reading boulder -...

4
1:200 The 3 work areas, the parents, the small children and the large children the parents area, : being comfortable and display and array of sitting positions. From sitting to almost laying down. : having the possibility to sit in the shading area and ind the sun in colder weather. Being able to watch your children play, from were you sit. Thisted has develop in collaboration with KPF ARKITEKTER a vision for the future culture space of Thisted. The culture space revolves around Christiansgave, the large Park in the center of Thi- sted it will gather the nearby local culture activity’s and create a open accessibility to the different cultural institutions. With that in mind this project will try to expand on one of the proposal from KPF, this being the area between the library and Christiansgave, in this place there is a proposal for a outdoor library and a children s playground. This proposal is created with 3 types of scenarios in mind. Small children playing, slightly bigger children playing, and parents reading books. Reading boulder

Upload: others

Post on 01-Sep-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

1:200

The 3 work areas, the parents, the small children and the large children the parents area, : being comfortable and display and array of sitting positions. From sitting to almost laying down.: having the possibility to sit in the shading area and ind the sun in colder weather.Being able to watch your children play, from were you sit.

Thisted has develop in collaboration with KPF ARKITEKTER a vision for the future culture space of Thisted. The culture space revolves around Christiansgave, the large Park in the center of Thi-sted it will gather the nearby local culture activity’s and create a open accessibility to the different cultural institutions.With that in mind this project will try to expand on one of the proposal from KPF, this being the area between the library and Christiansgave, in this place there is a proposal for a outdoor library and a children s playground. This proposal is created with 3 types of scenarios in mind. Small children playing, slightly bigger children playing, and parents reading books.

Reading boulder

The cons t ruc t ion i s bu i ld up by 18mm th ick sheets o f p lywood. I t w i l l be bu i ld in segments and assembled on s i te . In the shop the d i f fe ren t t r iang les wou ld be cu t us ing a CNC cu t te r . The d i f fe ren t segment w i l l be assembled w i th p iano h inges to ensure easy assembly i f there i s any inaccuracy in the segments . The foundat ion w i l l cons is t o f a se t o f concre te anchor po in ts p laced in the g round. The p lywood w i l l be a t tached on ly to the concre te p i l l a rs so tha t they do no t have con tac t to the g round leve l w i th 100mm. o f space be tween them.

1:50

Axonometr ic 1 :50

Foundation.Seating area.

Walls are made of five sections and assamble on site

Roof made of two sections an assembled on sit

Lamellae as the last part of the roof works as a loadbering beam

Al l the edges o f the cons t ruc t ion w i l l have a L - p ro f i le beam to p revent tw is t ing and bend ing in the open ings .The p lywood sheets cou ld be made f rom two mater ia ls , one wou ld be the Okoume wood w i tch i s a mater ia l made fo r ou tdoor use , bu t the p r i ce o f th is mater ia l i s a lmos t tw ice as expens ive as the o ther mater ia l tha t has been sugges ted in the p ro -posa l , w i tch i s beach P lywood. Beach p lywood can a lso be used ou ts ide bu t i t need to be t rea ted w i th add i t iona l wood pro te -c t ion , pa in t , o i l o r o ther t rea tment .

1:50

When dealing with a structure that has children playing around and on it there has been taken some safety issues in consideration when desig-ning. The primary safety consideration where hight of the construction and the ground material surrounding the structure. But also the size of the holes in the pattern of the climbing wall and the shape of those holes, when having open holes in a place where children climb, the shape of the

holes has to be designed in a way so that clothes and especially a hood string do not get caught in the hole. This could lead to strangula-tion and death. The maximum hight of the structure is 2000mm. This is to minimize the risk of personal injury when kids climb on the side wall. There has been placed shock absorbent material around the areas where the kids are playing, the material is sand and has a depth of 200mm and a distant of 1800mm from the climbing wall.

The ”Cave” area is a place for the toddlers and other smaller kids, the entrance to the cave is 1500mm tall and would not appeal to an adult.

The seating/reading area is divide up into 5 benches were some are situated in shadow area during the summer. The area is the center of the construction, and provides the adults with and overview of the playground and a look though the leaf pattern to the larger kids.

The view from inside the Reading-boulder towards the forrest-playground thru the leaf pattern.

The climbing-wall have a connection to the forrest-playground, this area is for the kids that are able to take care of themselves, the wall reach a max hight of 2000mm and the surrounding area I covert with sand to act as protection if the kids should fall.

1:50 1:50

1:50

1:501:50

The shape o f the s t ruc tu re i s des igned us ing the suns pa th in the sky to shape the a sea t ing a rea where you in summer t ime and h igh sun can s i t in shade, and in w in te r when the sun i s lower on the sky , the sun w i l l reach the person s i t t ing she l -te red f rom the w ind . The suns pa th has been chosen to inc lude hours f rom 10 to 18 as a des ign chang ing e lement . And the month inc lude spr ing to fa l l . November to february has been le f t ou t as thees months p rov ide l i t t l e to no sun .

1:100

9 to 18. sun path on september 15th.