RECONSTRUCTION OF THE PELL BRIDGE APPROACHES Newport, Rhode Island NORTH END THE POINT Newport Middletown 138 3rd Street J T Connell Highway Utility Road Van Zandt Avenue Dyer Street Admiral Kalbfus Road Girard Avenue Coddington Highway West Main Road Maple Avenue Farewell Street East Main Road Training Station Road Malbone Road John H Chafee Boulevard Broadway Thames Street Americas Cup Avenue Farewell Street Garfield Street Hillside Avenue Gateway Center Naval Station Newport 1. Resurface Pavement 2. Provide Pedestrian and Bicycle Connection Between Interchange and West Main Road 3. Provide Safety Improvements JT Connell Highway/Coddington Highway Improvements 1. Convert Interchange to New Local Street Network 2. Maintain Existing Downtown Off-Ramp and Provide Traffic Signal at JT Connell Highway 3. Remove Excess Infrastructure (Including 3 Structures) 4. Extend Pell Bridge Moveable Barrier for Special Event Traffic Management 5. Convert Rotary to Modern Roundabout 6. Reconfigure the Admiral Kalbfus Road at Third Street Intersection to Enhance Operations and Safety 7. Convert Admiral Kalbfus Road at Malbone Road to Signalized Intersection to Enhance Safety and Operations 8. Eliminate Van Zandt Avenue Connection to Farewell Street from Third Street 9. Restrict Farewell Street Westbound Traffic to Right-Turns Only Pell Bridge Interchange Improvements 1. Provide Pedestrian and Bicycle Connection between Interchange and Girard Avenue 2. Enhance Pedestrian and Bicycle Connectivity with Construction of Shared-Use Path between North End and Downtown Vulnerable User Improvements 1. Construct 200+ Space Park & Ride to Capture Inbound Traffic to Downtown Newport 2. Provide Platforms for Future Shuttle Service 3. Allow for Shuttle Service between Park & Ride and Downtown Transit Improvements Alternative 3B Reconstruction at Pell Bridge Ramps Newport/Middletown, Rhode Island 0 350 700 Feet Alternative - 3B

Upload: others

Post on 19-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

  • RECONSTRUCTION OF THE PELL BRIDGE APPROACHES Newport, Rhode Island

    NORTH END

    THEPOINT

    Newp

    ort

    Midd

    letow

    n

    138

    3rd Street

    J T Conne

    ll Highway

    Utility Roa

    d

    Van Zandt Avenue

    Dyer Street

    Admiral Kalbfus Road

    Girard A

    venue

    Coddington H

    ighway

    West Main Road

    Maple Avenue

    Farewell St

    reet

    East Main

    Road

    Training Station Road

    Malbo

    ne

    Roa

    d

    John H

    Chafe

    e

    Bouleva

    rd

    Broadway

    Thames St

    reet

    Americas C

    up Avenue

    Fare

    well S

    treet

    Garfield Street

    Hillside Avenu

    eGatewayCenter

    Naval StationNewport

    1. Resurface Pavement2. Provide Pedestrian and Bicycle Connection Between

    Interchange and West Main Road3. Provide Safety Improvements

    JT Connell Highway/Coddington Highway Improvements

    1. Convert Interchange to New Local Street Network2. Maintain Existing Downtown Off-Ramp and Provide

    Traffic Signal at JT Connell Highway3. Remove Excess Infrastructure (Including 3 Structures)4. Extend Pell Bridge Moveable Barrier for Special Event

    Traffic Management5. Convert Rotary to Modern Roundabout6. Reconfigure the Admiral Kalbfus Road at Third Street

    Intersection to Enhance Operations and Safety7. Convert Admiral Kalbfus Road at Malbone Road to

    Signalized Intersection to Enhance Safety and Operations8. Eliminate Van Zandt Avenue Connection to Farewell

    Street from Third Street9. Restrict Farewell Street Westbound Traffic to Right-Turns

    Only

    Pell Bridge Interchange Improvements1. Provide Pedestrian and Bicycle Connection

    between Interchange and Girard Avenue2. Enhance Pedestrian and Bicycle Connectivity

    with Construction of Shared-Use Path betweenNorth End and Downtown

    Vulnerable User Improvements

    1. Construct 200+ Space Park & Ride to CaptureInbound Traffic to Downtown Newport

    2. Provide Platforms for Future Shuttle Service3. Allow for Shuttle Service between Park & Ride

    and Downtown

    Transit Improvements

    \\Ri-data\projects\72900.00\graphics\FIGURES\Alternatives\Pell Bridge Alternatives.dwg

