Page 1: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

R&D on LAr single phase TPC at CERN

ICARUS-WA104 CollaborationS. Centro

CERN 13.01.2015

Page 2: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

The need for a continuing neutrino program

l The recent success of ICARUS-CNGS2 experiment has conclusively demonstrated that LAr-TPC is the leading technology for future short/long baseline accelerator driven neutrino physics.

l INFN has signed an MoU for WA104 activity in CERN and just concluded an important cooperation agreement for a SBN experiment in the framework of a US-LBNF collaboration, involving the long term realization of a truly large mass, LAr-TPC detector.

l The direct and continued access to a neutrino beam (FNAL) is necessary to maintain the appropriate levels in R&D and participation in physics developments within a “learning” process based on real events and cross sections.

2

Page 3: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Next neutrino activities

l ICARUS has been moved to CERN late 2014 for overhauling. Technology developments while maintaining the already achieved basic features of T600 will introduce important new features.

l ICARUS will then be operated (at SNB @ FNAL, provided the proposal submitted these days to PAC will be approved) collecting a large event sample (≥106) on short baseline with appropriate energy for the future LBNF exp.

l In addition to a definitive clarification of sterile neutrino, the R&D program in LAr may pave the way to ultimate realization of the LNBF detector for instance with:

An accurate determination of cross sections in Argon;

The experimental study of all individual CC and NC channels;

The realization of sophisticated algorithms capable of the most effective identification of the events. 3

Page 4: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

T600 run at LNGS: first publications1. “Underground operation of the ICARUS T600 LAr-TPC: first results”, JINST 6 (2011)

P07011.

2. “A search for the analogue to Cherenkov radiation by high energy neutrinos at superluminal speeds in ICARUS”, PLB 711 (2012) 270.

3. “Measurement of neutrino velocity with the ICARUS detector at the CNGS beam”, PLB 713 (2012) 17.

4. “Precision measurement of the neutrino velocity with the ICARUS detector in the CNGS beam”, JHEP 11 (2012) 049.

5. “Precise 3D Reconstruction Algorithm for the ICARUS T600 Liquid Argon Time Projection Chamber Detector”, AHEP 2013 (2013) 260820.

6. “Experimental search for the LSND anomaly with the ICARUS detector in the CNGS neutrino beam”, EPJ C73 (2013) 2345.

7. “Search for anomalies in ne appearance from nm beam”, EPJ C 73.2599 (2013).

8. “The trigger system of the ICARUS experiment for CNGS beam”, JINST 9, P08003 (2014)

9. “Experimental observation of an extremely high electron lifetime with ICARUS-T600 Lae-TPC”, JINST 9. P12006 (2014)8

Analysis of the large amount of physics data becoming progressively the

main activity of the CNGS2 collaboration

4

Page 5: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

New purity achievementsl LBNF requires: ele>12 ms and Edrift =

0.5kV/cm for 15% attenuation at 3.0 m,

l The result in Icarino is  ele ≈21 ms corresponding to ≈15 ppt, namely a ≈10-11 molecular Oxygen eq. impurity.

5

T600

Page 6: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

R&D-3: New Thermal Insulation

Slide 6

Purely passive insulation chosen for the installation at CERN, coupled to our standard cooling shield with boiling Nitrogen.Technique developed for 50 years and widely used for large industrial storage vessels and ships for liquefied natural gas.Expected heat loss through the insulation:T600 ≈ 6.6 kW Preliminary design appointed to GTT in Jan 2013No internal membrane is required for our case

6

Page 7: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

New T600 layoutWarm vessel cage External skin

Insulation panels T600 modules

7

Page 8: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

New T600 layout

Insulation top Top flanges (final layout)

8

Page 9: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

R&D-4: New cold bodies design

The new cold bodies design appointed to a mechanical engineering company connected to the Milano Politecnico (Finzi e Associati).

Work is progressing:• Detailed modeling of the aluminum

profiles (complete).• Compute behavior under the several

loading conditions (complete)• Optimization of the aluminum profiles

(done)• Define assembly and welding

procedures (in progress)• Verify time scale and construction cost

(in progress)

This solution could represent a valid alternative to membrane (as originally foreseen for MODULAr) for LAr containment.

