Report run on: January 11, 2013 10:22 AM RECAPP Facility Evaluation Report St. Bonaventure Catholic Elementary School B3286A Edmonton Edmonton RCSSD #7

Upload: others

Post on 25-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM

RECAPP Facility Evaluation Report

St. Bonaventure Catholic Elementary SchoolB3286A

Edmonton

Edmonton RCSSD #7

Page 2: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 2 of 45

B3286ABuilding Id:

St. Bonaventure Catholic EleBuilding Name:

EdmontonLocation:3004 - 139 Avenue Address:

3,021.42Gross Area (sq. m): $8,783,000Replacement Cost:1979Construction Year:

Evaluation Date: November 6 2012

Robert Bosnyak ArchitectEvaluation Company:

Robert BosnyakEvaluator Name:

St. Bonaventure Elementary School is a K-6 school constructed in 1980. The original one storey school has a floorarea of 2,556m2. A Portables Link.was constructed in 2003 at the northwest corner of the school with a floor area of71m2. Four portables are linked to the school and total 418m2 in area including the Portables Link. The school has acapacity of 542 students. St. Bonaventure Elementary School is non-sprinklered and of non-combustible construction.

General Summary:

Structural Summary:The 1980 Building foundation includes perimeter and interior grade beams bearing on concrete piles and a 125mmreinforced concrete slab on grade throughout. The 2003 Portables Link foundation includes existing and new reinforcedconcrete slab on grade. The suspended floor assembly at the mechanical penthouse is a cast-in-place concrete structural slab. The roof assembly is steel framed bearing on Du-al block and standard concrete masonry load bearing walls and steelbeams/columns. The concrete slab requires mud jacking at some corridors. Structural systems are in good condition.

Envelope Summary:Exterior wall assemblies are single wythe concrete masonry, shiplap wood siding over wood frame or a cavity wall withface brick, air space and wood frame backing wall. The wood clad fascia at the south elevation was replaced with pre-finished metal cladding in 2008. The roof membrane is the original BUR except for some SBS over the sloped roof atGymnasium Storage Room. The 2003 portables link has an SBS roof membrane installed in 2003. Windows are dark anodized aluminum framed with site sealed double glazing and integral horizontal blinds. Entrancedoors and utility doors are typically insulated hollow metal doors, with and without glazing, set in hollow metal frames. Painted wood cladding and soffits require replacement. Joint sealers also require replacement. The building envelope is in acceptable condition.

Interior Summary:Interior partitions are concrete masonry and metal stud/gypsum board. The primary ceiling finish is the originalsuspended acoustic T-bar ceiling. Other ceiling finishes include some suspended gypsum board at service rooms andexposed structure at the gymnasium. Floor finishes include mosaic ceramic tile, quarry tile, original and replacementvinyl tile,carpet and parquet wood flooring. Doors are hollow metal and solid core wood set in pressed steel frames.Some doors are glazed. Millwork is typically painted plywood or clear finish veneer plywood with plastic laminate clad counter-tops. Some casework requires repair or replacement. Some original suspended acoustic tile ceilings and original vinyl tileflooring is recommended for replacement. The wood parquet flooring in the gymnasium should be refinished. Interior systems are in acceptable condition.

Mechanical Summary:Floor mounted water closets, some with flush tanks and some with flush valves, wall hung urinals with flush valves,recess mounted enameled steel lavatories, stainless steel sinks, steel cabinet drinking fountains, shower valves intiled shower rooms. and floor mounted janitor sinks. Backflow presenters on heating system water make-up andirrigation system. Two natural gas fired hot water heaters new in 2006, circulating pump on hot water return line. Alldomestic piping is insulated with fiberglass pipe insulation. Building is heated with a hot water heating systemcomplete with two natural gas fired boilers, perimeter fin tube radiation, force flow units, unit heaters, and heating coilsin ventilation system. Three contant volume ventilation units with one unit for gym, one unit for stage and library, andone for classrooms and offices. Roof mounted exhaust systems. Humidification system provided to ventilation unitsand comprises of a natural gas fired steam boiler, steam grid humidifiers in supply air ductwork of ventilating units,condensate return pumps, water softener, chemical treatment injection system and steam and condensate piping.Pneumatic, DDC, and electric building control systems. ABC multi-purpose fire extinguishers.

25.30%5 year Facility Condition Index (FCI):

Facility Details Evaluation Details

Total Maintenance Events Next 5 years: $2,222,245

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Page 3: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 3 of 45

Mechanical system is in acceptable condition.

Electrical Summary:Utility pad mounted transformer with underground 120/208V/3PH/4W power service to main distribution switchboardwith 800 ampere main circuit breaker. Branch circuit panelboards located throughout school. AC magnetic andmanual toggle type motor starters. Copper wiring in conduit and copper cables. Mixture of recess mounted andsurface mounted fluorescent fixtures for interior lighting, complete with T12 lamps and ballasts. DC emergencylighting battery pack unit in emergency generator room. Select interior fluorescent fixtures in school connected toemergency panel and emergency generator for emergency lighting in building. Exterior lighting has someincandescent pot lights at main building entrance and wall mounted HPS light fixtures located around perimeter ofbuilding, all photocell controlled. Edwards hard wired fire alarm system in building with alarm bells and fire detectors.Basic security alarm system in building with alarm keypad, door contacts, and motion sensors. AC and DC clocks inclassrooms and work areas. Basic telephone system with telephones in each classroom and offices. Cat 5 datasystem new in 2001. Dukane public address system to classrooms. Cable TV outlet in each classroom. Natural gasfuelled emergency generator with transfer switch. Projects include replacing of interior fluorescent light fixtures with new fixtures having T8 lamps and ballasts. Electrical is in acceptable condition.

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

Rating Guide

5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.

Page 4: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 4 of 45

A1010 Standard Foundations*

A1030 Slab on Grade*

B1010.01 Floor Structural Frame (Building Frame)*

B1010.02 Structural Interior Walls Supporting Floors (or Roof)*

5 - Good

4 - Acceptable

5 - Good

5 - Good

Rating

Rating

Rating

Rating

1980

1980

1980

1980

Installed

Installed

Installed

Installed

0

0

0

0

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Mud jack concrete slabs.

Repair 2014 $4,507 Low

Concrete slab has settled in isolated areas of vestibules andcorridors.

