reference-list...- in cchambers t1, t2, the od-kz-150 was replaced with sf6 circuit breaker abb...

5
1 REFERENCE-LIST LLC «EDS-ENGINEERING» www.eds-ltd.com.ua [email protected] +38066-610-21-10 CONSTRUCTION OF ELECTRICAL SUBSTATIONS 2020

Upload: others

Post on 15-Aug-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REFERENCE-LIST...- In cchambers T1, T2, the OD-KZ-150 was replaced with SF6 circuit breaker ABB LTB-170. In S-1 chamber, the U-220 dead-tank oil circuit breaker was replaced with ABB

1

REFERENCE-LIST

LLC «EDS-ENGINEERING»

www.eds-ltd.com.ua

[email protected]

+38066-610-21-10

CONSTRUCTION OF

ELECTRICAL

SUBSTATIONS

2020

Page 2: REFERENCE-LIST...- In cchambers T1, T2, the OD-KZ-150 was replaced with SF6 circuit breaker ABB LTB-170. In S-1 chamber, the U-220 dead-tank oil circuit breaker was replaced with ABB

2

№ TYPES OF WORK NAME OF FACILITY,

CITY

NAME OF

CUSTOMER

START AND

END DATES

OF WORK

1 Major overhaul of the central power distribution station of Verkhovtsevo power

supply division located in Verkhn'odniprovs'kyi district of Dnipropetrovsk Oblast

with the replacement of the following equipment:

- 14 6 kV KSO chambers to 14 6 kV MVC of EDS production;

- 20 switchboard panels ShchO 90 0,4 kV to 9 input-distribution panels 0.4 kV

PowerLine of EDS production;

- current system of external lighting of the facility to Sh30 cabinet of EDS production.

Verkhovtsevo power

supply division,

Verkhn'odniprovs'kyi

district,

Dnipropetrovsk Oblast

JSC

«Ukrzaliznytsia» 2019 year

2 Modernization of the traction electrical substation "Fedorovka" 150/35/10 / 3.3 kV

in Zaporizhia Oblast.

During the modernization, the following work was carried out:

RECONSTRUCTION OF ORU-150 KV (outdoor switchgear):

- The replacement of power equipment in the chambers T-1, T-2, S-1 was carried out.

- In cchambers T1, T2, the OD-KZ-150 was replaced with SF6 circuit breaker ABB LTB-170. In

S-1 chamber, the U-220 dead-tank oil circuit breaker was replaced with ABB LTB-170 SF6

circuit breaker. In ORU-150 (outdoor switchgear), 150 kV disconnectors with a manual drive

were replaced with disconnectors with a motor drive and remote control in the amount of 6

sets, the replacement of 3 sets of 150 kV current transformers with the possibility of

commercial electric power metering was carried out, morally and physically obsolete 150 kV

surge arresters were replaced by surge arresters OPN-150 kV.

RECONSTRUCTION OF ORU-35 KV (outdoor switchgear):

- Replacement of power equipment in T-1, T-2, SV-35 chambers.

- 3 sets of oil circuit breakers were replaced with vacuum VR-35NSM, current transformers

and disconnectors were replaced.

RECONSTRUCTION OF ZRU-10 KV (indoor switchgear):

- The power equipment in the T-11, T-12, SV-10 chambers was replaced with vacuum one of

Schneider Electric production, and nine modern current transformers were installed.

Zaporizhia Oblast JSC

«Ukrzaliznytsia» 2019 year

3 Reconstruction of the power supply system of Dnipro starch plant with the

installation of new equipment at 35 kV electric substation.

RECONSTRUCTION OF ORU 35 KV (outdoor switchgear):

- installation of an additional power transformer TM6300/35 with an increase in power;

- replacement of 35 kV power equipment with 6 VR 35NSM vacuum circuit breakers, 11 sets

of disconnectors, 5 sets of surge arresters OPN 35 kV, 6 sets of 35 kV current transformers, 2

sets of 35 kV voltage transformers;

- installation of 3 KRUN 6 kV of EDS production.

- installation of 8 automation and control panels for ORU 35 kV and ZRU 6 kV, as well as

signal panel (all equipment was manufactured at EDS-ENGINEERING facilities).