9

Page 10: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Status of ICARUS Activities: transfer to CERN

l The second half-module, positioned in the transfer box since last November 24, has been loaded onto the transport truck last December 9 around 17:00 and finally left the Gran Sasso Laboratory at 21:40. The second box is positioned in Building 185 at the side of the clean room.

l The first half module has been completely transferred from the transport box into the clean room (December 10). The clean room has been disconnected from the transport box and closed.

l The operation required two days, including the opening of the transport box, the connection to the clean room and the preparation of tools and materials. CERN involvement has been essential.

l The first transport has been closed on December 15 and moved elsewhere.

Slide: 10

Page 11: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Overhauling activities at CERN (2015-2017)

• Second check on TPC conditions, after transportation (wires, PMTs, all material un-mounted and fastened to main structure, i.e. race-tracks).

• Activities on cathode:

– Mapping of deformations.

– Substitution of panels. A new design (presently under finalization) with better planarity will be implemented.

• Activities on photomultipliers:

– Design of new support structure, to sustain the increased number of detectors per TPC (around 100).

– Replacement of old devices with new 8’’ ones, with higher-QE (manufacturer to be chosen), and coated with wavelength shifter (TPB).

Slide# : 11

Page 12: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Present cathode

11/15/2014 - SBN Proposal Working Meeting Slide# : 12

Deformations from planarity: ± 5 mm

Detail of structure (pierced)

Page 13: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

PMT replacement

●In the previous phase of the ICARUS program, the Collaboration has gained experience in detecting light signals in LAr with conventional PMTs with a wavelength shifter (TPB) deposited on the glass windows.

●The original (first series) ETL 9357FLA tubes, presently mounted behind the TPCs, are largely outdated.

●New devices are available on the market with better QE, such the Hamamatsu R5912 series or ETL 9357FKBL.

●Characterization of such devices, for employment in the overhauled T600, is in progress:

●Gain and linearity as a function of temperature

●Effective Quantum Efficiency (i.e.: with TPB on window)

●Photocathode uniformity

●Noise

Slide: 13

Page 14: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

PMT selection

●HAMAMATSU R5912 series are good candidates for the present PMT replacement.

●10/14 dynodes models are available. Additional tests are ongoing to define the best option, in terms of linearity and gain attainable as a function of the HV biasing polarization and the voltage divider configuration.

Final decision is expected at the beginning of 2015.

●Further R&D activities are ongoing, related to:

●Best voltage divider configuration and signal extraction;

●PMT shielding, in order to avoid spurious signals on the wire planes in front of them (shadows in the 2D views).

Slide: 14

Page 15: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

The first transport box entering hall B

Slide: 15

Page 16: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Tight space

Slide: 16

Page 17: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

The first transport box in hall B

Slide: 17

Page 18: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Opening of the first vessel

Slide: 18

Page 19: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Sliding in of first detector

Slide: 19

Page 20: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Ready for travelling

Slide: 20

Page 21: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Ready to move inside white chamber at CERN

Slide: 21

Page 22: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Sliding inside chamber at CERN

Slide: 22

Page 23: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

The detector in place as never seen before

Slide: 23

Page 24: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Electronics upgrade for the

ICARUS T600 LAr-TPC

as presented at FNAL, 15 November 2014

(Francesco Pietropaolo)

Page 25: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Critical considerations

25

• It is important to remember that DAQ architecture for T600 was conceived in 1997 and front-end dual channel BiCMOS circuits were designed in 1998. The full system was designed and built from 1999 to 2000 and operated first time in 2001.

• In this scenario it’s very important to make a critical analysis at system level to spot areas where the necessary changes could led to a more efficient structure.

• Adopting a top down approach one evident limitation of T600 DAQ is due to the choice of VME standard (8-10 MB/s), perfectly legitimate at that time.

