reference costs 2006-07 afternoon workshop richard russell, dh ali connell, dh

23
Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH PbR – Finance and Costing Team

Upload: merritt-nixon

Post on 30-Dec-2015

24 views

Category:

Documents


1 download

DESCRIPTION

Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH PbR – Finance and Costing Team. Contents. Purpose of Reference Costs Organisational Roles and Responsibilities Key changes since 2005-06 HRG4 FCE and Spells Unbundling Data Definitions - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

Reference Costs 2006-07Afternoon Workshop

Richard Russell, DHAli Connell, DH

PbR – Finance and Costing Team

Page 2: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• Purpose of Reference Costs• Organisational Roles and Responsibilities• Key changes since 2005-06

– HRG4– FCE and Spells– Unbundling– Data Definitions– Collection System

• Known areas of difficulty• Timetable• Resources• Patient Level Costing

Contents

Page 3: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• Annual national benchmark exercise of average unit costs from providers in England

• Also serves to inform– Payment by Results: Tariff Development – Programme Budgeting– Efficiency measures– Organisational Performance Management

• So whilst some changes are to inform an improved benchmark we also need to take account of its other uses

Purpose of Reference Costs

Page 4: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• DH, Policy and Strategy, PbR, Operations

– Responsible for developing reference costs guidance, costing manual, collection system– Secretariat for the National Costing Development Group who are responsible for quality of costing in the NHS– Responsible for producing, national schedules and RCIs

• Information Centre for Health and Social Care (IC)

– DH commission trim points, OPCS/ICD10 to HRG mapping, HRG grouper

Roles and Responsibilities (1)

Page 5: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

Roles and Responsibilities (2)

• Connecting for Health (CfH)– Data Dictionary– Coding Guidance

• Strategic Health Authorities– Coordinating the exercise locally and answers

queries from Trusts and PCTs (with support from DH as required)

• Your own Finance Department– First source of advice on reference costs

Page 6: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

Reference Costs 2006-07 Communications

• SHA Reference Costs Leads• IC Roadshows• FAQs• Website• Mailbox

– (Diagram – next slide)

Page 7: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

What does the query relate to? What organisation? Where should I send?

PbR technical guidance

PbR development / policy

Reference Costs collection guidanceReference Costs data returns/resultsCosting manual

If query is a mixture of PbR and Reference Costs questions then should go to [email protected]

NHS Trusts

PCT

FT

SHA

DH

(Including specific subject header)

(If SHA cannot answer)

[email protected]

NHS Trusts

PCT

FT

SHA

DH

(If SHA cannot answer)

[email protected]

Page 8: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• HRG4 (note no word “version” or “vn” or “v”)

– Designed by clinicians

– Increased number of lines from approx 560 to over 1200

– Setting independent (APC, Outpatients, A&E, Adult Critical Care, Paediatric Critical Care, Neonatal Critical Care)

– Apply equally to Admitted Patient Care and Outpatients i.e. Outpatients grouped by HRG

Key changes since 2005-06HRG4

Page 9: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• Providers are paid on a Spells basis and need to measure their costs on the same basis• HRG4 is designed to be Iso-Resource at Spell level, not FCE level

• So the future of Reference Costs is Spells level costs by HRG

• For year on year comparability need a collection of both FCE and Spell costs

Key changes since 2005-06 FCE and Spells (1)

Page 10: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• DH issued guidance on how to get from FCE costs to Spell based costs• Point to note:

– FCE collection – count FCE’s that are part of a Spell that finishes in the 2006-07 financial year– Spell level collection, group Spells that finish in the year

• HRG4 Grouper assigns each FCE record the relevant FCE HRG and subsequent Spell HRG on same output file

Key changes since 2005-06FCE and Spells (2)

Page 11: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• For reference cost purposes this means services separately identified (by HRG4 Grouper) from FCE:

–Chemotherapy–High Cost Drugs–Diagnostic Imaging (Radiology)–Interventianal Radiology–Renal Dialysis –Radiotherapy–Specialist Palliative Care–Rehabilitation Services

• At a Spell level grouper also separately identifies these activities and does not group them within the main Spell

Key changes since 2005-06Unbundling

Page 12: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• Incorrect Trimpoints used will now ‘fail’ loading process - Vital to use correct ones

• Workbook structures have been made more consistent with Guidance

• Software providers

• Mid May – Live testing week

Key changes since 2005-06Collection System

Page 13: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• The reference cost guidance now links to the data dictionary wherever possible

• Biggest change is Outpatients, it is now a “pre-booked appointment at a clinic” i.e. setting independent – NB possibly big impact for PCTs?