RECONSTRUCTION OF ZRU 6 KV (indoor switchgear):

- installation of 13 6 kV chambers,

- modernization of RZiA (RPEA) in 12 previously installed chambers.

Dniprovs'ke village,

Dnipropetrovsk Oblast

PrJSC

«Dneprovsky

starch and syrup

integrated works»

2019 year

4 Technical re-equipment of ORU 10 kV (outdoor switchgear) L-45 chamber of

electrical substation SS «Chaplinka» 35/10 kV and SS «Mayevka» 150/35/10 kV

- on the 10 kV side a BB/TEL 10 kV vacuum circuit breaker manufactured by «Tavrida

Electric Ukraine» was installed instead of the old one, as well as two 10 kV current

transformers manufactured by Beontop and a set of voltage indication system

manufactured by KUVAG;

- technical re-equipment of L-45 chamber of 10 kV RP of SS «Chaplinka» 35/10 kV was

completed, a 3.5 MW SPS was connected to the L-45 power line;

- at the SS «Chaplinka» 35/10 kV the whole range of works on setting the RZiA system

(RPEA) was completed;

- at the SS «Mayevka» 150/35/10 kV was carried out the organization of busbar

disconnectors fork 35 kV «L-566-1» and «L-566-2» to enable the switching of 35 kV L-566

overhead lines from ІІ busbar section to І busbar section 35 kV for balanced load of SS

power transformers;

- a new disconnector was connected to ORU 35 kV with a help of busbar arrangement of

flexible steel-aluminum wire to the І busbar section of 35 kV.

Petrykivs'kyi district,

Dnipropetrovsk Oblast

JSC «DTEK Dnipro

grids» 2019 year

Page 3: REFERENCE-LIST...- In cchambers T1, T2, the OD-KZ-150 was replaced with SF6 circuit breaker ABB LTB-170. In S-1 chamber, the U-220 dead-tank oil circuit breaker was replaced with ABB

3

№ TYPES OF WORK NAME OF FACILITY,

CITY

NAME OF

CUSTOMER

START AND

END DATES

OF WORK

5 Reconstruction of 110/10 kV SS «Porshen'»:

1. Complete reconstruction of the construction part of the outdoor switchgear ORU-110 kV

was performed:

– dismantling works (dismantling the foundations of power transformers, dismantling

existing oil receivers, oil retainer, oil pipelines for emergency discharge of transformer oil,

dismantling reinforced concrete portals and 110 kV busbars, dismantling cable reinforced

concrete trays, dismantling of reinforced concrete racks of high-voltage equipment,

dismantling of old railway temporary transportation ways);

– assembly and installation of new foundations with oil receivers for power transformers,

new oil pipelines for emergency discharge of oil, installation of new portals on ORU-110 kV,

installation of new reinforced concrete cable consoles, installation of new racks of USO type

for high-voltage equipment, as well as foundations for 110 kV SF6 circuit breakers. One of

the new works that EDS-ENGINEERING specialists mastered during the implementation of

the project is the construction of railway tracks for rerolling transformers to ORU 110 kV

(outdoor switchgear).

2. Electrical installation work was carried out on outdoor switchgear ORU-110 kV:

– assembly of 2 power transformers of type TRDN 25000/110 kV manufactured by ZTR

(transportation, unloading, assembly and testing);

– assembly of 2 SF6 circuit breakers 110 kV manufactured by Siemens;

– assembly of 6 current transformers 110 kV manufactured by Arteche on prepared metal

structures;

– assembly of 6 disconnectors 110 kV manufactured by HVT;

– assembly of 8 surge protection devices 110 kV manufactured by ABB;

– busbar arrangement of ORU-110 kV (outdoor switchgear) with AS 185/19 wire with a total

length of 560 meters.

3. Electrical installation works were performed on the indoor switchgear ZRU-10 kV:

– replacement of 6 10 kV oil circuit breakers with vacuum VR-35 manufactured by RZVA

with adaptation for draw-out elements;

– installation of current transformers VC 10 kV, voltage transformers VC 10 kV in the

amount of 24 pcs., reconstruction of the rigid busbar 10 kV;

– installation of cabinet equipment manufactured by EDS-ENGINEERING: 8 panels of relay

cabinets, 2 TM cabinets, 8 terminal-block cabinets of YaZV-90, YaZV-120 types;

– laying of cabling and wiring products with a total length of about 22 km through cable

channels and substation equipment, followed by allocation and termination;

– reconstruction of the heating system of the indoor switchgear 10 kV, assembly of lighting

of ZRU-10 kV and ORU-110 kV;

– complete reconstruction of the grounding contour of 110/10 kV SS «Porshen'» at ORU-110

kV.

