ready. resourceful. responsive! naval inventory control point pbl sub-team out-brief 3 november 2004

13
Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

Upload: everett-marsh

Post on 17-Dec-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

Ready. Resourceful. Responsive!

NAVAL INVENTORY

CONTROL POINT

PBL SUB-TEAM

OUT-BRIEF3 November 2004

Page 2: Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

NAVICP

2

PBL TEAM

Team Leader: Steve SantosFacilitator: Jeff Brown/Troy BourgeoisSponsor: CAPT Kenney/CAPT Ellis

Team Members:

Maria Allen (02) Anita Perlman (03) Doug Nevins (02)Buster Jones (07) Elliot Redman (03)Karen Faber (03) Berkley Reid (84)Madeline Moore (02) Bob Wolfe (84)

Page 3: Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

NAVICP

3

Workload Savings Goals

CategoryFTE Per June 2004

Spread Sheet Savings Goal

F& P Acq Planning

Procurement PBL

Total

70

71

141

7 – 10

7 - 10

14 - 20

Proposed savings

9.0

10.2

19.2

Remove non-value-added steps in the PBL Process Value Stream with the goal of becoming LEAN while reducing the variability in the process.

Page 4: Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

NAVICP

4

Alpha Negotiation CRBContractComplete

PBL Process and Sub-processesCurrent State

SOW Process

J&A Process

PBL Prep Process

ROM

BCA Process

Data Queries

Page 5: Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

NAVICP

5

Alpha Negotiation CRBContractComplete

PBL Process and Sub-processesFuture State

SOW Process

J&A Process

BCA Process

KickoffData

Agreement

PBL Prep Process

SOWKaizen 1

SOW K3

SOW K5----SOW

K2SOW

K4

ROM

PricingGuidelines

= ProcessImprovement

BCA E 2

BCA E 3

BCAE 1

Page 6: Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

NAVICP

6

PBL PROCESS ELAPSED TIME

SOW (19 Months)BCA (21 Months)

J&A (8 Months)

ALPHA (10 Months)

29 MONTHS AVGAS IS

SOW

BCAJ&A

ALPHA

14 MONTHS AVG

TO BE(9 Months)(12 Months)

(5 Months)

(5 Months)

Page 7: Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

NAVICP

7

PBL PROCESS TOUCH TIME

SOW (1270 Hours)BCA (1371 Hours)

J&A

ALPHA (1076 Hours)

3841 HRS AVG

AS IS

SOW

BCA

J&A

ALPHA

2131 HRS AVG

TO BE(475 Hours)

(768 Hours)(68 Hours)

(820 Hours)

(124 Hours)

Page 8: Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

NAVICP

8

ROOT CAUSES

• Wide variation in the process– Guidance– Skills– Knowledge

• IPT Meeting time/agenda conflicts• Too many reviews/rework• Manual effort• Inadequate input data (for new equip)• Insufficiently defined requirements• Lack of dedicated resources

Page 9: Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

NAVICP

9

SOLUTION 1

EVENT DRIVEN PROCESS KICK OFF (3.9 FTE savings)

SOW DEVELOPMENT (1.9 FTE savings)

DATA AGREEMENT (5.0 FTE savings)

PRICING GUIDELINES (1.7 FTE savings)

TOTAL FTE SAVINGS• 12.5 FTE

– Benefits:• 50% Improvement in Cycle Time

• Reduces learning curve/provides training

• Eliminates rework

– Challenges:• Competing Priorities/Scheduling conflicts/Lack of travel funds

Page 10: Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

NAVICP

10

SOLUTION 2PROJECT MANAGER

– Responsibilities…enabler for “Events”• Schedules and facilitates all events• Develops the POAM • Monitors achievement of milestones • Assigns and tracks action items• Maintains metrics

– FTE SAVINGS: 1.3 FTE Net– Benefits:

• Reduced learning curve• Effective events• Identifies areas for continuous improvement• PBL development process can be monitored and controlled

– Challenges:• Access to resources with the right skill set• Reallocating staffing for the Project Management Team

Page 11: Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

NAVICP

11

SOLUTION 3

STATEMENT OF WORK TOOL Enabler for SOW event

– WEB Based

– Menu driven…drop down boxes

– Pre-reviewed statements to choose from

– FTE SAVINGS• 3.7 FTE

– Benefits:• Eliminates redundant reviews

• Reduces touch time

• Accelerates document development

– Challenges:• $60K development cost; Initial investment of review time

Page 12: Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

NAVICP

12

SOLUTION 4J&A Tool

– WEB based

– Electronic signature capability

– Workflow management capability

– Includes checklists from KO/CA/Legal

– FTE SAVINGS• .3 FTE

– Benefits:• Eliminates variation in expectations

• Reduces review time

• Reduces J&A development time

– Challenges:Resistance to workflow controls

Page 13: Ready. Resourceful. Responsive! NAVAL INVENTORY CONTROL POINT PBL SUB-TEAM OUT-BRIEF 3 November 2004

NAVICP

13

Summary Of Improvements

•Cycle Time Reduction: 50%

•Touch Time Reduction: 45%

•FTE Savings: 13%

PBL Process