• Other key changes are:

– Outpatients by Staff Type– Observation wards/assessment units clarification– Critical Care counting, Periods and ACP– Renal – now HRG4– Digital Hearing Aids– Mental Health – Mental Health Specialist Teams (Child/Adult/Elderly)– Pre-processing of data - Annex 1– Accounts reconciliation in reconciliation statement

Key changes since 2005-06Data Definitions and Collection structures

Page 14: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• With the new definition PCTs are now doing Outpatients, but generally do not using OPCS/ICD10 coding

• A number of organisations have not collected OPCS 4.3 since the start of the year (1 April 2006)

• Collection files are larger due to HRG4 introduction

• Data Collection issues for some of the areas of unbundling

Known areas of difficulty (1)

Page 15: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

Known areas of difficulty (2)

• Updated definitions in line with data dictionary and PbR requirements may require more local solutions than normal

• PAS systems not able to fully utilise all HRG groups at this time

• PCT’s post reconfiguration need to include activity and costs relating to pre configuration organisations

Page 16: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

Tools……• Ref Costs Final guidance available – 16th Feb (DH)• Costing Manual updates – March• Final Collection Files - March• ICD10/OPCS to HRG code to HRG mapping available Feb (IC)• Toolkit documentation available March (IC)• Grouper available end April (IC)• Trim Points available early May (IC)

Deadlines…..• First submission to DH – 29th June, Noon• Final submission to DH – 31st July, Noon• RCIs produced before end 2007 (DH)

Timetable

Page 17: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• Reference Cost Guidance: www.dh.gov.uk/refcosts

• NHS Costing Manual: www.dh.gov.uk/refcosts

• HRG4 Toolkit: www.ic.nhs.uk/casemix

• HRG4 Documentation: www.ic.nhs.uk/casemix

• OPCS/ICD10 to HRG Mapping (code to group in excel): www.ic.nhs.uk/casemix

• SHA leads contacts (details In pack and at www.dh.gov.uk/refcosts)

• Reference Cost Discussion Forum (this is a users resource and whilst promoted by DH it is not used by the DH as a way of receiving queries – the route for queries is via SHA Reference Cost Leads)

Resources and useful links

Page 18: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

The Future of Costing

• Response to Lawlor Review• National Costing

Development Group Support

• Patient Level Costing

Page 19: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• Historically reference costs tend to be calculated by finance, on a top down basis, with little clinical validation

– one hospital provided 1526 Diabetic Adult Face to Face Contacts for a total cost of £1,678 (avg of £1.10 each)– another provided 16 Intermediate Pain Procedures for a total cost of 80 pence - 5 pence each

• As reference costs have been used to calculate tariff then this undermines the credibility of the tariff

Patient Level Costing (PLC) 1

Page 20: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• PLC is a change in costing methodology to a bottom up approach.

• Will allow for improved clinical engagement as discuss actual patients rather than averages

• Will allow for better understanding of costs as will be able to compare cost buckets rather than just average costs

• Will better support tariff development as allows for greater level of detail to be collected

• Will support any future classification changes as simply sum up patient costs into whatever classification the organisation is using

Patient Level Costing (PLC) 2

Page 21: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• There are already 5 sites implementing PLC• Up to a years implementation time and then a further year to properly bed in• Makes better use of the existing investment in place to support PbR implementation

Will be supported by• Updated costing definitions and standards will be written by NHS experts• Process of peer review of quality of costing data in providers

Patient Level Costing (PLC) 3

Page 22: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• PLC is a forward looking medium to long term solution.• There is plenty that can be done now:

– Service level costing– Clinical validation of costing results– Benchmarking groups– Other ideas?

The short term

Page 23: Reference Costs 2006-07 Afternoon Workshop Richard Russell, DH Ali Connell, DH

• Large scale change for 2006-07 to support HRG4 tariff and costing development

– FCEs and Spells– Unbundling– OPCS4.3

• Organisations need to start planning for the reference cost collection now

• Any Questions?

WRAP UP