rd-8

Upload: aquaman-rivera

Post on 02-Jun-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/11/2019 RD-8

    1/76

    Dimensionless Graphs of Floods

    From Ruptured Dams

    April 1980

    Approved for Public Release. Distribution Unlimited. RD-8

    US Army Corps

    of EngineersHydrologic Engineering Center

  • 8/11/2019 RD-8

    2/76

    Standard Form 298(Rev. 8/98)Prescribed by ANSI Std. Z39-18

    REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188

    The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searchingexisting data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thisburden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, ExecutiveServices and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall besubject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ORGANIZATION.

    1. REPORT DATE(DD-MM-YYYY)April 1980

    2. REPORT TYPEResearch Document

    3. DATES COVERED (From - To)

    5a. CONTRACT NUMBER

    5b. GRANT NUMBER

    4. TITLE AND SUBTITLEDimensionless Graphs of Floods From Ruptured Dams

    5c. PROGRAM ELEMENT NUMBER

    5d. PROJECT NUMBER

    5e. TASK NUMBER

    6. AUTHOR(S)CEIWR-HEC

    5F. WORK UNIT NUMBER

    7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES)US Army Corps of Engineers

    Institute for Water Resources

    Hydrologic Engineering Center (HEC)609 Second Street

    Davis, CA 95616-4687

    8. PERFORMING ORGANIZATION REPORT NUMBER

    RD-8

    10. SPONSOR/ MONITOR'S ACRONYM(S)9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES)

    11. SPONSOR/ MONITOR'S REPORT NUMBER(S)

    12. DISTRIBUTION / AVAILABILITY STATEMENTApproved for public release; distribution is unlimited.

    13. SUPPLEMENTARY NOTES

    .

    14. ABSTRACTDams are subject to failure and the damages produced by the resulting flood are extensive. Alleviation or prevention of thedamaging effects requires the knowledge of the flood characteristics. These include primarily the time of arrival of the

    flood-wave front, the maximum flood level and the time at which the maximum flood level occurs after dam failure.

    Using a rational computation technique, based on the method of characteristics, dimensionless graphs of the aforementioned

    flood characteristics were prepared for a prismatic channel of general parabolic cross section and several values of the

    parameters involved. These values were selected to cover the practical range of the field conditions affecting the magnitude

    of the dam-break flood. Results were obtained for such periods of time that the flood peak advanced adequatelydownstream and either subsided or stabilized considerably.

    15. SUBJECT TERMSdams, floods, graphs, hydraulics, rivers, waves

    16. SECURITY CLASSIFICATION OF: 19a. NAME OF RESPONSIBLE PERSON

    a. REPORT

    Ub. ABSTRACT

    Uc. THIS PAGE

    U

    17. LIMITATIONOFABSTRACT

    UU

    18. NUMBEROFPAGES

    76 19b. TELEPHONE NUMBER

  • 8/11/2019 RD-8

    3/76

    Dimensionless Graphs ofFloods From Ruptured Dams

    April 1980

    US Army Corps of EngineersInstitute for Water ResourcesHydrologic Engineering Center609 Second StreetDavis, CA 95616

    (530) 756-1104(530) 756-8250 FAXwww.hec.usace.army.mil RD-8

  • 8/11/2019 RD-8

    4/76

  • 8/11/2019 RD-8

    5/76

  • 8/11/2019 RD-8

    6/76

  • 8/11/2019 RD-8

    7/76

  • 8/11/2019 RD-8

    8/76

  • 8/11/2019 RD-8

    9/76

  • 8/11/2019 RD-8

    10/76

  • 8/11/2019 RD-8

    11/76

  • 8/11/2019 RD-8

    12/76

  • 8/11/2019 RD-8

    13/76

  • 8/11/2019 RD-8

    14/76

  • 8/11/2019 RD-8

    15/76

  • 8/11/2019 RD-8

    16/76

  • 8/11/2019 RD-8

    17/76

  • 8/11/2019 RD-8

    18/76

  • 8/11/2019 RD-8

    19/76

  • 8/11/2019 RD-8

    20/76

  • 8/11/2019 RD-8

    21/76

  • 8/11/2019 RD-8

    22/76

  • 8/11/2019 RD-8

    23/76

  • 8/11/2019 RD-8

    24/76

  • 8/11/2019 RD-8

    25/76

  • 8/11/2019 RD-8

    26/76

  • 8/11/2019 RD-8

    27/76

  • 8/11/2019 RD-8

    28/76

  • 8/11/2019 RD-8

    29/76

  • 8/11/2019 RD-8

    30/76

  • 8/11/2019 RD-8

    31/76

  • 8/11/2019 RD-8

    32/76

  • 8/11/2019 RD-8

    33/76

  • 8/11/2019 RD-8

    34/76

  • 8/11/2019 RD-8

    35/76

  • 8/11/2019 RD-8

    36/76

  • 8/11/2019 RD-8

    37/76

  • 8/11/2019 RD-8

    38/76

  • 8/11/2019 RD-8

    39/76

  • 8/11/2019 RD-8

    40/76

  • 8/11/2019 RD-8

    41/76

  • 8/11/2019 RD-8

    42/76

  • 8/11/2019 RD-8

    43/76

  • 8/11/2019 RD-8

    44/76

  • 8/11/2019 RD-8

    45/76

  • 8/11/2019 RD-8

    46/76

  • 8/11/2019 RD-8

    47/76

  • 8/11/2019 RD-8

    48/76

  • 8/11/2019 RD-8

    49/76

  • 8/11/2019 RD-8

    50/76

  • 8/11/2019 RD-8

    51/76

  • 8/11/2019 RD-8

    52/76

  • 8/11/2019 RD-8

    53/76

  • 8/11/2019 RD-8

    54/76

  • 8/11/2019 RD-8

    55/76

  • 8/11/2019 RD-8

    56/76

  • 8/11/2019 RD-8

    57/76

  • 8/11/2019 RD-8

    58/76

  • 8/11/2019 RD-8

    59/76

  • 8/11/2019 RD-8

    60/76

  • 8/11/2019 RD-8

    61/76

  • 8/11/2019 RD-8

    62/76

  • 8/11/2019 RD-8

    63/76

  • 8/11/2019 RD-8

    64/76

  • 8/11/2019 RD-8

    65/76

  • 8/11/2019 RD-8

    66/76

  • 8/11/2019 RD-8

    67/76

  • 8/11/2019 RD-8

    68/76

  • 8/11/2019 RD-8

    69/76

  • 8/11/2019 RD-8

    70/76

  • 8/11/2019 RD-8

    71/76

  • 8/11/2019 RD-8

    72/76

  • 8/11/2019 RD-8

    73/76

  • 8/11/2019 RD-8

    74/76

  • 8/11/2019 RD-8

    75/76

  • 8/11/2019 RD-8

    76/76