Agenda 14.00- start of the meeting 14.05 – Presentation on issues related to planned
access channel reconstruction and to EIA procedure
14.35 - Discussion
Contacts : State Environmental Bureau, 23 Rupniecibas
street , Riga. LV1045.67321173 67321049 Freeport of Riga Authority , 12 O.Kalpaka
boulevard, Riga. LV1010. 67030800 67030835
Riga City Development Program 2006-2012
Guidelines : develop new territories outside the historical city center enhance Riga development as the center of logistics Riga port Development program, 1996 - 2010Tasks: Implement terminal capacity ,infrastructure and channel depth planning ; Dredge and expand the main shipping channel
līdz 5000 GT
5001-10000 GT
vairāk par 10000 GT
0.0 10.020.030.040.050.060.070.080.0
Ship percentage (%) per GT indicator in the Freeport of Riga
2004- 2008.
2008.g. 2007.g. 2006.g.2005.g. 2004.g.
Project background
Increase of bigger tonnage vessels proportion
Navigational safety in Riga port
Modern , well-equipped and environment- friendly vessels entering Riga port
Modern Riga port, that is competitive in the north-eastern region of the Baltic sea
Dynamic Riga port, relocated from the city center
Kundziņsala
Bolderāja
Daugavgrīva
Mangaļsala
Vecmīlgrāvis
Spilve
Vecrīga
Project time frame
By 2009- fairway concept 2009-2010- environmental impact
assessment 2009-2011- construction design project 2012- commencement of construction
work, performed in several stages
Reconstruction of Access Channel for Ship Entrance into the Port Project concept.
Tasks: specify approximate parameters of the access channel; define changes in guidelines; develop channel route location proposal; calculate approximate volume of dredged soil; develop new channel picketage
Objective-
Define main parameters of access channel reconstruction
Further activities(I)
1. implement environmental impact assessment procedure related to the planned activity.
2-1. perform relevant geological, hydrological and hydrodynamic research, perform soundings, investigate and assess water ecological systems, including fish resources, to develop project documentation.
Further activities(II)
2.2. Receive technical and special terms and conditions from public and municipal institutions.
2.3. Elaborate work project documentation for hydro-technical structures’ reconstruction on the basis of preliminary investigations and environmental impact assessment results, identifying risks and specifying optimal technological solutions with the aim to reach the set objectives: Ensure the shipping fairway depth up to 15,5 m at the section
from Kurpnieksala up to the middle of Kundzinsala . Ensure fairway depth up to 17 m from the reception buoy up to
the northern part of Kurpnieksala , Ensure fairway width at apprx . 180 m .
Further activities(III)
2.4. Parallel to work project elaboration the hydro-technical structures , that are related to access channel and have to be reconstructed, are identified as well as issues , that were specified in the process of EIA development.
3.1. Hydro-technical structures’ reconstruction performed by stages.
It is planned to perform reconstruction works of separate sections by stages in compliance with technological solutions, provided in the project.
Characteristics of the Riga port Shipping fairway
Hydro-technical structures(LR “Law on Ports”): Main shipping fairway, Access to berths, Shoreline reinforcements, berths, turning basins , piers, Current regulating jetties, breakwaters, as well as
navigation equipment and appliances that are transferred to possession of the Freeport of Riga Authority
Shipping channel parameters
Existing main fairway: From reception buoy „B”
up to Rienzi basin (berth ZO-12) -13.5
From Rinuzi basin (berth ZO-12) up to Pilumuizha -11.7
From Pilumuizha up to passenger terminal -8.0
Milgravis canal -9.05 Sarkandaugava canal-
9.05
4 turning basins
EIA stages
30.05.2008 – SEB resolution Nr.252 on EIA procedure application;
27.03.2009- 03.04.2009 – initial public hearing related to the project;
In compliance with the program, issued by SEB : Interim report Interim report submitted to public hearing Final report Final report submitted to public hearing SEB conclusion Riga City Council either approves or
disapproves the planned activity
Current status investigation
Surface and underground waterSurface water flow processesRiver water qualityAir quality River biological and ecological systems Waste managementTransport and access
Forecasted impacts on :
Existing environment systems: Climate, air quality, noise level River flow directions River condition River water quality Biological systems
Social-economical systems
In the framework of EIA the following issues will be specified :
What short-term or long-term changes of Daugava river and adjacent zones topography might occur
What changes of underwater vegetation might occur
What impact on fish resources can be anticipated Planned investigations (wells, tests) Forecasted requirements related to removal
works Forecasted requirements related to construction
works Forecasted requirements related to dredging
works
In the framework of EIA the following issues will be specified :
Forecasted requirements related to shoreline strengthening structures
Forecasted requirements related to material storage and transportation
Forecasted requirements related to dredged soil storage and disposal
Forecasted requirements related to risk mitigation at current pipeline crossing locations