Konotop city, Sumy

Oblast

PJSC

«Sumyoblenergo» 2019 year

6 Reconstruction of 15 35 kV surge arresters with replacement of disconnectors:

Krivorozhskiy RES (Power Distribution Zone)

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Khristoforovskiy

GPPZ» in RVD-31, RVD-32 chambers

Pyatikhatskiy RES (Power Distribution Zone)

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Trudolyubovka» in

RVD-31, RVD-32 chambers

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Pyatikhatskaya

PTF» in RVD-31, RVD-32 chambers

Sinel'nikovskiy RES (Power Distribution Zone)

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Varvarovka» in

RVD-31, RVD-32 chambers

Pavlohradskiy РЭС RES (Power Distribution Zone)

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Stroitel'naya» in

RVD-31, RVD-32 chambers

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Vodnaya» in RVD-

31, RVD-32 chambers

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS

«Santekhnicheskaya» in RVD-31, RVD-32 chambers

Verkhnedneprovskiy RES (Power Distribution Zone)

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Bummash» in RVD-

31, RVD-32 chambers

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Mosty» in RVD-31,

RVD-32 chambers

Dnipropetrovsk Oblast JSC «DTEK Dnipro

grids» 2019

Page 4: REFERENCE-LIST...- In cchambers T1, T2, the OD-KZ-150 was replaced with SF6 circuit breaker ABB LTB-170. In S-1 chamber, the U-220 dead-tank oil circuit breaker was replaced with ABB

4

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Bratskaya» in RVD-

31, RVD-32 chambers

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Travy» in RVD-31,

RVD-32 chambers

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Mishurin Roh» in

RVD-31, RVD-32 chambers

Novomoskovskiy RES (Power Distribution Zone)

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Novomoskovskaya

horodskaya» in RVD-31, RVD-32 chambers

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Zoovettekhnikum»

in RVD-31, RVD-32 chambers

Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Peschanka» in RVD-

31, RVD-32 chambers

7 Reconstruction of ZRU-110kV of Cherkasy TPP - replacement of oil circuit breakers by

SF6 Cherkasy city Cherkasy TPP

january

2018.

8 Construction of open transformer substations 0.4 / 35kV 1600kVA (10 pcs.), RP-35kV,

reconstruction of SS "Veseloye" (installation of 35kV switches)

Vesele village,

Zaporizhia Oblast

LLC "Uкrainian

system Solar"

january

2018.

9 Reconstruction of SS “DBK”: a reactor was installed; reconstruction of existing

chambers was completed.

Two chambers of KSO-393-11M type were additionally installed in the user

transformer substation.

Krasylivka village,

Brovars'kyi district,

Kyiv Oblast

PJSC

“Kyivoblenergo”

january

2018

10 Reconstruction of substation “Horodskaya” 35/10kV in Nizhyn city Chernihiv Oblast,

namely the installation of new relay panels, automation panels, control current

cabinets, commissioning works

Nizhyn city Chernihiv

Oblast

PJSC

«Chernigovoblene

rgo»

September

2018

11

Installation of step-up KTP-1000 (packaged transformer substation) 0.4/6kV - 2pcs

2 MW solar power

station in Pidhorodne

city, Dnipropetrovsk

Oblast

LLC"Sun Energy" august

2017

12

Reconstruction of SS "Solenaya" 150/10kV. Replacement of oil circuit breakers with

vacuum ones - 9 pcs.