    Alternative 3BReconstruction at Pell Bridge RampsNewport/Middletown, Rhode Island

    0 350 700 Feet

    NORTH END

    THEPOINT

    Newp

    ort

    Midd

    letow

    n

    138

    3rd Street

    J T Conne

    ll Highway

    Utility Roa

    d

    Van Zandt Avenue

    Dyer Street

    Admiral Kalbfus Road

    Girard A

    venue

    Coddington H

    ighway

    West Main Road

    Maple Avenue

    Farewell St

    reet

    East Main

    Road

    Training Station Road

    Malbo

    ne

    Roa

    d

    John H

    Chafe

    e

    Bouleva

    rd

    Broadway

    Thames St

    reet

    Americas C

    up Avenue

    Fare

    well S

    treet

    Garfield Street

    Hillside Avenu

    eGatewayCenter

    Naval StationNewport

    1. Construct 200+ Space Park & Ride to CaptureInbound Traffic to Downtown Newport

    2. Provide Platforms for Future Shuttle Service3. Allow for Shuttle Service between Park & Ride

    and Downtown

    Transit Improvements

    Pell Bridge Interchange Improvements

    1. Provide Pedestrian and Bicycle Connectionbetween Interchange and Girard Avenue

    2. Enhance Pedestrian and Bicycle Connectivitywith Construction of Shared-Use Path betweenNorth End and Downtown

    Vulnerable User Improvements

    JT Connell Highway/Coddington Highway Improvements1. Resurface Pavement2. Provide Pedestrian and Bicycle Connection between

    Interchange and West Main Road3. Provide Safety Improvements

    1. Maintain Interchange with New Local Street Network2. Replace Existing Downtown Off-Ramp with Loop Ramp3. Provide Evacuation Route above FEMA 50-Year Flood

    Elevation4. Extend Pell Bridge Moveable Barrier for Special Event

    Traffic Management5. Convert Rotary to Modern Roundabout6. Reconfigure the Admiral Kalbfus Road at Third Street

    Intersection to Enhance Operations and Safety7. Convert Admiral Kalbfus Road at Malbone Road to

    Signalized Intersection to Enhance Safety and Operations

    \\vhb\proj\Providence\72900.00\graphics\FIGURES\Alternatives\Pell Bridge Alternatives.dwg

    Alternative 1Reconstruction at Pell Bridge RampsNewport/Middletown, Rhode Island

    0 350 700 Feet

    Project Constraints

    Noise • Potential decrease in noise levels near downtown off-ramp to be removed.

    Environmental Justice (EJ) • Temporary construction impacts.

    Floodplains • Evacuation route infrastructure designed to be above 50 year FEMA flood zone while accommodating for sea level rise during project service life

    Wetlands • 0.2 acres of wetlands impacted

    Visual Impact• Elevated highway remains• New loop ramp

    Right-Of-Way • None

    Oil and Hazardous Materials

    • The project will need to go through the RIDEM Site Remediation process, including completion of the Site Investigation, public notices, a remedial action work plan, and a remedial action closure report.

    • The proposed remedy will be to cap the area (with roadway, sidewalks, and landscaped areas). Any excavated material that cannot be re-interred beneath capped portions of the project will need to be properly managed, stockpiled, sampled, and shipped off-site for proper disposal.

    Traffic Pattern Impacts

    • JT Connell Highway reconnected to Farewell Street. No need to use freeway segment. • Downtown traffic rerouted to flyover ramp

    Alternative - 1

    Traffic

    • Eliminates congestion on Pell Bridge during typical peak periods.• Allows for traffic management during special events • Travel time decrease to Naval Station Newport and point North.• Park and Ride with Future Shuttle removes vehicles from traveling downtown.

    Environmental Justice

    • Enhanced pedestrian and bicycle facilities• Neighborhood connectivity and walkability

    Safety/Connectivity

    • Mitigates crashes on bridge due to congestion• Provides off-ramp pedestrian and bicycle facilities, connecting North End to Downtown• Allows for pedestrian crossings throughout small portions the interchange area with the local street network

    Developable Land • 8.2 acres made available for potential redevelopment. Actual developable land within these area still to be determined

    Project Benefits

    Alternative - 3B