Page 1: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Reconstruction of Tillary St and Adams St

Page 2: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Tillary St Division between

Downtown Brooklyn and Dumbo

Adams St Connecting between the

Brooklyn Bridge Promenade and

Downtown Brooklyn

Phase I - Adams St

Phase II - Tillary St

Page 3: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Tillary and Adams Streets – Timeline

1954 Downtown section of Brooklyn-Queens Expressway Opens

Mid-80s Brooklyn Bridge Promenade extended to Tillary St.

1998 Planted medians and bike lanes installed on Adams St. south of Tillary St.

2001 Widened medians at Adams St. Intersection

2005 Protected Bicycle Lane Implemented between Clinton St. and Adams St.

2005 Improved pedestrian signal timing at Tillary St. and Adams St.

2008 Safety Project at Tillary St. and Adams St. eliminated two left-turns

2014 DOT installed plaza at Clinton St and Tillary St in temporary materials

Page 4: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Adams St at Tillary St: Gateway to Brooklyn

Insufficient tourist gathering space

Highway aesthetic

Undesirable path from Brooklyn Bridge

Page 5: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Tillary St: Existing Issues

Bisected community

Pedestrian Safety

Long Crossings

Cyclist Safety and Network Connections

Page 6: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Tillary and Adams Streets – Bicycle Benefits

New two way raised protected bikeway

Shared bicycle/pedestrian path

Gateway treatment with shared path from Brooklyn Bridge

Page 7: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Widened sidewalks

Unified boulevard landscaped median treatment

Median treatment with shared path from Brooklyn Bridge

New plaza

Tillary and Adams Streets – Pedestrian Benefits

Page 8: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Clarified lane assignments

Better lane alignment along the corridor

Tillary and Adams Streets – Vehicle Benefits

Increased flexibility approaching the Brooklyn Bridge

Page 9: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

New bike paths Build out plaza

Widened sidewalks

Existing

Proposed

Page 10: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Existing

New bike paths Landscaped medians

Proposed

Page 11: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Shared path on median

Increased vehicle options

Existing

Proposed

Page 12: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Gateway treatment from Brooklyn Bridge Promenade

Existing

Proposed

Page 13: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St
Page 14: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Wider sidewalks

New landscaping

Page 15: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Wider median with robust bicyclist/pedestrian convergence area

Page 16: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St

Landscaped gateway to Brooklyn

Page 17: Reconstruction of Tillary St and Adams StMid-80s ; Brooklyn Bridge Promenade extended to Tillary St. 1998 : Planted medians and bike lanes installed on Adams St. south of Tillary St