Concern:

Mud jack concrete slab where settlement has occured.Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)S1 STRUCTURAL

Event:

Type Year Cost Priority

Updated: JAN-13

1980 Building foundation includes perimeter and interior grade beams bearing on concrete piles. 2003 Portables Link foundation includes existing and new reinforced concrete slab on grade.

125mm reinforced concrete slab on grade throughout 1980 Building. Existing and new reinforced concrete slab on grade at Portables Link..

Reinforced concrete structural slab at mechanical penthouse. Wood joist raised floor at Music Room/Stage supported onwood frame pony walls. All wood framing clad with fire rated GWB. Portables Link floor assembly includes 19mm plywood sheathing, 38mm x 184mm wood floor joists at 400mm o.c.supported on adjacent portable classroom structure or existing 1980 Building concrete masonry exterior wall.

Load bearing concrete masonry interior partitions supporting suspended floor assemblies at mechanical penthouse. Wood frame interior partitions at 2003 Portables Link.

Page 5: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 5 of 45

B1010.03 Floor Decks, Slabs, and Toppings*

B1010.05 Mezzanine Construction*

B1010.07 Exterior Stairs*

B1020.01 Roof Structural Frame*

5 - Good

5 - Good

4 - Acceptable

5 - Good

Rating

Rating

Rating

Rating

1980

1980

2003

1980

Installed

Installed

Installed

Installed

0

0

0

0

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

150mm painted concrete structural slab at mechanical mezzanine. Portables Link floor assembly includes 19mm plywood sheathing, 38mm x 184mm wood floor joists at 400mm o.c.supported on adjacent portable classroom structure or existing 1980 Building concrete masonry exterior wall.

150mm cast in place concrete structural slab at mechanical mezzanine.

Treated lumber (and plywood risers) exterior stair at west entrance to Portables Link installed in 2003. Supported onconcrete sidewalk pads and compacted gravel.

1980 Building roof structure includes steel structure bearing on Du-all block/concrete block and steel beams/columns. 2003 Portables Link roof includes conventional wood frame structure supported on wood frame exterior walls.

Page 6: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 6 of 45

B2010.01.02.01 Brick Masonry: Ext. Wall Skin*

B2010.01.02.02 Concrete Block: Ext. Wall Skin*

B2010.01.06.03 Metal Siding** - 1980 Building

B2010.01.06.04 Wood Siding** - 1980 Building

5 - Good

4 - Acceptable

4 - Acceptable

3 - Marginal

Rating

Rating

Rating

Rating

1980

1980

2008

1980

Installed

Installed

Installed

Installed

0

0

40

40

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Replace prefinished vertical metal siding (38m2).

Replace wood siding (103m2).

Lifecycle Replacement

Failure Replacement

2048

2014

$11,700

$31,400

Unassigned

Low

Painted wood siding is cracked in places and a maintenanceconcern.

Concern:

Replace wood siding with prefinished metal cladding (103m2).Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)S2 ENVELOPE

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Face brick as outer wythe of cavity walls at east elevation primarily.

Single wythe of concrete masonry at exterior walls at west and north elevations and high walls at gymnasium (du-alblock). Also south wall of original ancillary classroom.

Prefinished vertical metal siding at fascia over storefront windows at south wall of 1980 Building. Approximately 1,600mmhigh x 24,000mm long. Small quantity of infill metal siding near main entrance.

Stained wood shiplap siding at high wall of Library (above roof line) and above windows at east elevation. Some shiplapsiding at south elevation near entrances.

Page 7: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 7 of 45

B2010.01.06.04 Wood Siding** - 2003 Portables Link

B2010.01.09 Expansion Control: Ext. Wall*

B2010.01.11 Joint Sealers (caulking): Ext. Wall**

4 - Acceptable

4 - Acceptable

3 - Marginal

Rating

Rating

Rating

2003

1980

1980

Installed

Installed

Installed

40

0

20

Design Life

Design Life

Design Life

JAN-13

JAN-08

JAN-13

Updated

Updated

Updated

Replace wood siding at 2003 Portables Link(22m2).

Cut out and replace caulking (2,687 sq. m).

Lifecycle Replacement

Failure Replacement

2043

2014

$6,700

$6,196

Unassigned

Low

Integrity of building envelope. Brittle, cracked and loose jointsealers.

Concern:

Re-caulk all joints to the building envelope. Allowance basedon area of school (2,687m2).

Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

19mm shiplap siding at north and west elevations of 1980 Portables Link installed in 2003.

Periodic control joints in face brick and concrete block.

Control joints and transitions between dissimilar materials are caulked.

Page 8: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 8 of 45

B2010.01.13 Paints (& Stains): Ext. Wall**

B2010.02.03 Masonry Units: Ext. Wall Const.*

B2010.02.05 Wood Framing: Ext. Wall Const.* - 1980 Building

B2010.02.05 Wood Framing: Ext. Wall Const.* - 2003 Portables Link

B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation*

B2010.05 Parapets*

4 - Acceptable

4 - Acceptable

5 - Good

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

2011

1980

1980

2003

1980

1980

Installed

Installed

Installed

Installed

Installed

Installed

15

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

JAN-13

JAN-08

Updated

Updated

Updated

Updated

Updated

Updated

Re-paint all exterior walls (733m2).

Lifecycle Replacement 2026 $15,400 Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Type Year Cost Priority

Updated: JAN-13

Du-all block is painted. Wood cladding painted (see B2010.01.04.04 for event). Exterior of building repainted in 2011.

Du-all block on gym walls above adjacent roof line. Single wythe concrete masonry at west and north side of building. Also south wall of former ancillary classroom. Poor thermal performance.

Wood stud framing backing wall at east and partial south elevation brick faced cavity wall. 140mm wood studs. Fiberglassbatt insulation at stud space.

38mm x 140mm wood framed exterior wall throughout 2003 Portables Link.

Drawings indicate vapour barrier and insulation at cavity exterior walls only. 2003 Portables Link drawings indicate polyethylene vapour barrier, fiberglass batt insulation in stud space and buildingpaper over sheathing.

Pre-finished cap flashings where exposed to view and galvanized where not exposed to view in most areas.

Page 9: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 9 of 45

B2010.06 Exterior Louvers, Grilles, and Screens*

B2010.09 Exterior Soffits*

B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 1980

4 - Acceptable

3 - Marginal

4 - Acceptable

Rating

Rating

Rating

1980

1980

1980

Installed

Installed

Installed

0

0

40

Design Life

Design Life

Design Life

JAN-08

JAN-13

JAN-13

Updated

Updated

Updated

Replace wood soffits (36m2).