Page 26: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Outline

Improvements are conceivable based on more modern electronic components. Main upgrades concern:

More compact version of the front-end amplifierAdoption of high frequency serial ADCsHousing and integration of electronics onto detector

and/or (possibly) “cold” electronicsAdoption of a modern serial bus architectureOptical links for Gbit/s transmission rate

Slide: 26

Page 27: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

The present analog/digital front-end

l The analog chain consists of a front-end low noise charge sensitive pre-amplifier, based on a BiCMOS dual channel IC, custom designed, with external j-Fet input stage and followed by a baseline restorer stage. Two different decay times: 3us (“current mode”) for

collection and induction1 wires, ~30 us (“charge mode”) for induction2 wires.

Overall gain is 1V/164fC.l The 10bit ADC input range is 1V with least count equivalent

to 1000 electrons, matching the amplifier noise of ~1200 el. with a detector capacitance of 450pF (wires plus cables).

l The digitizing stage consists in a set of 32 channels connected (through 16:1 MUX) to a 10bit ADC sampling at 20MHz. The sampling time is then 400ns per channel, revolving.

l An S/N > 10 was obtained during the whole LNGS run. Slide: 27

Page 28: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Induction vs collection signals

l Based on the T600 experience, the induction2 front end still require further optimization, addressing mainly: The signal pulse height affected

by the preamp rise-time (presently set at ~2us

peaking time) The residual undershoot of the

electronic chain degrading in particular the reconstruction of complex event topologies in the induction2 view.

l Improvement of induction1 signals presently read in “current” mode are also being investigated. Slide: 28Wires

Dri

ft t

ime v

ert

ical

Page 29: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

New preamplifiers designl Two jFet, IF4500 (Interfet)

or BF861/2/3 (Philips), are connected in parallel to increase gm (50-60 mS) at input.

l A custom IC in BiCMOS technology is used to miniaturize the amp: a two channel classical unfolded cascode integrator with external feedback network

l Independent optimization of the pre-amp response (rise/decay time, gain) is envisaged for collection and induction signals.

Slide: 29

Production PC Board “scored” so that the IC circuits are “snapped” in eight sets of eight pre-amplifiers

Page 30: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

The “Cold” optionl The possibility of front-end in

liquid Argon has also been investigated. The amplifier serial input noise, e2 ∝ Cd

2/gm, linearly increases with detector and cable capacitance, Cd, and decreases with input stage trans-conductance, gm.

Slide: 30

l Shorter cable and 26% higher gm at LAr temp. would allow S/N improvement.

l However, due to the lack of accessibility inducing the risk of a sizable dead volume, a “warm” architecture with accessible/replaceable electronics has been preferred.

l This option would also allow implementation of major improvements on electronics due to its natural evolution and progress.

U310 jFET

Page 31: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

New simplified digital schematics

l A relevant change, in the new electronics design, concerns the adoption of serial ADCs (10-12 bits, one per channel) in place of the multiplexed ones used in T600 al LNGS.

l The main advantage is the synchronous sampling of all channels (at 400 ns sampling time) of the whole detector, not to mention compactness and price.

Slide: 31

Present ICARUS front-end Upgraded DAQ scheme

Page 32: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

The flange of T600 is an opportunity

32

• For T600 a very reliable and cost effective flange has been developed.

• Presently it allows for the connections of 18 twisted pair flat cables, each conveying 32 signals from wire chamber to external electronics. (576 ch’s per flange).

• It is conceivable with a compact design to host the full electronics on the flanges, using the external side of the flange as a sort of backplane that support both analogue and digital electronics.

• It requires a minor change of flange design. The overall cost will be drastically reduced.

Page 33: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

The ICARUS signal flanges

l The external contacts, on both sides, are on a different plane respect to the internal vias, allowing for SMD connectors use and guaranteeing vacuum tightness.

l Reinforcing brass disks are embedded to the flange structure making it able to stands atmospheric pressure without deformation in case of use on vacuum vessels.

Slide: 33

Page 34: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

The flange as electronics backplane

l Multiplicity has been reduced to 16 cables (512 channels) to allow for more space among connector rows and permitting the use of the external side of the flange as electronic cards backplane in a special crate.

l The connectors on the external side allow for direct insertion of electronics boards where both analogue and digital electronics, with a compact design, are housed.

