Re-use In Construction Malcolm Waddell WRAP 22 March 2012

Upload: vuongquynh

Post on 06-Feb-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

Re-use In Construction Malcolm Waddell WRAP 22 March 2012

Page 2: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

About WRAP and WRAP’s work in Construction and Refurbishment

Construction Products Resource Efficiency

Re-use in Construction Products

Flooring Resource Efficiency Action Plan

Carpet / Carpet Tiles Re-use

Agenda

Page 3: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

WRAP’s vision is a world without waste, where resources are used sustainably.

We help businesses, individuals and communities reap the benefits of reducing waste, developing sustainable products and using resources in an efficient way.

About WRAP

Page 4: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

To reduce the carbon impact of materials and water use in the built environment by mainstreaming resource efficiency in the design and construction of new buildings, infrastructure, and refurbishment projects.

reduction in materials use

waste prevention

durability/reuse/recyclability in refurbishment

lower embodied carbon materials and design

improved water efficiency

Construction and refurbishment

Page 5: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

What is Resource Efficiency?

Energy Water

Operational Impacts

Life-span

Recycled Content

End of Life

Material Quantity

Scarcity Wastage

Embodied Impacts

Page 6: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

Waste hierarchy

Page 7: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

Re-use – to use something again for the same purpose

Recycle – to process (waste) materials to make into new materials or as part of a new product.

Benefits

Often cheaper than virgin/recycled alternative

CO2 savings

Reduced raw material use

Moves up the waste hierarchy

Diverts waste from landfill

What is re-use?

Page 8: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

Demolition/excavation stages

Refurbishment

On-site re-use

Off-site re-use

Cleaning and resale (as re-used product)

Re-use in construction

Page 9: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

1998 - 2,967,000 tonnes reclaimed

2007 - 2,233,000 reclaimed

Why has there been a decrease?

Overview of re-use in construction

Page 10: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

Woolwich SLAM (Single Living Accommodation Modernisation)

Re-use of aggregate, steel work, brick, doors, sanitaryware.

Re-use in construction – case study

3,500 tonnes of aggregate re-used

Saved between £26,500 and £42,000

350 lorry movements and 11 tonnes of vehicle CO2 emissions.

290 tonnes of doors

380 m2 - composite brick paving

Saved 14 t CO2 and £8 - £11000

Steel - fire escapes, radiators and stair treads (70t CO2)

Page 11: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

Moss Side Regeneration, Manchester

Re-use of variety of materials – roof slate, window sills, timber joists, bricks

Bricks – 480m3 / 576 tonnes of bricks salvaged for reuse

Re-using 1,000 bricks: 800kg CO2/kg.

Re-use in construction – case study

Page 12: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

Site Swap Shop

Free of charge between sites rather than purchasing new materials – the only cost incurred is transportation.

Examples drainage at Bamford Power station saved £8500 less £50 extra transport cost

Also saved >19t of CO2

South East Electricity Substation Alliance

Page 13: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

Launched September 2010

Covers actions for:

Carpets/carpet tiles

Resilient flooring

Hard flooring

Resin flooring

Why?

600kt of flooring waste each year

2% recycled

Costs industry over £45 million

Flooring – A Resource Efficiency Action Plan

Page 14: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

First years progress

Carpets

60 small scale collection trials

16.5% carpet diverted from landfill

32 000 tonnes recycled/reused

34 000 tonnes sent for Energy recovery

Manufacturers diverting 85% of carpet waste from landfill (6000 tonnes)

Flooring – A Resource Efficiency Action Plan

Page 15: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

First years progress

Carpet tiles

Manufacturers doing trials on increasing recycled content and recyclability of carpet tiles

Refurbish / reuse 800k carpet tiles in 2011 (86% increase from 2010)

Increased outlets for Energy from Waste of carpet tiles.

Carpet Re-use market research and strategy report produced.

Flooring – A Resource Efficiency Action Plan

Page 16: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

Typical cost

Re-use within organisation free

Purchase re-use tiles externally £0.50p per tile

Buying new £2.00 per tile

800 000 reused in 2011 would save £1.50 per tile of £1.2 million

Carpet Tile re-use

Page 17: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

Abingdon Flooring

Re-use of Packaging

Recently acquired carpet tiles warehouse

Will send carpet tiles for re-use

Quadrant

Take back of any carpet tiles at fit-out

Social enterprise scheme

Usable carpet is given a useful second life

within third sector and deserving communities.

Re-use of Carpet Tiles

Page 18: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

Forbo

22,000 tonnes diverted since 2001.

Benefits individuals, communities

and the environment.

Transport miles reduced due to local re-use

Re-use of Carpet Tiles

Milliken

InterfaceFLOR- Through its ReEntry® scheme

Desso – The Take Back™ programme

Page 19: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

Malcolm Waddell

WRAP Construction Products Project Manager

01295 817883

[email protected]

Further information

Page 20: Re-use In Construction - Carpet Recycling UK · PDF filewaste prevention durability/reuse/recyclability in refurbishment ... Malcolm Waddell WRAP Construction Products Project Manager

Questions