Replace all aluminum windows (32m2).

Failure Replacement

Lifecycle Replacement

2014

2020

$8,600

$48,000

Low

Unassigned

Painted woof soffit is cracked in places and a maintenanceconcern.

Concern:

Replace wood soffits with pre- finished metal cladding (36m2).Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Painted metal louvres throughout.

Insulated soffits with wood cladding above aluminum storefront windows at south elevation.

Dark anodized aluminum framed windows with operable awning type vent along the bottom. Site sealed double glazedcomplete with integral horizontal blinds. One window at each classroom (8 total). Approximately 1800mm wide x 1600mmhigh). Aluminum framed fixed windows at clerestory continuous above east wall of Library.

Page 10: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 10 of 45

B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 1992

B2020.02 Storefronts: Windows** - Aluminum Frame

B2020.02 Storefronts: Windows** - Steel Frame

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1992

1980

1980

Installed

Installed

Installed

40

40

40

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Replace aluminum windows at south wall (6.7m2).

Replace storefront aluminum windows (36m2).

Replace steel framed storefront windows (1.6m2).

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2032

2020

2020

$10,100

$43,200

$1,500

Unassigned

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

Dark anodized insulated aluminum windows added at south wall of former ancillary classroom in 1992. Awning typeoperators and sealed units. Four 1200mm wide x 1400mm high windows.

Aluminum framed storefront with double glazing, vents and crezon plywood panels located on south wall adjacent mainentrance. Crezon panels repainted in 2011.

Painted hollow metal frame sidelights both sides of storefront doors at main entrance.

Page 11: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 11 of 45

B2030.01.02 Steel-Framed Storefronts: Doors**

B2030.01.11 Metal Entrance Door** - 1980 Building

B2030.01.11 Metal Entrance Door** - 2003 Portable Link

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1980

1980

2003

Installed

Installed

Installed

30

0

0

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Replace steel framed storefront doors (2 total).

Replace hollow metal entrance doors (6 doorstotal).

Replace hollow metal entrance doors (4 doors).

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2020

2020

2043

$4,800

$14,400

$9,600

Unassigned

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

Original painted steel framed storefront doors at main entrance. Approximately 900H x 600W GWG window panel at eachdoor.

Insulated hollow metal doors at south, northeast and northwest entrances. Hollow metal frames throughout. Some glazedpanels complete with GWG.

Insulated hollow metal doors at north and west entrances to Portables Link installed in 2003. Hollow metal framesthroughout. Glazed panels complete with GWG at west entrance doors.

Page 12: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 12 of 45

B2030.02 Exterior Utility Doors**

B3010.01 Deck Vapour Retarder and Insulation*

B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**

5 - Good

4 - Acceptable

3 - Marginal

Rating

Rating

Rating

1980

1980

1980

Installed

Installed

Installed

40

0

25

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Replace hollow metal utility doors (7 doors).

Replace BUR membrane (2,590m2).

Lifecycle Replacement

Failure Replacement

2020

2013

$6,700

$453,250

Unassigned

Medium

Evidence of ponding and reports of past leaks. Original roofis nearing end of effective life.

Concern:

Replace existing BUR membrane with Modified BituminousMembrane Roofing (SBS) (2,590m2).

Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Hollow metal doors set in pressed steel frames and painted. Egress doors at gymnasium and former ancillary classroom,exterior doors to gas meter room, exterior storage and roof access door.

1980 Building drawings indicate rigid insulation and deck vapour barrier. 2003 Portables Link drawings identify 12mm fibreboard over sloped rigid insulation (150mm to 75mm thickness) and avapour retardant.

BUR membrane on all roof areas of 1980 Building. Numerous blisters repaired and ballast added in 2011.

Page 13: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 13 of 45

B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** - 2003 Portables Link

B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** - 2010

B3010.08.02 Metal Gutters and Downspouts**

B3020.01 Skylights**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

2003

2010

1980

1980

Installed

Installed

Installed

Installed

25

25

30

25

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-08

JAN-13

Updated

Updated

Updated

Updated

Replace SBS roofing at Protables Link (71m2).

Replace SBS roofing over Gym Storage (28m2).

Replace gutters and downspouts (7.2m)

Replace acrylic skylights (2.25m2).

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2028

2035

2016

2016

$12,400

$4,900

$3,200

$1,127

Unassigned

Unassigned

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Event:

Event:

Type

Type

Type

Type

Year

Year

Year

Year

Cost

Cost

Cost

Cost

Priority

Priority

Priority

Priority

Updated:

Updated:

Updated:

Updated:

JAN-13

JAN-13

APR-08

JAN-13

Modified Bituminous Membrane Roofing (SBS) roofing at Portables Link installed in 2003.

Modified Bituminous Membrane Roofing (SBS) roofing on sloped roof over Gym Storage installed in 2010.

Pre-finished metal gutter and downspout at bottom of sloped roof.

Double acrylic dome skylight set in aluminum frame on base over stair to mechanical penthouse.

Page 14: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 14 of 45

C1010.01 Interior Fixed Partitions*

C1010.05 Interior Windows*

C1020.01 Interior Swinging Doors (& Hardware)*

C1020.03 Interior Fire Doors*

C1020.04 Interior Sliding and Folding Doors*

4 - Acceptable

5 - Good

3 - Marginal

5 - Good

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1980

1980

1980

1980

2005

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Updated

Replace 6 damaged interior wood doors.(6)

Failure Replacement 2014 $4,055 Low

Selected wood doors throughout have been damaged.Concern:

Replace interior wood doors at select locations (6 doors).Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)S3 INTERIOR

Event:

Type Year Cost Priority

Updated: JAN-13

Concrete masonry partitions at corridors, classrooms and locker room areas. Metal stud and qypsum board partitions in office and staff areas.

Original wired glass and tempered glass set in pressed steel frame windows (2000W x 2200H) at Library and LearningRoom. Large steel frame windows added in 2005 between General Office and main entrance vestibule and lobby as partof General Office Redesign. Georgian wire glass.

Wood doors set in pressed steel frames and wood frames. Some doors have glazing. Original knob style latchsets atmost doors.

Hollow metal and solid core wood set in pressed steel frames in most areas. Fire doors are labeled.

