Aims• We will be attempting to gain good lighting shots and

a variety of angles. We hope to achieve this by going to locations that are well lit eg house or indoor car park

• We are aiming to re-do the main chorus lip syncing base track

• And most importantly our time management. As we only have 1 more day to film all of this must be done in that day. So our time keeping should be precise and realistic

Schedule

• Because previously lighting has been a problem , we would allow 30 minutes prior to meet up time to arrange everything

• As a group we will meet at 6:30 pm on Tuesday• We will then head to our first location – (supermarket

car pack) and shoot the base tracks • Our next location will be in a home set in the living room • After our necessary scenes have been recorded we will

unpack all our equipment and have it ready for the next morning

Risk Assessment Car park – The car park will obviously be full of moving vehicles , we must move quickly and find a spot that is not as busy and try and work with it. We must also consider the equipment and the safety of others whilst filming. We hope to have at least one person out as the look out to prevent any accidents

House – There is a slight possibility an accident could occur with equipment but i believe by simply placing the equipment in a reasonable area and being aware of its surroundings. All accidents can be avoided

Costume and Planning On this particular occasion we are going to be lenient with costumes because , we want the scenes that we are planning to shoot to reflect realism and seem more natural. Furthermore if our artists are more comfortable they are more likely to work better