Slide: 34

Page 35: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Prototype boards under test

l The first working prototype boards are presently under test at LNL (Padova). Each board serves 64 channels and uses serial optical links.

l The digital part is fully contained in a single high performance FPGA (Altera Cyclone V) per board, used to handle filter and organize the serial information provided by the serial ADC’s, allowing also easy firmware upgrading.

l A single serial optical link (1.5 Gb/s) per flange is foreseen, amply sufficient to sustain data throughput without dead time

Slide: 35

Page 36: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Improved data throughputl Performance, in terms of throughput of the read-out

system, will be improved replacing the VME (8 - 10 MB/s) and the sequential order single board access mode inherent to the shared bus architecture, with a modern switched I/O. Such I/O transaction can be carried over low cost optical Gigabit/s serial links.

Slide: 36

A prototype is under development, based on CONET (by CAEN) transfer protocol and one A3818 controller for up to 4768 channels

Page 37: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

General layout comparison

l ~595 liters, 576 chs (modulo 32). Bandwidth: 10MB/s

Slide: 37

l ~10 liters, 512 chs (modulo 64). Bandwidth: >1GB/s

l Old electronics configuration

l New improved system

Page 38: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Final considerations on DAQ

38

•The ICARUS DAQ basic architecture is well suited even for larger size LAr-TPC.

• Main upgrades concern:

More compact version of the front-end amplifier;

Adoption of high frequency serial ADC;

Adoption of a modern serial bus architecture;

Optical links for Gb/s transmission rate;

Housing and integration of electronics onto flanges or cold electronics? Or a mix: cold front-end and warm digital processing? In cooperation with BNL team, tests with cold front-end will be performed at CERN

Page 39: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Prototype for cold electronics

39

Page 40: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

BNL November 2013LNGS_May2011 Slide 40

Thank you !

Page 41: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Prototype of flange under test

41

Page 42: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

PMT replacement

●In the previous phase of the ICARUS program, the Collaboration has gained experience in detecting light signals in LAr with conventional PMTs with a wavelength shifter (TPB) deposited on the glass windows.

●The original (first series) ETL 9357FLA tubes, presently mounted behind the TPCs, are largely outdated.

●New devices are available on the market with better QE, such the Hamamatsu R5912 series or ETL 9357FKBL.

●Characterization of such devices, for employment in the overhauled T600, is in progress:

●Gain and linearity as a function of temperature

●Effective Quantum Efficiency (i.e.: with TPB on window)

●Photocathode uniformity

●Noise

Slide: 4211/14/2014 - SBN Proposal Workshop

Page 43: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Quantum efficiency

●Example of effective Quantum Efficiency of HAMAMATSU R5912 series as a function of the incident light wavelength.

●Measurements are carried out using a monochromator.

●The PMT glass window was coated with a TBP layer 200mg/cm2 thick.

Slide: 43

128 nm

11/14/2014 - SBN Proposal Workshop

Page 44: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Response uniformity

●Example of response uniformity of HAMAMATSU R5912 series.

●Measurements are carried on by illuminating the PMT windows in different positions, with an optical fiber. Data in figure are normalized to the response in the central position.

Slide: 4411/14/2014 - SBN Proposal Workshop

Page 45: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

MC simulation

Slide: 45

●Dedicated Monte Carlo calculations have been carried out in order to evaluate the localization capability (resolution) of the light collection system, with the following input parameters:

●Cosmic muons distribution follows a cos2(q) dependence on the azimuthal angle;

●Interaction in LAr generates 42000 VUV g/cm (m.i.p. at 500 V/cm);

●5% Quantum Efficiency is conservatively assumed for the PMTs (including TPB conversion and geometrical efficiency);

●200 MeV electromagnetic showers are simulated as clusters of points releasing 1 MeV each.

●For each simulated event, the original position coordinates (vertical, X and longitudinal, Z) are evaluated by averaging on the PMT coordinates, weighted on the related signal intensities.

●The space resolution is defined as the distance between the simulated and reconstructed positions, and it is evaluated as a function of the PMT geometrical layout (number of devices, positions in X,Z).