Large wood sliding doors at Staff Room coat closets installed in 2005 as part of General Office Redesign.

Page 15: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 15 of 45

C1020.07 Other Interior Doors* - Rolling Shutters

C1030.01 Visual Display Boards**

C1030.02 Fabricated Compartments (Toilets/Showers)**

C1030.08 Interior Identifying Devices*

4 - Acceptable

4 - Acceptable

4 - Acceptable

5 - Good

Rating

Rating

Rating

Rating

1980

1995

1980

1980

Installed

Installed

Installed

Installed

0

20

30

0

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Replace 24 whiteboards and 60 tackboards.

Replace all metal toilet partitions (13 stalls)

Lifecycle Replacement

Lifecycle Replacement

2016

2016

$28,800

$15,200

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Original metal rolling shutters at kitchen opening into gymnasium and corridor on south wall. Two rolling shuttersapproximately 900mm wide x 1000mm high.

Whiteboards, chalkboards and vinyl covered tackboards throughout. Typical classroom includes 2 whiteboards, 5tackboards and one smart board.

Original floor mounted metal toilet partitions at student washrooms and change rooms.

Original cast aluminum signage plates with raised letters mounted on doors.

Page 16: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 16 of 45

C1030.10 Lockers**

C1030.12 Storage Shelving*

C1030.14 Toilet, Bath, and Laundry Accessories*

C2010 Stair Construction*

C2030 Interior Ramps*

4 - Acceptable

5 - Good

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1980

1980

1980

1980

2003

Installed

Installed

Installed

Installed

Installed

30

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-08

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Updated

Replace 7 metal lockers.

Lifecycle Replacement 2016 $3,400 Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Type Year Cost Priority

Updated: JAN-13

Limited quantity of metal lockers including 2 single tiers lockers at Custodian Office and 5 double tier lockers at Girl'sChange Room.

Clear finish wood and metal shelving used throughout.

Institutional grade mirrors, soap dispensers, toilet tissue dispensers and paper towel receptacles throughout.

Wood framed stairs to stage and storage mezzanine. Original vinyl treads and risers. Solid wood (2x6) painted handrail,wall mounted on one side. Steel stair to mechanical mezzanine c.w steel pipe guardrail and handrail. Steel grate treads and landing.

Wood ramp at 2003 Portables Link to transition from slab on grade to portable classroom floor elevation. Finished withrubber sheet flooring. Refer to C3020.07 Resilient Flooring** - Sheet Rubber. Painted steel pipe handrail on one side.

Page 17: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 17 of 45

C3010.02 Wall Paneling**

C3010.06 Tile Wall Finishes**

C3010.09 Acoustical Wall Treatment** - Classrooms

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1980

1980

1992

Installed

Installed

Installed

30

40

20

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Replace wood paneling in library (26m2).

Replace glazed ceramic wall tile (7.9m2).

Replace acoustic panels at classrooms (63m2).

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2016

2020

2016

$8,000

$1,900

$14,300

Unassigned

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

Stained wood paneling on upper portions of library walls.

101mm x 101mm glazed ceramic wall tile around urinals at washrooms. Also around utility sinks at Janitor Room.

Acoustic panels all four walls above door line at 1992 classrooms. Fabric wrapped. Some with aluminum frames.

Page 18: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 18 of 45

C3010.09 Acoustical Wall Treatment** - Gymnasium

C3010.09 Acoustical Wall Treatment** - Music Room

C3010.11 Interior Wall Painting*

3 - Marginal

5 - Good

4 - Acceptable

Rating

Rating

Rating

1980

2009

1995

Installed

Installed

Installed

20

20

0

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Replace acoustic wall panels (160m2).

Replace acoutstic panels at Music Room (45m2).

Failure Replacement

Lifecycle Replacement

2014

2029

$31,544

$10,200

Low

Unassigned

Acoustic panels are no longer effective at controlling noise.Gym is a noisy teaching space.

Concern:

Replace and supplement acoustic wall panels in gym(160m2).

Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Fabric wrapped acoustic panels on upper portions of gym walls. 20 panels at approximately 900mm x 1200mm.

25mm thick fabric wrapped acoustic wall panels added to Music Room as part of Music Room renovation in 2009. All fourwalls of Music Room.

Interior GWB and concrete masonry walls are painted.

Page 19: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 19 of 45

C3020.02 Tile Floor Finishes** - Mosaic Tile

C3020.02 Tile Floor Finishes** - Quarry Tile

4 - Acceptable

4 - Acceptable

Rating

Rating

1980

1980

Installed

Installed

50

50

Design Life

Design Life

JAN-13

JAN-13

Updated

Updated

Replace mosaic floor tile (3m2).

Repair shower curbs.(2 curbs)

Replace quarry tile flooring (244m2).

Lifecycle Replacement

Repair

Lifecycle Replacement

2030

2014

2030

$1,100

$1,000

$65,700

Unassigned

Low

Unassigned

Replacement 25mm x 25mm ceramic mosaic tile at top ofshower curbs. Mosaic tile is chipped, lifting or missing. Somesharp edges.

Concern:

Remove and repair shower curbs (2 curbs approximately150mm x 900mm).

Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

Mosaic ceramic floor tile at washrooms adjacent urinals.

Quarry tile at four entrance vestibules and adjacent corridor at northeast, southeast and southwest entrances. Also at allstudent washrooms and locker rooms (2x2 quarry tile at change rooms). Change rooms currently used for storage.

Page 20: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 20 of 45

C3020.04 Wood Flooring**

C3020.07 Resilient Flooring** - Sheet Rubber

3 - Marginal

4 - Acceptable

Rating

Rating

1980

2003

Installed

Installed

30

20

Design Life

Design Life

JAN-13

JAN-13

Updated

Updated

Repair gym flooring (404m2).

Replace gym wood flooring (404m2).

Replace rubber sheet flooring (19m2).

Repair

Lifecycle Replacement

Lifecycle Replacement

2014

2016

2023

$25,600

$112,661

$1,500

Low

Unassigned

Unassigned

Wood boards have minor damage and have yellowedsignificantly.

Concern:

Sand down to bare wood, make repairs and re-finish (404m2).Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

Parquet wood on plywood and pads over concrete slab in gym.

Rubber sheet flooring at 2003 Portables Link corridor ramp. Raised studs.

