITORING
2. EXAMPLES OF PERFORMANCE DATA
3. LIVE LOG-IN TO WEB PORTAL
* Period: 2010; ** independent certified engineering service (yield certificate)
REFERENCE UNDER MONITORING
Project: StraßkirchenLocation: Bavaria, GermanyPower: 51 MWpOrientation: SouthInclination: 25°Installation: December 2009Segment: Utility Application: Field installationPerformance Ratio*: 86%Simulated PR**: 81,6%
*Period: May 18 – May 31 2011
REFERENCE UNDER MONITORING
Project: PotsdamLocation: Brandenburg, GermanyPower: 8.46 kWpOrientation: SouthInclination: 30°Installation: 2010Segment: ResidentialApplication: RooftopPerformance Ratio*: 86%
Überwachte Referenzanlage
9
REFERENCE UNDER MONITORING
Project: DelitzschLocation: Saxony, GermanyPower: 5,4 kWpOrientation: SouthInclination: 40°Installation: March 2010Segment: ResidentialApplication: RooftopPerformance Ratio*: 86%Special Energy Yield*: 1049 kWh/kWpSimulated PR**: 86,8%Simulated Yield**: 1004 kWh/kWp
* Period: March 2010 – February 2011, **PV*SOL Simulation with Application Note
REFERENCE UNDER MONITORING
Project: SchackenthalLocation: Saxony Anhalt, GermanyPower: 30,34 kWpOrientation: South-South-EastInclination: 14°Installation: March 2010Segment: C&IApplication: FlatroofPerformance Ratio*: 85%Specific Energy Yield*: > 903 kWh/kWpSimulated PR**: 87,5%Simulated Car**: 951 kWh/kWp
* Period: March 29th 2010 – March 28th 2011, **PV*SOL Simulation with Application Note
REFERENCE UNDER MONITORING
Project: Alice SpringsLocation: Alice Springs, AustralaPower: 5,61 kWpOrientation: NorthInclination: 20°Segment: Utility (test site)Weblink: http://www.dkasolarcentre.com.au/
Best performance under extreme conditions
CONTENT
12
1. NETWORK OF REFERENCES UNDER MONITORING
2. EXAMPLES OF PERFORMANCE DATA
3. LIVE LOG-IN TO WEB PORTAL
Live Login to Web Portal
13
Q.PRO example system
Q.SMART example system
Login-Data: www.q-cells.com/monitoring
Username: qcells_intersolar_deu
qcells_intersolar_eng
Password: 2011intersolar
Temporary login to web portal for intersolar guests
THANK YOU.
REFERENCES UNDER MONITORING
15
Irradiance cell (in module plane)
Module temperature sensor
Ambient temperature sensorEnergy counter
Data logger
Database
WAN/GSM
Analogue signals
Digital Signal (S0)
Bus (RS485)Web server / Portal
www
Inverter interface
Monitoring Components
References under Monitoring – Indicators
16
SPECIFIC ENERGY YIELD [kWh / kWp]
Energy feed into grid normalized to installed nominal (STC) module power
PERFORMANCE RATIO [%]
Irradiance sensor is needed to calculate PR! Describes, how efficient the incoming irradiance energy is used Performance Ratio = 100%: The entire system runs with
nominal module efficiency
Überwachung von Referenzanlagen – Kennzahlen
17
Loss factors: Inverter efficiency, wiring, low light behavior, temperature and shading
Common knowledge, annual PR > 80%: “Good” value
REFERENCE UNDER MONITORING
Project: SteutzLocation: Saxony Anhalt, GermanyPower: 22,05 kWpOrientation: SouthInclination: 32°IInstallation: March 2010Segment: C&IApplication: RooftopPerformance Ratio*: 87%Special Energy Yield*: 1041 kWh/kWpSimulated PR**: 86%Simulated Yield**: 994 kWh/kWp
* Period: March, 18th 2010 – March, 17th 2011, **PV*SOL Simulation with Application Note
Überwachte Referenzanlage
19
REFERENCE UNDER MONITORING
Project: Solibro FacadeLocation: Saxony Anhalt, GermanyPower: 17 kWpOrientation: SouthInclination: 90°Installation: June 2008Segment: C&IApplication: BIPVPerformance Ratio*: 84%Special Energy Yield*: 705 kWh/kWp
* Period: 2010