11/14/2014 - SBN Proposal Workshop

Page 46: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

ICARUS overhauling

●The upgraded light collection system will have the following characteristics (in red, improvements w.r.t. old configuration):

●High granularity (~100 devices per TPC);

●Large surface, higher QE photomultipliers (8’’);

●Sensitivity to 128 nm photons from LAr scintillation, obtained by coating the (sand blasted) PMT windows with TPB;

●PMTs located in the 300 mm space behind the wire planes, with dedicated support structures;

●Implementation of electrostatic shields, to prevent inducted spurious signals on wire planes;

●Read-out electronics based on 12-bit ADC waveform digitizers:

●~ 20 MHz sampling rate + ~ 100 ns shaper or

●1 GHz sampling rate + zero skipping + direct signal in order to exploit the available beam bunch-structure as suggested byCarlo Rubbia.

Slide: 4611/14/2014 - SBN Proposal Workshop

Page 47: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Proposed PMT deployment

Slide: 47

●The present T600 light detection system can be extended/completed with additional 8” PMTs.

●Given the present TPC mechanical structure, a possible layout foresees a PMT deployment of 90 devices behind each chamber (a total of 360 PMT in the whole T600 detector).

●This design yields a 5% photocathode coverage.

The drawing above shows a 90-PMTs layout: PMTs are depicted as dark circles. A photo-editing of the deployment is also shown (top-right).

11/14/2014 - SBN Proposal Workshop

Page 48: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

MC simulation

Slide: 48

●Dedicated Monte Carlo calculations have been carried out in order to evaluate the localization capability (resolution) of the light collection system, with the following input parameters:

●Cosmic muons distribution follows a cos2(q) dependence on the azimuthal angle;

●Interaction in LAr generates 42000 VUV g/cm (m.i.p. at 500 V/cm);

●5% Quantum Efficiency is conservatively assumed for the PMTs (including TPB conversion and geometrical efficiency);

●200 MeV electromagnetic showers are simulated as clusters of points releasing 1 MeV each.

●For each simulated event, the original position coordinates (vertical, X and longitudinal, Z) are evaluated by averaging on the PMT coordinates, weighted on the related signal intensities.

●The space resolution is defined as the distance between the simulated and reconstructed positions, and it is evaluated as a function of the PMT geometrical layout (number of devices, positions in X,Z).

11/14/2014 - SBN Proposal Workshop

Page 49: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Event localization

Slide: 49

●Examples of MC cosmic muon tracks in ICARUS T600 LAr-TPC with 90 devices behind each wire plane. The color code reflects the light intensity (photon number Ph.) seen by each PMT. The star indicates the reconstructed position coordinate on the PMT plane. 3D picture of the muon tracks in the active volume are also shown.

Ph PhZ (cm)

Drift (cm)Drift (cm)

X(cm)

X(cm)

X(cm)

X(cm)

Z (cm)

Z (cm)Z (cm)11/14/2014 - SBN Proposal Workshop

Page 50: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Space resolution

Slide: 50

●For the considered PMT geometrical layout (90 devices for each chamber) the resolution is found to be better than 1m.

●In the plots the residual distance from the reconstructed and simulated track position is shown for the vertical (X) and longitudinal (Z) coordinate. 10000 simulated events are considered.

X coordinate RMS = 25 cm Z coordinate RMS = 16 cm

●Reconstruction algorithms, although already quite satisfactory, can be still significantly improved, especially for boundary events.

X vertical coordinate Z longitudinal coordinate

11/14/2014 - SBN Proposal Workshop

Page 51: R&D on LAr single phase TPC at CERN ICARUS-WA104 Collaboration S. Centro CERN 13.01.2015

Conclusions

Slide: 51

●In the new experiment it will be necessary to correctly identify the events associated with the beam spill, therefore it is important to improve our ability to associate tracks in the TPCs with their own interaction times.

●An upgrade of the T600 light collection system, with an increasing the number (about 100 per wire chamber) of modern high performance PMTs is required. The association between tracks and light signals can be obtained with a resolution far lower than 1 m in space and 100 ns in time or even better to exploit the beam bunch structure.

●Dedicated R&D activities are ongoing in order to select the new model.

●This is one of the main goals of the CERN program WA104 for overhauling the T600 detector.

Final decision is expected at the beginning of 2015.

11/14/2014 - SBN Proposal Workshop