Page 21: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 21 of 45

C3020.07 Resilient Flooring** - VAT 1980

C3020.07 Resilient Flooring** - VCT 1992

C3020.07 Resilient Flooring** - VCT 2003

3 - Marginal

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1980

1992

2003

Installed

Installed

Installed

20

20

20

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Replace vinyl floor tile (960m2).

Replace VCT flooring (142m2).

Replace vinyl tile flooring at Portables Link (51m2).

Failure Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2016

2023

$48,900

$7,200

$2,600

Low

Unassigned

Unassigned

Tiles are cracked or stained in areas; joints opening up.Concern:

Replace vinyl floor tile (960m2).Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

Original vinyl tile flooring at most classrooms and storage/service rooms as well as Administration Suite. Patchingthroughout.

Replacement VCT at southwest classroom adjacent stage as part of Ancillary Room conversion to classrooms.

305mm x 305mm vinyl tiles at Portables Link corridor (except for ramp area) installed in 2003.

Page 22: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 22 of 45

C3020.07 Resilient Flooring** - VCT 2012

C3020.08 Carpet Flooring** - 2002

C3020.08 Carpet Flooring** - Music Room

C3030.04 Gypsum Board Ceiling Finishes (Unpainted)*

5 - Good

5 - Good

5 - Good

5 - Good

Rating

Rating

Rating

Rating

2012

2002

2009

1980

Installed

Installed

Installed

Installed

20

15

15

0

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-08

Updated

Updated

Updated

Updated

Replace VCT flooring at corridors (178m2).

Replace 2002 Library carpet (198m2).

Replace Music Room carpet (67m2).

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2032

2017

2024

$9,100

$14,900

$5,000

Unassigned

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

305mm x 305mm VCT flooring throughout all corridors installed in 2012. Includes new 100mm high coved rubber base.

Carpet in library and 2 adjacent resource rooms replaced in 2002.

Music Room renovations in 2009 included new carpet throughout.

Gypsum board ceilings in some service rooms.

Page 23: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 23 of 45

C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - 1980

C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - 1992

3 - Marginal

4 - Acceptable

Rating

Rating

1980

1992

Installed

Installed

25

25

Design Life

Design Life

JAN-13

JAN-13

Updated

Updated

Replace ceiling tiles in corridors (265m2).

Replace classroom and offices' ceiling tiles(1,680m2).

Replace suspended acoustic ceiling (142m2).

Failure Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2016

2017

$14,083

$85,622

$6,700

Low

Unassigned

Unassigned

Ceiling tiles have some water damage; other tiles have beenreplaced with mismatched patterns.

Concern:

Replace acoustic ceiling tiles in corridors (265m2).Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

Original 2x4 suspended T-bar grid system with acoustic tiles in corridors, classrooms and offices.

New suspended acoustic ceiling at southwest classrooms as part of conversion of ancillary classroom to two classroomsundertaken in 1992.

Page 24: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 24 of 45

C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - 2003

C3030.07 Interior Ceiling Painting*

C3030.09 Other Ceiling Finishes* - Acoustic Panels

C3030.09 Other Ceiling Finishes* - Exposed Structure

4 - Acceptable

4 - Acceptable

5 - Good

4 - Acceptable

Rating

Rating

Rating

Rating

2003

1980

2009

1980

Installed

Installed

Installed

Installed

25

0

0

0

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Replace suspended acoustic ceiling at 2003Portables Link (71m2).

Lifecycle Replacement 2028 $3,300 Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Type Year Cost Priority

Updated: JAN-13

Standard 2x4 suspended acoustic t-bar grid and panels at 2003 Portables Link.

Gypsum board and exposed structure in gym are painted.

New fabric wrapped acoustic panels over existing GWB ceilings at Music Room installed in 2009.

Exposed metal deck and open web steel joists at Gymnasium and Gymnasium Storage Room.

Page 25: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 25 of 45

D2010.04 Sinks**

D2010.05 Showers**

D2010.08 Drinking Fountains/Coolers**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1980

1980

1980

Installed

Installed

Installed

30

30

35

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Replace stainless steel sinks (5) and fiberglass &janitor sinks (4)

Replace showers (6)

Replace drinking fountains (4)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2016

2016

2016

$17,500

$9,000

$6,400

Unassigned

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)S4 MECHANICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

Recess mounted stainless steel sinks, recess mounted fiberglass sinks, and floor mounted janitor sinks. Original sinks. Replace original sinks.

Two tiled shower rooms each with three institutional type shower heads. Shower rooms currently used as storage rooms.

Wall hung vitreous china and wall hung stainless steel drinking fountains.

Page 26: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 26 of 45

D2010.10 Washroom Fixtures (WC, Lav, Urnl)**

D2020.01.01 Pipes and Tubes: Domestic Water*

D2020.01.02 Valves: Domestic Water**

D2020.01.03 Piping Specialties (Backflow Preventers)**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1980

1980

1980

1980

Installed

Installed

Installed

Installed

35

0

40

20

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Replace water closets (18), urinals (7), andlavatories (19)

Replace domestic water valves (30)

Replace backflow preventers (2)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2016

2020

2016

$75,000

$36,000

$6,200

Unassigned

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

Floor mounted water closets with flush tanks and flush valves, wall mounted urinals with flush valves, and recessedenameled steel lavatories.

Copper piping and fittings.

Isolation valves on main water service, service to irrigation system, domestic hot water tanks, and isolation service inbuilding.

Backflow preventers Installed on irrigation line and heating system make up line.

Page 27: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 27 of 45

D2020.02.02 Plumbing Pumps: Domestic Water**

D2020.02.06 Domestic Water Heaters**

D2020.03 Water Supply Insulation: Domestic*

D2030.01 Waste and Vent Piping*

D2030.02.04 Floor Drains*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1980

2006

1980

1980

1980

Installed

Installed

Installed

Installed

Installed

20

20

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Updated

Replace recirculating pump (1)

Replace domestic hot water heaters (2)

Lifecycle Replacement

Lifecycle Replacement

2016

2026

$1,200

$11,000

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Circulating pump on hot water return line to hot water heaters.

Two natural draft domestic hot water heaters located in mechanical room, each rated for 66.25 KW and storage capacityof 246 L.

Fiberglass pipe insulation with canvas recovering on exposed insulation.

Cast iron and copper piping.

Floor drains in mechanical rooms and washrooms.

