REDD+ in The Democratic Republic of Congo: Institutional Framework and Associated Instruments to Steer Country Readiness. Bruno Guay, Technical Advisor (UNDP), National REDD Coordination of the DRC and Jean-Marie Bakanseka, Head of IT and Database, Central African Forest Observatory (OFAC) Workshop: Maputo, May 2012.

Upload: others

Post on 05-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

1

REDD+ in The Democratic Republic of Congo: Institutional Framework and Associated Instruments

to Steer Country Readiness.

Bruno Guay, Technical Advisor (UNDP), National REDD Coordination of the DRC

and

Jean-Marie Bakanseka, Head of IT and Database, Central African Forest

Observatory (OFAC)

Workshop: Maputo, May 2012.

Page 2: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

2 2

Strategic vision for implementation framework

Emerging implementation framework for REDD+ in the DRC

Institutional framework for REDD+ in the DRC

Instruments to steer country readiness for REDD+

Tools supporting REDD+ implementation framework

• “Homologation”: accreditation procedure for REDD+ projects

• National Registry of REDD+ Projects and Initiatives

• Visualisation and analysis functionalities for coordination and

transparency

• New tools for implementation and Independent oversight mechanisms

Conclusion

Outline

Page 3: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

3 3

Phase 0

2009 2010 2011 2012 2013 2014 2015 2016

Initialisation

Phase 1

Readiness

Phase 2

Investment

Phase 3

Implementation

Interim / experimental framework (regulatory)

Strategic Vision for Implementation Framework

Implementation framework

(embedded in law)

Core objectives

Finding a way forward for all approaches (projects and programs) during the first 2 phases of deployment.

Ensuring that we learn from these projects and initiatives to develop the best possible strategy and associated legal framework.

Page 4: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

4 4

Emerging Implementation Framework for REDD+

Page 5: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

10 10

Instruments to Steer Country Readiness for REDD+ (1/5)

Draft regulation surrounding the development of local

REDD+ projects

CREATE AN EXPERIMENTAL MECHANISM TO GRANT USAGE RIGHTS FOR

« CARBON CREDITS » IN THE CONTEXT OF REDD+ PROJECTS IN DRC

Ensure a contribution to the national readiness process (information sharing and capacity building)

1. CRITERIA FOR « HOMOLOGATION » (APPROVAL)

2. PROCEDURE FOR « HOMOLOGATION »

3. ASSOCIATED REGISTRY

Main objective

Promote environmental integrity (Avoid double counting, assess leakage and REL setting, etc.)

Ensure respect for social and environmental standards and safeguards

Specific Objectives

Tools

Promote transparency and ensure legality (prevent money laundering and other illegal activities )

Page 6: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

11 11

Key Facts: REDD+ Regulation Design and Adoption

Instruments to Steer Country Readiness for REDD+ (2/5)

Initial contact with credible project developers and consciousness on the need to regulate to avoid future problems

National and international consultation with stakeholders

Ministerial Decree fixing the procedure of homologation of REDD+ Projects signed on the 15th of February 2012.

Integral part of the decree, the book of homologation procedure for REDD+ Projects.

Homologation Procedure for REDD+ Projects

Page 7: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

12 12

Key Facts: Registry Design and Implementation

Instruments to Steer Country Readiness for REDD+ (3/5)

Creating synergies for information management for REDD+ projects (OFAC works on protected areas and forest concessions)

Consultation with international experts

Computer programming of initial phase

Homologation Procedure for REDD+ Projects

Computer programmers, foresters, legal experts, civil society advocacy groups and the public administration coming together to create an operational and transparent process.

Page 8: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

13 13

Modalities

Instruments to Steer Country Readiness for REDD+ (4/5)

Registration of Project Developer

• Controlling the “honorability” of the project developer and his partners (due diligence)

• Assessing the “receivability” of the project

Homologation (Accreditation)

• Approving the project through “homologation”

Validation

• Accreditation of project validation from a recognized carbon and socio-environmental standard

Maintaining Homologation

• Perdiodically assessing the project developer’ fulfillment of his obligation over the project’s lifetime

Homologation Procedure for REDD+ Projects

Page 9: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

14 14

Instruments to Steer Country Readiness for REDD+ (5/5)

Homologation Procedure for REDD+ Projects

The big picture of the process

Page 10: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

15 15

Instruments to Steer Country Readiness for REDD+ (5/5)

Page 11: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

16 16 http://www.observatoire-comifac.net/REDD.welcome.php

Everyone knows

who, when and what

in real time!!!

Online administrative process embedded in the registry : innovative ways

to mitigate corruption and streamline administrative processes

Tools supporting the Institutional Framework (1/3)

Page 12: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

17 17

Transparency and coordination: visualization interface embedded in Terra Congo satellite land monitoring system (preview available online)

Tools supporting the Institutional Framework (2/3)

Page 13: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

18 18

The Democratic Republic of the Congo (template for demo)

Tools supporting the Institutional Framework (3/3)

Transparency and coordination: embedded search engine to consolidate

information and produce national statistics

Page 14: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

19 19

Oversight: a new combination of tools in DRC

Independent verification

DOE model (VCS, CDM)

Monitoring and evaluation of administration agents MECNT

Civil Society (e.g. Moabi (rdc.moabi.org)

Validation of the information notified by REDD + DRC civil society

Identification of overlapping land rights

Report on non-certified REDD projects +

Congolese civil society and particularly those involved in participatory

mapping will be key to power this initiative

Page 15: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

20 20

This emerging framework (procedures and associated registry) is

essential to provide the accountability, predictability and the synergies

to attract investors in the development of REDD + and engage

communities in transformational change.

It is key to maintain flexibility as we engage in the first two phases of

REDD+. The DRC will support itself on studies and “guided

experimentation” through pilot projects to build a strong legal

framework in the medium term.

Today, the DRC undertakes this process, it is an African leader but is

nonetheless facing serious human and financial constraints. Capacity

building will be key at both national and provincial levels for the current

and future legal reform to be a success.

Conclusion

Page 16: REDD+ in The Democratic Republic of Congo: Institutional … · 2015 2016 Initialisation Phase 1 Readiness Phase 2 Investment Phase 3 Implementation Interim / experimental framework

21 21

A collaborative work process

Vincent Kasulu

Directeur du Développement Durable, Ministère de l’Environnement, Conservation de la Nature et Tourisme de la

RDC

[email protected]

Nicky Ineet Kingunia

Chef de bureau gestion des stocks de carbone, Direction du Développement Durable, Ministère de l’Environnement,

Conservation de la Nature et Tourisme de la RDC

[email protected]

Bruno Guay

Conseiller Technique, Coordination Nationale REDD de la RDC , appui du PNUD au Ministère de l’Environnement,

Conservation de la Nature et Tourisme de la RDC

[email protected]

Léopold Kalala N.-K.

Conseiller juridique, Cellule Environnement

Ministère de l’Environnement, Conservation de la Nature et Tourisme de la RDC

[email protected]

Jean-Marie Bakanseka

Responsable Informatique, Observatoire des Forêts d’Afrique Centrale (OFAC)

[email protected]

http://www.mecnt.cd/ et www.observatoire-comifac.net