Solone village,

Dnipropetrovsk Oblast

PJSC "DTEK

Dneprooblenergo

"

2017

13

Reconstruction of SS "Surskaya" 35/10kV - installation of 35kV circuit breakers,

installation of relay panels

Brats'ke village,

Dnipropetrovsk Oblast

PJSC "DTEK

Dneprooblenergo

"

2017

14

Technical re-equipment of RZA (relay protection and automation devices) and

secondary switching schemes in the chambers of SS “Ochistnyye”

Novoaleksandrovskaja

Village Council

Dnipropetrovsk Oblast

High voltage

Union-RZVA 2017

15

Construction of SS-35/10 with the installation of 4 transformers TM-6300kVA

Greenhouse complex,

Novooleksandrivka

(Dnipro city)

LLC "Realty

Estate" 2016

16

Installation of 10 KTP-1000/10 and one 2xKTP-1000/10 (packaged transformer

substation)

Greenhouse complex,

Novooleksandrivka

(Dnipro city)

LLC "Realty

Estate" 2016

17 Installation of two KTP-630/6 (packaged transformer substation) - 2 units,

reconstruction of SS "ITsKK" - 150 / 6kV - replacement of circuit breakers with vacuum

ones in RU-6kV (switchgear)

Gas filling station,

Izmail city

LLC

"Ukrrezervuarserv

is"

11.2015-

11.2016

18 Organization of external power supply for ATB stores - according to the technical

conditions of power transmission organizations, reconstruction was made of PS-35kV -

1 unit, TP-10 / 0.4kV - 150 units.

Trade network,

Ukraine LLC "АTB-Market"

2011- till

present.

19 Production, supply and assembly of medium voltage chambers (6 kV) of KSO393 type

complete with LS 1000 A vacuum circuit breakers for the reconstruction of port

transformer substations.

Berdyansk sea port Ukrainian Sea

Ports Authority

11.2016 -

12.2016

Page 5: REFERENCE-LIST...- In cchambers T1, T2, the OD-KZ-150 was replaced with SF6 circuit breaker ABB LTB-170. In S-1 chamber, the U-220 dead-tank oil circuit breaker was replaced with ABB

5

№ TYPES OF WORK NAME OF FACILITY,

CITY

NAME OF

CUSTOMER

START AND

END DATES

OF WORK

20 Repair and construction works at the SS 150/35/6 kV:

- replacement of current transformers 150 kV;

- replacement and installation of additional TSN (auxiliary transformer);

- relay protection reconstruction

Electricity

Transmission

organization

Dnipropetrovsk Oblast

PJSC “ENE”

Central Energy

Company””

2016

21 KTP-10/0.4kV (packaged transformer substation) installation for power supply of oil

depot Neftebaza, Dnipro city "AMIC ENERGY"

08.2016-

12.2016

22

Reconstruction of RU-10kV TP warehouse - assembly of medium voltage chambers of

the KSO393 type completed with LS 1000 A vacuum circuit breakers

Pharmaceutical

company, Udarnykiv

St. 27, Dnipro city

“BaDM” LLC 12.2016 -

02.2017

23 Reconstruction of 35-10 kV electric grids of PJSC "Nikopol Pipe Fittings Plant": -

replacement of power transformers, RU-10kV (switchgear), ORU-35kV (outdoor

switchgear).

Pipeline Fittings Plant,

Nikopol' city PJSC "NPFP"

05.2015-

08.2015

24

Construction of a transformer substation with 2xTM-2500/10 transformers.

Reconstruction of existing transformer substations in the part of RU-10kV

(switchgear).

Oil refinery, Feodosia

city

Feodosiya

enterprise on

providing oil

products

2013

25 Construction of two transformer substations with two transformers of TM-1600/10

type each.

Logistics center,

Dnipro city

LLC “Master Profi

Plant Ukraine”

09.2012-

09.2013

26

Modernization of relay protection KRU-6kV Zuevskaya TPP

Zuhres city, 60 rokiv

Zhovtnia St, Donetsk

Oblast

DTEK

Vostokenergo 2012

27 Reconstruction of SS-150/35 /6kV with the replacement of 150kV air circuit breakers

with SF6 of ABB production. Replacement of electromagnetic RZiA (RPEA) with

microprocessor based on the equipment "Diamant" manufactured by "Hartron Incor".

Ordzhonikidze city,

Dnipropetrovsk

Oblast, Ukraine

Procter&Gamble 2011

Director ______Zapishniy О.О._______ ______________ ______________ (Name of the head / director / owner) (signature) (date)