Page 28: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 28 of 45

D2040.01 Rain Water Drainage Piping Systems*

D2040.02.04 Roof Drains*

D3010.02 Gas Supply Systems*

D3020.02.01 Heating Boilers and Accessories: H.W.**

D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1980

1980

1980

1980

1980

Installed

Installed

Installed

Installed

Installed

0

0

0

35

35

Design Life

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Updated

Replace boilers (2)

Replace chimney (10 meters)

Lifecycle Replacement

Lifecycle Replacement

2016

2016

$60,000

$7,000

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Cast iron piping.

Cast iron roof drains with dome type strainers, average of one roof drain per roof section.

Schedule 40 steel piping.

Two natural draft natural gas tube type boilers, Raypack model 945-WTO, each with a natural gas input of 277.27 KW.

Galvanized steel chimney serving two boilers. Galvanized steel combustion air duct.

Page 29: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 29 of 45

D3020.02.03 Water Treatment: H. W. Boiler*

D3040.01.01 Air Handling Units: Air Distribution**

D3040.01.04 Ducts: Air Distribution*

D3040.01.07 Air Outlets & Inlets: Air Distribution*

D3040.03.01 Hot Water Distribution Systems**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1980

1980

1980

1980

1980

Installed

Installed

Installed

Installed

Installed

0

30

0

0

40

Design Life

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Updated

Replace air handling units (3)

Replace hot water distribution system (2,556sq.m./gfa)

Lifecycle Replacement

Lifecycle Replacement

2016

2020

$250,000

$242,000

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Chemical pot feeder, side stream filter, and flow indicator. System is chemically treated.

Three built-up air handling units, each constant volume complete with return air fan, mixing section, filter section, hotwater heating coil, and supply air fan. One unit serves gym, one unit serves stage and library, and one serves remainderof building including classrooms and offices.

Galvanized steel low velocity ductwork.

Ceiling mounted supply air diffusers and ceiling mounted return air grilles.

Schedule 40 steel and copper piping and circulating pumps.

Page 30: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 30 of 45

D3040.04.01 Fans: Exhaust**

D3040.04.03 Ducts: Exhaust*

D3040.04.05 Air Outlets and Inlets: Exhaust*

D3050.03 Humidifiers**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1980

1980

1980

1980

Installed

Installed

Installed

Installed

30

0

0

25

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Replace exhaust fans (7)

Replace humidication system (1)

Lifecycle Replacement

Lifecycle Replacement

2016

2016

$14,000

$45,000

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Cabinet exhaust fans on roof, inline-exhaust fan inside of building, and range hood in staff room.

Galvanized steel low velocity ductwork.

Ceiling mounted return air grilles.

Humidification system comprising of one steam boiler, steam grid humidifier in two ventilating units, schedule 40 steelpiping for steam supply and condensate return lines, condensate pump, chemical treatment injection system, and watersoftener for system water make-up. Humidification system is shut off due to high operating and maintenance costs and isno longer used. Steam boiler is A Bryan natural gas boiler, movel F250-SG complete with natural gas input of 65.98 KW.

Page 31: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 31 of 45

D3050.05.02 Fan Coil Units**

D3050.05.03 Finned Tube Radiation**

D3050.05.06 Unit Heaters**

D3060.02.01 Electric and Electronic Controls**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1980

1980

1980

1980

Installed

Installed

Installed

Installed

30

40

30

30

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Replace force flow units (4)

Replace finnied tube radiation (2.556 sq.m./gfa)

Replace unit heaters (4)

Replace electric controls (2,556 sq.m./gfa)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2016

2020

2016

2016

$22,000

$120,000

$22,400

$7,500

Unassigned

Unassigned

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Event:

Event:

Type

Type

Type

Type

Year

Year

Year

Year

Cost

Cost

Cost

Cost

Priority

Priority

Priority

Priority

Updated:

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

JAN-13

Force flow units installed at building entrances.

Perimeter radiation in metal cabinets and in millwork in classrooms.

Unit heaters in mechanical room, link to portables, and gym.

Line voltage controls to unit heaters and force flow units.

Page 32: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 32 of 45

D3060.02.02 Pneumatic Controls**

D3060.02.05 Building Systems Controls (BMCS, EMCS)**

D4030.01 Fire Extinguisher, Cabinets and Accessories*

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1980

1990

1980

Installed

Installed

Installed

40

20

0

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Replace pneumatic controls (2,556 sq.m./gfa)

Replace DDC building control system (2,556sq.m./gfa)

Lifecycle Replacement

Lifecycle Replacement

2020

2016

$38,000

$67,000

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Dual circuit air compressor, refrigerated air dryer, pneumatic control valves and damper operators, and pneumaticthermostats.

Andover AC256M DDC control system.

Multi-purpose ABC fire extinguishers on hooks and in cabinets located throughout building.

Page 33: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 33 of 45

D5010.01.02 Main Electrical Transformers (Utility Owned)*

D5010.03 Main Electrical Switchboards (Main Distribution)**

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

D5010.07.02 Motor Starters and Accessories**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1980

1980

1980

1980

Installed

Installed

Installed

Installed

0

40

30

30

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Replace main distribution switchboard (1)

Replace branch circuit panelboards (10)

Replace motor starters (20)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2020

2016

2016

$31,000

$48,000

$30,000

Unassigned

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)S5 ELECTRICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

Pad mounted utility transformer located at the front of the school complete with 120/208V/3PH/4W power service to maindistribution switchboard in school.

Federal Pioneer main distribution switchboard, 120/208V/3PH/4W complete with 800 ampere main circuit breaker.

Federal Pioneer branch circuit panelboards located throughout building.

Westinghouse AC magnetic and manual toggle type motor starter switches.

Page 34: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 34 of 45

D5020.01 Electrical Branch Wiring*

D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*

D5020.02.02.02 Interior Fluorescent Fixtures**

D5020.02.03.01 Emergency Lighting Built-in*

4 - Acceptable

4 - Acceptable

3 - Marginal

4 - Acceptable

Rating

Rating

Rating

Rating

1980

1980

1980

1980

Installed

Installed

Installed

Installed

0

0

30

0

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Replace fluorescent fixtures (400 fixtures)

Failure Replacement 2013 $160,000 High

T12 lamps are no longer manufactured. Existing fixture lensare cracked. Fixture reflectors and lens are yellowing.

