reduce cost and improve the quality of your programme ... · reduce cost and improve the quality of...
TRANSCRIPT
©2014 EZPMO Ltd.
Reduce cost and improve the quality of your Programme Management Office.
©2014 EZPMO Ltd.
Summary
• The reporting tool can draw in information from many different sources, reformat the data and generate high quality MS Powerpoint materials.
• It’s easy to configure the tool to work with the existing project management artifacts that are in place, and to design the outputs, so an organisation can get exactly the information it needs, in the right format.
• The tool replaces the time consuming and expensive processes to collate information, reformat it and populate reports with a single button press and reports taking minutes to produce.
• ezPMO is Excel based, so there’s no expensive additional infrastructure or complicated set up to worry about. Reporting can be up and running in a matter of days rather than weeks or months.
• The toolset has been a proven track record with a return on investment in just a few months.
* pronounced “easyPMO”
ezPMO* provides a simple, configurable reporting tool that works
with existing project management tools to drastically reduce PMO costs, whilst improving quality.
©2014 EZPMO Ltd.
Case Study
THE CHALLENGE
A large service organisation was operating a small PMO function which due to inefficient processes were struggling to add value, and were seen as a bottleneck to the governance process.
Information collection was a time consuming process, with little buy in from the project manager community.
As a consequence, there was no sense of common purpose between the PMO and other programme staff, or ownership of the information used in the various reporting packs that were in circulation.
THE RESULT
PMO seen as a value add function – less admin, more time with project managers.
Clarity in reporting – focus on what matters.
Time to produce reports slashed.
Improved working relationship with project manager community.
Same PMO group provide extra services at no incremental cost.
COSTS
Estimated 50% less resource required
PERFORMANCE
Additional services provided and focus on value add activity rather than admin.
QUALITY
Consistent , clear and well formatted output.
TIME
Reports generated in minutes rather than hours
©2014 EZPMO Ltd.
Report
Control
Centre
ezPMO Set Up
Risk and
Issue Management
Status
Reporting
Change
Management
Programme
Financial Control
Planning
Resource
Management
=Sharepoint
Reporting uses a PowerPoint
template file that contains the
branding for the design of
reports that are generated.
PM
updates
source
PM
updates
source
PM
updates
source
PM
updates
source
PM
updates
source
Content
of
reports
Creation
of KPI
and
metrics
1Each element of source data
updated by PMs
2PMO uses Report Control
Centre to generate Powerpoint
report
3QA of output – source data
revisited and report rerun if
required
4
Additional ad-hoc materials
added to report
5
Report issued for use in relevant
forum
Note – this process represents an example of potential suite of products used in the PMO
– the actual configuration of source data will vary by client
Steering
Board
Workstream
Project
©2014 EZPMO Ltd.
PM
updates
source
Programme
Financial Control
ezPMO – example report - Gantt
Risk and
Issue Management
Status
Reporting
Change
Management
Resource
Management
=Sharepoint
Reporting uses a PowerPoint
template file that contains the
branding for the design of
reports that are generated.
PM
updates
source
PM
updates
source
PM
updates
source
PM
updates
source
1Each element of source data
updated by PMs
2PMO uses Report Control
Centre to generate Powerpoint
report
3QA of output – source data
revisited and report rerun if
required
4
Additional ad-hoc materials
added to report
5
Report issued for use in relevant
forum
Note – this process represents an example of potential suite of products used in the PMO
– the actual configuration of source data will vary by client
Steering
Board
Workstream
Project
Report
Control
Centre
Content
of
reports
Creation
of KPI
and
metrics
Planning
©2014 EZPMO Ltd.
PM
updates
source
Planning
PM
updates
source
Programme
Financial Control
ezPMO – example report - Risks
Status
Reporting
Change
Management
Resource
Management
=Sharepoint
Reporting uses a PowerPoint
template file that contains the
branding for the design of
reports that are generated.
PM
updates
source
PM
updates
source
PM
updates
source
1Each element of source data
updated by PMs
2PMO uses Report Control
Centre to generate Powerpoint
report
3QA of output – source data
revisited and report rerun if
required
4
Additional ad-hoc materials
added to report
5
Report issued for use in relevant
forum
Note – this process represents an example of potential suite of products used in the PMO
– the actual configuration of source data will vary by client
Steering
Board
Workstream
Project
Report
Control
Centre
Content
of
reports
Creation
of KPI
and
metrics
Risk and
Issue Management
©2014 EZPMO Ltd.
ezPMO Track Record
• ezPMO formed by 2 consultants with over 20 years experience of automating activity with the objective of improving the efficiency and quality of ProgrammeManagement Offices.
• Automation implemented at organisations including:
• Automation has delivered:
– For PMO activity, reduced time to produce, fewer resources, and better quality.
– Improved the Project Managers toolset and processes.
– Reporting is more timely as there is less of lag in information submission and report generation.
©2014 EZPMO Ltd.
The Proposition
•PMO setup slow and difficult
•Higher PMO resource than necessary
•Inefficient processes impact Project Staff –
e.g.repetition of data entry
•Existing tools and technologies not being leveraged
•Overcomplicated PPM tools in place
Initial
assessment
Why use it?
How is it
implemented?
What is it?A service to streamline PMO processes with a focus on automation to exploit the existing Project and Programme
management tools available to a client. Rapid incremental implementation through reuse of existing components.
Who should use it?Any business operating a PMO, or service provider providing PMO services that wants to differentiate themselves from
competitors, or improve their margins through improved efficiency.
•Slow turnaround of information from PMO
•Version control from data sources being duplicated
•Inability to report at a Programme or Portfolio level
•Lack of integration between data sources
•Lack of consistency in reporting output
initial review of existing
process, tools & culture
Proposal and Business
Case
Proposal and Business
case
Incremental implementation
Rapid implementation of point solutions, each new
area being plugged into a central reporting hub.
Knowledge
transferOngoing support
Can be 1 week to 3 months
What does it deliver?
•Speed to set up PMO processes dramatically reduced
•Dramatically reduce overheads
•PMO staff can focus on value add
•Time to produce reports slashed
•Project Manager buy in – use of familiar tools
Example Business Case
Cost
• Base Cost -£15k
• Monthly licence and support -£1k
Tangible benefits delivered
• Saving 1 PMO consultant at £400 per day from implementation
ROI achieved in Month 3
Plus intangible benefits:
• Speed to set up
• Quality
• Consistency
©2014 EZPMO Ltd.
Incremental Implementation
ezPMO:
Central Reporting Hub
Ez:Planning
Ez:Status
Ez:Risk
Ez:Issue
Ez:Finance
Ez:Change
• A Central Reporting Hub is initially implemented.
• Point solutions (e.g planning, risks, status reporting etc.) can be easily implemented on an incremental basis, as required.
• The point solution may be pre-existing solutions (e.g. a workbook, an MS Project plan, a Sharepoint list or some other system that provides a data feed).
©2014 EZPMO Ltd.
Contact
• Contact for further information:
Andy Thomas
+44 (0)7903 655530
Dave Galbraith
+44 (0)7901 854971