Concern:

Replace fixtures with new fixtures having T8 lamps andballasts.

Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Type Year Cost Priority

Updated: JAN-13

Copper wiring and cables.

Line voltage light switches to control lights in each room.

Surface mounted light fixtures with wrap around lens in classrooms, surface mounted light fixtures in gymnasium, andrecess mounted fluorescent fixtures in all other areas. Fixtures have T12 lamps and ballasts.

Select fluorescent fixtures and exit signs connected to emergency power panel for emergency lighting in building.

Page 35: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 35 of 45

D5020.02.03.02 Emergency Lighting Battery Packs**

D5020.02.03.03 Exit Signs*

D5020.03.01.01 Exterior Incandescent Fixtures*

D5020.03.01.04 Exterior H.P. Sodium Fixtures*

D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1980

1980

1980

1980

1980

Installed

Installed

Installed

Installed

Installed

20

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Updated

Replace emergency lighting battery packs (1)

Lifecycle Replacement 2016 $1,200 Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Type Year Cost Priority

Updated: JAN-13

DC emergency lighting in generator room.

Exit signs located in corridors and paths to corridors.

Recess mounted incandescent lights located by building main front entrance.

Wall mounted HPS light fixtures located along building exterior.

Exterior lighting is photocell controlled.

Page 36: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 36 of 45

D5030.01 Detection and Fire Alarm**

D5030.02.02 Intrusion Detection**

D5030.03 Clock and Program Systems*

D5030.04.01 Telephone Systems*

D5030.04.04 Data Systems*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1980

1980

1980

1996

2001

Installed

Installed

Installed

Installed

Installed

25

25

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Updated

Replace fire alarm system (2,556 sq.m./gfa)

Replace security alarm system (2.556 sq.m./gfa)

Lifecycle Replacement

Lifecycle Replacement

2016

2016

$82,000

$75,000

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Edwards 6616 hard wired fire alarm system complete with fire detectors, alarm bells, and fire pull stations.

Basic security system with control panel, alarm keypad, door contacts, and motion sensors.

AC and DC clocks in classrooms and LED digital clock in general office.

NEC 124I telephone system with telephone in each office and classroom.

Cat 5 data system.

Page 37: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 37 of 45

D5030.05 Public Address and Music Systems**

D5030.06 Television Systems*

D5090.02 Packaged Engine Generator Systems (Emergency Power System)**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1979

1979

1980

Installed

Installed

Installed

20

0

35

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Replace public address system (2,556 sq.m./gfa)

Replace emergency generator (1)

Lifecycle Replacement

Lifecycle Replacement

2016

2016

$52,000

$58,000

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Dukane model 3200 intercom system with console in general office, return call switch in each classroom, and speakers ineach classroom and corridor.

Cable TV outlet provided in each classroom.

Kohler 13.8 KVA, 120/208V/3PH/4W natural gas emergency generator complete with Westinghouse Robotic transferswitch.

Page 38: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 38 of 45

E1090.04 Residential Equipment*

E1090.07 Athletic, Recreational, and Therapeutic Equipment*

E2010.02 Fixed Casework** - 1992 Classrooms

E2010.02 Fixed Casework** - Administration Suite

5 - Good

5 - Good

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1995

1980

1992

1980

Installed

Installed

Installed

Installed

0

0

35

35

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Replace casework at 1992 classrooms (14.4M).

Replace all casework at Administration Suite(16.3M).

Lifecycle Replacement

Lifecycle Replacement

2027

2016

$12,900

$14,700

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Staff Room: residential range, dishwasher, refrigerator (newer) and microwave. Commercial coffee maker. Kitchen: range and hood, freezer, refrigerator and commercial cooler. Classroom 109 (kindergarten): range and microwave.

Two ceiling folding and four wall folding basketball backboards and one electric score board. Climbing structure. Postanchors for nets.

Birch ply perimeter storage cabinets at Classroom 111 and Classroom 112 installed in 1992 as part of AncillaryClassroom subdivision. 8 x 900W x 750H x 500D birch ply base complete with plastic laminate clad plywood countertopper classroom.

Original painted plywood casework at Administration Suite includes: kitchenette (6 x 400W x 900H x 600D base cabinetwith plastic laminate clad top and 8 x 400W x 750H x 300D uppers); 3600L painted ply coat rod with hat shelf; WorkRoom storage casework (800W x 900H painted plywood storage cabinet with plastic laminate top, 2 x400W x 900H x600D painted ply cabinets with 4 x 400W uppers, 1 800W base cabinet and 3 x 800W x 1525H x 400D veneer ply openstorage); Infirmary/Counseling Office (plastic laminate clad sink unit approximately 1600mm wide and General Office(3900W front desk with wood cladding at front and newer plastic laminate at countertop).

Page 39: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 39 of 45

E2010.02 Fixed Casework** - Classrooms

4 - AcceptableRating

1980Installed

35Design Life

JAN-13Updated

Replace 50% of classroom plastic laminatecountertops (42M).

Replace casework at classrooms (95M).

Replace educational casework in Art Classroom(22M).

Repair

Lifecycle Replacement

Failure Replacement

2013

2016

2014

$6,300

$71,200

$16,500

Medium

Unassigned

Low

Plastic laminate edging loose or missing at several locations.

Cabinet doors are warped and not closing properly atClassroom 105 (Art Classroom). Plastic laminate and linoleumdelaminating. Painted finish is a maintenance concern.

Concern:

Concern:

Replace plastic laminate at at 50% of countertops inclassrooms (42M).

Replace millwork at Classroom 105 (22M).

Recommendation:

Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

Clear finish and painted plywood with plastic laminate clad countertops in classrooms. Typical classroom includes 10 x900W x 750H x 400d painted plywood perimeter casework with plastic laminate clad plywood top and integratedradiation/grilles. Also a 4 x 900W x 600H and 600D painted plywood sink unit with plastic laminate top. Additionalcasework includes 6 x 500W x 1220H x 500D painted plywood storage unit with doors at Classroom 102 (ECS) and 56 x400W x 750H x 600D painted plywood perimeter casework at Classroom 105 (Art) c/w linoleum top and solid woodedging and 16 x 400W painted plywood upper cabinets. Also 28 x 900W x 750H x 600D painted plywood perimetercasework at Classroom 109 (kindergarten) with 7 x 800W upper wall mounted cabinets. Kindergarten Storage includes 5x 800W cx 900H x 600D base cabinets with 4 x 600W c 750H x 300 D upper wall hung cabinets and 3 metal shelves. Display case with tempered glass sliding doors.

Page 40: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 40 of 45

E2010.02 Fixed Casework** - Kitchen

E2010.02 Fixed Casework** - Library

E2010.02 Fixed Casework** - Music Room

4 - Acceptable

4 - Acceptable

5 - Good

Rating

Rating

Rating

1980

1980

2009

Installed

Installed

Installed

35

35

35

Design Life

Design Life

Design Life

JAN-13

JAN-13

JAN-13

Updated

Updated

Updated

Replace kitchen casework (5.4M).

Replace Library casework (66M).

Replace Music Room casework (11.4M).

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2016

2016

2044

$8,100

$49,600

$17,100

Unassigned

Unassigned

Unassigned

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

JAN-13

JAN-13

JAN-13

Painted plywood casework at school kitchen. Original plastic laminate clad plywood countertops. Approximately 5400Lbase cabinets and 2000L upper wall hung cabinets. Original plastic laminate top.

Original Library casework includes 25 x 900W x1500H x 300D painted plywood book shelves, 7 x 900W x 1220H x 450veneer ply double sided shelving, a painted plywood 6 x 450W x 900H x 600D sink unit c/w plastic laminate top, a 6 x800W x 900H x 600D painted plywood reception desk, 12 x 800W x 750H x 600D plastic laminate clad computerworkstations and a newer (2009) birch ply closet (4 x 450W x 2150H x 600D). Also additional computer workstations atadjacent Resource Rooms (24 x 800W x 750H x 750D). Some plastic laminate edging loose.

Clear finish birch plywood storage casework at Music Room installed in 2009 as part of Music Room/Stage renovation.Approximately 5 x 900W x 750H x 600D base cabinets with plastic laminate clad plywood countetops and 12 x 450 x2150H x 400D birch ply storage. Also one 1500L sink unit.

Page 41: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 41 of 45

E2010.02 Fixed Casework** - Vanities

E2010.03.01 Blinds**

3 - Marginal

4 - Acceptable

Rating

Rating

1980

1980

Installed

Installed

35

30

Design Life

Design Life

JAN-13

JAN-13

Updated

Updated

Replace all plastic laminate clad plywood vanities(11M).

Replace window blinds (75m2)

Failure Replacement

Lifecycle Replacement

2014

2016

$8,300

$22,500

Low

Unassigned

Plastic laminate delaminating at most locations. Somechipped laminate. Sealant requires replacement. Some waterdamage.

Concern:

Replace all vanities at student washrooms (11M). Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Plastic laminate clad plywood vanities on metal legs at all student washrooms and at change rooms.

Integral blinds at aluminum windows except for newer windows at 1992 classrooms. Horizontal aluminum blinds at fourwindows (1.2M x 1.4M). Vertical blinds at Staff Room windows installed in 2005.

Page 42: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 42 of 45

K4010.01 Barrier Free Route: Parking to Entrance*

K4010.02 Barrier Free Entrances*

3 - Marginal

3 - Marginal

Rating

Rating

1980

1980

Installed

Installed

0

0

Design Life

Design Life

JAN-13

JAN-13

Updated

Updated

Upgrade access to BFA parking.(52m2)

Add power door operator (2 doors).

Barrier Free Access Upgrade

Barrier Free Access Upgrade

2012

2014

$10,139

$27,100

Low

Low

Designated H/C parking has not been provided.

Power door operators not provided at main entrance.

Concern:

Concern:

Designate a BFA parking stall within staff parking and addsidewalk directly to main entrance (52m2).

Add power door operators at main entrance (2 doors).

Recommendation:

Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)S8 SPECIAL ASSESSMENT

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

JAN-13

JAN-13

Direct access to main entrance from parking required but not provided.

Main entrance lacks automatic door operators.

Page 43: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 43 of 45

K4010.03 Barrier Free Interior Circulation*

K4010.04 Barrier Free Washrooms*

K4030.01 Asbestos*

K4030.04 Mould*

3 - Marginal

5 - Good

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1980

2000

1980

1980

Installed

Installed

Installed

Installed

0

0

0

0

Design Life

Design Life

Design Life

Design Life

JAN-13

JAN-08

JAN-13

JAN-13

Updated

Updated

Updated

Updated

Provide inclined platform lift at Music Room .(1)

Barrier Free Access Upgrade 2014 $24,400 Low

No barrier free access to elevated Music Room/Stage. Twoexisting stairs at east and west wall.

Concern:

Provide inclined platform lift at one stair.Recommendation:

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Event:

Type Year Cost Priority

Updated: JAN-13

Single level facility. Access good to teaching spaces except Music Room/Stage. Public counter at main reception area.Most doors have round knobs on locksets and latchsets.

Large dedicated BFA washroom provided for students with special needs.

A hazardous building materials survey conducted by Golder Associates Ltd. in January 2008 identified ACM (asbestoscontaining materials) in the facility, including the following: pipe fitting insulation, incandescent light fixture paper and at tar collected from the steel structure above the ceiling.

No mould observed or reported.

Page 44: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 44 of 45

K4030.09 Other Hazardous Materials*

K5010.01 Site Documentation*

4 - Acceptable

4 - Acceptable

Rating

Rating

1980

2012

Installed

Installed

0

0

Design Life

Design Life

JAN-13

JAN-13

Updated

Updated

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

A hazardous building materials survey conducted by Golder Associates Ltd. in January 2008 identified other hazardousmaterials present in the school including: lead-based glazed ceramic wall tile, lead acid batteries in the emergencylighting units and lead flashings at roof drains. Five light ballasts inspected were found to contain PCBs. Two mercury-containing thermostats were identified during the survey. Smoke detectors are suspected to contain radioactive materials.ODS (ozone depleting substances) in refrigerators are suspected.

Site Plan.

Site Plan.

Page 45: RECAPP Facility Evaluation Report - Alberta · 2013-05-29 · The concrete slab requires mud jacking at some corridors. Structural systems are in good condition. Envelope Summary:

Report run on: January 11, 2013 10:22 AM Page 45 of 45

K5010.02 Building Documentation*

4 - AcceptableRating

2012Installed

0Design Life

JAN-13Updated

Edmonton - St. Bonaventure Catholic Elementary School (B3286A)

Main Floor Plan.